Document 0qxMoqNwd0xDy16D1wb9jmQaR
90-M84 inter office memo TENNECO CHEMICALS, INC.
To J. T. Sweeney
At Flemington
From W. D. Bord
at Flemington
Subject VCM Control Report for the Period 6/3/78 to 6/9/78
Reactor Building Recovery Comp. Room General Area Pilot Plant Parshall Flume
VCM Average Level
0.4 1.4 0.4 0.3 1.4
Date June 20, 1978
Copy to
C. N. Brown* W. R. Fogelsanger D. M. Hershkowitz F. W. Kanzler F. S, Klopp R. A. Lojewski S. P. Robbins* P. D. Ruane M. K. Rosen C, F. Rothenbeck G. I. Rozand M. E. Wagshul R. J. Young
*Table III Only
% > 1 ppm
8.6
31.8 2.8 5.4
38.7
Number 100 ppm
2
0 4 0 0
The Reactor Building remained at a low level of 0.4 ppm.
The excursions greater than 100 ppm in the Weigh Scale Area were caused by a leaking charge valve on the weigh tank. Maintenance has corrected this problem. Excursions greater than 100 ppm in the West Lab was caused by the exhaust blower being shut off while VCM sample containers were being stored. Technicians have been instructed to leave the exhaust blower on during this operation.
Bendix IWA Analysis:
All classifications were below 1.0 ppm except for the vessel cleaners and they were protected by the use of breathing air.
WDB :ms
W. D. Bord
rEN 4599
W IO**
nteropp.cememo TENNECO CHEMICALS, INC.
To W. D. Bord
At Flemington
From P. D. Ruane
at Flemington
Subject VCM Control Report for the period 6/3/78 to 6/9/78
Date June 20, 1978
Copy to
C. N. Brown* W. R. Fogelsanger D, M. Hershkowitz F W. Kanzler F. S. Klopp R, A. Lojewski S. P. Robbins* M. K. Rosen C. F. Rothenbeck G. I. Rozand J. T, Sweeney M. E. Wagshul R. J. Young *Table III Only
Attached is a summary of the Flemington Plant VCM levels as determined by the Computerized Area Monitoring System for the week of June 3, 1978 to June 9, 1978.
PDR:ms
P. D. Ruane
rEN 4600
TABLE I FLEMINGTON AREA MONITORING SYSTEM
Weekly Summary
Period: 6/3/78 to 6/9/78
Number of Readings & Percentages
Area
Average PH4.VCM
Reactor Building
0.4
Recovery Comp. Room
1.4
General Area
0.4
Pilot Plant ^^Parshall Flume
0.3 1.4
Total
i
5
Samples N . 7o N % N
7675
659 8.6 100 1.3 9
1342
427 31.8 74 5.5 4
6710
189 2.8 84 1.3 21
5360
292 5.4 51 1.0 3
670
260 38.7 43 6.4 1
25 %
0.1 0.3 0.3 0.1 0.1
100 N1 2 0.03 00 4 0.1 00
00
4 kL/3
p. D. Ruane
TEN 4601
TABLE II
AREA MONITORING SYSTEM - FLEMINGTON Excursions 100 ppm VCM
Location
Reactor Bldg.
General Area
Reactor Bldg. General Area General Area General Area
Date
Time
6/7/78 6/8/78
1833 1650
6/9/78 6/9/78 6/9/78 6/9/78
0749 2119 2134 2304
Area
Weigh Tank Chip Basket Area
Quality Control Lab, West
Weigh Tank Chip Basket Area Tank Car Unloading Platform Tank Car Unloading Platform Tank Car Unloading Platform
Excursions
1
1
1 1 1 1
foJfrjio P. D. Ruane
TEN 4602
ri pMTN'nrr'f- TrMP.vi'rf.KTrn rvprcrTir a h-:c a r r.
CALCULATED FPOM BEr.'PI'-' MCN I TCP I MC DATA
0 6/03/7P TO C6/0O/7R
CLASS IF I CAT I CM
TT/A
TABLE XII
FOL'LTrOPMAM Lr AIP PCL^FCPMAM LC AIP SHIFT FODMAL D AIP SHIFT FCPMAM LtC AIP PEACTCP CFEr.-CHDC -V; AIP PEACTCP. CPEP-CHPG VC AIP PEACTCP CPLP-DUMPG V AIP PEACTCP OFEF.-EUHPG. VC AIP. PEACTCP OPEP.-PELIEF V AIP F.EACTCP CPEP-PELIEF VO AIP UTILITY OPEP V AIP UTILITY OPEP L'O AIP
r-lT>\r-C T' ('r'7^
.. ti.r
--i- -- - *;
-- f -- - - - w w *
VAPEHCV SEP AM - E AC G E17
RELIEF
w-*.-*
CP,E- P
.
PEP IF "LA'-'T t
>
-
. "x
. 1' .
.2 .3 .2 .3
/> (D
.2 * rj
c-
.6
A * <--
.7 .2 1.6 .p
.I 1 .0
Jfc AINTENANCE FCPMAU
MECHANIC. SHIFT HECHAMIC DAV BO I LET C ~ L P
. - - - - Cz rTCPELLL lAIL'TEf LUCE CLEPK ,
T' AID T.TC AIP -imciam-
GFCUF ,.LEADED EMCILEEP TECHMCLCGIST t?:ct,l I Cl At:
MAIM'? TLCHMICIA.L'
GELLPAL APEA
PILOT -PLAN?
F
TEN 4603