Document 103zO7vB21Qpdb8OLDV0Omvmj
MEMORANDUM
SUBJECT:
CLEAN AIR ACT INSPECTION REPORT Charter Steel, Cuyahoga Heights, Ohio
FROM:
Carlo Demma AECAB (MN/OH)
THRU:
Brian Dickens, Section Supervisor AECAB (MN/OH)
TO:
File
BASIC INFORMATION
Facility Name: Charter Steel
Facility Location: 4300 East 49th Street Cuyahoga Heights, OH 44125
Date of Inspection: April 23, 2024
EPA Inspector(s): 1. Carlo Demma, Physical Scientist (Env.)
Other Attendees: 1. Jay, Lawniczak, Senior Environmental Engineer, Charter Steel
Contact Email Address: lawniczakj@chartersteel.com
Purpose of Inspection: Evaluate electric arc furnace and ancillary equipment's fugitive emissions, baghouse capture, and operational procedures.
Facility Type: Steel coil and iron bar manufacturing
Regulations Central to Inspection: The facility is subject to the opacity rules of Subpart YYYYY-- National Emission Standards for Hazardous Air Pollutants for Area Sources: Electric Arc Furnace Steelmaking Facilities, which limit the fugitive opacity emissions to 6% on a six-minute average, and Charter Steel's Title V permit which restricts the periods of time during which the door at the west
Facility Name: Charter Steel Facility Location: 4300 East 49th Street
Date of Inspection: April 23, 2024
end of the melt shop is open more than 6 feet above grade for the shortest period of time practicable (both in duration and frequency) to allow scrap cars to enter or exit the melt shop, and specifies requirements for the analysis of Melt Shop baghouse dust.
Arrival Time: 9:25AM Departure Time: 1:15PM
Inspection Type: Unannounced Inspection Announced Inspection
OPENING CONFERENCE
Presented Credentials Stated authority and purpose of inspection Small Business Resource Information Sheet not provided. Reason: Not a small business Provided CBI warning to facility
The following information was obtained verbally from Jay Lawniczak unless otherwise noted.
Process Description: Charter Steel operates an electric arc furnace (EAF) to make coil and special bar quality steel (SBQ) products. Over 90% of the material charged into the EAF is scrap, the reminder of the material added is lime, coal, and other alloys depending on job order. Electricity is used to melt and produce a steel heat. Each heat can last about 50 mins until tap. After slag off and tap the heat is transferred to a ladle car which takes it to the Ladle Metallurgy Furnace (LMF) where the heat is refined to specific specialty grades. Charter Steel can typically do about 23-25 heats per day. The DEC baghouse controls emissions from the metal bath when the electrode is activated. The canopy baghouse controls fugitive emissions associated with charging and tapping inside the Melt Shop. Most heats (nearly 80%) are sent to the vacuum tank degasser (VTD) for further refinement. The VTD is not controlled, as it operates under vacuum, that is connected to a steam ejector. The steel ladle is tapped into the tundish which casts into four individual strands of 6X6 billet by 28 feet long. The semi-finished product can become SBQ or coil as job order demands.
Staff Interview: Facility personnel indicated to EPA that daily visible emission reads (VE's) are taken off the west side door. If the west side door becomes inoperable then the facility will perform USEPA Method 9 readings on every single heat, until it is fixed. Melt Shop baghouse dust reports are generated from a third-party recycler that Charter Steel uses to log chromium, magnesium, manganese, lead, zinc, and mercury content levels. The mercury levels were very low and nearly non-detect. As of March 2024, Charter Steel's production throughput was 600,647 tons (rolling summation).
TOUR INFORMATION EPA Toured the Facility: Yes
Facility Name: Charter Steel Facility Location: 4300 East 49th Street
Date of Inspection: April 23, 2024
Data Collected and Observations: During the tour, EPA monitored the Melt Shop for some time on the west side, but did not see any visible emissions emanating from the Melt Shop roof monitor. EPA did not perform Method 9 or Alt Method -082. EPA photographed the canopy pickup point at the top of the Melt Shop. EPA inspected the west side door for leaks, but did not see any VE's from the door. Later in the tour, EPA did note the presence of emissions emanating from the lower portion of the Melt Shop. Upon further inspection, the source of the emissions was determined to be a propped open door on the north side of the Melt Shop that led to a corridor which ultimately led to the Melt Shop's control room area. EPA then inspected the DEC's plenum pressure which read 10.5 inches/W.C. while in operation.
Photos and/or Videos: were taken during the inspection and are listed in Appendix A.
Field Measurements: were not taken during this inspection.
CLOSING CONFERENCE
Provided U.S. EPA point of contact to the facility
Requested documents: Daily VE reads from melt shop baghouse stack from the previous 3 months. Quarterly reports for all of CY 2023 and 1st quarter of 2024. Most recent stack test of melt shop baghouse. Production throughput for all of CY 2023 and 1st quarter of 2024. One year worth (April 2023 to April 2024) of Melt Shop dust analysis reports. A copy of the Scrap Management Plan.
Concerns: EPA stated that propping the door open is a concern as, it allows emissions to subvert the roof monitor and control equipment. EPA stated that the doors to the Melt Shop should remain closed.
DIGITAL SIGNATURES
CARLO
Digitally signed by CARLO DEMMA
Report Author: _D__E_M__M___A________-_05_'0_0_' ____________ Date: 2024.06.18 08:21:54
Section Supervisor:
BRIAN
Digitally signed by BRIAN DICKENS
_D__I_C__K__E_N__S_______1_3:_2_0:_1_2_-0_5_'0_0_' ______ Date: 2024.06.18
APPENDICES 1. Appendix A: Digital Image Log and Digital Video Log
Facility Name: Charter Steel Facility Location: 4300 East 49th Street
Date of Inspection: April 23, 2024
APPENDIX A: DIGITAL IMAGE LOG AND DIGITAL VIDEO LOG
Facility Name: Charter Steel Facility Location: 4300 East 49th Street
Date of Inspection: April 23, 2024
Inspector Name: Carlo Demma Archival Record Location: Enf_CharterSteel_OH_24_InspRpt
Image Number
1 2 3 4 5 6 7 8 9
File Name
IMG_0490.JPG IMG_0491.JPG IMG_0492.JPG IMG_0493.JPG IMG_0494.JPG IMG_0495.JPG IMG_0496.JPG IMG_0497.JPG IMG_0498.JPG
Date and Time (incl. Time zone and DST)
4/23/2024 10:38 4/23/2024 10:38 4/23/2024 10:51 4/23/2024 10:56 4/23/2024 11:00 4/23/2024 11:00 4/23/2024 11:13 4/23/2024 11:13 4/23/2024 11:13
Description of Image
West Melt Shop door West Melt Shop door_2
Charging EAF Charging EAF
EAF Melt EAF Melt Melt Shop canopy pickup Melt Shop canopy pickup_2 Melt Shop canopy pickup_3