Document 10342zRpJm9Ed3mDqoD0xgdVa
;* 91370:246(1) .
. r3 ^ ;
. * 2/21/68
in. TSD Process-Job List .
' ;
. ;y .
Priority
JOb
Capital Savings/Benefits
. EDO
1 '; V 2
Install heat exchanger on Project 5334 (app roved). Follow startup.
$8,0.00
Meet 1968 sales needs, insure $25,000 rate savings In 1968.
4/1/68
" ' Coordinate quality tests 6 ' Protect $5 M market in conjunction with PR3>
effort.
3/1/68 - .^
3 ' Make nitrogen blanket * -system operable.
$1,000
Quality -
.
4 Determine biphenyl loss-' 0 . Quality, minimize
es under various chlori-
losses '
.
nator conditions. Recom
mend conditions for 1968.
4/1/68
5/1/68 *
5
Design and install fume $7,000
Safety
removal system.
.'
6/1/68
6 Investigate possible
blend specification
changes!
.
0 ' Increase blend capacity 5/1/68 $l,000/yr in lab costs Raw material savings
7 . Check still operation
0 Quality
at pressure lower than
40 mm.
Evaluate level recorder
for still #2, install
If justified.
- ..
$1,500
Process control
' 4/1/68 *6/1/68
00
9
Evaluate liquid nitro-
TBD
Lower nitrogen costs
4/1/66
- gen supply system for
: . .
' Dept. 246/254.
'. .
'. . . .
'.. .
` '.
10
Evaluate automatic drum $200-
$20,000/yr labor sav-
flushing and drumming
300 M
ings and quality
. installation with new .
. improvement ,
building. ' '
11 ' . Evaluate equipping #1 . still with horizontal
* pump and boildown .facilities
$15,000 '
Increase distillation ' 1/1/70
capacity by 5 M lbs/ .
_
year
'
3in. -?6
STLCOPCB4071712
1. HEAT EXCHANGER
The spiral heat exchanger. Project 533,4', increases still capacity 10# by pre-heating the still feed from the blow tank. It was installed 5/18/68 and operated properly from 4/18/68 to 6/10/68 when it was shut down due to leaking gaskets. The heater was opened up and inspected by a factory representative; no faults in workmanship were detected. The gaskets were re placed 9/17/68, but a faulty steam trap and flow restrictions in the inlet line prevented proper operation. These problems were corrected and the heater worked successfully for a few days, but catalyst plugged the inlet line once again. The catalyst will be removed. However, with the addition of #5 and #4 stills, the increased capacity provided by the heat exchanger is not needed (yet).
2. QUALITY
Because samples of Aroclor from foreign competitors were analyzed to be of higher quality than Monsanto's, a concentrated effort was begun in 1967 to improve the stability of our own Aroclor. A goal of 0.10 maximum thermal chemical chlorides was set for 1242 Aroclor. Normal batch operation produced TCC levels of 0.50 average.
Based on lab findings that iodine co-catalyst reduces TCC level, four demonstrations were run in the plant batch equip ment using iodine. Unfortunately the lab results could not be reproduced in the plant.
PR & D then tested all plant sources of chlorine in the lab chlorinator. Except for Hooker chlorine, all sources pro duced Aroclor equal in quality to plant-produced Aroclor although poorer in quality to that produced using the lab's "bottled" chlorine. Aroclor made from Hooker chlorine yielded much higher TCC levels.
Because bromine levels are higher in Esterhazy-KCL, the bromine content of the snift gas is being monitored weekly. Bromine concentrations over 200 PPM are suspected of increasing Aroclor instability. Whenever the BR2 concentration reaches 200 PPM, the chlorination temperature is raised to 195C which nullifies BR2's detrimental effect.
PR & D's quality efforts are now centered on Aroclor (1242) produced in the continuous process. Initial results indicate thatthis process produces Aroclor with TCC levels around 0.20.
3^ OS'N
STLCOPCB4071713
3. MAKE NITROGEN BLANKET OPERABLE
Due to malfunctioning instruments on .9, 10 and 11
v storage tanks, a nitrogen blanket could not be maintained
.
over the finished Aroclor, protecting its quality. The
nitrogen blanketing systems were to be checked and corrected
before installation of the Airco liquid N2 supply system.
