DOW CHEMICAL U.S.A.
June 29, 1990
ST03(t3474
TO: ALL EMPLOYEES
RE: ASBESTOS NOTIFICATION LAW
On January 1, 1989, the California Asbestos Notification Law became effective. This law requires owners of buildings constructed prior to 1979 to notify all employees if the buildings where they work contain asbestos. This letter is being sent to you in order to comply with this law. The Company does not believe that the presence of asbestos in the buildings poses a threat to human health or the environment.
ATTACHMENT
Attached to this letter is a summary of the results of any
Asbestos Survey conducted at your location. Included in the
summary is the building number, the location of any asbestos
in the building, its description, the results of sampling
conducted, and the recommended response to be taken. The
individual surveys for each building and the description of
the sampling and analytical methods used are available
during normal working hours through your Industrial Hygiene
Function.
Bulk samples were analyzed using the
Environmental Protection Agency "Interim Method for the
Determination of Asbestos in Bulk Insulation Samples, EPA
600/M4-82-020, Dec. 1982." Air Samples were analyzed using
the "NIOSH (National Institute of Occupational Safety and
Health) Method 7400."
HANDLING PROCEDURES
There must be no disturbance of asbestos containing building construction material without prior notification to and approval from supervision. Disturbance of this material could release fibers into the air and this must be minimized. This means no drilling, sawing, pounding, or using power or hand tools, for example. Report any damage to asbestos containing construction materials which you observe -- such as flaking, peeling, breaks with rough edges, etc. -- immediately to supervision.
AN OPERATING UNIT OF THE .DOW CHEMICAL COMPANY RESTRiCTEO *OR USE WiTh<n THG OOW CHEMiCAL COMPamv
Page Two
BEFORE any remodeling, renovation, or maintenance which could involve asbestos containing material, the notification procedures in the Division Asbestos Guidelines must be followed. The use of these procedures will ensure proper containment and handling. The Guidelines have been widely distributed in the past and are available through your Industrial Hygiene Function.
POTENTIAL HEALTH RISKS
Extensive air sampling during removal projects in our plants has shown very low fiber levels. Although no air monitoring has been conducted in office buildings during normal working conditions, it is expected that these levels would be much lower than levels found during a removal project. No significant health risk, therefore, would be expected. Harmful exposure conditions (meaning both level of airborne asbestos fibers and duration of exposure) can cause progressive lung impairment (asbestosis), cancer of the lung, and cancer of body cavity linings (mesothelioma). Please refer to the Division Asbestos Guidelines, pamphlets which have been distributed, and your local Industrial Hygiene and Medical Functions for specific details on health effects associated with asbestos.
Please note, only such materials which are in good condition
or which are non-friable (not prone to releasing airborne
fibers) will be left in place.
All other asbestos
containing construction material will be removed.
In
addition, following the procedures outlined above will
minimize any potential health impact from asbestos
containing materials in our buildings.
INDUSTRIAL HYGIENE FUNCTION
The following is a list of the people and the phone numbers of the Industrial Hygiene Function in your location:
Pittsburg LA Ops. Fresno
Stacy Ellis Vickie Teas Bryan Corcoran
x5183 x5336 x7669
Should you have any questions regarding this letter, please feel free to contact us.
ST0343475
Industrial Hygiene
BLDG. LOCATION
DESCRIPTION
1 25 Upstairs Men's Room
Tile
1 40 Control Room 140 Control Room 140 Storage Bldg.
