Document 14eeEeDnDxd5QeJjB1304ejm
FORM DC OO01 6> R I
<DANA^ DANA CORPORATION
Victor Gasket Division - Chicago
INTRA-COMPANY COMMUNICATION
subject October Activity Report Gasket Manufacturing Area
TO W. J. Sheehan
DATE November 14, 1969
1. Output in October was 14,550,142, compared to September of 13,139,281.
2. Incoming orders totalled 13,954,100, compared to 7,019,500 in September.
3. The two new Buick items 3867-VCM and 3441-VCM are running to
schedules, but not without problems. The all hard C.O. flange dies are still causing problems.
4. The Mack Truck stainless steel gasket orders, from O.E. Service, fell through and we will be supplying the old copper versions until Mack Engineering makes a decision. (Stainless or Victocor)
5. As of today, we have requested approval on $58,000.00 worth of capital tooling. This is almost 4-1/2 months of our projected Capital Budget for tooling and we are only in the third month.
6. October Direct Labor was very high at $90,400.00 and absorbed $22,000.00 more than our expenses. (early forecast)
7. This area is generally on target with objectives and goals as measured through "Vital Signs".
R. T. DeFi1ippis
rb
VPD-91-0002145
TO: FROM: RE:
W. J. Sheehan R. T. Budovec October Activity Report
November 3} 1969
Tool Engineering
A. Design Section Work load in the design section reached the high for the year - 1400 hours.
We were fortunate in obtaining a Tool Designer replacement for Mr. G. Orton. Mr. J. Scissom finished his tool making apprenticeship earlier this year and e xpressed a desire to go on to Engineering. He is now in training as a Tool De signer. Mr. Frank Ahrens retired during the month. Mr. C. Flasza has agreed to take his place as Lead Tool and Die Designer.
B. N/C Programming
Scheduled work load in this area has remained fairly stable.
New Tool Room -Department 260
Work loads remain heavy requiring a 50 hour week and an occa sional Saturday.
Repair Toolrooms
Work loads in repair are continuing at a high level requiring both 9 hour days plus a considerable amount of repair being per formed outside.
Handmade
Work loads in handmade started to fall off at the beginning of the month, but then immediately turned around and went up to 2700 hours plus.
General
1. The first FRP mold arrived and first try sampled obtained. The outlook for production of this part is very good with final debugging to be completed during the month of November.
VPD-91-0002146
October Activity Report
2
November 3, 1969
Cost estimates are being compiled by Process Engineering to determine the best method of manufacture.
2. The N/C tape drill installation and debugging has been com pleted. We have quoted 5 different mold plates for Plant 3 to be done on this machine. We have not received an order at this writting.
3. A relati vely steady flow of information has been establi shed with T.F. Victor. Their progress report to date indicates that they have converted 4 presses to the sandwich striker plate and are experiencing no production difficulties.
R. T. Budovec J`m
VPD-91-0002147
November 5, 1969
TO: FROM:
W. J. Sheehan G . M. B rown
SUBJECT: ACTIVITY REPORT FOR OCTOBER, 1969 RAW MATERIALS DIVISION
Department 201
Wet machine began operation October 20th, will operate four weeks.
Began new method of shut down and cleaning of the wet machine. Will reduce
clean up time by about thirty-eight (38) man hours per week or $3,000.00
annually.
Department 203 and 204
No unusual activity in this area.
Department 205
Philip Carey corrected poor quality problem on Asbestos. Recent material to purchase specification. Approximately 100,000 pounds rejected and returned to Philip Carey.
Crush grinding of perforating dies is feasible, waiting for vendor to notify us when he is set up and we will have dies sharpened.
Department 206
Sander for Victocor 300 Inline relocated to second floor for continuous operation.
Victocor 130 perforating die has been reworked to produce thick Victocor 300.
A Work Order has been written to convert cut-off, when this is complete, we will be in a position to produce thick Victocor 300- 12" wide on a production basis.
Department 207
No unusual activity in this area.
VPD-91-0002148
Activity Report for
October
(Cont *d)
Rage 2
Department 213
Victolene requirements took a nose dive. We are currently blanking cored
gaskets, flanges and closing for Department 219.
Department 221
No unusual activity in this area.
Department 227
,
Swedge gasket demand continues at a high level.
Department 239
No unusual activity in this area.
Department 24A, 247 and 264
No unusual activity in this area.
ds
VPD-91-0002149
VPD-91-0002150