Document 0jDe31MpaQ249nDgxk75Y2Xx
CEA-1800 - Aroclor Expansion - W.G.K.
0199252
TOWOLDMONOQ45469
M eeting
Agenda
. . . AGENDA ' For
Directors Review Meeting On
Aroclor Expanslon-WGK (CEA l800) .
't
I. Introduction---------------------------------- W. A. Kuhn and/or J. W. Molloy
II. Objectives (Dated 8/27/68 and Previously Issued) -- Specific Questions
III'. Chemistry of Process --------------------------- C. W. Hamlet - PR&D
IV. Summary of Plant Process and Equipment -- R. S. Yates - CED
V. Current Status of Project
A. Construction--------------------------- R. S. Yates - CED
B. Manning -------- --------------------------- H. F. Ray - Mfg.
C. Training Program----------------------H. F. Ray - Mfg.
D. Overall Timing------------------------- H. F. Ray - Mfg.
VI. Start-Up Plan----------------------------------------------- H. F. Ray - Mfg.
VII. Project Risks A. In Process -- .............-- C. W. Hamlet - PR&D B. In Design --......................R. S. Yates - CED
C. In Operation ......................H. F. Ray -
Mfg.
0199263
TOWOLDMONOQ45470
w^j.'a
Aroclor Expansion - WSK (CEA-1800)
Start-Up Objectives
A. Overall
Primary; 1. Demonstrate.'safe operation of the expanded
Aroclor process within the control limits
' prescribed by PR&D in Tentative Process No.
P1504.
;
'. .
;
-
2. Effectively define problems and resolve the proper group (CED, Research, Mfg.) in their
: resolution.
Secondary: 1. Produce Aroclors which meet the specifications : outlined in the Tentative Process.
2. Demonstrate the ability of the facilities to ' produce at designed capacity, specifically:
.'
- / Aroclor 1242
40 V.i/Yr.
. : All Other Aroclors 30 1#/Yr.
'. ... .
Total - 70 E#/Yr.
.3 Demonstrate the ability of the facilities to
realize cost standard biphenyl yield or better
on total Aroclor production, specifically:
Raw Material
# Theory Yield
,
Biphenyl
97#
. 4. Demonstrate the ability of the facilities to meet standard manufacturing cost.
5. Achieve the above objectives within a 45-day
, . start-up and demonstration period and within
budgeted start-up expense.
_
B. Technological Objectives
1. Demonstrate the optimum continuous porocel absorption column
operating conditions in terms of capacity, quality, porocel usa^e
and product loss.
:
2.. Demonstrate the ability of the ferric chloride catalyst addition -system to insure proper catalyst level in the continuous chlori-
nator line.
.3 Demonstrate the ability of the "dynatrol" to control the Aroclor 1142 specific gravity within specification limits.
4. Demonstrate the ability to continuously monitor the power factor of the finished product with the in-line analyzer developed at
Anniston.
TOWOLDMON0045471
-2-
B. Technological Objectives (continued)
5. Demonstrate the effect of maintaining finished product elec
trical properties (Power Factor and Resistivity) during extended
storage periods through use of nitrogen blanketing.
6. Evaluate the effect of aging Aroclor 1142 on Aroclor 1242
'Stability.
.
.
7. Demonstrate operating conditions which will allow duplication .
of Anniston production.
.
r
01992*5 TOWOLDMONOQ45472
Manning Charts
FORSMEN "T
Premium w
Still w
Second j j Swingman Oper. (4)j !#2 (1)
Standard ! (2)
Days/Wk.
7 Days/Wk. I 7 Days/Wk,
Shifts/Dayl 3 Shifts/Dajy 3 Shifts/IDay
Duties Batch
Duties | 2 Stills
Duties
Chlorinatoi-s (Existing)! 3 Mix Tan'ks (Existing)
Continuous 4 Chlorinatoks
New Stills
Tank Farm Load all
Catalyst 1 Mix Tank
2 Blow Tanks Cars & (Existing)! Trailers
21st
5 Days/Wk.
Shift-
2 Shifts/
Still
5Day
21st
Shift -
Duties
Second S&S ,
All . Drum.-
Standard minS of
1 Day 1 Standard
material in Dept.
Biphenyl 1 Head Tank
(Existing)
Off Gas Condenser
4 Absorbers;
&! Complete j Charge of! Therminoll Heating System
Pump Finished Product Tanks To Storage
j j
Off Gas |
Storage { Tank & Misi Eliminator t
Continuoup Blow Tankj
Sample ; 1 Surge Tank!
Repair (1)
|-#S1wing(m1a)n i
5 Days
Monday j
.1 Shift 21st Shift -j
Premium |
Biphenyl
Handling Thurs. & Frjt
&
2 Days
j
All Repair Repairman^
Work
Sat. & Sun. s
12 Days
j Relief
| Foreman
Porter (1/2) |
5 Days/Wk. 1/2 Shift/Day
Clean Control Room, Rest Room 2 Offices & Smoking Shelter
TOWOLDMONOQ45473
019"*
START-UP ORGANIZATION (Tentatively Effective 10/15/68)
J. W. Molloy | Gen. Sunt. |
|
'r |! i:
'!