Outside walls Sprayed on material Inside ceiling Walls
210 Maintenance shop 210 Maintenance shop 210 Maintenance shop 210 Maintenance shop 210 Maintenance 210 C02 Tank 21 0 Bldg.fi 12 210 C02 Tank 210 Cooling Towers 210 Maintenance 210 Cell Repair Office 210 Cell Repair Lunch Room 210 Outside line
South wall Wails in l&E shop Roof over MCC East wall West wall Root over tank MCC Bldg. 112 West Wall H-1 anf H-2 Floor tile in l&E shop Tile Tile South of control room
220 220 220 220
220 220 220 220 220 220 220 220 220
Loading rack shack MCC room Switch room #6 Switch room #7 Switch room f6 Switch room #7 T-220 East of switch room #8 Loading rack shack Control room Lunch room Laboratory Restroom
Walls Walls Walls Walls Wall below switch room Wall below switch room Tank covering Wall Packing between transits and Irame floor tile floor tile floor tile Floor tile
310 Warehouse 310 South Side 310 Next To Lab 310 Locker room
Pipe Insulation Steam Pipe Insulation Linoleum Linoleum
361 South End of Basement
Black 6*x9* floor tile
361 Basement, Across From B-6 6' pipe Insulation
361 Basement Off of Room B-6 I2*xl2` floor tile
361 Room E17
Sand Plaster ceiling
361 Room W8
Pipe Insulation
361 Room W8
Pipe elbow insulation
361 Hallway Next To Lobby
Grey floor tile & acoustic
ceiling material
361 Room W8
Tape on ducts
460 Hallway
Acoustic Ceiling material
463 Room 1 463 Room 2 463 Room 3 463 Rm 4 Above ceiling 463 Rm 5 Above ceiling 463 Rm 6 Above ceiling 463 Room 7 463 Room 8 463 Hallway B 463 Storeroom 463 Room 11
463 Room 12 463 Room 13 463 Room 14
4' Steam Pipe Insulation 4* Steam Pipe Insulation 4' Steam Pipe Insulation 4* Steam Pipe Insulation 4* Steam Pipe Insulation 4* Steam Pipe Insulation 4* Steam Pipe Insulation 4' Steam Pipe Insulation 4` Steam Pipe Insulation 4* Steam Pipe Insulation 4* Steam Pipe Insulation
4* Steam Pipe Insulation 4* Steam Pipe Insulation 4* Steam Pipe Insulation
RBOOMMBiOEO RESULTS FRIABLE RESPONSE
10-15%
N/A N/A
Translte 5-10% Transiie
N/A N/A N/A N/A N/A N/A
Translte Translte Transiie Translte Translte Transiie Translte Translte Transiie
1-5% 1-5% 45-50% 15-20%
Translte Transits Translte Translte Translte Transiie Transite Transite 30-50%
1-5% 1-5% 1-5% Trace
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
-
20-30% 30-35% 35-40% 35-40%
5-10% 5-10% 1-5% 1-5% 55-50% 45-50% 5-20%
30-35%
5-10%
Yes O&M Program Yes O&M Program No O&M Program No O&M Program
No O&M Program No O&M Program No O&M Program Yes O&M Program Yes O&M Program Yes O&M Program No O&M Program
No O&M Program
Yes O&M Program
35-45% 35-45% 35-45% 40-50% 40-50% 40-50% 40-50% 40-50% 40-50% 40-50% 40-50% 40-50% 40-50% 40-50%
Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog Yes Repair O&M Prog
Yes Repair O&M Prog Yes Repair O&M Prog
ST0343476
Page 1
BLOa LOCATION 463 1st Floor oflloe 41
642 above ceiling 463 Room 1 463 Room 2 463 Room 3 463 Rm 4 Above celling 4 63 Rm 5 Above celling 463 Rm 6A Above ceiling 463 Rm 11 Above ceiling 463 Room 12 463 Room 13 463 Room 14 463 1st Floor mens room 463 Lab 13 A Office 463 Rm 4 Offices 463 Hallway B 463 Storeroom 463 Storeroom 463 Room 0 463 Room 10 463 Boom 21 463 Room 11 463 Room 13 463 Room 16 463 Rm 19C 463 Rm 18 463 Above Hallway Ceiling,
