FR0M J. J. CONGLETON ROCKDALE WORKS
^ H&S --Indu_-s--t-r-i-a--l--H--y--g--ie- nner
PLANT SAFETY & HEALTH STEERIN' COMMITTEE
1979 November 19
'' RE: PLANT SAFETY AND HEALTH STEERING COMMITTEE MEETING MINUTES
Dates and Times
1979 November 9, 2:30-4:00 p.m. 1979 November 13, 12:00-1:00 p.m.
Attending
Weldon Henson, Thomas Williams, Huey Dick, Finis Black, James Magee, Ike Korenek, E. R. Goltra, MD, Garry Blagg, Dave Smith, Nelson Fernandes, Terry Stuller, Brooks Parker, Jerry Congleton
The topic of discussion at the November 9 meeting was the upcoming visit of Mr. J. R. Archibald. The active and complete project list was reviewed.
The November 13 meeting was a luncheon meeting during Mr. Archibald's visit. Safety activity and objectives were discussed. The plant grievance committee was also present at this meeting.
A copy of the projects list is attached.
The next meeting of this committee will be December 13 at 2:00 p.m. in Room 138, Building 80.
J. J. CONGLETON
cw
Copy - F. P. Bergeron/W. J. Drake Managers Department Heads Superintendents Smelting Safety Managers J. R. ARchibald, Pittsburgh T. B. Bonney, Pittsburgh Christine Dixon, Pittsburgh H. D. Belk, MD, Pittsburgh L. E. Anders, USWA, Rockdale
ALCOA
ARD 001856
PLAINTIFF'S exhibit AL-1740
DEPARTMENT
PLANTWIDE
ACTIVE SAFETY PROJECTS ____
RESPONSIBLE PERSON
Item and Brief Description
Status
1. Safety representative recognition and training A,Purchase safety caps B.Train safety representatives
Safety caps - fluorescent green - received 78-07-31. Distribution complete 78-9-7. J. J. Congleton to develop safety representatives' training program.. Safety reps were trained on CORE Chapter 8, Planned Inspections, during July and Aug., 1979.
2. Safety rule book format needs revising
After reviewing safety rule loose leal: notebook, general safety rule concept followed by departmental rules, it was agreed to pursue this format. Letters to appropriate areas of responsibility will be written and sent requesting review and submission of final safety rules for their respective areas. . A. Crane safety l'ules - Nelson Fernandes, Ed Gaas B. Welding/Burning - Garry Blagg, Finis Black C. Tag Out - Garry Blagg, Finis Black D. Confined Spaces - Jerry Congleton, Ike Korenek E. Chlorine - Huey Dick, Brooks Parker F. Fire - Thomas Williams, Nelson Mueller G. Visitors - Ike Korenek, Terry SCuller H. Bldg. 66 - Ron Simpson, Jack Leggett A draft copy of the General Safety Rule Book will be compiled by J.J.Congleton. Services Department Safety Rule Book Complete 79-10-01.
4. People not using walkway to and from showers - using the street. People walking through Ingot Plant building in inclement weather.
Publish safetygram (C.H.Satcher/H,N.Mueller). As of May 3, people are still using the street as a walkway by the Carbon Plant. Enforcement of people to use walkway. Cost estimate for covered walkway to Bldg. 49,50 showers has been prepared. Under consideration by Management, 79-11-02.
5. Establish teams to again audit dept, safety & health steering committees
Start in December, Cholly Weise will scheudle.
.
ARD 001857
>
D
5 0 0' )1 ' J '
.
ACTIVE SAFETY PROJECTS DEPARTMENT _plantwide _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
RESPONSIBLE PERSON
Item and Brief Description
Status
Number of bathrooms in Bldg.27 is insufficient for number of people usinj these facilities-100 people maximum 2 urinals and 2 stools.
Engineering actively pursuing cost estimates done; final cost estimate should be complete months following approval. Jackie Chesnutt
and scope of project. Preliminary draft 1979 November. Project completion six
Plantwide disaster plan
Jimmie Davis and Nelson Mueller have completed the general work on the plan. Meetings will be held in each department to give an account of the plan and tell what that area will do in the plan. Estimated completion 80-02.