W. A. Kuhn TPM . '
1
! i
R. S. Yates CED .
| i
H.- F. Ray Mfg. Retir.
i
V. Brawley Start-Up t Foreman
| j
j l
C. V. Hamlet PRffiD
j J. Cagle
| Relief/Shift,
I Foreman
<
I W. Crahtree
! j Relief i Foreman
I I
! T. At^mer
! Shift i Foremen
! G. Craine
I* | Shift I Foreman |
; V. Cook ;
| Shift I Foreman
| /
i' j
TOWOLDMONOQ45474
T ra in in g
Plans
AHOCX.OH EXPANSION "(CEfl~-l800)
TRAINING PROGRAM
.
I. Course Content
.
-.
A* Supervisory
1. Introduction to Key Personnel
.
2. General' Indoctrination __ _____ _
3- Dept. Tour
A. Dept. Organization
5. Security of Information
6. Process Technology
7. Review and Discussion '
8. Introduction to Training
' 9< Assignments, Responsibilities and Authority
' 10. Process Equipment and Control Limits
11. Process Instrumentation
'
.
IP. Assignments for Operator Training
13.. Operating Instruction of Existing Equipment
lA. Safety
'
15. Materials Handling
16. Utilities
17. Quality
18. Yields
.
19* Economics
20. Process Description
21. Risk Analysis
22. Communications
23. Equipment Repairs
2^4. Records
25. Follow Process in Field
26. Preparation for Water Batching
0199258
TOWOLDMONOQ45475
COURSE CONTENT A. Shift Supervisors
Week Beginning g?p7"57T5'5ir' Sept. 16, 1968 Sept. 23, 1968
Sept. 30, 1968
Subject Introduction to Key Personnel
General Indoctrination Dept. Tour
Department Organization Security of Information Process Technology
.
Review and Discussion of First Week Subjects Introduction to Training
Assignments, Responsibilities, and Authority Process Equipment and Control Limits Process Instrumentation Process Technology
Operating Instructions of Existing Equipment Assignments for Operator Training
Review and Discussion of Previous Subjects.
Safety
Process Instrumentation
Materials Handling
Utilities
Quality
Yields, Economics
Process Technology
Process Description
Risk Analysis
Review and Discussion of Previous Subjects Communication Follow Process Flow in Field
Materials Handling Records
Equipment Repairs Check-out on Preparation for Operator Training Risk Analysis Review
Preparation for Water Batching Materials Handling
01992*9 TOWOLDMONOQ45476
.. MASTER TRAINING SCHEDULE
Shift Supervision
-3
Week Beginning
Subject
.
'
Sept. 9> 1968 '>
' '
1. .
. ''
Introduction to Key Personnel
H. Ray - Manufacturing Representative and . Dept. Supv.
R. Yates'- Project Manager (C.E.D.) J. Molloy - Production Superintendent V. Rrawley -Dept. Foreman
R. Cederstrom - CED Construction Supt.
2. General Indoctrination Introduction to Aroclor
How it is made . Uses
' .-
3- Dept. Tour Existing Equipment New Equipment
4. Dept. Organization
Salaried
.
* Supervisor
Foreman
Hourly Relief Foreman Premium Oper. Still Oper.
SeCOi'iu Opei*.
Standard Oper. Repairman Porter
5. Security of Information Reason for Security
6. Process Technology . a. Batch
b. Continuous
Sept. 16, 1968
1. Review and Discussion of First Week
2. Introduction to Training Subjects to be Covered
. Trainers
3. Assignments, Responsibilities and Authority Assignments - shift coverage of entire
dept, making flow sheets, completing IFO's, devise data sheets, etc.
Responsibilities - Supervise safe running
of equipment by hourly personnel, produce
scheduled pounds of quality material as
'
outlined in the Start-up Objectives.
'
0199260 TOWOLDMONOQ45477
MASTER TRAINING SCHEDULE (cont'd) Shift Supervision (cont'd)
Week Beginning Sept. 16, 3968
Sept. 23, 1968
Subject '
"
3. ;-
cont'd.
`.
Authority - Overall direction of all
operators and operations. Make decisions
on process changes for safe operations and
quality material. Have equipment matin- '
tained on shifts and weekends.
4. Process equipment and control limits.
Explanations of the function of each pjece of equipment and safe limits of each.
. Make flow sheets for operator training.
5. Process Instrumentation
'
V.B. - Explain instrumentation on existing equip
. L.V. - Explain instrumentation on new equip.
Complete IFO's on new equip.
6. Process Technology
7. Operating Instructions of existing equipment. Read & discuss Operating Instructions.
8. Assignments for Operator Training
Brawley - Biphenyl and catalyst mix tar}k. Sp. Gr. controller.
Craine - All chlorinators and Intermediate Storage Tank.
Athmer - 3 Blow tanks, 4 stills, thertyinol system.
Cook -
All still receivers, surge tanks, blend tanks, absorbers, finish
product tanks and power factor analyzer.
1. Review and discussion, of previous subjects.
2. Safety . General Dept, safety, clean-up and house
' keeping. Plant disaster plan for plant and dept, location and use of safety showers, fire extinguishers, gas masks, Scott aiif pak, emergency clothing, stretcher, fire alarm and eye protection.