North End, 2nd Floor 463 Room 23 463 Copy Room 463 Penthouse mech. room 463 Penthouse mech. room 463 Penthouse mech. room 463 Penthouse mech. room
464 Restrooms 464 Shop Office 464 Bldg. 464
465 I.H. Room
4 66 Next to I.H. Room 466 Room A
471 Equipment room 471 Equipment room 471 X-ray room
562 Office and lab
562 High Pressure Lab 562 East Side ot Building 562 Fume hood "HI"
562 Fume Hood*H2*
562 Fume Hood'H3"
562 Fume Hood"H4* 562 Fume Hood*H5*
562 Fume Hood'KT 562 Center or room
563 Control Room, Level 1 563 Control Room. Level 2
DESCRIPTION
4* Steam Pipe Insulation 4* Filtered Water Pipe Insulation 4* Filtered Water Pipe Insulation 4* Filtered Water Pipe Insulation 4' Filtered Water Pipe Insulation 4* Filtered Water Pipe Insulation 4* Filtered Water Pipe Insulation 4* Filtered Water Pipe Insulation 4` Filtered Water Pipe Insulation 4* Filtered Water Pipe Insulation 4* Filtered Water Pipe Insulation White A Brown
Marble 12*x12* floor tUe Green 9"xS* floor tile Steam pipe elbow above ceiling Light grey 12*x12* floor tile 8* Steam Pipe Insulation 8* Steam Pipe Insulation 8* Steam Pipe Insulation 8' Steam Pipe Insulation 3* Steam Pipe Insulation 3* Steam Pipe Insulation 3' Steam Pipe Insulation Paper insulation on 4* pipe
above ceiling Paper on duel work above 2nd
floor ceiling Light grey I2*xl2' floor tile Pipe Insulation above celling Packing material around pipe Cloth wrap aroun pipe Felt wrap around 4* pipe Taping material In duct work
Orange Hnofeum Green 9*x9* floor tile 3* Pipe elbow
Tan I2*xl2* floor tile
Spray on fireproofing 3* Pipe Insulation
Pipe Insulation Pipe elbow insulation Grey linoleum
3* off-white pipe Insulation above ceiling
3* off-white pipe elbow 3* off-white pipe Insulation 1/4* translte lining 161/4* colorllth lab top 1/4* translte lining 141/4* colorllth lab top 1/4* translte lining 141/4* colorllth lab top 1/4* translte lining 1/4*translte lining 161/4' colorllth lab top 1/4' translte lining 161/4* colorllth lab top 161/4* colorllth peg board
Brown 12*x12* floor tile Brown 12*x12* floor tile
Page 2
RECOMMBIDED RESULTS FRIABLE RESPONSE
40-50% 35-35% 35-35% 35-35% 35-35% 35-35% 35-35% 35-35% 35-35% 35-35% 35-35% 10-15% 10-15% 20-25% 35-45%
1-5% 15-30% 15-30% 15-30% 15-30% 25-35% 25-35% 25-35% 15-20%
55-50%
Yes Repair 06M Prog Yes Repair 06M Prog Yea Repair 06M Prog Yes Repair 06M Prog Yes Repair 06M Prog Yes Repair 04M Prog Yes Repair 06M Prog Yes Repair 06M Prog Yes Repair 06M Prog Yes Repair 06M Prog Yes Repair 06M Prog No 06M Program No 06M Program No 06M Program Yes Repair 06M Prog No 06M Program Yes Repair 06M Prog Yes Repair 04M Prog Yes Repair 06M Prog Yes Repair 06M Prog Yes Repair 06M Prog Yes Repair 04 M Prog Yes Repair 04 M Prog Yes Repair 04 M Prog Yes Repair 04 M Prog Yes Repair 04 M Prog
5-10% 30-40% 5-10% 60-90% 35-45% 70-80%
No 06M Program Yes Removal. Yes 04M Program
Yes Repair 06M Prog Yes OSM Program Yes OSM Program
15-20% 30-40% 35-50%
No 04M Program No OSM Program Yes Repair OSM Progrs
10-15%
No OSM Program
25-30% 25-30%
Yes Removal Yes Removal
40-45% 50-55% 5-10%
Yes OSM Program Yes OSM Program No OSM Program
10-15%
Yes Repair OSM Prog
5-15% 5-10% Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed
