Document 10gnoaz60JBDLR9me9NNnxQ0m
INDUSTRIES
To: H. C. Hank - Lake Charles
Jcc: Leman White - Lake Charles
W. J. Fetter - Pittsburgh
INTER-OFFICE CORRESPONDENCE
Date: December 18, 1981
From: G. J. Goetz
Location: Philadelphia RSO
Subject:
Certain-teed Corp Valley Forge, Pa.
Re: VCM transfers
Basis the Lake Charles S.O.P. transfe'r procedure dated 9/9/81 and the internal CTC memo of 2/4/81 (cc of both attached) do you see any problems with transfering some of the psig ranges to our S.O.P. "key points" section, e.g. 3(c) and 3(d) of the CTC memo? Also, can you establish what a mimimum flow rate should be, e.g. section of the CTC memo?
This S.O.P. will become our part of the Appendix to the contract. Do you see any things else that should be on the S.O.P.?
Secondly, from our November 30 meeting, the concensus was that if CTC doesn't check-out to within 0.23% of our values then we will mutually seek out the problem and resolve it. Will the plant accept this differential now that every thing is in place?
Please advise. Thanks for your input.
GJG/r
FORM 503-A REV 6-1-70
SL 049043
CONFIDENTIAL:
Subject to Protective Order of 14th Judicial District Cour
No. 91-1145
V-
STANDARD OPERATING PROCEDURE
TRANSFER TO CERTAINTEED Page
STEPS
check
KEY POINTS
1. Open suction valve on tank to be
transferred from.
.2 Check fill line to be sure it is
blocked on line from spheres and daytanks.
3. Open recirculating line to tank that is to be transferred.
4. Check to be sure vent valve is closed.
5. Staft pump.
6. Open valve to CertainTeed.
7. Be sure meter bypass and old meter are blocked.
.8 Record pump discharge pressure.
9. Record line temperature from TI.
.10 Record Varec level on tank that is
being transferred.
.11 Record pressure on tank that is-beinc transferred.
.12 Record transfer meter starting
reading from both meters.
.13 Record starting temperatures on tank
that is being transferred.
.14 Record DP reading from VCM control
panel.
'.
.15 Be sure that VCM-II computer is
on line.
.16 Notify CertainTeed that they can
start transferring. RECORD TIME.*
.17 After CertainTeed starts transfer,
call up point on computer and
record. (TE6605)
To be recorded only after CertainTeed notifies that line is packed. To be recorded only after CertainTeed .notifies that line is packed. To be recorded only after CertainTeed notifies that line is packed.
CONFIDENTIAL: to Protective r-
(Transfers should be stopped at 3'0" low level.)
SL 049044
NO. 1
DATE 9/9/81
INITIAL
^)Ml*UnKU UrcKMlll^b fKUUlUUKt
STEPS
check
TRANSFER TO CERTAINTEED
Page t
KEY POINTS
When CertainTeed calls and says that transfer is completed:
18. Record time.
______
19. Block valve to CertainTeed.
______
20. Record final line temperature .from TI and TE6605.
' 21. Record final Varec level.
~ '
,
22. Record pressure on tank.
23. Be sure that equalizing line is open.
_1__ *
' Line must be floated or it will result in _______SRV lifting.
24. Record transfer meter final reading."
25. Record final temperature*on-tank.
i 26. Record final DP reading.
____ __
,* ______
'
*
27. Shut down pump.
` 28. Remove transfer report from the
VCM-II printer.
______ _____ _
....... .. .
.'
.V 'SL 049045 NO. DATE
INITIAL