Lock, Tag, Try Procedures
An audio-visual slide presentation has been developed concerning lock, tag, try procedures to educate everyone about it. A committee was formed to handle any questions in the developing or revising of our procedures. This committee is composed primarily of the Plant Safety & Health Steering Committee. Managers and superintendents have reviewed the audio-visual presentation- minor corrections were suggested. 79-10-29.
Time clocks in center passageway by
Clock should be moved out of this highly congested area. Engineering studying location. Estimated completion 80-02.
*
ARD 001858
ACTIVE SAFETY PROJECTS
DEPARTMENT
___________ plantwide_______________
4
Item'and Brief Description
Status
RESPONSIBLE PERSON
10. Safety representative training
'>*
t
'
! Sandblasting pot shells to remove
"acid
_
f* Crocket Street traffic congestion *
3- Trees along eastern road along the '
lake are growing taller and hanging
out into the road
,
A. \ Paint used on concrete walkways has been reported to be slippery when : wet
As discussed the the Plant Safety & Health Steering Committee,., the following agenda
was suggested
'
1. Potential problems and effectiveness of the combination of positions, i.e.,
safety representative/stewards - how to handle
2. Discussion of CORE safety tools with safety representatives
A. Accident Investigation
.
B. Planned Inspection - Completed 79-08-31
3. Perception characteristics of safety representatives
4. Safety representatives should be a communication and information center - what
can we do to make this happen?
5. Organizational structure of plant and department safety & health steering
committees and roles
6. How can we recognize good performance by the safety represntatives?
A $12,000 local shop order has been approved to install an air line in the southwest
corner of the plant away from the railroad. More pipe is on order as of 79-10-15.
Estimated completion date - 79-12-31. R.E.Cox, G. Wilson \t
.
Congestion on this street in the vicinity- of the vehicle maintenance shop, propane
and natural gas storage, diesel and gas filling station, and coke unloading is
under evaluation by Jimmie Davis, A1 Paulsen, and Harry Brooks.
'*
Mr. Bob Sugg rep'orted that these trees will eventually be removed because they may damage the dam. Most likely work will be completed in the spring of 1980
. 3>D D
. 00 CODl
.
PARTMENT
potrooms
.4
em and Brief Description
ACTIVE INDUSTRIAL HYGIENE PROJECTS
Status
RESPONSIBLE PERSON___ llunh Mci.nuchl in
Pot tenders eating their lunch in
Project as originally defined is complete, however, additional work is needed.
potrooms (exposure to fluorides through Schedule is as follows:
through ingestion)
1. Provide adequate air conditioning in all center passageway lunchrooms by 5/1 -
Water cooled AC units on hand. Awaiting piping material and installation.
Installation underway by Mech.Maint. Complete 79-09 per S.W. Tucker
2. Provide sink, eye wash, water fountain combinati.on in Lines 1-6 by 6/1 - Trial
unit installed and found satisfactory. Others ordered, anticipate project
complete 1980/4/30.
3. Start a campaign to eat in the lunchroom - November 1
4. Present education program to all supervisors in December- All employees beginning
t
January 1
'
5. Total compliance with above compaign will be a continuing program
Fluoride exposure
. ' .V
,
PotrOom~crane--cab-envi-ronmen-t-
1. Proper respirators provided and people trained - complete. (Results of OSHA
tests indicated compliance. Mandatory respiratory use not indicated.)
2. Pot covers have been redesigned for additional strength. Covers for Lines 768
ordered and being placed in service as received. Reinforcing added to Lines 1-6
cover design.
J
'
-1--Festoon-s-ystem-design_complete. but installation on hold because of cost
inequities with present self-storing system.
2. Present self-storing system is installed in Rooms 20 and 22 and is operational.
Operator acceptance has been marginal at best.
3. All cranes are equipped with snorkles and tests are underway to determine its
effectiveness at fluoride exposure reduction.
'
> JO O oo 0\oT0)
DEPARTMENT
SERVICES
Item and Brief Description
1. Asbestos - cleaning off pot shells
in Potlining
ACTIVE SAFETY PROJECTS
RESPONSIBLE PERSON Dave Smi th
Status
Three recent tests have not indicated problems on indiviual jobs being done. However at the Union's request, we will test the total job being done on midnight shift. A worst case of asbestos on pot shell will be picked for the monitoring.