Yes OSM Program Yes Repair OSM Prog No OSM Program No OSM Program No OSM Program No OSM Program No OSM Program No OSM Program No OSM Program No OSM Program No OSM Program No OSM Program
No OSM Program No OSM Program
3-8% 3-8%
No OSM Program No OSM Program
* IUJ4 34 77
BLDG. LOCATION 563 Control Room, Level 1 563 Control Room, Level 2 563 Control Room, Level 2
DESCRIPTION White linoleum In rest room White linoleum In rest room Dark Brown 12"* 12* floor tile
RESULTS 25-30% 25-30% 5-10%
RECOMMENDED FRIABLE RESPONSE
kb OSM Program No OAM Program No OSM Program
564 Bay 7, Levels 1 to 4
24* Insulation on Bl
564 Bay 7, Levels 1 to 4
24* Insulation on B2
564 Bay 7, Levels 1 to 3
24* Insulation on B3
564 Bay 9. Level 3
Tank on West Side
564 West side ot Bay 6, Level 2 10* Insulation around valve
564 West side o( Bay 10, Level Mud insulation on top of tank
564 South side ol Bay 8, Level 2 3* Steam pipe Insulation,
564 Bay 10. Level 1
4* pipe Insulation on Chloropyridine
tank outside of Bay 10
564 Bay 10, Level 1
Insulation on Chloropyridine tank
564 Bay 9. Level 1
Insulation on tank, middle of Bay
1-5% 1-5% 1-5% 1-5% 1-5% 20-25% 1-5% 1-5%
1-5% 5-10%
Yes Repair OSM Prog Yes Repair OSM Prog Yes Repair OSM Prog Yes OSM Program Yes Repair OSM Prog Yes OSM Program Yes Repair OSM Prog Yes Repair OSM Prog
Yes Repair oSM Prog Yes OSM Program
566 Norm Side ot- Building
3* off-white pipe Insulation
566 North Side, East ol Building Off white cloth wrap on pipe
566 Fume hood "A"
1/4* transile lining 1S1/4 colorlith lab top
566 Fume hood *B*
1/4* transite linlg
181/4* colorlith lab lop
566 Corrugate Transite Siding
25-35% 55-55% Assumed Assumed Assumed Assumed Assumed
Yes Removal Yes Removal No OSM Program No OSM Program No OSM Program No OSM Program No OSM Program
1019 1st floor A/C room
_. - . 1019 1st floor A/C room 1019 1st floor A/C room 1019 1st floor hallway 1019 1st floor restroom 1019 2nd fl. telephone room 1019 2nd floor hallway 1019 2nd floor A/C room
1019 2nd floor A/C room 1019 2nd floor A/C room
1019 2nd floor A/C room 1019 2nd floor A/C room 1019 2nd floor A/C room 1019 2nd floor janitor closet 1019 2nd floor janitor closet 1019 2nd floor janitor closet 1019 2nd floor lunch room 1019 2nd floor vault 1019 Above celling, 2nd floor
hallway 1019 Entrance to room 62 1019 Hallway across from
room 85 1019 Outside J. Fujll's office 1019 Stairs, first floor 1019 Room 62 1019 Room 76 1019 Rm. 6 storage 1019 Room 80 1019 Room 84 1019 Room 91
Butuminous cover on 8* chill water line
Wall plaster 4* to 6* pipe Insulation Insufation on 4' pipe Orange linoleum Brown 9*x9* floor tile Lt. areen floor tile under carpet Insulating cement with bituminous
cover on chill water return line Bituminous material on 3/4* pipe Insulation on 4* low pressure
steam line Wall plaster Acoustic panels on door. Insulation on corner ol duct work Insulation on 4* pipe. Wall plaster Insulation under canvas of duct work White I2`xi2` floor tile. Brown 9*x9* floor tile. Insulation under canvas of duel work
50 I f.
N/A 50 l.f. 180 1.1. 140 sq.ft. 42 sq. ft. N/A 40 sq.ft
8 l.f. 70 l.f.
N/A N/A 375 sq. ft 4 l.f. N/A 224 sq. ft N/A 140 sq. ft 1500 sq.ft.
Yes Repair. OSM.
N/A N/A Yes Repair, OSM. Yee Repair, OSM. No OSM Program No OSM Program. N/A N/A Yes Repair. OSM.
Yes OSM Program Yes Repair, OSM.
