Document 0kwwxR5YEMbaEBR8gyxo3nxn
I 0=
EMPIRE SOILEI
by
trj~'j.Lu.4.1Iv'iarr,3')ru, ,i;k-
'
Installation - Operation
and
Maintenance Manual
_ .. .... ...
.......FOR
' TYPE O-GS-E GAS FIRED BOILERS
APPROVED BY AMERICAN G~AS ASSOCIATION
ft--:
i: it"r-
fc.-,V
fxi
Sr'A
Li v;T*?,
Notice io Installer and Operator This Booklet Must Be Affixed to or Placed in Suitable Pocket on the inside of the Access Panel
iMESZCAIT
' < ' ` -f
First in. b eating.. . flrst'So pl'.mbin^
i if Q Oyief
19157
empire: boiler
A-v-mcA-v
TYPE O-GS-E o
,'fc
?
19158
(^EMPIRE boiler
A mum cam
TYPE O-GS-E l
ERECTING
Location
If water condition is encountered in bnement, or if it has been ` necessary to water-proof the basement flooi^boiler should be mounted - on concrete or hollow tile base at least 3 ir.rhes above floor level.
Testing
Before connecting boiler, plug openings 5>r testing. Flanged open-
` ings can be closed by using flanges provifed on Low Water Cutoff
and Gauge Glass Piping with openings fugged. Fill boiler with
water and subject to not less than 10 lb. normore than 30 lb. pressure.
Inspect boiler inside and outside for leakage to insure against break-
: age from handling and shipping. To safeguard accuracy of gauge sup-
- ~ plied with boiler do not install gauge unfi after test of boiler. This
/ precaution of testing the boiler will simpHy handling of any neces
sary replacements or adjustments and assitf in treating claims against
transportation companies. After test, drans and remove plugs where
: required. Remove plugs and. replace flaiges on Low Water Cutoff
' ,:and Gauge Glass Piping.
Assembly of Platework and Controls
r T1. Position boiler section assem-
-r 'blage so that removable cleanout
' plates are accessible for periodic
r cleaning.
2. Remove outer nut from front
of upper tie rod, then loosen all other
: tie rod nuts until they are finger-
tight only.
.. : 3. Install metal backed insulation
; plate at front of boiler and fasten in
-jJ`;7?S<place with outer nut from upper tie
^.^r^rodl See Fig* 3. Attach terminal
block and number-series plate to in-
d'LL'Vi sulation plate with sheet metal
d : screws.
r 'i
"
Rod Nuts 3. Cleanoul Cover " '
2. ftfltyGroove
Elates
Fta. I--Sect' .:' Assemblage
S -V .
-J
19159
2 EMPIRE BOILER
American
TYPE O-GS-E
4. Attach low water cutoff and gauge glass piping assem blies to boiler. Assemble the working mechanism to the low water cutoff with gasket and screws (This mechanism is furnished in separate pack age). Fig. 2, shows complete assemblies. Fig. 3, shows these assemblies attached to boiler.
5. Assemble the water gauge glass trim to the gauge glass pipe and attach the steam gauge as shown in Fig. 3.
t. Low Water Cutoff
2, Gauje Glass
Fie. 2--Low Water Cutoff and Steam Trim Assemblies
6. Fill putty groove around top of sections with boiler putty then place can' opy so that turned-down edges are firmly imbedded in putty to make gas seal. Smooth off excess putty.
; 7. See that air shutters are assembled on mixing tubes, then seat burners firmly on
tapered ends of mixing tubes. Place burner with pilot , bracket and attachments and mixing tube assembly in left side of combustion chamber
' with lugs on the mixing tube resting on the support cast on center section. Place remain ing burner and mixer assem bly in right side of combustion chamber.
7. Steam Trim Assembly
. Fig. 3--Steam Trim Assembled
8.' ' See that orifice spuds in ends of spud holders or burner cocks are screwed in tight and that orifices are drilled to size specified on ?tag. attached to manifold. Place manifold and piping assembly inposition with ends of burner cocks or spud holders pushed firmly "into tapered holes of mixing tubes, then attach manifold brackets to front section with 5/16 inch round head screws.
19160
u empire boile*
Be sure arrows on auto matic gas valve, gas pres sure regulator and BASO automatic pilot valve point in direction of gas flow. Connect steam con trol element of automatic gas valve to tee fitting on steam gauge piping with ,5/16 inch copper tubing and connections. Remove plug and fill tubing with .water before starting boiler.