' ft '
'
ARD 001861
DEPARTMENT
SERVICES >
Item and Brief Description
Dust from coke blasting flexible riser connections in potrooms
. Bag changers exposed to unregenerated alumina in A-446 reactors
(
Dust.Spillage from trash-screen
"sys;pfems
'-----------
ACTIVE INDUSTRIAL HYGIENE PROJECTS
RESPONSIBLE PERSON dave smttii
Status
1, Pangborn refused to quote on blast enclosure. Sanding belt alternatives are being studied. Reciprocating sander received from PEL is being evaluate d. Revisions needed to make effective. No additional progress.
1. Evaluation of English barrier cream complete. Found to be somewhat effective,
but not a cure-all. 'Additional quantities orde.red.
.2 Evaluation of cool suit completed. Found to be satisfactory except for weight
of the hoses - need lighter equipment. Disposable coveralls and disposable
air-supplied hoods and vests with vortex tube being evaluated. System works,
but excessive water in compressed air plugs filters in very short time. Water
traps have been ordered and evaluated. Concern exists that air volume may not
be adequate. Investigation continues. Evaluation in CY160 seemed to be satis
factory with TripL trap, but additional experience in other courtyards will be
necessary to see how effective TripL trap is in highly wet air. Looking into
various air driers. Expect completion by 79-07-01. Missed date, still
evaluating driers. Local R/A for trailer-mounted filter/drier approved and
equipment ordered.
1i
(
, '
Proposed new ore unloading station will include means of screening trash
> DD D
OO
tt>
f6Oi>
DEPARTMENT ingot & properzi
, >1
Item and Brief Description 1. Excessive noise
i
,j '
ACTIVE INDUSTRIAL HYGIENE PROJECTS
RESPONSIBLE PERSON ted Randall
Status
'
1. Evaluation of muffled filter box burners completed at ATC. Sample mufflers to be shipped for evaluation. Evaluation at Rockdale complete. Mufflers effective but overly expensive. Inactive
2. Relocation of whistle at No.3 DC - Complete
3. Modification of operator cubicle at No.3 DC to provide sound damping appears feasible. However, muffling filter box burners is a more satisfactory way of reducing noise exposure. No action planned until results of exposure dosimeter survey are available. Survey scheduled week of 78-11-13. Results of dosimeter survey 78-11-13 through 11-15 indicated need for hearing'protection at No.3 DC but nowhere else in Bldg. 34. Shop order approved. Estimated completion 1979 December.
V
1 )1 .
1
T,
*'
.
ARD 001863
PARTMENT carbon p^ant ,*
em and Brief Description
Dust from belching of Carbon Plant precipicator
ACTIVE INDUSTRIAL HYGIENE PROJECTS
RESPONSIBLE PERSON
bill f.ckf.rt
Status
1. Implementation of Research Cottrell recommendations complete. Still had belching. Research Cottrell representative called in and he pointed out a few things needing attention. Unit performance improved. Long-range solution is to replace unit. Engineering on replacement in progress. Recent dusting is believed to be due to changes being made-will be complete May 6. System will be balanced at that time.'Balancing complete. R/A f.or $500,000 for replacement of the precipitator in Pittsburgh. If approved completion date 80-12-01.
Dust leaks .ia dense phase ore transport 1. Establish practice :to ' provide for rapid shutdown and repair of leaks - needs
system
/
further discussion
2. Ceramic elbow sections evaluated and approved - being installed on a replacement
basis ^ Complete.
_
,t'
ARD 0016164
DEPARTMENT ELECTRICAL ENGINEERING
Item and Brief Description
1. Carbon monoxide alarm not installed for plant air compressors that are used for breathing'air
ACTIVE INDUSTRIAL HYGIENE PROJECTS
' RESPONSIBLE PERSON burney iiowell
Status
'
1. Installation for monitoring only - complete 78-02-03
,
2. CO monitors are installed and operating in Bldg. 66, 27G, and 402. The shutoff valves for the portable compressors remain to be installed. They should be installed by 79-11-30'...
'i J w!
