Document 0qnqVBwmK3doa557jMpB5xM4n

to: W. E..Roush, Finance D. w'. French, Plant Manager K. J. Whalen, DHQ Central Unit, HAC M. B. Jamin, DPE R. P. Shupper, GHQ H. T. Erode, Plant Engineer (2) J. A. Lawrence, I.E. Supervisor (2) H. F. Lloyd, Purchasing Agent C. G. Stelchek, Production Superintendent A. M. Curry, Quality Control Supervisor File: 3-11-2 rc*u !*tc PAINTED ID V.*.*. location Denison appropriation envision pipe obp*t nauc Transite Finishing ocp't no. 071 titlei Finishing Dust System Revision and Separate Collector for Mandrel Shot Blaster 1. PURPOSE: To provide finds for the purchase and installation of all new duct work and machine dust hoods for the Finishing End Dust Collector System, - and for a separate dust collecting system at the mandrel shot blasting station. / II. PRESENT FACILITIES: Since the time the Finishing Dust System was designed and installed, it'has undergone a number of modifications. Each new' extension or alteration has reduced the capacity of the system. As a result, it no longer provides adequate control in all areas. In addition, the shot blasting equipment is connected to the same network. This places a continuous load on the entire system even though the shot blasting operation is intermittent and does not require control air at all times. III. PROPOSED FACILITIES: To install all new ductwork and hoods on the Finishing End Machines and to install a new dust collector, fan and associated equipment at the shot blasting station. The new ductwork will be installed adjacent to the existing lines, thus allowing the transition to be made with a minimum.of machine downtime. Risers will be sized to maintain 5000 fpm air velocity and main headers will be sized for 4500 fpm. The shot blasting equipment will be disconnected from the main system and attached to a new and separate intermittent type cloth tube collector. '.(See Environmental Engr. - Dept. Repiort P32-7159 Denison Finishing Dust System) IV. VIII. IX. ESTIMATED COST: Capital Item Description 1. Ductwork & hood purchase . & installation 2 Shot blasting collector 3. Shot blasting collector installation Total Capital Expense Sales Tax ' Total Expense Sub Total Contingency Engineering TOTAL APPROPRIATION Cost $ 90;, 000 .8,000 ' 2,500 $100,500 $ 2,6002,600 103,1#00 9,900 10,500 $123,500 Life (Yrs.) 'Account 15 .- 2415 ' 15 2415 Systems 1112 Par.. # ' .5. ' .5 2415 62000 .5 ,S *' * .5j / V W.E.Roush', Mgr. Svcs. vwr DISPOSITION OF PROPERTY: Scrap OTHER INVESTMENT: None M.S.'Burton,' I.R. Mgr. BENEFITS OR SAVINGS: These proposals are necessary in order to provide Transite Finishing with an efficient dust control system. With the upcoming std. of 2 fibers/cc these revisions will be necessary for the Finishing Department operation to continue. TIME TO COMPLETE AFTER APPROVAL: 12 months LABOR & UTILITY REQUIREMENTS: Slight increase in power usage REMARKS: - ' 1. President's Bulletin #161. 4. Project was included in the 1973 CEP. 2. Job Order No. 6640. 5. Prepared by: J. A. Dukes, Industrial Engineer. 3. Budget addition is not requested. MU PftBPARCD O A-f c ItCCUCtTKO 12-19-72 APPROVAL *ll.L AUTHORIZE AN EXPENDITURE OPi $123,500 APPROVAL *- jjl.rit Prerich - Dl-:w - 2S Cr^Kil UnJLt - HAC M. TM. Jomin - 5N R. r. Shuppcr - 4N J. A*. Lawrence - DEN II, F. Lloyd - DEN C. G. Stelchek - DEN A. M. Curry - DEN . APPROP. NO.: U26-EC-632 DATE OF: . Orig. approval 1/31/73 Original expir 6/30/74 .Proposed expir 4/28/75 Localjuu Denison m . REQUEST FOR TIME EXTENSION ON APPROPRIATION__________ Form AR-2 Division Pipe' Dept. Name Transits Finishing Dept. No. 071 Reason for request: Time extension is required to 'complete the installation of the UCL line replacement dust system fan.