PEH-123 August 8, 1979
Mr. Bill Stewart, P. E. Executive Director Texas Air Control Board 8520 Shoal Creek Boulevard Austin, Texas 78758 Dear Mr. Stewart: The Celanese Chemical Company, Inc., at Bishop Texas, plans to demolish a building containing piping covered with friable asbestos insulation. There is about 860 linear feet of piping ranging in size from 2-inch to 6-inch dia meter. All of the pipe is covered with the insulation. This pipe demolition will begin about August 27, 1979. The insulation will be removed as the first step, and landfilled in the designated asbestos landfill located on the Plant Site. All the precautions in 40 CFR 61.20-61.25 will be observed. This letter will serve as notification of this work as required by 40 CFR 61.22 (d) (2). The attached data sheet lists all of the pertinent data. Please contact me if you have any questions or comments. Very truly yours.
r. r,. nine Plant Manager PEHrbt
002233
CELANESE CHEMICAL COMPANY. INC. BOX428. BISHOP. TEXAS TELEPHONE 512--584-3511
NOTIFICATION INFORMATION - DEMOLITION
I. II. III.
IV.
V. VI. VII. VIII.
Owner: Celanese Chemical Company, Inc.
Address: P. 0. Box 47320 1250 W. Mockingbird Lane Dallas, Texas 75247
Description:
Remove friable asbestos insulation from about 860 linear feet of pipe ranging in size from 2-inch to 6-inch diameter. Then remove pipe and support structure.
Address of Site:
Chemcel Plant Celanese Chemical Company, Inc. P. 0. Box 428 Bishop, Texas 78343
Starting and Completion date: Start-August 27, 1979 End - October 15, 1979
Nature of Demolition: See III above.
Procedures:
Wet insulation thoroughly, strip off insulation, pack in plastic bag, landfill in registered (on-site) land fill.
Landfill Site: Texas Department of Water Resources Registration #30084
002234