/ V.U
.... :. ,
1. Copper Tubing 2. Steam Control
Element 3. Automatic Gas Valve
4. Burners 5. Manifold Brackets 6. Manifold
Fie. 4--Bursters and Control Piping
9. Install manual shutoff valve assembly in gas supply line as
shown in Fig. 9.
.
u-. ' r
. .*_f **
\^rux* line
-i
Ij RETVSN TAPPtNO,
- * ...^r.'V.
-.. I?' tr . : v- W - -'
- ,. ,..., ',;.: Vr ' ".-' -
a'
i*
> Fic. 5--Cross Section Through Combustion Clumber
;'. -! r:
^- V'.. - - . =;-
J-
19161
iI 4 EMPIRE BOILER
American
Connecting Control*; For Mfd., Nat. and Mixed Gases, Manual Ignition
TYPE O-GS-E
1. Connect pilot line from pilot l cock on manual shutoff valve assem
bly to union in pilot line attached to pilot burner.
2. Connect vent tube from gas pressure regulator to vent tube on pilot burner bracket. Be sure stain-, less steel tip is screwed in securely and that flame check is in place in vent tube connection on regulator. (See Fig. 7.)
2. Thermocouple 5. Gas Pressure
3. BASO Auto-
Regulator
matic Pilot 6. Manual Shut-
Valve
off Valve
Assem.
Fig. 6--Connecting Controls
City Gases
.3. Connect thermocouple lead r . from pilot burner bracket to BASO . ."`'V -C automatic pilot valve.
'* : -
.Wire according to wiring dia-
.v- - gram in Fig. 8.
4W0 WAUCUASHTICTUWK0AUI<CWL.G0*
CXCK
Fic. 7--Flame Check
LOeWurMo*ft*
' : .r
Fic. 8--Wir-ng Diagram
Fig. 9--Supply Piping Arrangement
'2. '
19162
1 o) EMPIRE BOILER
America*
TYPE O-GS-E
t
1I Connecting Controls for Liquefied Petroleum Gases, Manual Ignition
(
! LV 'l
5
1. Connect pilot line from pilut cock on BAS0 automatic pilot valve to union in pilot line attached to pilot burner.
2. Connect. thermocouple lead from pilot burner bracket to BASO automatic pilot valve.
3. Wire according to wiring dia gram in Fig. 8.
L Thermocouple 4. BASO Aulo-
2. Pilot Line
matic Pilot
3. Pilot Cock
Valve
Flc. 10--Connecting Controls Liquefied Petroleum Gas
Connecting Controls For Liquefied Pci o!eiun-Air Gases, j. - Manual Ignition
1. Connect pilot line from pilot ' cock, and pilot filter on BASO auto, . ' matic pilot valveto union on pilot line - attached to pilot burner.
' ' 2. Connect vent tube from gas
pressure regulator to vent tube on
'
v-'pilot burner brackets. Be sure stain-.'
L Pilot Line . 2. Vent Tube
5. Pilot Cock 6. Gas Pressure
3. Thermocouple -
Regulator
;?;'"f5'.'-iess `steel tip is screwed in' securely . 4. Pilot Filter
V%|^&and that flame checfc is. in'place^inV
Tic. H-hCoiiriec:7.g Controls
JVi'^V-vent tube connection on regulator. 7 Liquefied Petrolca::'.-Air Gas
- (SeeFig. 7.) _ - > :
'
19163
6 EMPIRE BOILER
Amebicam
TYPE O-GS-E
3. Connect thermocouple lead from pilot burner bracket to BASO automatic pilot valve.
4. Wire according to wiring diagram in Fig. 8.
Flow and Return Connections
1. Make flow and return connections and tighten all bushings and fittings that will be covered by jacket.
2. Plug all unused tappings and install drain cock return fitting subassembly in return tapping at rear of boiler.
3. Screw short end of 1/4 inch brass stud in tapping on front section and install front burner access door. Fasten with wing nut.
v 4_ Be sure rear burner access door is attached to rear section with : 1/4-20 x 1/2 in. round head screws.
, Jacket Assembly
- 1.. Place rear jacket panel in position then place side jacket panels with grooved edges engaging flanges of rear jacket panel. Attach side jacket panels to rear jacket panel at top and bottom with screws and nuts. An opening is provided in Left Side Panel for gas inlet pipe, o. 2.. Place front jacket panel with flange engaging grooves of side jacket panels and attach at-top and bottom with screws.