- The-fan.is -scheduled to ship in January 1975. J/ 'i lx Capital Contingency Engineering Tax S/ dUDOdl L.> Amount approved Lo dare Total paid & committed Funds avail, to complete Estimated final CCS 3 .............. ... ....... 110,400 0 10,500 -2,'600 ' 110,253 0 0 457 147 o -10,500 2,143 116,000 0- '0 . '600 V Prepared by: Date: _____ ,_________ -. : p* Kline^^Ny/^Vw^ . 9/26/74 -^ Approval , } (r /7 A4a Date Approved #1 Time Extension APPROPRIATION APPROVAL CHECKLIST APPROPRIATION REQUESTS REQUIRING PRESIDENT S APPROVAL REFER TO SYSTEMS 3419 FOR REQUIRED APPROVAL LEVEL TITLE Approp. Request No.. 026-EC--632 ~pa7e T(T/2 2jl A NAME INITIAL DATE Pill SIDENT (To S4Q0.000 total & $300,000 capital portion) EXCCUTIVE V.P. FINANCE & ADMINISTRATION (To S200.000I SENIOR V.P. PRODUCTION & ENGINEERING (ToS75.000) SENIOR V.P. CORP. MARKETING (over S50.000 with sales forecast) Dir&ctor of Env. Eng.iTosso.oooi V.P. OF J-M CORPORATION (ToS35.000) J. E. Hesse D. E. Hillier i0 <frd /ihz- / DIVISION GENERAL MANAGER (To S25.000I DIVISION PRODUCTION MANAGER OR (ToS2,000) RESEARCH DIRECTOR OR (To S2.0001 DIRECTOR GENERAL SERVICES OR 'ToS2.000' PLANT OR MINE MANAGER (ToSI.000) Form AR-8 (7/74J \i l 1 - j I i ( % At t nvt ma 11UN1^^J1UIULA I lUN t rotii mo. Cer--ence: Pros. Bull, 161 Efcrc. Bull. 31-27 Systems 3419 Check one: Division) ____________14 po____________ Plant: Donison Sub-part not exceeded Sub-part exceeded Ptoj.el 7 'll.- finishing End Dust Control System :DPE Pr P32-7159 Modification No.: 1 Chock one classification: Low estimate, escalation or omission . Change under $5,000 .. . Change $5,000 - $10,000 a Change $10,000 - $20,000 Change over $20,000 Description and icosons for modification. Explain fully. ED a It is required to spend contingency funds approved for this project. The west finishing end dust control system exhaust fan is not performing to required specifications. This fan is original equipment purchased and installed in 1957 under another project. It is inadequate for the new system. It is necessary to replace this fan with a new unit to meet the required dust control standard. The MOA lathe dust hood will , be modified to duplicate the existing Stockton plant arrangement. This modification will permit the use of approved contingency funds to accomplish the above. f * ,s -` Order of Approval, and then Return to Departmen t Clerk, DPE Signature J' Date J Jr.-pf ur.p J. Goldfield .s-f if IV//-?& i/4 >IR. PI T. FKirtf? D' E` Hilller - .. ` ' :I /. i r/ IV. Fur,R. _ E. J. Mitchell ff " ' * IV. PROD. MGR. W* A- Sells /'V </?'' >iv -fn wcr. ER. V.P. . Est. chonge in cost of this request (Increase) (32X&Cofrc) Amount previously approved for item(s) modified bv this reauest Pace amount of approved appropriation S 9,900 $ 100,500 5 1-23,500 Revised estimate J123,500 Originotod By: J. p. Kline'O*? Y-L_i .V\ -d> Dot.: 7/24/74 DISTR.: Orig. -- Finance Mgr. \ l F vLloyd / French^ cc: OCRDE D. Roth '.P. FOR PROD. l-'or readjustment of approved funds and for job orders affected, see reverse side. PERFORMANCE DATA FINISHING END DUST SYSTEM - WEST Fan Model CF11 Inquired CFM Attained Design Pressure Actual Pressure Design Ductwork System Resistance Actual Ductwork System Resistance Motor HP ' Design HP Actual HP Fan RPM1 .Ap Collector Start-Up ' 1957 Westinghouse 404OB 35,000 41,000 13.5" 11.5" - 8.1" 100 91.8 75 1,735 2" Start-Up T974 After Installation ' ' of Inlet Vai 53,800 41,550 15.75" . 7.8" mm 53,800 41,550 15.75" 8.1" 9.75" 9.75" 6.6" 7.4" 150 167 94.5 150 167 "94. 1,910 1,910 1.2" 1.9" Finishing End Dust System Financial Status Capital Tax Engineering Contingency Total Approved AR $100,500 2,600 10,500 9,900 $123,500 Capital Approved Spent or ccrr.itted to date Unspent capital Estimate Required to complete project $100,500 99,000 1,500 $ 9,900