N/A N/A N/A N/A Yes Repair. OSM. Yes Repair, OSM. N/A N/A Yes Repair, OSM. N/A N/A No OSM Program Yes Repair. OSM.
Orange linoleum Sprayed on acoustic celling with
black paint 2'x4` ceiling tile Plaster under stairs
Light green floor tile under carpet Sprayed on acoustic celling Light green floor tile under carpet Sprayed on acoustic ceiling Sprayed on acoustic celling Black batting on fiberglass Insulation
Inside duct work.
32 sq. ft. N/A
N/A N/A N/A N/A N/A N/A N/A N/A
No OSM Program N/A N/A
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
ST03U3U78
Page 3
P !) 08IANDPR PLANT E fiCTPCTION
0301835 SAFTT
<$T^3'4 341 i, A
DOW CHEMICAL U.S.A.
June 29, 1989
6i*iC*i0iS
TO: ALL EMPLOYEES
RE: ASBESTOS NOTIFICATION LAW
On January 1, 1989, the California Asbestos Notification Law became effective. This new law requires owners of buildings constructed prior to 1979 to notify all employees if the buildings where they work contain asbestos. This letter is being sent to you in order to comply with this new law. The Company does not believe that the presence of asbestos in the buildings poses a threat to human health or the environment.
ATTACHMENT
Attached to this letter is a summary of the results of any
Asbestos Survey conducted at your location. Included in the
summary is the building number, the location of any asbestos
in the building, its description, the results of sampling
conducted, and the recommended response to be taken. The
individual surveys for each building and the description of
the sampling and analytical methods used are available
during normal working hours through your Industrial Hygiene
Function.
Bulk samples were analyzed using the
Environmental Protection Agency "Interim Method for the
Determination of Asbestos in Bulk Insulation Samples, EPA
600/M4-82-020, Dec. 1982." Air Samples were analyzed using
the "NIOSH (National Institute of Occupational Safety and
Health) Method 7400."
HANDLING PROCEDURES
There must be no disturbance of asbestos containing building construction material without prior notification to and approval from supervision. Disturbance of this material could release fibers into the air and this must be
minimized. This means no drilling, sawing, pounding, or using power or hand tools, for example. Report any damage to asbestos containing construction materials which you observe -- such as flaking, peeling, breaks with rough edges, etc. -- immediately to supervision.
AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY RESTRICTED FOR USE WITHIN THE DOW CHEMICAL COMPANY
=Quality== Performance
Means More A/ Ctoi*
Page Two
BEFORE any remodeling, renovation, or maintenance which could involve asbestos containing material, the notification procedures in the Division Asbestos Guidelines- must be followed. The use of these procedures will ensure proper containment and handling. The Guidelines have been widely distributed in the past and are available through your Industrial Hygiene Function.
POTENTIAL HEALTH RISKS
Extensive air sampling during removal projects in our plants has shown very low fiber levels. Although no air monitoring has been conducted in office buildings during normal working conditions, it is expected that these levels would be much lower than levels found during a removal project. No significant health risk, therefore, would be expected. Harmful exposure conditions (meaning both level of airborne asbestos fibers and duration of exposure) can cause progressive lung impairment (asbestosis), cancer of the lung, and cancer of body cavity linings (mesothelioma). Please refer to the Division Asbestos Guidelines, pamphlets which have been distributed, and your local Industrial Hygiene and Medical Functions for specific details on health effects associated with asbestos.
Please note, only such materials which are in good condition
or which are non-friable (not prone to releasing airborne
fibers) will be left in place.
All other asbestos
containing construction material will be removed.
In
addition, following the procedures outlined above will
minimize any potential health impact from asbestos
containing materials in our buildings.
INDUSTRIAL HYGIENE FUNCTION
The following is a list of the people and the phone numbers of the Industrial Hygiene Function in your location:
Pittsburg LA Ops. Fresno
Stacy Ellis Vickie Teas Bryan Corcoran
x5183 x5336 x7669
Should you have any questions regarding this letter, please feel free to contact them.
ST0343480
F. D. Axe Industrial Hygiene
ST0343481
0Q0C^*4CN.L>*
(P'JlLDuC*
loco now
r......................