3. Place top jacket panel in position with perforations over con-
''* trols. 4. Attach Lighting Instruction Plate to inside of control access
- door. Plate should be placed on "Z" clips and secured by bending down six tabs which are provided. Install control access door on
front jacket panel.
, ' rr'i/kV ' '
- \-
5;Place draft hood in position through top jacket panel firmly^
^ engaging flue outlet of canopy.
X./ .6..- Connect flue pipe to draft hood. _
~
19164
EMPIRE BOILER
Ameeican
TYPE O-GS-E
", Fic. 12--Front View
Fic. 13--Rear View
Filling System
' Caution: Never start boiler unless it is properly filled. After boiler is in operation, make up water should be added slowly. Fill until water is visible midway up gauge glass between try codes. Keep boiler properly filled.
fid'" Pilot Adjustment
.
X ... ".'y- '' >
`' * :
V' -T
c-yi 'c .
/fi^-lt^yLight boiler as directed in operating,instructions and check, for
' 1'gas leaks.. Adjust pilc.t flame to extend just over top of burner. Pilot
rate can be adjusted with screw underneath ::-p on pilot cock.
19165
l 8 EMPIRE BOILER
Americah
.TYPEQ.gs.; {
Normal Pilot Input For BASO Pilot Burners
Mfd.
(Input per Burner Btu/Hr. 1000
Nat. 1100
Mixed 1200
LP. 1000
r
I>
1000 ;
Main Burner Inp.it Adjustment
After boiler is warmed up, shut off all other gas appliances con
r nected to gas meter and time gas consumption. Adjust gas pressureregulator to give rated input indicated on nameplate.
G23 Consumption (Cubic Feet per Hr.)
Input Rating (3tu. per Hr.) Heating Value of Ges (Gtu per Cu. Ft.)
To increase consumption, turn adjustment scr.; - (beneath cap on pressure regulator) clockwise; to decrease, turn screw counterclock wise..
Main Burner Primary Air Adjustment
Adjust burner flame by opening or closing primary air shutter. Flame should bum quietly, show no yellow and should have a notice able inner blue cone. After adjustment, tighten screw to lock shutter in position.
Checkup of Low Water Cutoff
/. 1.. Light pilot as indicated In Operating Instructions. Turn vthermostat to highest temperature. Automatic Gas Valve should
open in approximately two minutes. . 2.' Open drain cock and drain water until water level is about an inch below center line of Low Water Cutoff. Automatic Gas Valve . should close in approximately one minute.
- . 3. Refill until water level is above center line of Low Water Cut; off. Automatic Gas Valve should open in approximately two minutes.
OPERATING
Shutting Off (For All Gases) r 1. ` Close manual shutoff valve and pilot cock. V- 2. Turn off s witch in electric line to appliance.
19166
o SOtLER
A.wnucAW
TYPE O-GS-E 9
Relieving (Manual Ignition; Mid., Nat. and Mixed Gases)
19167
I
!
10 EMPIRE BOILER
American
type o-gs-e
Relighting (Manual Ignition; Liquefied Petroleum Gases)
.1. Pilot Burner 2. Pilot Code 3. BASO Automatic Pilot Valve 4. Manual Shutoff Valve
Fic. 15--Controls for LP Gases
1. Pilot Burner Z Pilot Cock 3. BASO Automatic Pilot Valve 4. Manual Shutoff Valve
Fic. 16--Control Arrangement for Liquefied Petroleum-Air Gases
1. . Set thermostat at lowest temperature, and turn off switch in electric line to appliance.
2. Make sure the nvmual shutoff valve 4, and pilot cock 2, have
.-
-v., been shut off for at least five minutes before proceeding.
; ; 3. . Open burner access door.
" 4. - Open pilot cock 2.
..
- 5. Light taper and hold to pilot burner.
A*
iir*;*
'"jr.'JL - Open mahual shutoft valve 4, to full open position.
. -- 9. . Turn on switch in electric line to appliance.-
' 10. Set thermostat at desired temperature.
at.
$
19168
rj'FlEE BOILER
Amihic-vs
TYPE O-GS-E ri
Pifut Goes Out If the pilot flame is extinguished, the automatic pilot will shut off
` .uc automatic gas valve. If boiler is not operating correctly, call Heating Contractor or Gas Company service : -.a. If boiler is oper ating correctly, relight as directed above.
Operation During Failure of Electric Power Supply
In case of'failure cf supply of electric current, boiler will auto
matically shut off. Boiler will not operate automatically while elec-
C i tric power is off; however, boilers equipped with Detroit automatic
v;-vv?,--.
n\ *
\ -T'V u. 1 A-rc 'j'J ,.