COMPLETED SAFETY & INDUSTRIAL HYGIENE PROJECTS
-I,
: II 1 'O
I l iM AMD P,RTF.P DILSaUITION
AUFA HP PI AMT ri:si'(v;s i f'.i i.nv
.V.TI<L\'
Chlorine respirators not available for emergency escape from area
Properzi
E. B. Parker T. J. Randall
No attempt to reduce air flow from plant air system (100 psi i 15 psi) being used to blow off pots and .superstructures
Plant Wide '
_ W. R. Smith
Electric fork t/uck no. 33-164 had non-approved
modification to overhead guard (from four post
to three post overhead guard)
s'
Ingot
Violation of respirators standards
Total Plant
'1
) .
v
-fLTnn)^npen-ing_above mixer not quarded
Asbestos exposure
'
Bldg. 127. Potrooms
W. D. Essary
E. B. Parker
l
\
D. L. Smith
F. H. Sutton
Pitch fumes from hot packing material placed on.green carbon in baking furnace pits
Carbon Plant
J. VI. Ilavins J. L. Roddy T. Williams
1. Respirators placed in area-eemipleie. 2. Training of dupu rimer.L cnordinaloi'S-
comp Ic-te. 3. Training of employees - complete.
1. Approved blowpipes issued and unauthorized pipes removed from service - complete.
2. Check material and design to eliminate pipe breakage- complete.
1. Overhead guards on all electric
,
trucks modified to be in compliance-
complete.
1.'Respirator program developed
2. Departmental coordinators trained
- complete.-
3. Program implemented- complete.
1. Install permanent guard - complete.
1. Asbestos-free siphon gasket' evaluation - complete.
2. Asbestos millboard - discontinued. 3. Discontinue use of compressed air
to blow out brake drums- complete,
1. Lengthen firing cycle in old furnaces when new furnace is in service complete.
2. Purchase new fluid coke boxes for old furnaces - complete.
ii.{
. ''w'
COMPLETED SAFETY & INDUSTRIAL HYGIENE PROJECTS
ITIM AND WIFI- PliSCR I IT IPX' (0) Dust from blowing off dock plates
(9) Dust front blowing off superstructures out for maintenance
(10) Inadequate .dust clean-up
<
(11) Dust-from bath crushing and handling
ARP.A 0I: PI ANT Pot rooms Potrooms Pot rooms '
Potrooms
, I'
7.
(12)cPrbon bouncing off trailers because of rough street and floors-(a)Milam St; between Bldg. 33 & ftm.4 (b)west passageways-(c)bumpers-on trailers (d)Carbon hugger at push-off station
Plantwide ...........
RliSRONS F. II. Sutton
D. L. Smith
F. H. Sutton E. Gaas
F. II. Sutton E. B. Parker E. Gaas
actht:
1. Chunge prat:I ice to provide fur cle.miiui of li.; C L phili.'S wi til lil'iivjl,. and shovels - complete
1. Establish practice of sweeping and blowing off supers true turns to minimize dust - complete.
1. Sweeping schedule modified and sweeper operators instructed to empty sweeper and shake bags more often - complete.
1. Sweeping done more frequently, but no immediate engineering solution to control dust has been found. Long range solution lies in replacin' bath crushing facility. In meanwhile 'equipment operators in bath crushing area have been issued Airstreamhelmets - complete.
S.J.Spell
A,B.$40,000 R/A for passageway floors
W.G.Johnson
& street repair complete
................_C.Start 79-4-14,complete
D.Start 79-4-14, complete
(13) Silica dust from brick saw being used by contractor
14) Need to identify areas of exposure to harmful air contaminants
Carbon Plant Entire Plant
T. Ilonmith
1. Material being cut was cardboard no silica problem - complete.
E. R. Goltra.HD 1. Sampling program implemented and
E. 0. Parker
is a continuing process - complete.
ARD 001867
. ' f ' *t> ,
_.
' i. % ' COMPLETED SAFETY & INDUSTRIAL HYGIENE PR0JEFR-
'
m
'`is- - V O'
.
_ HIM AND .BRIEF DESCRIPTION 5) Hypertension (high blood pressure) among
employees
6) Not enough parking palces and excessive speed in parking lot
7) Chlorine fumes from Ingot Plant furnace stacks
t
-t
i3) Blowing out potshel1s for patching
19) Dust at butt crusher
20). Pitch burns from dust leaks in A446 regenerators
AREA OF PI ANT
responsibility
ACTION
'
Entire plant
E. R. Goltra.MD 1, Dr. Goltra assists in hypertension control program through annual
physicals of all employees and
program is continuing - complete.