01992<>1
TOWOLDMON0045478
-5MASTER TRAINING SCHEDULE (cont'd) Shift Supervision (cont'd)
Week Beginning Sept. 23, 1968
Subject
'
2. cont'd. List safety devices for new equipment.
List all grounding points in existing and new Equipment.
Hold Safety Review for project.
3. Process Instrumentation Complete writing IFO's.
4. Materials Handling Cover all chemicals used in dept., t,oxicity
consistency, special precautions. Use "Standard Manufacturing process'* for
existing dept. Sample raw materials for identification.
5. Utilities
Utility Plant Air Inst. Air
. 80# Steam 200# Steam City Water
Natural Gas
Line Location and Shut-Off ground Floor at Catch Pot, Ground floor north of air
dryers. Hnigh-linne - Dterot. 25ti4
Next to roadway, south of water tank.
Ground floor, north of sprinkler house.
6. Quality Review Spec Sheets List most critical properties List frequent problems and solutions
Discuss sampling.
List sample needs on start-up.
7. Yields, Economics Review 1969 Cost Standard (Start-up) Process yield loss points Blends
8. Process technology Read and discuss tentative process for
continuous unit.
9. Process Description Read and discuss process description of
new equipment.
0199Z6Z
TOWOLDMONOQ45479
MASTER TRAINING SCHEDULE ..Jeont.ld)_______ Shift Supervision (cont'd)
Week Beginning Sept. 23. 19-8
Sept. 3P, 1968
Subject
10. Risk Analysis Read and discuss risk analysis for start-up of new equipment.
.1. Review and" discussion of previous subjects
2. Communications
Verbal Written
3. Follow process flow in field. Trace all process lines in existing and
new equipment. Check out all instruments
4. Material Handling Explain trailer, car and drum loading. How to inspect each.
5. Records
'
Make new data sheets for gathering in
formation on start-up. Also determine
. where samples are to be taken, how fliany,
what size and frequency.
'
6. Equipment Repairs Discuss equipment repairs that must be
made soon as possible and what equipment can wait until next day. Also discqss how to contact necessary crafts on bights and weekends.
7. Check-out on preparation for operating training. Make certain each man is prepared tp train, knows when to train and knows who hq must train.
8. Risk analysis review Review risk analysis so possibly problems and possible solutions are discussed and known.
9. Preparation for water-batching
Make final check on equipment.
.
Discuss what material will be used for
water-batching, how it will be transferred
and what will be done with material after
water batching.
.
Check inventory of material carefully.
0199263
TOWOLDMON0045480
B. Premium Oper itor.
Meek Beginning Sept. 30, 1968
Subject
".
Water-batch Biphenyl/catalyst mix tank
..
Check-out instrumentation on Bi0/catalyst mi'x tank.
Water-batch #6'through #9 chlorinators.
Check-out instrumentation on all chlorinator*'?.
Check-out instrumentation on intermediate storage
tank.
Check-out panel alarms and instruments.
Trouble Shooting-
.' .
Equipment Failure ...................
Sampling
Data Sheets
1. Water-batch Biphenyl/catalyst mix tank. Fill mix tank with 12^2 Aroclor. Circulate to check-out line and pump.
2. Check-out instrumentation in Biphenyl/cqtalyst
mix tank.
Check-out all Instrumentation in fie^d and
on panel board, including timer.
3. Water-batch #6 chlorinator Fill #6 chlorinator with 12^2 Arocloi*.
. Circulate to check out line and pump.
Ii . x J ~ x ~
~J)C . 1. ^ .. f .. . x - ..
XHO l/A WillCli I/O. t-XU IJ Uli f! U tlllVi IIJO, tui
Check-out all instruments in field apd
on panel board.
Oct. 1, 1968 Oct. 2, 1968
1. Water-batch #7, 8 and 9 chlorinators. Check-out all instruments in field apd on panel board, giving special attention to the specific gravity controller.
1. Check-out instrumentation on intermediate storage tank. Check-out all instruments in field apd on panel board.
2. Check-out panel alarms and instrument control points. Discuss each alarm on panel board stating problems and corrections. Discuss settings
. and control points on instruments.
oi't'rtt'1' TOWOLDMONOQ45481
B. Premium Operator
Week Beginning
Sub.lect
Oct. 3 1968 , .' '
1. Equipment failure Discuss equipment failure and power failure.
2. Sampling Discuss sampling frequency, size bottles, reason for and necessary analysis.
'3.' Data Sheets Discuss record data sheets, what data is needed, how to record and what it should mean to operations.
4. Check-out HC1 line to condenser and drowhing jet. Check-out valve line-up from each chlo|rinator to the HC1 condenser and to the new drowning jet.
