Document 0qnqVBwmK3doa557jMpB5xM4n
to: W. E..Roush, Finance D. w'. French, Plant Manager K. J. Whalen, DHQ Central Unit, HAC M. B. Jamin, DPE R. P. Shupper, GHQ
H. T. Erode, Plant Engineer (2) J. A. Lawrence, I.E. Supervisor (2) H. F. Lloyd, Purchasing Agent C. G. Stelchek, Production Superintendent A. M. Curry, Quality Control Supervisor
File: 3-11-2
rc*u !*tc
PAINTED ID V.*.*.
location Denison
appropriation
envision
pipe
obp*t nauc Transite Finishing ocp't no. 071
titlei Finishing Dust System Revision and Separate Collector for Mandrel Shot Blaster
1. PURPOSE: To provide finds for the purchase and installation of all new duct work and
machine dust hoods for the Finishing End Dust Collector System, - and for a separate dust
collecting system at the mandrel shot blasting station.
/
II. PRESENT FACILITIES: Since the time the Finishing Dust System was designed and installed,
it'has undergone a number of modifications. Each new' extension or alteration has reduced
the capacity of the system. As a result, it no longer provides adequate control in all
areas. In addition, the shot blasting equipment is connected to the same network. This
places a continuous load on the entire system even though the shot blasting operation
is intermittent and does not require control air at all times.
III. PROPOSED FACILITIES: To install all new ductwork and hoods on the Finishing End Machines and to install a new dust collector, fan and associated equipment at the shot blasting station. The new ductwork will be installed adjacent to the existing lines, thus allowing the transition to be made with a minimum.of machine downtime. Risers will be sized to maintain 5000 fpm air velocity and main headers will be sized for 4500 fpm. The shot blasting equipment will be disconnected from the main system and attached to a new and separate intermittent type cloth tube collector. '.(See Environmental Engr.
- Dept. Repiort P32-7159 Denison Finishing Dust System)
IV.
VIII. IX.
ESTIMATED COST: Capital Item Description
1. Ductwork & hood purchase
. & installation
2 Shot blasting collector 3. Shot blasting collector
installation Total Capital
Expense Sales Tax ' Total Expense Sub Total Contingency Engineering TOTAL APPROPRIATION
Cost
$ 90;, 000 .8,000
' 2,500 $100,500
$ 2,6002,600
103,1#00 9,900
10,500 $123,500
Life (Yrs.) 'Account
15 .- 2415 ' 15 2415
Systems 1112 Par.. # '
.5. ' .5
2415 62000
.5
,S
*' * .5j / V
W.E.Roush', Mgr. Svcs.
vwr
DISPOSITION OF PROPERTY: Scrap OTHER INVESTMENT: None
M.S.'Burton,' I.R. Mgr.
BENEFITS OR SAVINGS: These proposals are necessary in order to provide Transite
Finishing with an efficient dust control system. With the upcoming std. of 2 fibers/cc
these revisions will be necessary for the Finishing Department operation to continue. TIME TO COMPLETE AFTER APPROVAL: 12 months
LABOR & UTILITY REQUIREMENTS: Slight increase in power usage
REMARKS:
-
'
1. President's Bulletin #161.
4. Project was included in the 1973 CEP.
2. Job Order No. 6640.
5. Prepared by: J. A. Dukes, Industrial Engineer.
3. Budget addition is not requested.
MU PftBPARCD O A-f c ItCCUCtTKO 12-19-72
APPROVAL *ll.L AUTHORIZE AN EXPENDITURE OPi
$123,500
APPROVAL
*- jjl.rit Prerich - Dl-:w - 2S
Cr^Kil UnJLt - HAC M. TM. Jomin - 5N
R. r. Shuppcr - 4N
J. A*. Lawrence - DEN II, F. Lloyd - DEN C. G. Stelchek - DEN A. M. Curry - DEN .
APPROP. NO.: U26-EC-632
DATE OF: . Orig. approval 1/31/73
Original expir 6/30/74
.Proposed expir 4/28/75
Localjuu Denison
m
.
REQUEST FOR TIME EXTENSION ON APPROPRIATION__________
Form AR-2
Division Pipe'
Dept. Name Transits Finishing
Dept. No.
071
Reason for request:
Time extension is required to 'complete the installation of the UCL line replacement dust system fan.- The-fan.is -scheduled to ship in January 1975.
J/ 'i lx
Capital Contingency Engineering Tax
S/ dUDOdl L.>
Amount approved Lo dare
Total paid & committed
Funds avail, to complete
Estimated final CCS 3
..............
... .......
