Document 0qGZN2GMgy7qvwDQ7ZB0LE0Rm

i I _________ NIW$ L8TTIU, JULY 1*73 BUY -- Guyod Stacks Rovisod Recently, failure occurred is Vie" diameter steel trend guy wire i the field-fabricated termination where the etrand ei beat trouad a thimble. Terminating eteel strand by beading around a thimble ehould be diecoatiaued until the eauae of the failure hae been determined. If aied etrand ie uecd. it ehouJd be terminated by ueiag open etrand sockets. Terminatiooe requiring thimblee for eteel etrand have been deleted from B11Y. The uee of preformed ruy gripe hae aleo been euepeaded pending investigation. The term*natione for wire rope are acceptable ae ahowa in the etandard. The A & C Section, Design Diviaioa, Engineering Department, hae initiated a teat program to determine the cause of failure. All plant* having tuck guy* of eteel etraad with thimble and dip or preformed guy grip termiaadoae ehould make a viaual inspection of the cable termination for damage. Any that ate found defective ehould be re placed using the eocket method. Consultation on atack guy problems or inspection ehould bit referred to the appropriate AAC Section Supervisor. It would be appreciated if all tuck guy failures we're reported to A A C Design. Other minor revisions have been made to BUY for clarification. When the testing program in completed, the standard will he reviewed and, if appropriate, use of the deleted terminations for eteel etrand will be reinstaled. April 1959 -- that's when our "old friend" firii appeared In the News letter. Since that time, he hoi been busy keeping up with the developments in the standards thot hove occurred In these post U year*. This will be ha lost appsarancs. Ho retiree with this issue. Whirs Wo Art - Asbestos Insulation Substitutes In April 1972, Cod* 502, Insuladag Omeui and Code 502.1, Insulating and Finishing Cement were revised te indude only aebeetoe free materials (tat SN500M). Included b> the May 1973 ie--e was a revision to Engineering Material Specificstion.SNIOOM. Preformed Bloeh and Pipe. This specification now isdudee only eibeeeoe-free inhibited and uninhibited ealdam-itteatt insulation for Code# 102 and 102.1. Tha maaafoctnrera' new materials were validated by the Procam Insulation Subcommittee after oa-aite evalua tion and estndve testing at foe Engineering Tern Center. Suitable asheetowbee replacement products for Cade 130, Asbestos Board and Code 715, Aabmtoa doth are under development by maanfoctarm and are being re viewed and tested by foe Company. The replacements/ these two products will aUmiaate all of the malerial* in foe in--In- don standard* which coaid create as asbestos duet problem. ____ __ ____ STANDA(OS ttSuibtN JtKY INCtUOINO OSHA WtOVWtONS : ,2S: B9Y, DE10C S24B, SSG, SW20-3W, SW20.22W j, In heaping with tha times, he Is being replocad by two ycung men -- both eager to loom end to absorb oil ol tho Information covered by the etandorde. They will appear from ttme-to-time In the New* lener - discovering thot - It's in the Standards DUP 0903240 SC-DP-04380