5. Check-out chlorine lines Check-out lines and instrumentation for chlorine addition to each chlorinator.
Oct. 4, 1968
1. Review and discuss all equipment and training.
0199?65 TOWOLDMONOQ45482
Aroclor Expansion (CEA-l800) Training Program
C. Still Operator
Content
1. General Indoctrination
' Dept. Organization
' '
3. Introduction'to Personnel ;4. Dept. Tour
5. Security of Information
.6 Safety and Housekeeping
>. *
7 Introduction to Training 8. Classroom Training
9. Field Training 10. Materials Handling
- 11. Quality
.12 Sampling
13. Instrumentation 14. Trouble Shooting
15. Recording Data 16. Plant Disaster Plan
, 17. Discussion
TOWOLDMONOQ45483
C. Still Operator
1st Week
General Indoctrination Dept. Organization Introduction to Personnel
Dept. Tour Security of Information Safety and Housekeeping Introduction to Training Train on Existing'Equipment
_ ''
|
2nd Week Monday
Tuesday Wednesday Thursday
Friday
Review Training of Previous Week Materials Handling Quality
Sampling , Classroom Training on function of equipment
' Field training for location of equipment,
lines and process flow.
.
'
Field training for location of instruments Classroom training for function of instruments
Field training on complete operation of continuous blow tank.
" " " " still operations
" " " " thermir.c! system
Field training on receivers 3 and 4, surge tajiks 3&4 , All 4 porocel absorbers both Power Factor Analyzers
and finish product tanks 3 and 4.
3rd Week Monday
Tuesday Wednesday Thursday
Friday
Review and discussion of previous training. Safety, plant disaster plans. Field train on rework and transfer lines. Field train on therminol system.
Field training on complete process flow on alj. 4 still systems.
Review instrumentation and panel board. Trouble shooting and discussion on equipment failure.
Review record sheets, how to fill out, where to get readings and samples.
Run #1 and #2 stills.
Open discussion of.all equipment and training. Final check-out in field of any problem or qupstion-
able areas.
01992&7 TOWOLDMONOQ45484
C.___Still Operator
1st Week
1. ' General -Indoctrination Introduction to Aroclor, areas of respopsibilities, plant and dept, procedures."
2. Department organization
Salaried
. ` Hourly
. H. Hay - Dept. Supv.
Premium Operator
J. Molloy - Prod. Supt.
Still Operator
V. Brawley -Foreman
Second Operator
: J. Cagle - "
Standard Operator
' T. Athmer------ " --.....
Repairman
G. Craine -
"
Porter
V. Cook -
"
0. Schwartztrauber- Cost Analyst
3. Introduction to personnel
k. Dept. tour
Existing Equipment New Equipment
.
5. Security of information Reason for security
6. Safety and Housekeeping Discuss dept, safety record, eye protection, safe working habits. Location and use jof
emergency equipment ec how to turn in fire
alarm. Discuss housekeeping expected.
7. Introduction to training Discuss briefly how training will be done,
subjects to be covered and probable tiding.
8. Train on existing equipment Actual training with Premium Operator oh
existing blow tanks, preheater, stills :1 and 2, jets, receivers, blend and finish product tanks, city water tank and pumps.
2nd Week Monday
.
1. Review training of previous week. Discussion of Ptills 1 and 2
2. Materials Handling
'
Discuss all chemicals used on Immediate job in
respect to toxicity, consistency, special
precautions.
'
3. Quality ' Review spec sheets and discuss how the opera
tion will affect the material specifications'.
TOWOLDMONOQ45485
C. Still Operator
-------- T-------- ------- 7;;-'-
2nd Week Monday (cont'd)
4. ' Sampling:------------- - --..... - --
Discuss sampling. Importance of good samples
and how to sample.
...............
. 5. Classroom training on function of equipment.
Chalk talk on function of new equipment and
safe limits of each.
'
Tuesday
1. Field training for location of equipment, lines
and process flow.
Identify new equipment,' trace out all
' connecting lines and follow process flow.
Wednesday .
1. Field training for location of instrument? Locate instrumentation in the field and identify its function.
2. Classroom training for function of instruments.
Chalk talk on function and operation of
instruments.
Thursday . "
1. Field training on complete operation of con
tinuous blow tank. Dry-run complete operation
of the continuous blow tank.
-
2. Field training on complete operation of $3 & p\ still operations.
Dry-run complete operation of Stills 3 & 4.
3. Field training on complete Therminol system. Dry-run complete operation of therminol system.
Friday
1. Field train on receivers 3 & 4, surge tanks 3 & k, all 4 porocel absorbers, both power factor analyzers and finish product tanks 3 & 4.
Dry-run complete operation of the above equipment.
3rd Week Monday
1. Review and discussion of previous training. Review and discussion of all equipment.
2. Safety and Plant Disaster Plan.
Discussion of all safety devices including
therminol unit.
Review of the Plant Disaster Plan.
3. Field train on rework and transfer lines. Trace all connecting process lines so necessary transfers can be made. Also locate all valves in lines.
0199269
TOWOLDMONOQ45486
C. Still Operator
3rd Week Monday (cont'd)
^t. Field train on Therminol system. Final check-out on Therminol system.
Tuesday
1. Field train on complete process flow on all . 4 still systems.
Dry-run complete operations of all 4 sti'll systems.
Wednesday
1. Review instrumentation and panel hoard.
Discussion of panel alarms and how to correct
problems. Also demonstrate how to change charts.
2. Trouble shooting and discussion on equipment
failure.
Discuss how to correct problems indicated on
instruments on panel board and in field.
Discuss in detail, equipment failure and' power
failure.
Thursday
1. Review record data sheets, how to fill out', where to take readings and samples. Discuss record data sheets so each operator will know what data is needed and how data should be recorded. Also where readings are to be taken from and what they should mean to operations.
