Document 0q3JOjrExQ2owOZZGnxNMz4O

ETHYL CORPORATION INTER-OFFICE 1$ PLAINTIFFS^ || I. r EXHIBIT RTrO-441 1 1 To Mr. W. D. Gottwald Address Richmond From D. B. Crawford Subject Engineering Contract Address Baton Rouge Date November 24, 1969 Attached is the original signed copy, along with "Advice of Contract Clearance" and "Request for Authorization" of the following contract: Barnard & Burk Industrial Corporation 11-21-69 This will complete your Engineering department contract file to date. dw attachments D. B. Crawford bcc: Messrs. J. W. Fleniken C. A. Kyle G. S. Roberts F-08646 ETHYL CORPORATION Advice of Contract Clearance Division or Department Engineering __________ Contract Date Nov. 21, 1969 Location_____ Ba>on Rouge Contract Number (If any) Contractor (Individual or Corporation) Barnard & Burk Industrial Corporation Description (Brief Outline) Revision to hourly rate schedule for engineering work performed in Contractor's offices. A. Reviewed and Cleared by: Not Required. ______Name or Initial_____ Date Law ______________________________ _________ Patent (if required) ______________________________ Finance: Tax ________ Insurance ______________________________ Cash Control NOTE B. This contract does not require specific clearance under Section V of Contract Procedure, since it is a "standard" or "simple, routine" contract. /I, 6 Div. or Depty/Contract Administrator's Initials Date Note: After clearance has been completed, the department or division contract administrator will forward this form attached to the appli~ cable contract to the Corporate Contract Administrator for his records. E-08647 ETHYL CORPORATION INTER-OFFICE To Dr. G. F. Kirby Address From Subject G. $. Roberts Monpower Contract - Barnard & Burk Address Date Tower Tower November 7, 1969 This is to request approval to modify the Engineering department's "evergreen" contract with subject company in accordance with the attached letter. This increase in hourly rotes will apply only to services performed in their offices, effective January 1, 1970. Their request is reasonable on the basis of current economic con ditions, and the increased rates will result in little or rto cost increase to Ethyl since we rarely exercise this particular contract option, most of our work being done "in-house". /id cc: Mr. T. M. Smylie G. S. Roberts F--08648 BARNARD AND BURK INDUSTRIAL CORPORATION MAYFAIR DRIVE -- PARK FuAZA OX 1SA BATON ROUGE, LOUISIANA 70615 0 October 8, 1969 Mr. G. S. Roberts Ethyl Corporation P. 0. Box 341 Baton Rouge, Louisiana Gentlemen: Although costs have been escalating at an ever increasing rate in recent years, we have held the line with our hourly rate schedule for engineering work performed in our offices since January 1965. Regretfully, we find we must request an adjustment to these rates commencing on January 1, 1970. We, therefore, propose that our contract with you dated December 13, 1968, will be amended to reflect the indicated rate changes for the following classifications: CLASSIFICATION - HOURLY RATES Project Engineer Department Head $16.00 Senior Engineer Section Head Survey Coordinator $14.50 Engineer Checker Senior Designer Specification Writer Estimator $11.00 Designer Senior Draftsman $10.00 Junior Designer Draftsman $ 7.00 F-08649 Mr. G. S. Roberts October 8, 1969 Page 2. CLASSIFICATION Stenographer-Clerk Party Chief Instrumentman Rodman Chainman HOURLY RATES $ 5.00 $ 9.50 $ 7.00 $ 5.75 $ 5.75 If you wish to discuss these proposed adjustments, we will be happy to meet with you. If not, will you please indicate your acceptance by signing and returning one copy to this office. Very truly yours. BARNARD AND BURK INDUSTRIAL CORPORATION FK/eg Enclosure ACCEPTED AND AGREED TO THIS BY: -r _ DAY OF & E--08650