UMJ3040 M* III ' w 1 *0 4
CN.IM3WQA DUCMPnOM
[ >]4`rMiwnM|i
................. ..
OtOULtl :
:MI4BL
;BCOMMIM)CO UOPMI
iJiowa___ t ocATiom__________P ncmmow________ JIUWCTl_____:f *ASLl
5J............. .......l!S?.L_".r!S.._ K1M.00A Ml aaomwo room w* ft ir a ir.tow^Wo ^ ^ 14%^
:no
MCMMMOe IIIPONU
0444 PMOO^AM
OILDMO 144 lav 7 WW ii 4
r.HDMOM* llav * wo
M` raulan wU
i 1%
m
;fM4 04*4 0fg
--.............................................. ............ *
............... ............... ******
M' ruuion on u
i-*%
m
; wbm o*m oraq
%UH0040 440 hwiwot IUH.0040M1 Moarafir
fwy4M eawnq `owtanaa
: hf* pwiiw mw*
_4'o%__ _____ ;vm____
19%
:**
104*4 PAOOAM4 OiMPMOOfUM
....... ............................................. --
KAMUt lull IMDl ------------------------------------------------- _
Tanorawltt
. i-*%
m
* -OMIfttOMM
040*49 0*1 ^wn va
WJHwi.
M 40%
: -voo
j--------------------------10444 PP094MM
UKAMM4 il#V 4. LOW 2.
10* IMIW OrM VWM wow Mo of
1 f%
UlANQUi
WlfM------l----------
iMOKMIWtOlB !w tar* wool udo w
90-2*%
ro________ tftawair O**i ^o^ _ VM *0444 awwwii
MiOOMMI^ Powowo
:PiiWMMaai 4440%
040*49 Ml hunt nom o mwp. Am tow wo woof 14 W%
RUU.0049M1 Aoomwt
iTapponwwcw
30 0*%
rroo :mo -No
^ 04UPW0MM4**** 0444 P90OMA44 O4MPM0O4U44
^5855.;.____ :
lUtDKIM*
1* n mo %iuan.'io%
-............... -
mOi moo of a*f
^____
uioeki U4 4*t 19 LwW 1
4* po nmoionn wi
craoropfnam ura
Olio Of Nr *0 -----------------------j------------------------------
' i f%
tmXIMIM illrlOLKWl
i *J*_0*O M* Ibtl LM<
1
owjaianan cnarapvnanoo urn
%--M w *p 10
t JtMMWVlira. [mCKM Of NT I
: i-1%
:4-IO% J
voo Impair 04M 0ra MCOCM-aLO. 6wMwwraraom
--............ ........................... -......... MTocALtixe
**a ;%wr 04M Orog MtocPLiLaa
Bwjwnwra roan X4v room
'^oirwkMlwi
IL_ 40M%
hM oaow owaotwi amy lrw*w
*444% 410%
mum w*9*MOui
raoramoi
2400%
voo : Oopwr 0*04 orog
t
UL0040 >10 ,ioiin4*iib,*"`
'laaoTpioo muutwi*'** >004%
i Tn
: :0*M Oro^fiam
ULOOOJIO Nan to uo uiLONSlIo" LaMar room
^11*0*1 LTmoow
^ 114-40% 34*40%
:va* joo :m :rm .No Mo
OBJ mOOCOM.MM
0414 POOOJUM
O4MPN09AM4
10444 PMOOIUM j
-OtMPNOdPMM I
CUM PMOC4U44
'
moTpomm
OLfeOltNQ Ml iU Cano* ini, 1LM 1
' 141 conrw Mm
IriMi if l> Mo N t |^
1-4% ^
mo m
! 04M o^pam 04M Oi'o&tm
......... -........-I--------------------- -- -----------------------.......................... .................... ...........
-t-f II
i!
ii
1
' 4iai0P0 14) 141 conm Nn
1
( ! ** wwoun fl ' r+ti rpgm _.................. ...
i 141 conrw Nm
1
------------------------ ------------------------------ !
!
