Document 10gnoaz60JBDLR9me9NNnxQ0m

INDUSTRIES To: H. C. Hank - Lake Charles Jcc: Leman White - Lake Charles W. J. Fetter - Pittsburgh INTER-OFFICE CORRESPONDENCE Date: December 18, 1981 From: G. J. Goetz Location: Philadelphia RSO Subject: Certain-teed Corp Valley Forge, Pa. Re: VCM transfers Basis the Lake Charles S.O.P. transfe'r procedure dated 9/9/81 and the internal CTC memo of 2/4/81 (cc of both attached) do you see any problems with transfering some of the psig ranges to our S.O.P. "key points" section, e.g. 3(c) and 3(d) of the CTC memo? Also, can you establish what a mimimum flow rate should be, e.g. section of the CTC memo? This S.O.P. will become our part of the Appendix to the contract. Do you see any things else that should be on the S.O.P.? Secondly, from our November 30 meeting, the concensus was that if CTC doesn't check-out to within 0.23% of our values then we will mutually seek out the problem and resolve it. Will the plant accept this differential now that every thing is in place? Please advise. Thanks for your input. GJG/r FORM 503-A REV 6-1-70 SL 049043 CONFIDENTIAL: Subject to Protective Order of 14th Judicial District Cour No. 91-1145 V- STANDARD OPERATING PROCEDURE TRANSFER TO CERTAINTEED Page STEPS check KEY POINTS 1. Open suction valve on tank to be transferred from. .2 Check fill line to be sure it is blocked on line from spheres and daytanks. 3. Open recirculating line to tank that is to be transferred. 4. Check to be sure vent valve is closed. 5. Staft pump. 6. Open valve to CertainTeed. 7. Be sure meter bypass and old meter are blocked. .8 Record pump discharge pressure. 9. Record line temperature from TI. .10 Record Varec level on tank that is being transferred. .11 Record pressure on tank that is-beinc transferred. .12 Record transfer meter starting reading from both meters. .13 Record starting temperatures on tank that is being transferred. .14 Record DP reading from VCM control panel. '. .15 Be sure that VCM-II computer is on line. .16 Notify CertainTeed that they can start transferring. RECORD TIME.* .17 After CertainTeed starts transfer, call up point on computer and record. (TE6605) To be recorded only after CertainTeed notifies that line is packed. To be recorded only after CertainTeed .notifies that line is packed. To be recorded only after CertainTeed notifies that line is packed. CONFIDENTIAL: to Protective r- (Transfers should be stopped at 3'0" low level.) SL 049044 NO. 1 DATE 9/9/81 INITIAL ^)Ml*UnKU UrcKMlll^b fKUUlUUKt STEPS check TRANSFER TO CERTAINTEED Page t KEY POINTS When CertainTeed calls and says that transfer is completed: 18. Record time. ______ 19. Block valve to CertainTeed. ______ 20. Record final line temperature .from TI and TE6605. ' 21. Record final Varec level. ~ ' , 22. Record pressure on tank. 23. Be sure that equalizing line is open. _1__ * ' Line must be floated or it will result in _______SRV lifting. 24. Record transfer meter final reading." 25. Record final temperature*on-tank. i 26. Record final DP reading. ____ __ ,* ______ ' * 27. Shut down pump. ` 28. Remove transfer report from the VCM-II printer. ______ _____ _ ....... .. . .' .V 'SL 049045 NO. DATE INITIAL