South Parking Lot A
W. D. Essary
1. Restripe parking lot and install speed bumps - complete.
Ingot Plant >
G. G. Owen T. J. Randall '
1. Minimize furnace fluxing through use of in-line metal processing A. Equipment has been installed at
No.3 DC B. Equipment has been installed at '
No.2 DC C. Mo plans to install equipment at
No.1 DC
Potrooms
D. L. Smith t
1. .Establish and.enforce practices of cleaning out with brooms and._. shovels. Use aii' to blow out cracks that can not be cleaned with -b.izooins and shovels - complete.
y Carbon Plant Carbon Plant
J. L. Roddy T. Williams
G. Johnson
1. Installation of new butt crusher complete.
2. Production equipment to be inter locked with dust collection equip ment by 1978-08-15. Complete.
1. Redesign of one regenerator complete Capacity and performance of edesigned unit greatly improved.
2. Two new regenerators to be placed in service in late April or May, Problems with units' insulation . have delayed their full use.
3. Improvements in system's operation have eliminated the problem. r.... 1 q h q
COMPLETED SAFETY & INDUSTRIAL HYGIENE PROJECTS
I TIM AND nUIF.r nTSCUIPTION
(21) Blowing dust from baked carbon on temporary conveyor
(22) Silica exposure during gunniting of flue wal Is
(23) Vehicle operating and maintenance program
<.' T
7
>.
'
(24) Inadequate clean-up of regenerated alumina spilled from A446 units and regenerators in Courtyards 58,60,62
> HJ
o
oo
00
0ID5
Alii:A OP PI.AMT Rodding Room
Carbon.Plant
Plant Wide
RPSI'OMSI 111 I.PIT
AiTIO.'J
G. Johnson T. Williams
1. Temporary convoyin' remove J , however blow-off was moved lo another area along new conveyor. SoluLi on Lo problem lies in improving effective ness of carbon cleaning machines. Work complete.
J. L. Roddy T. Williams
1. Personal exposure tests indicated occasional overexposure. Respirator use made mandatory. Complete.
2. Still have problem with skin irritatioi Barrier cream appears most effective protection. Complete.
T. J. Randal 1
1. Safety and Health Steering Committee
appointed sub-committee to develop
program for vehicle operation and
maintenance improvements. Sub-
.
committee has met and recommended -that
`Safety and Health Steering Committee
handle the matter. Complete.
Carbon Plant
D. L. Smith II. N. Mueller W. G. Henson
1. Evaluation of ice cream cart Tennant sweeper complete. Equipment did not perform as hoped, brooms and shovels still best way of cleaning up in tight spaces. Complete.
2. Evaluate small supersucker. Vacuum attachment fabricated and tried. Slow, but effective. Some modifi cations may be needed. Will be used in connection with manual methods.
Complete. 3. Coordination of waste removal
improved. Continuing attention required. Complete.
f
ITI-M AND BRIIT INSCRIPTION `8) Recognition brochures
COMPLETED SAFETY & INDUSTRIAL HYGIENE PROJECTS
AREA OF PI ANT ' RESPONSIBILITY
ACTION
4. Engineering looking at ways of reducin', wet beds. EE working on 4 zone con trol. ME looking at possibility of using potable water for sprays. This will reduce instances of dumping wet ore into the courtyards. Since clean-up is now considered adequate, project as originally stated is complete.
Plant Wide
J.J.Congleton
1. Printed and distributed by supervisors at departmental safety meetings. Complete 78-06-29
ARD 001870
____________________ _it_____ ____ Item and Brief Description
COMPLETED SAFETY & INDUSTRIAL HYGIENE PROJECTS
Area of Plant
Responsibility
Action
Dust from blowing off superstructures Potrooms when slipping jacks
.
Dust from blowing off cranes in
potrooms
/
,,j
Coal tar pitch volatiles exposure (Carbon Plant)
Potrooms Furnace Room
7 t4
Dust from ore belt transfer
points
,
'
. Service Dept.
H. McLaughlin E.. Gaas
i W.T.Eckert
E. B. Parker
t D.L.Smith'
1. Use of 30 lb. air to blowwoff is most effective way of cleaning found thus far. Ultimate solution lies in reducing ore spillage when filling ore bins. Since there is no other apparent solution to problem, item will be removed from the active list.
1. Vacuum cleaning not satisfactory. No other apparent solution. Item will lie removed from active list.
1. QSHA samples, indicated compliance. Alcoa
samples showed borderline results. Should
be retested after conditions stabilize.
