Document 15G0MBmNxwOm41oDvNm1YxVgj
INDUSTRIAL HYGIENE SURVEY OF THE Polychlorinated Biphenyl Production Operation
Monsanto Industrial Chemicals Company Sauget, Illinois
SURVEY DATE July 21-22, 1976
SURVEY CONDUCTED BY Mark Jones
Janson Becker
REPORT WRITTEN BY Mark Jones
DATE OF REPORT
Industrial Hygiene Section Industrywide Studies Branch Division of Surveillance, Hazard Evaluations and Field Studies National Institute for Occupational Safety and Health
Cincinnati, Ohio
HONS 047677
PLACE VISITED:
Monsanto Company W.C. Krtimmrirli Sduget, Illinois
*
DATE OK VISIT:
July 21-22, 1976
PEOPLE CONTACTED:
Mr. Art Leisy Manufacturing Superintendent
Mr. Paul Heisler
-Supervl8or-T*--AiT-PoHution / . . .
-r *
: v; , f. ... r .M i" ' .1 " i e. V|
Mr. Bruce Eley Corporate Industrial Hygienist
, (' * '
. Mr. Virgil Brawley Supervisor - PCB Production
Mr. John Peduzsi Supervisor - Incineration
* ^............ ^ * Mr. Julio Mun&o2 - Air Pollution Group
. LtKL','`
r Mr. Neil Sullivan - Air Pollution Group
. --------
Mr. Frank Baslle - Air Pollution Croup
,,
Mr. Ed Neuman - Air Pollution Group
Mr. Dale Rachel - Foreman, PCBs Production Mr. Tom Carrico - Foreman, PCBs Production
. C-'.-Irc
PERSONS MAKING VISIT:
Mark Jones Janson Becker
PURPOSE:
To conduct an industrial hygiene survey to determine the workers' level of exposure to chemicals present in the polychlorinated biphenyls production area at the Sauget,
Illinois facility.
HUNS 047678
INTRODUCTION Recent*literature has linked polychlorinated biphenyls with possible , carcinogenic effects. Because this literature is Incomplete, the Division of Surveillance, Hazard Evaluations and Field Studies of the National Institute for Occupational Safety and Health has undervay an ''industrywide" study of Industries using poly9hlorlnated biphenyls. Since Monsanto is the aole producer of polychlorinated biphenyls In the United States, an industrial hygiene survey was conducted at their PCBs production area in Sauget, Illinois, on July 21-22, 1976. This survey was conducted by Janson Becker and Mark Jones.
During the visit, 18 sir samples were collected for evaluation of polychlorinated biphenyls exposure. In addition, samples were collected for expoaure to iron silica and chlorine.
DESCRIPTION OF THE FACILITY
The polychlorinated biphenyls production operation is one .of many operations
present at the Monsanto facility in Sauget, Illinois. Sulfuric acid, jMmaewe end benzene derivatives, rubber chemicals (antioxidants, etc.),
. acMveted chlorine end phosphorous products are othef products produced
at the facility.
The facility began production of polychlorinated biphenyls around 1929.
Production continued to grow until 1970 when Monsanto began restricting to
the sale of PCBs iar use In closed systems.
*
tm
f [i;`
>i (ft {<*,'. '
,
. HONS 047679
The entire work force et the facility ie approximately 1300 persons* with approximately 835 of these persons being hourly employees. Approximately 25 employees are involved with the production of PCHs. The union representing this group is the International Chemical Workers* Local 412.
MEDICAL, INDUSTRIAL HYGIENE AND SAFETY PROGRAMS
A dispensary is located at the plant. Nurses are present at the
dispensary 24 hours a day and a physician is present during the
day. All employees are required to take a pre-employment physical
f 11 1 : > (. examination Certsla-employees-are thenrequiredto-take periodic
physical examinations* (i'> tos-K
&<*' oa< ro*v/M/( f< fab (kAbb'n,*l,
.t IS t.jr/o *
/ / *l t L ''
<1 K. ./rr *
f .
Industrial hygiene matters et the facility are handled by the Air rrw:?v.--~7
Pollution Group. The six people*who are assigned to this group.work
in conjunction with the safety department. The only sampling that has
been done for polychlorinated biphenyls Is the discharge'^rom the area,
//I /.......I._ ...... f-, '
'
7.
9 t` u isioJ*4*o*ed^ twice a weekend the collection of a few air samples (Appendix B).
Pour people work in the safety department. Safety meetings are held every month and safety information Is provldsd to the different work areas through safety committees. Personal protection programs used at the plant include safety shoes, safety glasses* hard hats* protective clothing and respirators (where needed).
Corporate industrial hygienists also give support to the industrial hygiene and safety programs.
-2-
MQNS 047680
DESCRIPTION OF PROCESS Three products are made in the PCBs production area; Aroclor 101b, Aroclor 1242, and Aroclor 1254. Aroclor 1016 is uaed in capacitors and Aroclor 1242 and 1254 are used in transformers. The operation is outdoor and consists mainly of pipeline, reaction vessels, distillation columns and storage tanks. Even though the system is theoretically a closed system, samples are drawn off and leaks occur which give a potential for employee exposure.
