Document 10wZpNRRn9DmzgxJ5o32LNvom
INTER-OFFICE CORRESPONDENCE
T0________ Thos listed b low____________
NAME
LOCATION
Datf.______ June 1 1981____________________
From Subject
Mr. J. A. King;__________________
NAME
LOCATION
SEPT. 1981 VCSA MEETING
Hooker Chemical
PLASTICS DIVISION
Copy to:
The latest request for preparing the agenda is attached. A "Tru Confession" is any item, not specifically listed as a subject on the agenda in the past, we may wish to broadcast in order to help memb r companies with similar problems or to attempt to gain information for ourselves. As someone once said - the value of the meeting depends on what we all put into it.
R sponses to the first request (April 27) for agenda items resulted in the following list:
F. Hoy: 1. Who is being hassled by EPA (on VCM emissions)? 2. Are other plants reporting every valve discharge regaxdl ss of how small?
C. J. Kleinert: 3. On Emergency Releases: What is reported? How are these releases controlled? Is there anything new on short stop or instrumentation?
What is the feeling on change or tightening of the Standard?
5- What is the current status of those using carbon adsorbers for VCM vent gas?
6. How do others face water soluble hydrocarbons that are discharged in effluent related to VCM/ViAc copolymer manufacture?
How do others handle "hazardous hydrocarbons" like Toluene/DOP wastes that we would burn if we were permitted?
D* M. Connor: 8: Corrosion update on reactors, strippers, recovery equipment, incinerators and other primary emission control devices.
(90 Effluent problems particularly regarding POTW * s and NPDES permits.
6b) Personnel monitoring.
s" n. Engineering safeguards to prevent opening the wrong reactor. (12. Update on OSHA and EPA inspections.
13. Have any PVC plants been fined for excursions reported in Semiannual Reports?
(Dave recommends alternating production plant representatives in
attending the me tings in addition to anyone
els who may b s nt.)
'CI41
i'y. A. King
OCC 5418
JAK/rm
______ ^
Cop1 e: BgBrsO.F.lloy( o.j.Kleinert, K.H.Garner, J.Ii.Hilt (Pjvl),
G. W.JSngbrOin (BUrlinaton). M. w. Ua,nt
V
INTER-OFFICE CORRESPONDENCE
To _ _ _ Memo
NAME
Date
August 7, 1981
LOCATION
From Subject
Mr. J. A. King
NAME
LOCATION
VCSA MEETING AGENDA - SEPT., HILTON HEAD
Copy to:
Mr. F. F. Hoy Mr. C. J. Kleinert Mr. R. W. Arnold
Mr. K. H. Garner Mr. K. P. Hochschwender Mr. D. J. Baldwin Mr. C. W. Engblom Mr. A. E. Schmeck Mr. T. E. Moses Mr. J. R. Hilt, Pyvl Mr. D. M. Connor, Pyvl Mr. H. Giovannelli, Pyvl Mr. M. W. Handler, Addis Mr. J. V. Lessig, Addis Mr. R. C. Knight, Addis Mr. R. K. Diehl, Addis Mr. T. Nasife, Burlington Ms. B., Blowers, Burlington Mr. A. Kowalewski, Burlington
Hooker Chemical
PLASTICS DIVISION
RECEIVED
AUG 10 1981
0. M. CONNOR
Attached is the agenda,, and a tabulation of member-submitted data on FVC Relief Valve Area Size; limited distribution of the latter.
Mr. D. M. Connor, Mr. H. Dubec and I will attend the meeting. He suggested soliciting your questions other than those that will apparently be covered on the agenda. You are all hereby requested to write these to Messrs. D. M. Connor, H. Dubec or me by Sept. 16 - we leave Sept. 23.
,,_,, rh / /
tT. A. King ' JAK/rm
Attachments
OCC 5419
141