2. Run Stills #1 and #2. Run existing Stills 1 and 2 at direction of Premium Operator.
Friday
1. Open discussion of all equipment and training. Question, answer and discussion of any or all subjects.
2. Final check-out in field of any problem or questionable areas.
Make final check-out in field, of previous known problem areas of equipment.
0199270
TOWOLDMONOQ45487
C. Still Operator 3rd Week
(AlJ.erna.te .Elan)____
Monday
Review and discussion of previous training " Water batch & simulate continuous blow tank operation. Water batch & simulate' #3 Still operation, - .
#3 Receiver, Surge tank, then ' Finish Product Tan);.
Tuesday
Water batch & simulate #4 still operation, , Receiver, Surge tank, then
Finish Product tan);. 'Trouble shoot during simulation.'
Wednesday
Water batch & simulate Therminol system operation Pack all Porocel absorbers.
Thursday
* . '
Review record sheets, how to fill out, where |to get
readings & samples.
Review Instrumentation on panel board
Field train on rework and transfer lines.
\
Discuss equipment and power failure.
Discuss polishing filters on absorber lines.
Friday
Open discussion of all equipment and training.
Final check-out in field of any problem or question
able areas.
'
C. Still Operator
3rd Week Monday
(Alternate Plan) 1. Review and discuss previous training.
2. Water batch and simulate continuous blow tank operation. Fill continuous blow tank with 12k2 Aroplor and simulate actual operation, pumping (naterial
to #3 still pot.
3. Simulate actual operation of #3 still linp. Circulate material in #3 still pot, chepk-out all possible instrumentation, then move material
to #3 receiver, surge tank, and finish product tank.
Tuesday '.
1.
1. Simulate actual operation of #4 still line.
Circulate material in #4 still pot, chepk out
' all possible instrumentation, then move material
to #4 receiver, surge tank, and finish product
tank.
2. Trouble shoot during simulation. Trouble shoot in each possible area to Jearn
possible problems and corrective action needed.
0199271
TOWOLDMONOQ45488
C. Still Operator
3rd Week
(Alternate Plan) - cont'd
Wednesday
1. Water-batch and simulate Therminol system operation. Fill Therminol surge tank with 12^2 Arocflor
and simulate actual operation, chec-king out instrumentation and trouble shoot to lefirn possible problems and corrective action needed.
2. Pack Porocel absorbers. Fill absorbers with porocel.
Thursday
1. Review record sheets, how to fill out, where to get readings and samples. Review record sheets, discussing what informa tion is needed and what value the readings should be to the operator and why it is necessary to record it. Also discuss sampling, where to get samples and what is to be done with
them.
2. Review Instrumentation on panel board. Final check-out on panel board.
3. Field train on rework and transfer lines.
b. Discuss equipment failure and power failure. Discuss what is expected to happen if afiy equipment should fail and necessary action to be taken.
Discuss what will happen to equipment if the power fails and what are the most critical operation to be performed after failure,
5. Discuss polishing filters on absorber lines. Discuss polishing filters, purpose, and
actual change of cartridges and gasket.
Friday
1. Open discussion of all equipment and training.
2. Final check-out in field of any problem or questionable areas.
0199272
TOWOLDMONOQ45489
Plans
CEA-1800 - AROCLOR EXPANSION - WOK Start-Up Plans
PROJECT SCHEDULE
In order to demonstrate the expanded Aroclor facilities at
WOK while adhering to the requirements outlined in the start
up objectives. Phase II will be completed on the following
construction schedule.
Construction
Phase II Area
Completion Date
A. Off-gas Purification System
9/4
B. Chlorinator Area (catalyst mix tank
thru continuous blow tank)
9/30
C. Therminol System
10/14
D. #3 Still System and #1 Absorber (1242 Line) 10/21
E. #4 Still System and #2 and 3 Absorbers
(1248/1254 line)
11/4
F. #4 Absorber (1260 line)
11/11
0. Anniston Duplication
11/18 thru 12/1
(Demonstration)
PROJECT DEMONSTRATION
A. Off-Gas Purification System - This system was activated on 974 due to earlier failure of the existing department puri fication system. The equipment was thoroughly checked out prior to start-up and as a result no operating difficulties were incurred. The only aspect of the system not yet demonstrated is utilization of the material recovered from the off-gas in production of non-electric Aroclor. This wi}l
be completed as soon as sufficient material has accumulated4
B. Chlorinator Area - Process simulation will be accomplished using Aroclor 1242. Chlorination control in the continuous line will be checked out by chlorinating the 1242 to ll48. Catalyst addition effectiveness will be measured by allowing
an Aroclor 1242/catalyst mix to cascade thru the system.
When the above operations have been checked-out (1 week maximum)I the continuous chlorinator line will be brought on-stream tq produce Aroclor 1142. This material will be collected in the intermediate storage tank Wfitivo which it will either be trans ferred to the existing #1 and #2 blow tanks for future pro cessing to Aroclor 1242, or else transferred to the batch chlorinator head tank for further chlorination.
C. Therminol System - This system will be charged with Aroclor 124b from tne department storage tanks. The entire thermincfl
control system can be demonstrated prior to start-up of the . stills.