Biphenyl le brought to the facility by tank car and pumped to storage tanks. The chlorlna used for the operation comes by pipeline from another part of the plant. The chlorine and biphenyl are piped into a chlorinotor In the presence of -an.A>vsem catalyst and allowed to react. ' There are two separate groups of chlorinators, one group for producing Aroclor 1254 and the other for Aroclor 1242. The product from the Aroclor 1254 chlorinators goes through a purifying operation which Includes a still, receiving tank and filtering system. From this operstlon the polychlorinated biphenyls go to the appropriate storage tank. The product from the Aroclor 1242 chlorinators goes to an inter mediate storage tank and then either through a similar operation as the Aroclor 1254 or to a distillation column whlok-spparafcco the-dlffsrent pplychl^rlnatred-blphenyl-rieome** for producing Aroclor 1016. From here It goes to the storage tanks.
The mixing tanks are used to formulate the final product by the intro duction of the appropriate additives needed to give the polychlorinated
-3- MGNS 047661
biphenyls the properties desired by the customer. 3e-glve~the-i>olychlori.uat*id-blpUcnyJe_Ji:t.tex-.e4ecfcr-J-csi*-U-p.fp.p-i^rt^o~*;nirtR --Amount-irf
-4 <K t4 /tliiotomoceous earth Is od4ed-e--th^-W-en4-s<whe--nee-o-wrok--end-then /llterd~*ut.
INSPECTION OF PLANT. Potential Health Hazards Potential health hazards observed during this survey were as follows:
1. Polychlorinated biphenyls exposure 2. Chlorine exposure 3. Free silica exposure
Ventilation Since the operation Is outdoors there is very-4itt-le ventilation. Local exhuast ventilation is used in two operations. The drumming operation is equipped with a hose which is placed near the opening of the 55 gallon drum while it Is filled. Near the chlorlnators is a work station where employees perform specific tests on samples drawn from the chlorlnators.
1 > ,'/. /. ^ . (, r.4. This work station has a hood over the area where the tests are performed.
f' Housekeeping Housekeeping In the polychlorinated blphenyle production area was taken care of fairly well. The alaleways were kept clean and clear.
HONS 0476B2
SURVEY PROCEDURES
General Air samples were collected In the polychlorinated biphenyls production area for evaluating exposure to polychlorinated biphenyls, iron chloride, and chlorine, A bulk sample of the dlatomaceoua earth used was analysed for free silica content. The following paragraphs describe the methods used to collect and analyze the air samples.
Polychlorinated Biphenyls Both personal end area air samples were collected In the polychlorinated biphenyls production area. Sipln SP1 pumps were used to collect the air samples on florosil tubes. The tubes contain magnesium silicate absorbent called florosil and have a 100 mg primary section and a 50 mg backup section. Samples were collected for six to eight hours at a flow rate of approximately 200 cc/mln. The polychlorinated biphenyls were desorbed from the florosil with hexane and analyzed by using a gas chromato graph with an electron capture detector.
Iron Chloride Area air samples were collected. for iron chloride while the employees poured the Iron chloride (powder) niilnlim into theamsaeeers. MSA Model G pumps were used to collect the sir samples on a 0.8 micrometer pore size mixed cellulose ester filter (37 mm in diameter). Samples were collected for the duration of the task which was approximately three minutes at a flow rate of 1.7 liters per minute. The samples were analyzed for Iron by atomic absorption and are reported as such.
-5M0NS 047683
Free Silica
One bulk, sample of the diatomaceous earth used was colluded for analysis ot
free silica content. The per cent free silica was determined by x-ray
diffraction.
.
Chlorine Detector tubes were used to evaluate concentrations of chlorine in the PCBa production area. Chlorine measurements were made using "Beudlx Gastec Analyzer Tubes - Low Range (1-8 ppm)."
-6-
HONS 047684
RESULTS AMD DISCUSSION
Polychlorinated Biphenyls
,
The results of the area and personal air samples are given in Table l
and the Job descriptions corresponding to the Job titles are in Appendix A.
Eleven personal and seven area air samples were collected for analysis for polychlorinated biphenyls. The polychlorinated biphenyls being produced at the time of the survey vere for Aroclor 1016 (42% chlorine). The personal air samples ranged from a concentration of 20 pg/m3 to
66 pg/m while the area air samples ranged from 16 pg/m to 55 pg/m ,
These are all well below the current standard for chlorodiphenyl. (42Z
3 of chlorine) of 1 mg/m. However, tfrle-stfiidard-ls-based-upon-akin
nma W*w
o*
i/**
irrltatlon^arttt Recent literature haa^llfiTtidcarclnogenlc effects to
.
.. .
,
polychlorinated biphenyls. Therefore, this standard may not adequately
protect the workers health.
.