Retesting complete. No overexposure
indicated - complete.
...
1. Improved dust collection designed and
complete.
-
ARD 001871
COMPLETED SAFETY AND INDUSTRIAL HYGIENE PROJECTS
-Item and. Brief Description
.
Action
3. Ditch Road - Detour A. Oil on raods bleeding B. Evaluate installing guard rail to prevent autos going into lake C. Fill in holes on bypass lake road D. Dust from the bypass lake road
To investigate and take appropriate action. Covered roads with slag, watered both morning and afternoon. Road detour removed 1979 February. Roads will be improved as weather and construction activity allow. Complete 1979 February. J.J.Congleton
4. Safety Billboards A. Temperature hard to read B. Cannot tell which dept, had Lost Work Day Case
Paint center needle red to help identify present termperature. When the Igith is turned on a 1& will be added to the number column for the dept, having suffered the
Lost Work Day Case - i.e.. Potlining 1M (H.N.Mueller)
5. Numerous low-profile type vehicles such as bicycles, scooters, payloaders, mowers, small tractors, and some fork trucks have been involved in several accidents and near-misses
in the last few years. One of the reasons is poor visibility. >
'
B-._Li.ghts on vehicles
.
Purchase 1,000 bicycle falgs of a bright orange color with green safety logo, ALCOA, and "Drive'Safely" printed on them. (1 ) 500 for in-plant use (2) 500 for employee sales-- Alcoa will share in the expense and offer them to employees at the reduced price of $1 each. (Promote off-the-job safety.) Complete
l
V
Vehicle lighting policy - complete
'
7. Lights from Room 134 that shine on street - one out of seven working
W.OJ 6618, 79 March 21 - Lights all working per E.- V. Patschke/Bob Thompson 79/3/23
8. North road curve is sharp and needs a reflective curve sign and relo cated further north
Sign ordered - P.0. 698984 (W.J.Davis) Complete
ARD 001872
>
JO o
-
'. .
oo .
05
N>
1 1
r. . >
COMPLETED SAFETY AND INDUSTRIAL HYGIENE PROJECTS
I tem and Brief Description
Action
39. Have Mr. Leonard Ring, Auckland, New Zealand, recognized interna tionally in the prevention and con trol of back injuries conduct lectures and tours for Rockdale
Back Control Program - February 26 to March 2
14 Safety Meetings with 1550 management & hourly employees-1 hour . 5 Management Meetings with 129 management employees - 2 hours ' 1 Engineering Meeting with 40 engineers & drafters - 2.5 hours Tours with superintendents of respective areas to look at material handling jobs.- - 14 hours . Community relations.andvspouses and friends lecture on Weds.,Feb.28 ' from 7:30-9:30 p.m. at Rockdale High School Auditorium-1.5 Mrs. Rotary Club - Rockdale, 20 people, 0.5 hours
Total People Attending - 1,778
.
Complete ,
.
14 Hrs. 10 Hrs. 2.5llrs. 14 Hrs.
1.5Hrs.
0.5!!rs
42.5 Hrs
40. Potline scrubbers plugged causing gas to fill up .east end, room 4
1t 41. Inadequate cleanup'of regenerated
alunjina spilled from A446 units and regenerators in Courtyards 58,60,62
Regarding potline scrubbers, mechanical maintenance is responsible for inspection,
cleaning and operation (Steve McFaull) Complete 1979-02-08
.
Evaluation of ice cream cart Tennant sweeper complete. Equipment did no perform as hoped. Brooms and shovels still best way of cleaning up in tight spaces. Complete. Evaluate small supersucker. Vacuum attachment fabricated and tried. Slow, but effective. Some modifications may be needed. Will be used in connection with manual
methods. Complete. Coordination of waste removal improved. Continuing attention required. Engineering looking at ways of reducing wet beds. EE working on four zone control. ME looking at possibility of using potable water for sprays. This will reduce instances of dumping wet ore into the courtyards. Since cleanup is now considered
adequate, project as originally stated is complete.
41. Bldg. 403 airslide crosses over stairway. This causes a head bumping hazard. Need some sort of warning device.
Painted for hazards - Complete (L.E.Tate)
ARD 001873
COMPLETED SAFETY AND INDUSTRIAL HYGIENE PROJECTS
Item and Brief Description
Action
2. Audio-visual lost work day review
3. Gasoline and diesel pump station main entrance to plant near walkway
4. Coffield junk truck hauling material not secured or tied down. Material has been observed having fallen off along roadside ..
