Document 10x6re1JezdMX0yGz5veB1Kgo

Company: DOW CHEMICAL CO. ~*ocess: HDPE - POLY B Worksheet, HAZOP-PC 1.00 Node: 11 Page: 1 ----------- ------------------------------------------------------ ----------------------------------------------- ----------------------- ----------------- --------------------------------------------------- i- Node: 11 First Stage Dryer (DR-2007) / Process +--P---a--r--a--m---e---t-e+r-:----F--l-o--w-------- +----------------------------------- Intention: 33,000 lb/hr +------------------------------------- +----------------------------------- +----- + IGUIDEWORD|DEVIATION| POSSIBLE CAUSES | CONSEQUENCES | RECOMMENDATIONS |BY | +------------ ----I------------------(---------------------------------------------- -------------------------------------------------- 1-------- -- -----------------------------|--,,-- No No Flow Rotary feeder Shutdown train. Motor amps are * trip. Fused polymer. monitored. Dryer rotor trip. Powder overhead. Broken blades. Plug exchangers. Speed alarm. * Broken coupling. High pressure. Motor shutdown. Powder recycle to * Fused polymer in prevent buildup. the discharge. Excessive buildup Evaluate % solids BS analyzer on hydroclone overhead. Set rotor blades. * More More Flow See Node#l/More flow. Excessive seal flush. Overload dryer. High seal flush Solvent wet powder switch. Refer Node#1/More flow. See Node #1. * AsWellAs AsWellAs Flow Jacket crack. Water in the Backup from system. second stage Stop reaction. dryer. Generate HC1 in Mechanical seal. dryer. Left from shudown Nitrogen in dryer. Evaluate how to get water out of D--2302. Equipment drying procedure. RF GH Operation train. GH Worksheet HAZOP-PC 1.00 Company: DOW CHEMICAL CO. "-ocess: HDPE - POLY B Node: 11 Pag : 2 +-------------------- -------------------------------------------- -------------------------------- ------------------------------------------------------------------------------------------------------------+ Node: 11 First Stage Dryer (DR-2007) / Process Parameter: Temperature Intention: 30-90 Deg. C H--------------------------------------------------------------- 1 ----------+--------------------------- ----------------------- ----I------------- -------------------- --H------|- |GUIDEWORD|DEVIATION| POSSIBLE CAUSES I CONSEQUENCES | RECOMMENDATIONS |BY | +--------------------- i More Higher Temp Loss of heating water control. Fused polymer. Plug outlet. Shutdown train. HAZOP temp.control. BB Less Lower Temp +---------------------- Loss of steam to E-2017. Loss of water flow to the dryer High solvent feed. Loss of heat transfer due to buildup. Wet product. Emissions problem in extrusion area. Plugging. Reach explosive range in the check hopper. Low temperature shutdown. Hot water control scheme. * * 00 A 120965 CONFIDENTIAL Company: DOW CHEMICAL CO. r,'*ocess: HDPE - POLY B Worksheet HAZOP-PC 1.00 Node: 11 Page: 3 +*- ------------------ ----------------------------------------------------------- -- -------------- ------------ --------------------------------- --------------------------- -- -----------*----- ---------------------------- -----+ Node: 11 First Stage Dryer (DR-2007) / Process Parameter: Pressure Intention: 1. psig. +--------------+--------------+---------------------------+---------------------------- +---------------------------+---- + |GUIDEWORD|DEVIATION| POSSIBLE CAUSES | CONSEQUENCES | RECOMMENDATIONS |BY | +--------------------- +--------------------- +-----------------------------------------+--------------------------------------------+-----------------------------------------+------+ More Higher Pressure Vapor outlet plugged or blocked. Nitrogen on the end plate open. Loss of MRU or chilled water. PSV Discharge. Powder in the flare header. Isopentane in DR-2008. Operations training. System pressure alarms. Block feed on high pressure. RF * * Less Lower Pressure control Get water from Low pressure * Pressure valve failure. DR-2008. alarm. Get oxygen into the dryer. Evaluate adding GH nitrogen to D-2302 for low pressure or high oxygen. +-------------------- +------------------ +----------------------------------- +------------------------------------- +----------------------------------- +----- + DO A 120966 CONFIDENTIAL Worksheet HAZOP-PC 1.00 Company: DOW CHEMICAL CO. "'ocess: HDPE - POLY B Node: 11 Page: 4 +----------- ___________________----------------------- __________----------------------- _________________--------------h Node: 11 First Stage Dryer (DR-2007) / Process Parameter: Vessel Entry Intention: Safe Operating Procedure +------------- +-------------- +---------------------------+---------------------------- +---------------------------+---- + |GUIDEWORD|DEVIATION| POSSIBLE CAUSES I CONSEQUENCES | RECOMMENDATIONS |BY | +--------------------+----------------------+-----------------------------------------+--------------------------------------------+-----------------------------------------+-------+ Inadeguat Inadeguat Pyrophoric Fire. Evaluate C02 or RF Vessel concentrations. Asphixiation. steam purge or Entry Nitrogen atmos. Hydrocarbon nitrogen purge Inadequate entry release. saturated with preparation. water. Write vessel RF opening procedure for DR-2007. +---------------------+----------------------+----------------------------------------- +--------------------------------------------+-----------------------------------------+-------4-