0199273
TOWOLDMONOQ45490
PROJECT DEMONSTRATION (continued)
D. 3 Still System and #1 Absorber (1242 line) - This line wil 1 fee' s'imuTirted usfng Arbclor~Tc;ff&. Complete checkout of the system excepting effectiveness of tie-up of residual HC1 and ferric chloride with lime will be possible pri,or to actual start-up on Crude 1142. Demonstration of this isystem will allow production of Aroclor 1242 and one other Aroclor simultaneously. Only the 1242 will be upgraded in the . Porocel columns at this point; however.
E. #4 Still Area and #2 and 3 Absorbers (1248/1254 line) This Tine wlTl be checked out similar to the' procedure outlined in Section D. Start-up of this system will allow demonstra tion of the 40 M #/yr. Aroclor 1242 design rate as we],l as the effect of porocel treatment on Aroclors 1248 and 1,254.
F. #4 Absorber (1260 line) - This line will be checked oijt with Aroclor 1242 prior to' start-up. Start-up of this system will allow demonstration of the effect of porocel treatment on Aroclor 1260.
0. Anniston Duplication - Start-up of Item F completes demon stration of"the design premises outlined in the CEA-l^OO scope report. The final item to be demonstrated in tfye start-up objectives is duplication of Anniston production. Process conditions will be modified at this time to conform with those at Anniston in attempt to duplicate this produc tion and allow shipment to any customer from both plapts.
ghw
cc: Messrs. R. S. Yates C.W. Hamlet R. Kuster J. W. Molloy
. V. Brawley J. Cagle T. Athmer V. Cook G. Craine R. Cederstrom
Prepared by; H. F< Ray
TOWOLDMONOQ45491
W. G. Krummrich Plant Sauget, Illinois
August 22, 1968
Aroclor Expansion - WGK (CEA 1800) Risk Analysis;
To: D. C. Armstrong - WGK
V. Brawley - WGK
M, S. Feld
- WGK
T. E. Greenman - WGK
C, W. Hamlet - WGK
J. R. McClain - WGK
R, M. McCutchan - WGK
J. W. Molloy - WGK
P. Verna
- WGK
H. S. Bergen
- G.O.
D. B. Hosmer
- G.O.
R. E. Howard
- G.O.
R. M. Kountz
- G.O.
W. A. Kuhn
- G.O.
R. J. Stratmeyer - G.O.
M. E. Gibbs - 2nd St. R. H. Munch - 2nd St.
m sr
A nalysis 1
Attached are the Aroclor Expansion - WGK (CEA 1800) Risk Analysis Data Sheets indicating the major and minor risk considerations in this start up. Consider able preventive action has been taken to minimize the risk involved in the major problem areas.
If there are questions concerning this analysis or any of the risks indicated, do not hesitate to contact the appropriate representative of CED, Research (PR&D) or Manufacturing.
Hi F. Ra Mfg. Refs'.
ap Attachments:
R. S. Yates Proj. Mgr.
0199275
TOWOLDMONOQ45492
1.
Specific Potential Problems
,^
.. . .
____ Threat .________+5
1. Raw Materials Received__
Probability Seriousness E,
a. Biphenyl
1) Variation In quality . a) Moisture contaminated b) Impurity level
2) Availability b. Chlorine Snlft Gas
1) Variation In quality a) Impurity level (Bromine) b) Sulfuric Acid content
2) Availability c. FeCl3
i60
30
180
30
50 450
10 101 100
j100 900
100 900 5 *15
10 10 100
1) Particle size too large or too small 2) Moisture contamination 3) Availability d. Lime 1) Availability 2) Moisture contamination
5 :'5 10
5 5
5 25 10 50 10 100
10 50 2 10
e. Borocel
1) Availability 2) Moisture contamination 3) Particle size too large or too small
5 5 10
10 50 9 *15 5 50
Raw Materials In Storage a. Biphenyl
1) Moisture contamination 2) Storage tank freeze-up
10 10 100 10 :3 30
0199276
TOWOLDMONOQ45493
2.
Threat
HGPj
Probability Seriousness o
Chlorinator Area
a. FeCl^ Mix Tank
1) Inadequate catalyst supply to #6 chlorinator
5 HO 50
b. Chlorinators
1) Unstable product 2) Crude 1142 out-of-spec on Sp. Gr.
20 20
no 200 no 200
3) Inadequate biphenyl feed to #6 chlorinator
10 no 100
4) Inadequate temperature control
10
3 30
c. Intermediate Storage Tank
1) Cannot feed stills or head tank
10
3 ' 30
2) Cannot maintain proper aging temperature
. 10
6 60
3) HC1 emissions d. Blow Tank
20 8 160
1) Cannot feed stills at required rate 2) Cannot control level in tank 3) HC1 emissions *) HC1 is not removed to desired level
10 10 20 10
8 80
8
80
8 l6o
2 20
e. Off -gas system 1) Cannot control off-gas temperature
10
!5 50
2) Drowning jet will not handle full HC1 load
3) High back pressure Water in HC1 off-gas
.