On 7/24/68 plant air was connected to the system in order
to detect the malfunctioning instruments. The problem was
diagnosed as three faulty Varec vents. Functioning properly,
the vents relieve tank pressure above 5 inches of water or
below 2 oz. vacuum. These vents were stuck open. They were
repaired and replaced by the instrument shop 10/4/68. Proper
operation of the system will be demonstrated whenever installa
tion of the liq. N2 supply system is complete. EDO H/l/68.
4. DETERMINE BIPHENYL LOSSES
Biphenyl losses in the Aroclor process result mainly from vapor loss In the off-gas. Brinks demisters eliminate most of the entrainment but material losses approach $30,000/yr when chlorination temperature is raised to 195C. This loss was nearly eliminated when the off-gas system from the batch process was tied in to the off-gas condensate tank in the new expansion. The off-gas is cooled and any organic material Is condensed and collected in the condensate tank. When sufficient material accumulates, it is reworked in a batch chlorinator. Since tie-in 9/4/68, several batches of 1248 have been produced from the off-gas condensate.
3. - FUME REMOVAL SYSTEM
An increase in the intensity of Aroclor and HC1 fumes
released at the chlorinator sample spots has created the need
for a fume removal system. The fume problem is a result of the
increased chlorination temperature. Tentative Amendment "D" -
Aroclor Process Description. The drumming station is also .
Included In this project.
`.
An Atlac 382 plastic ductwork and blower system was chosen; the fabrication was done by Hell Process Equip. Corp. The blower was oversized to accomodate the sampling spots at the new chlorinators. A $9750 estimate was approved 7/2/68 and the project package was submitted. 7/29/68. All Hell equipment was approved and delivery was 10/1/68. A field review was conducted with Planning and installation is scheduled for 11/1/68. A revised 'estimate ($2750), needed to cover increased labor and the stores overhead on the Hell equipment, is awaiting approval.
SW 311728
STLCOPCB4071714
6. -I-M--P---R--O---V--E- --;-B--L--E--N---D--I-N---G-----O---P--E--R---A--T--I-O--N---S--
p-
As part of Project 1800, CED is upgrading and improving Dept. A-246 blending facility. The project includes:
1) Providing a TTCB storage tank
.'
2) Converting #8 storage tank to #3 mix tank
3) Providing metering facilities for mix tanks.
These improvements will make TTCB readily available and Increase the probability of blending in-spec material on he first try. The operators can now set a Brodimatic meter to stop the flow to a mix tank whenever the proper volume of a component has passed. A chart is available which will
indicate the proper blend composition given the specific gravities of the two components to be mixed. Under present operation the operator must eyeball a float and chain type indicator to determine composition. Using this method much time is wasted adjusting the blend to correct specifications.
7. STILL VACUUM AT 40 MM Hg No justification for work.
`8. INSTRUMENTATION CHANGES
Three project packages for instrumentation changes have been submitted by R. Hydzik.
1) Chlorine Interlock System - The function of the
interlock system is to shut off the chlorine flow
to the chlorinator whenever a high temperature is
reached in the chlorinator body. At present, the
high temperature shut-off is' actuated when the air
. cooler exit temperature is too high. The present
system does not account for a recirculating pump
failure.
'
2) Level Recording Controller for #2 still.
3) Level indicator for product tanks.
DSW 311729
STLCOPCB4071715
9. LIQUID N2 SYSTEM
v To protect Aroclor quality. Dept. 246 'uses nitrogen to
blanket eight finished product storage tanks and the four new
porocel columns. Replacement of compressed N2 cylinders with
an Airco liquid N2 supply system will save $17,400/yr at a
560.000 SCF/Mo. usage rate. (This includes Dept. 254 at
300.000 SCF/Mo.) A^$0.32/100 SCF price differential between
revaporized and compressed nitrogen makes this savings
possible.
.
An $8100 estimate for the system was approved 8/12/68. The construction, given to CED as part of Project 1800, was begun 9/5/68 and completed 10/15/68. It consisted of installing a 19' x 12-1/21 x 1*.concrete pad, two gas meters and pressure regulators, a 250,000 SCF Airco tank and two air vaporizers, all enclosed by a four foot high fence.
The storage tank was filled with liquid N2 10/15/68, but due to leakage In the N2 lines around the meters the system has not yet been tied in. The leaks should be corrected by II/I/68 and proper operation of the blanketing system will then be demonstrated. Construction for completion of the pipeline connecting Dept. 254 will begin 11/1/68.
10. AUTOMATIC DRUM FLUSH No work.
11. #1 STILL HORIZONTAL PUMP No work.
DSW 311730
STLCOPCB4071716