Iron Chloride The results of the air samples are given in Table XI. Two samples were collected for determining worker exposure to Iron chloride. No Iron COuld be detected on one of the samples, but the other sample Had an iron concentration of 8.1 mg/m^. Since this procedure of adding the Iron $/'.-
cat*lyt~io,tht reactor only take*# 3 minutes and-is-done-oncefershift
the workers time weighted average Is well below the current standard for 3'
iron salts of 1 mg/m based upon soluble iron. The big difference in
sample results was probably due to the differences in operating procedures
observed each time the task was performed.
Jjf 1 JU T-rf"
//c> 4^^i
^/(
Jd
mofcJ Okm *
Jiu Wl *4
, __
MONS 047685
Free Silica The bulk sample of diatomnceous earth was analyzed and determined to hnve a free silica content of 9.8%. Since the p^e^<iMre"tTf-"nddfng
`Ufijtomocpous-earth to-the-blend:-tank Is done usually^ only once a week, the survey team was unable to observe this procedure.
Chlorine No concentrations of chlorine were detected.
CONCLUSIONS AND RECOMMENDATIONS Based on the observations made during this survey and the results of the air asnples, the following conclusions are drawn and recommendations for Improvements made;
1) Even though the concentration of iron chloride found dvclng-the
v'// V --,. /' r.-/
eddltlon-of-the-catalyet-to-the-reactor is below the Federal Standard* It would be good industrial hygiene practice to continue wearing an approved respirator when this task Is performed.
2) Since the diatomaceous earth contains 9.8% free silica* an approved dust respirator should be worn when thd worker performs this Cask if this practice is not presently employed.
3) Because of the recent concern of the possible carcinogenic effects of polychlorinated biphenyls* engineering methods should be used to prevent employee exposure to polychlorinated biphenyls.
9) Emergency equipment (self-contained breathing apparatus) should be readily available In case of a chlorine leak.
-8- MONS 047686
. Tnble I
CONCENTRATIONS OF POLYCHLORINATED BIPHENYL (detected as Aroclor J016) IN A FACILITY MANUFACTURING POLYCHLORINATED liU'hL.NYLS
Personal Air Samples
Job Title Premium Operator
II
Second Operator II
Column Operator l
Still Operator it
Standard Operator Distribution
Operator i
Data
7/21 7/22
7/21 7/22
7/21 7/22
7/21 7/22
7/22
7/21
7/22
Total Time (min.)
436 451
432 648
446
432 444
445
413
419
Volume (liters)
91.0 97.8
80.0 95.3
74.9 85.7
94.6 67.6
96.1
88.3
91.3
Concentration (pg/m3)
4/ 20
46 43
66 51
40 86
61
54
36
33
57* 63 61 45
Are* Air Samples
Location Drumming
ii
Date
7/21 7/22
Temperature Testing 7/21
. II
7/22
Chlorlnstors II
7/21 7/22
Incinerator Burner
7/21
Totel Time (min.)
418 418
417 455
419 459
409
Volume (liters)
89.1 87.6
-
201.6 105.4
89.0 70.3
81.6
Concentration Average i
(ug/m3)
(v-V) 1
45 51
68
25 52
39
55 36
66
16 16
`Arithmetic Average
HONS 047607
Table II
'
r.ONCBNTKATU)NS Or IKON riii.oit i mFOUND WHILE OPERATOR ADDED IT AS A CATALYST
' Location
Near Reactor Lid (1
Date
Total Tima (min.)
7/21 7/22
3 3
Volume (liters)
5.1 5.1
Concentration of Iron (mg/m3)
N.D. 8.1
Concentration of Iron Chloride (mg/m3)
_
18.4
HONS 04 7688
Appendix A JOB DESCRIPTIONS
Premium Operator - Operates both the continuous and batch chiorinators.
This Includes keeping the chlorlnatora running, adding
iron chloride
oatalyst^oivce'^<ah4ft and drawing samples off--twlce- a~Trirl~f t.
Second Operator - Loads the tank cars for shipment and takes care of tha
tank farm and blend tanks.
,
Standard Operator - In charge of making sure area la clean and doea all the filling of the 55 gallon drums.
Column Operator - Operates the distillation column used to produce Aroclor 1016.
Still Operator - Operates both stills used in producing Arolcor 1254 and 1242.
i Distribution Operator - Works in a different area of the plant and la in charge of operating the incinerator.
-7-
MUNS 047609
Appendix B
CONCENTKAT ION IN THE ATMOSPHERE 1R THE MANUFACTURING DEPARTMENT BATTERY LIMITS AS MEASURED IN OCTOBER, 1975
Date 10/ 9/75 10/ 9/75
10/13/75
10/13/75 10/14/75 10/16/75
Location
12 ft. operating level at batch chlorlnator
12 ft. operating level at contlnuoue chlorlnator
12 ft. operating level at batch chlorlnator
12 ft. operating level at continuous chlorlnator
Ground floor operating level
Ground floor, scrubber discharge area
mfi/m 0.022 0.012
0.057
0.058 0.006 0.338
SOURCE: Monsanto
MONS 047690