,,V
--
"! '
.:>/ gas valve may be operated manually as follows: u-rf; .ri. If pilot is out, relight as directed for manual ignition.
?: / Remove rectangular housing from top of valve. ; 3. Pull up knob located on top. (Burners should light.)
' * `'(vV. /V/'
"V .vvrxs;
: Caution--Shut off boiler by pressing reset lever, located next to'knob, before water temperature becomes excessive.
'/Bear in mind that operating the boiler manually is an emergency
.- '// condition and that constant supervision is required to prevent the
boiler to
unsupervised
.V^^^S^^sValve is fully recycling and will return to automatic operation
f' ^y^./ .when electric po\yerLreturns. .
. . . .
* .'-w-.. v.'
,y -.v -
- L......
. .
v. -.
-. f/v
//IR
19169
12 EMPIRE BOILER
American
TYPEO-GS-E
CARE AND ATTENTION
In Fall before Starting Boiler
Drain system sufficiently to remove sludge in bottom of boiler. Do not chain more water than necessary to remove sludge. Then refill to proper level as directed above.
> Care of Boiler while in Operation
1. Check water level regularly and add water slowly when needed.
2. This boiler is fired automatically.
3. Test safety valve on boiler at beginning of season and once a
month thereafter:
-
. a) Fasten cord or wire to valve lever.
b) When pressure is up, stand safe distance away and pull cord. (Steamshould be released.)
~rt-ul. In Winter wlJle Not in Operation
; \ Drain entire system to prevent damage from freezing. Drain through drain cock, located at lowest point in system. Be sure boiler
1 is completely drained.
h In Summer while Not in Operation
Fill boiler as during heating season. Have boiler inspected by - . i service man before the start of the heating season. If necessary, re
move jacket front and side panels so that cleanout cover plates are : accessible. These may be removed from either side of the boiler for
' ' . cleaning between the sections.
General Care of Heating System ' Keep radiators and convectors clean.
Keep system in good repair. It is advisable to have it inspected "u r;v2;:.by your heating contractor at least once a -year.
A ^f^&Blowing Off Steam Boilers .,
process of installation, oil, grease or grit works into new \ systems'causing steam boilers to foam. Therefore, it is frequently -inecessary to blow off boiler under pressure, and to sometimes repeat .'Ai?'' r-^th.e operation until boiler water and water column glass are clean.
blow off, remove front jacket pane!*,then remove safety valve
* v ...
19170
S-triR-E EOILER
AmESICAN
TYPE O-GS-E
and bushing from tee at upper end of low water cutoff piping as
sembly. Connect a 1" pipe with valve to tee and run pipe to a suitable drain. Close flow and . eturn valves if available or all radiator valves.
Fill boiler with, watc.- lu top of gauge glass. Light burners as di-
ivCcu. in Operating I:-.-.`.ructions and when steam pressure is o"er
10 lbs. but below 15 I'.-e open blow off valve and regulate valve to
maintain pressure in i: : Jer. Add water as required to maintain full
gauge level in boiler. Continue for about 2 hours. Then drain water
to proper level, rein: blow off piping and replace safety valve and
bushing.
If water supply 1 . not sufficient pressure proceed as above but
open blow off valve ' .Uy and let pressure drop to zero. Then close valve, replenish wat er and repeat several times. At end of blow off
build up 10 lb. pressure, shut off burners as directed in operating in
structions and blow water out through drain opening. Refill to
proper Jevcl, AFTER BOILER HAS COOLED. Do not use soda,
alkali, vinegar or any acid for cleansing the boiler' ' In severe cases,
the use of "Vinco" is recommended. Use 3 lbs. of Vinco for 350 Sq. Ft. radiation or less and 1 lb. for each additional 150 Sq. Ft.
Caution
^
.
. -After the blow off operation, a checkup shc-.dd be made of the Low j ...
Water Cutoff as directed on Page 8. ,
r .'
. NOTE: All parts of tins boiler have been carefully inspected and packed. In case of shortage, make sv.re that sill parts have been re moved from shipping container and examine packing material thoroughly. If part _aot be found, report shortage to your dealer, giving boiler size, :; ies number, date, inspector's number and packer s number. ( :' : Parts List and Packer's Check Tickets.)
Give boiler size ar... cries number when ordering repair parts.
KERB CHECK TICKET Boiler Size..'....: Series No! (See sc .lplate on boiler) Date .......................... !.........................
19171
19172