10 10 10
8 80 9 90 IP 100
0199277
TOWOLDMONOQ45494
4. Stills
3. , rH _______ Threat ,
T'r_ ro' 1bab' ility Ser--iou1--snes"s" o
reboiler tubes 2) Cannot maintain vacuum 3) Cannot meet forward flow color spec. 4) Cannot control temperature 5. Absorbers 1) Cannot meet electrical property specs 2) Cannot feed desired rate thru absorber 3) Cannot meet free chloride spec TherminciL Furnace
1) Coil failure 2) Cannot provide adequate heat for stills Housekeeping
V... 1) Unable to achieve acceptable level
30 10 10 10
20 10 10
10 . 10
10
to 300 to 100 to 100
8 8o
to 200 to 100 to 100
10 100 to 100
8 8o
0199278
TOWOLDMONOQ45495
Aroclor Expansion (CEA l800) Risk Analysis Worksheet
A.
0199279
Potential Problems
Likely Causes
Prevention Take Preventive Action or Accept
Risk
Protection Set Contingent
Action or Accept " Risk
Provide for Informatior
Trigger
Contingent
1. Raw Matls. Reed, a. Biphenyl
1) Variation in quality
1. Anniston operation variances.
2. Tank car coil failure
1. Accept risk
2. Sample every car
1. Review quality variation with Anniston
Lab identifies off-spec material
2) Availability
1. Anniston pro duction out age
2. Rail Strike 3. Coil failure
in Associated Sales Stg.Tk.
1. Accept Risk
2. Hold Associated Sales & Dept. Stg. Tks. at least 80$6 full.
1. Transfer Associ ated Sales Matl. to WGK.
2. Notify Anniston of low Biphenyl
level.
Daily Inventory Sheet indicates quantity on hand below 6001#
b. Chlorine . Snift Gas
1) Variation in quality
Chlorine Dept. operation variances
1. Monitor bromine content of KCL shipments.
2. Monitor numb'er of DeNora cells on KOH.
3- Sample snift gas chlorine supply weekly.
Raise chlorination
temperature to 195C.
1. High bromine content in KCL
2. High bromine content in CI2' gas
' 2) Availability Chlorine Dept,
1. Accept Risk
Accept risk
outage
2. Obtain priority
to use revapor
ized chlorine.
\
1. Notification of scheduled chlorin*
--Dept, outage. --
2. Low chlorine supplyopressure
'_-
TOWOLDMONOQ45496
5
Potential Problems
Likely Causes
Prevention lake Preventive
Action or Accept Risk
Protection
Set Contingent Action or Accept
Risk
Provide for Information
Trigger Contingent
3. Chlorinator Area
a. FeCl^ Mix Tk.
1. Inadequate . catalyst
- supply to #6 chlorinator
1. System pluggage 1. Sightglass
1. Accept Risk
provided
2. Circulating pump*
2. Manually add
failure
2. Motors alarmed
catalyst to
, each chlorin-
3. Agitator failure(3. Temperature
ator
indicated in
4. Steam heating
field
.
system failure 4. Level recorded f -
5. Mix tank is
on panel
empty
5. Catalyst flow
6. Catalyst flow
timer on panel
controller
failure
5. Catalyst feed
valve alarm
for abnormal
position
Lab identifies unstable product
b. Chlorinators 1. Catalyst doesn't 1. Accept Risk 1. Spare catalyst
carry thru chlors. 2. a) Catalyst
addition nozzles
1) Unstable
2. Inadequate cat-
tank level
provided on each
product
alyst feed to
recorded on
chlorinator.
#6 chlorinator
panel.
2. Accept Risk
3. Chlorination temp. b) Catalyst 3. "
"'
too low.
flow timer 4. Raise chlorina-
4. High bromine
on panel
tion temperature
content in
c) Catalyst
to 195C
chlorine supply.
feed valve
5. Raise overflow
5. Vapor phase
alarm for
level in chlor-
chlorination
abnormal
inators to de-
____*_____________________ 6. Sulfuric acid
position
crease vapor
in chlorine
d) Catalyst
space.
supply
tank agitator 6. Accept Risk
7. Circulating
& pump motors 7. "
"
pump failure
alarmed.
Lab analysis indicates off-spec material.
TOWOLDMONOQ45497
Potential Problems
b. Chiainators (Contd.)
o
Xfcs>>>o-*
-
~ 2) Crude 1142
out of spec on sp.gr.
Likely Causes
Prevention Take Preventive Action or Accept
Risk
Protection
Set Contingent Action or Accept
Risk
6.
Provide for Information Trigger Contingent
8. Technology
2. e) Sightglass
inadequate to
in catalyst
meet corpor
circulating loop.
ate goals.
3. Chlorinator
9. Continuous
temperature
chlorination
recorded &
technology in
alarmed on
adequate to
panel
meet specifi 4. a) Monitor
cation on
DeNora cells
stability.
. on KoH
b) Monitor
KCL Bromide
Content
c) Monitor
bromine con
tent of chlorine
supply.
5- Accept Risk
6. Brink mist
eliminators in
chlorine supply
line.
7. Motors alarmed.
8. Accept Risk
9. Continuous chlor
ination demon
strated at
Anniston
1. Chlorine feed 1. Flow recorded
in each chlor-
on panel.
inator too high 2. Accept Risk
or too low.