110,400 0
10,500 -2,'600
'
110,253 0 0 457
147
o -10,500
2,143
116,000 0-
'0 . '600
V
Prepared by: Date:
_____ ,_________ -. : p* Kline^^Ny/^Vw^ .
9/26/74
-^
Approval ,
} (r /7
A4a
Date
Approved
#1
Time Extension APPROPRIATION APPROVAL CHECKLIST
APPROPRIATION REQUESTS REQUIRING PRESIDENT S APPROVAL REFER TO SYSTEMS 3419 FOR REQUIRED APPROVAL LEVEL TITLE
Approp. Request No.. 026-EC--632 ~pa7e T(T/2 2jl A
NAME
INITIAL
DATE
Pill SIDENT (To S4Q0.000 total & $300,000 capital portion)
EXCCUTIVE V.P. FINANCE & ADMINISTRATION (To S200.000I SENIOR V.P. PRODUCTION & ENGINEERING (ToS75.000) SENIOR V.P. CORP. MARKETING (over S50.000 with sales forecast)
Dir&ctor of Env. Eng.iTosso.oooi
V.P. OF J-M CORPORATION (ToS35.000)
J. E. Hesse D. E. Hillier
i0 <frd
/ihz-
/
DIVISION GENERAL MANAGER (To S25.000I
DIVISION PRODUCTION MANAGER OR (ToS2,000)
RESEARCH DIRECTOR
OR (To S2.0001
DIRECTOR GENERAL SERVICES
OR 'ToS2.000'
PLANT OR MINE MANAGER (ToSI.000) Form AR-8 (7/74J
\i
l
1 -
j
I
i (
%
At t nvt ma 11UN1^^J1UIULA I lUN
t rotii mo.
Cer--ence: Pros. Bull, 161 Efcrc. Bull. 31-27 Systems 3419
Check one:
Division)
____________14 po____________
Plant:
Donison
Sub-part not exceeded Sub-part exceeded
Ptoj.el 7 'll.-
finishing End Dust Control System
:DPE Pr
P32-7159
Modification No.:
1
Chock one classification: Low estimate, escalation or omission .
Change under $5,000 .. .
Change $5,000 - $10,000
a Change $10,000 - $20,000
Change over $20,000
Description and icosons for modification. Explain fully.
ED
a
It is required to spend contingency funds approved for this project.
The west finishing end dust control system exhaust fan is not performing to required specifications. This fan is original equipment purchased and installed in 1957 under another project. It is inadequate for the new system. It is necessary to replace this fan with a new unit to meet the required dust control standard. The MOA lathe dust hood will , be modified to duplicate the existing Stockton plant arrangement.
This modification will permit the use of approved contingency funds to accomplish the above.
f
*
,s
-`
Order of Approval, and then Return to Departmen t Clerk, DPE
Signature J'
Date
J Jr.-pf ur.p J. Goldfield .s-f if
IV//-?&
i/4
>IR. PI T. FKirtf? D' E` Hilller
- .. ` ' :I /. i r/
IV. Fur,R. _ E. J. Mitchell
ff " '
*
IV. PROD. MGR. W* A- Sells
/'V </?''
>iv -fn wcr. ER. V.P.
.
Est. chonge in cost of this request (Increase) (32X&Cofrc)
Amount previously approved for item(s) modified bv this reauest
Pace amount of approved appropriation
S 9,900 $ 100,500 5 1-23,500
Revised estimate
J123,500
Originotod By: J. p. Kline'O*? Y-L_i .V\ -d>
Dot.: 7/24/74 DISTR.: Orig. -- Finance Mgr.
\
l
F vLloyd / French^
cc: OCRDE
D. Roth
'.P. FOR PROD.
l-'or readjustment of approved funds and for job orders affected, see reverse side.
PERFORMANCE DATA FINISHING END DUST SYSTEM - WEST
Fan Model CF11 Inquired CFM Attained Design Pressure Actual Pressure Design Ductwork System
Resistance Actual Ductwork System
Resistance
Motor HP ' Design HP Actual HP
Fan RPM1
.Ap Collector
Start-Up ' 1957
Westinghouse 404OB 35,000 41,000 13.5" 11.5"
-
8.1"
100 91.8
75
1,735
2"
Start-Up T974
After Installation ' ' of Inlet Vai
53,800 41,550 15.75" . 7.8"
mm 53,800 41,550 15.75"
8.1"
9.75"
9.75"
6.6"
7.4"
150 167 94.5
150 167 "94.
1,910
1,910
1.2"
1.9"
Finishing End Dust System
Financial Status Capital Tax Engineering Contingency
Total Approved AR
$100,500 2,600
10,500 9,900
$123,500
Capital Approved Spent or ccrr.itted to date Unspent capital Estimate Required to complete project
$100,500 99,000 1,500
$ 9,900