Project complete. Shown at May 3 Plant Safety and Health Steering Committee meeting, (Dave Smith, Chris Stern, Nelson Mueller)
Present gasoline and di'esel pump station to be relocated. Suggested locations are: (1)vicinity of new vehicle repair shop (2) across from Properzi building (3) northeast of potroom Line 8. These proposals have been reviewed with R.P.McCracken, Pittsburg!) Fire Protection. Review with plant safety and health steering committee at 78-9-21 meeting. In the meantime, enforcement of our present rule prohibiting tank trucks from filling the underground tank at shift change will be emphasized. RFA approved in early December per W.D.Essary. Completed 79-11-02.
Jack Fry contacted Coffield regarding situation. Item complete.
. Purchasing of safety equipment at Stores trailer, particularly safety shoes,."is frustrating because one has to do-this after shift because of "emp-loyee--sales--hours---8-:-00=9-:-00-a,.m._ and 3:00-5:00 p.m. Monday 'thru Friday
Complete
ARD 001874
OMM.nTnn industrial iiygii-nr products
' I"Ti'M' AND BRU IHF DFSCRIPTION ' 11
-----A--R--F-A----O--F-- PI A. N. T --...--R--F--S-P--O--N--S--I-R---f-L-I-T--Y--
ACTION
(1) Chlorine respirators not available for emergency escape from area
Properzi
(2) No attempt to reduce air flow from plant air system (100 psi t 15 psi) being used to blow off pots and superstructures
Plant Wide
(3) Electric fork- truck no. 33-164 had non-approved modification to^overhead guard (from four post to three'post overhead guard)
(4) Violation of respirators standards
'
Ingot Total Plant
(5) Floor'/opening above mixer not guarded (6) Asbestos exposure , <
Bldg. 127. Potrooms
(7) Pitch fumes from hot packing material placed on green carbon in baking furnace pits
Carbon Plant
E. B. Parker T. J. Randall
W. R. Smith
W. D. Essary
E. B. Parker
t. 6. L. Smith F. H. Sutton
J. W. Havins J. L. Roddy T. Williams
1. Respirators placed in area-complete.
2. Training of department coordinators-
complete.
.
3. Training of employees - complete.
1. Approved blowpipes issued and unauthorized pipes removed from service - complete.
2. Check material and design to eliminate pipe breakage- complete.
1. Overhead guards on all electric trucks modified to be in compliance-
complete.
1. Respirator program developed 2. Departmental coordinators trained-
complete. 3. Program implemented- complete.
1. Install permanent guard - complete.
1. Asbestos-free siphon gasket evaluation - complete.
2. Asbestos millboard - discontinued. 3. Discontinue use of compressed air
to blow out brake drums- complete.
1. Lengthen firing cycle in old furnaces when new furnace is in service complete.
2. Purchase new fluid coke boxes for old furnaces - complete.
ARD
I.fr. M,| .<
COMPLETED INDUSTRIAL'"! rfGIENE PROJECTS
.
,/
ITEM AND BRIEF DESCRIPTION (
;) Dust from blowing off deck plates
.
AREA OF RIANT Potrooms
RESPONSIBILITY F. H. Sutton
ACTION
1.- Change practice to provide for cleaning of deck plates with brooms and shovels - complete
') Oust from blowing off superstructures out for maintenance
Potrooms
D. L. Smith
1. Establish practice of sweeping and blowing off superstructures to minimize dust - complete?.
0) Inadequate dust clean-up
Potrooms
- F. H. Sutton E. Gaas
1. Sweeping schedule modified and sweeper operators instructed to empty sweeper and shake bags more
often - complete.
1) Dust from bath* crushing arid handling j
... f >'
v
.
Dij-s-t-l-eaks--i-n_dense_phas.e__ore. transport
system
.;
`/
'
Potrooms Carbon Plant
F. H. Sutton E. B. Parker E. Gaas
\
1. Sweeping done more frequently, but
no immediate engineering solution
to control dust has been found.
Long range solution lies in replacing
bath crushing facility. In meanwhile,
equipment operators in bath crushing
area have been issued Airstream
helmets - complete.