......... ^ ^
'OOMO^vam
t i
--.................................... .... .............. ............ ............ .................................... r---------------------------------* iC4M Orogram.
:: il
t ........................ f......................... ;-----------------------------
UlDNG Ml 141 conrw l*n
>D*riw IT i T :*-!%
MO
w t
i UlLOOaG M3 Ortco 4 UO
i low m
' ytlliniw
:io-i*%
rii* "**
mwMiar bow
! "rs........... ......... ___________ _________
(K*iD*a w 'HotpmuiM Iroimoeo*
?**%
n
!C4M iMogram
" ;,wawao"o*M oraq**' ------ ---------------- -------------------------------- 1.---------------------------------- ' *""**'* *
:o*m o%9ara
--
1"
*
i j
rx_z_.z.<
SST-------------------------- ---------------------
UlONC Ml lElUiOtoiM)
3*oflaoraoao
>10%
v
| 'MIIlM ......4............................ _L............ .. .......................:...................... ...
: : rmm. OiM Pro*
-------------------------------- ;------------------------------------
* "" \
l
KA0MH4 :Nrmi0( tUg lroHmnf -----------------------!------------------------------- huilw
1 .......................... ...
tut0M M* Imwh wooaati
00 wow ooot ra
f MB
an poo
-IMH : M-4A%
r tipi
Inwnoow *Tl*wniaT'****
UN.OTCG Ma_ MO M
............ 1............ . 1
lAo^jrwowwww jwrjNjj^......... ^Aowjmaa
` i*i'* corona* uo tap :
U40MO M2 tstm rrno *HT
io* omoMo war
joaoumoo
!*tAOMCiu
mm 'KT
<iV4* cotorar up ioo-.Aa*roa
' I4` taw
;
'4w*noo
--....-....i................. 1*1/4* covin up u|:wun
Mo :OM4 Prowam mo :q4w Proofwn
i:
j No_____ no
^
'[PM Proywn
--*C4M *Prowam* T
No ;CWW Prawww M __ ^ ^04U Pro-am
............... ....................*.............. .............. ............
..........------------------------------ i-----------------------------------
:
;
i"
IlI <
.
_________________ i
1f _______^_J
fi Si
\.-- ---------------- i------------------ --------------------- ----------------------
--
4-- ------------------------------ *----------------------------------- ------------------- ---------------------- --
IAOMOM2
nooo *mo*
14-famoo orariB
:imw
M
*04*4 Pmam
lAOWO *_ *jm11***
IMa TlWM MWB
:W|JNW
1*1/4' UXWIW 1*0 BOiMaMHOO
No no
**To4m Pmcviam. ........ -- *0444 Mowam
:
-------------------- ----
U4CMG M2 Sam IMS *lO* . 14* rnoM ortry
Uaoonoe
------------------------------ f................................ -- **.......... --
*
ULOMHt Coraw wraom
1*1/4* eowra^ rap raf^Mojwwi_____ No___________ ;04M Pmy_am______ --
i*iw* eowraai poo MM
; tawawoo
1M
:o*M Proam
--
--
uumuT fcawThooi'A*'"*
i ar v*airwM wo*
; 'iurnor
<*i/a* oouraot i4i wp'Aoawnoo
Na *" no
ToMI Mowam........... !o4*4 Pmam
lU*jfpi MA *" SinTraioonP****'"*" ir vin/N mb
; li rwn ******* nT'**
To4M*M-ait
1 iukamm* j*~...
T
i*i/4' ceaanrfi up *oo;ao4*ioo
_.................................... ........................
Carn^iMJ^onawa____ ^amon^
*..........."j...
! NO -04M Pmam
i i......................... .........................
] No ;C4M Pmam
1
4.-- ------------------------------- j.----------------------------------- -------------------- ----------------------- ---------------------
!i
--------------------------1-------------------------------
--... .......
i4o
_ MfiriWM 410%
] No
:04M Pm^rwo
--
ULDoaO 341^ laomao. moo WW *om 44
rpMMMMft
-410%
(MO ;044i 0maM --------------------- i---------------------- -------- ......................
-.........--l--------------------