'
D. L. Smith T. Williams
. 1. Establish practice to provide for raprd shutdown and repair of Teaks- -
complete. 2. Ceramic elbow sections evaluated and
approved - being installed on a replacement basis - complete.
13) Silica dust from brick saw being used by contractor
L4) Need to identify areas of exposure to harmful air contaminants
Carbon Plant Entire Plant
T. Hormuth
1. Material being cut was cardboard no silica problem - complete.
E. R. Goltra.MD 1. Sampling program implemented and
E. B. Parker
is a continuing process - complete.
T , V...
*, _ { COMPLETED INDUSTRIAL 11YGIENE PROJECTS
ITEM AND. BRIEF DESCRIPTION___________________ AREA OP PI ANT RESPONSIBTLITY
ACTION
(15) Hypertension (high blood pressure) among employees
(16) Not enough parking palces and excessive speed in parking lot
(17) Chlorine fumes from Ingot Plant furnace stacks
/
,,t
(13) Blowing out potshells for patching
r 1 74
4
Entire plant
South Parking Lot Ingot Plant
Potrooms
E. R. Goltra.MD 1. Dr. Goltra assists in hypertension control program through annual
physicals of all employees and program is continuing - complete.
W. D. Essary
1. Restripe parking lot and install speed bumps - complete.
G. G. Owen T. J. Randall
1. Minimize furnace fluxing through use of in-line metal processing A. Equipment has been installed at
No.3 DC B. Equipment has been installed at
No.2 DC C. No plans to install equipment at
No.1 DC
D. L. Smith 11
1. Establish and enforce practices of cleaning out with brooms and shovels. Use air to blow out
( - cracks that can not be cleaned with , brooms and shovels - complete.
ARD 001878
ITEM AND BRIEF :pESCRIPTION (19) Dusting at ore unloading
station
t
i 7
COMPLETED INDUSTRIAL HYGIENE PROJECTS
AREA
RESPONSIBILITY
ACTION
Services
Dave Smith
1. Investigate standardization of ore cars-complete
Not possible. 2. Investigate use of lean-to obtained from Pt.Comfort
to place against rail car during unloading. Does
not appear feasible. Complete 3. Investigate ways of keeping floor hoppers full to
_ avoid intermittent dust clouds when opening rail car
hoppers. Project is feasible,but has lav priority
' because of lew order of dust exposure. Complete.
4. Evaluate vacuum cleaning vs. sweeping in basement,
complete. Dust exposure significantly reduced by
vacuum cleaning. Permanent vacuum lines installed and
in use. Dust leaks in duct system have been repaired.
Complete.
. 5. Shop order for improved ore blending device (to
. minimize slugs of fine material in ore stream) has been approved. Installation complete. Equipment
. -performing satisfactorily. Complete.
6. Respiratory protection provided and people trained.
, Complete. 7. Investigate reducing volume of hoppers to reduce
dusting when unloading into an empty hopper. Wooden
--------------------------------------------------------------.prototype_constructed_for_evaluation. Prototype
awaited installation so long that it rotted and had
to be scrapped. 8. Cancel project. Technology in new facility will
resolve these problems.
COMPLETED INDUSTRIAL HYGIENE PROJECTS
ITEM AND BRIEF DESCRIPTION_______________ AREA_______ RESPONSIBILITY__________
ACTION
(20) Coal tar pitch volatiles exposure Press Room W.T.Eckert
1. Compliance testing of modified lube system-complete. Results still indicate overexposure. Respirator usage made mandatory for press operators. .
2. Area lias been retested. Results indicate marginal compliance with 0S1IA standard. Respirator use still recommended.
3. Engineering considering means of providing additional ventilation. Fabrication of roof cover openings complete. Ventilation complete.
4. Employees retested - awaiting results. 5. Results show compliance, respirator protection made
optional. 6. Retesting by OSHA 8/7/79. Results indicated .compliance
project complete
(21) Inadequate number of drinking fountains
Carbon-
7
W.T.Eckert
1. Survey made and additional fountains to be provided. Request for money to reinstall, fountain in Bldg.60 and to install 4 additional fountains, one on the east side of each furnace room has been submitted. Shop
[order approved, engineering in progress. New fountain installed in Bldg.62. New water line required for
60 (2), 62E, 58E - 79 March. Fountains have been installed in 64E and 160W. Cost estimate has been made on remaining fountains. Engineering has been requested to go ahead with the project. Project complete.