<3. Flow recorded on
2. Density control j panel. Low flow
system failure on #9 chlorin-
!t1
alarm. '
ator
|
8. Lab distill crude & analyze results.
9. Initiate PR&D work to improve technology.
10. All the above.
1. Regulate flow manually
2. Run sp.gr. manually
3 Regulate flow manually
! 4. Regulate level | manually
Operator analysis indicates off-spec material.
1
!
TOWOLDMONOQ45498
7.
Potential Problems
Likely Causes
Prevention
Take Preventive Action or Accept
Risk
1 Protection Set Contingent Action or Accept Risk
(Provide for Information I Trigger
Contingent
b. Chlorinators (Contd.)
3. Biphenyl feed 4. Intermediate
rate to #6 Chlor Stg. Tk. level
inator too high
recorded on
or too low.
panel. Hi/Lo
4. Level controller level alarm
failure on #9
on Int. Stg.
chlorinator.
#9 Chlor.
5. Circulating
5. Motors alarmed.
pump failure
6. Operator will
routinely
analyze each
chlorinator
every two hrs.
5- Accept Risk
6. Have instrumenta tion system
checked for repair. 7. Redesign Sp.Gr. control system if not adequate.
3) Inadequate 1. Biphenyl feed 1. Motor alarmed
Use Biphenyl
Biphenyl
pump failure
2. Stg. tank temper transfer pump to
feed to #6 2. Line pluggage
ature recorded
feed #6 chlorina
. chlorinator 3 Flow controllers
on panel
tor
failure
3. Flow indicating
4. Feed tank empty I controller on
5. Rate of charg 1 panel and at FeCl^
ing FeClj mix i mix & head tanks,
& head tanks is too high
j Lo flow alarm. . 4. Daily inventory.
.
4) Inadequate temperature
control
i
1. Circulating pump il. Motors alarmed
failure
j2. Hi/Lo tempera-
2. Temperature con- i ture alarms
troller failure 3. Temperature
1. Adjust number of louvres attached to controller.
3. Line pluggages i recorded on panel 2. Change chlorine
4. Air cooled heat 4. Two speed fans
flow rates
exchanger fan j provided
3. Accept Risk
o
-- '
&f0s>9t
speed too fast 5. High temperature
j or too slow.
j chlorine shut-
' 13. ~Too~asnyr or too 1 town. -- -
few air cooler 6. Low temperature
louvres attached | fan shutdown
j to controller 7. Chlorine flow
J
j recorded on panel
Biphenyl flow recorder indicates low/high flow. Lo flow alarms. '
Temperature
recorder indicates
temperature too
high/low.
i
t1 | j1
TOWOLDMONOQ45499
8.
Potential Problems
b. Chlorinators (Contd.)
4) Inadequate temp. cont.
4. Stills 1) Erosion and/ or pluggage of reboiler tubes
2) Cannot main tain vacuum
"Vo
CD
Likely Causes
j Prevention j Take Preventive
Action or Accept Risk
6. Chlorine flow j
is too high or too low.
7. Sulfuric acid in Chlorine
supply
1. Lime-catalyst slurry at high velocities
2. Tube diameter 3. Circulating
pump failure
1. Accept Risk 2. Accept Risk
3. Motor alarmed
1. Vacuum jet
1. Spare jet pro
failure
vided
2. Pressure con 2. Set up spare
troller fail
parts
ure.
Pressure gauges
3. System leaks
provided
4. Receiver level 3. Accept Risk
too high or
4. Hi & Lo level
tank is empty ' alarms provided
5. Condenser
5. Sightglass in
freeze-up
forward flow
6. Receiver pump
line. Forward
packing leakage flow temperature
7. Vacuum line
recorded
pluggage
6. Accept Risk
8. High level in 7. Accept Risk
catch tanks
8. Level gauge
provided
Protection Set Contingent Action or Accept . Risk
Provide for Information
Trigger Contingent
1. Set up spare heat exchanger
2. Drill out tubes 3. Set up spare
pump
4. Increase pump impeller size
High pluggage frequency
Tube failures
1. Change to spare Vacuum recorder jet indicates poor
2. Repair controlle ? vacuum
3. Repair leaks 4. Isolate problem
& resolve
5. Raise cooling water temperatur !
6. Repack pump
7. Clean-out lines 8. Drain tanks
TOWOLDMON0045500
9.
' Potential Problems
Likely Causes
Prevention
Take Preventive Action or Accept
Risk
Protection Set Contingent Action or Accept
Risk
Provide for Information Trigger Contingent
3) Cannot meet forward flow
color spec.
1. Entrainment separator run back line
plugged 2. Inadequate lime
in still
1. Sight glass pro
1. Clean out line
vided
2. Re-lime still
2. Record lime charge.
Modify re-lime
Feed integrator
frequency
alarm bn panel
Lab analysis indicates off-spec product
5. Absorbers
1) Cannot meet electrical property specs.
1. Treating temper 1. Column feed
ature too high
temperature
2. Packing is wet
controller
3. Clean-up filter
backed up with
not removing
temperature
porocel parti
recorder.
cles
2. Analyze packing
A. In line analyzer for moisture
malfunctioning
prior to column
5. Packing is shot
start up
3. Accept Risk
4. Accept Risk
5. In-line analyzer
provided
2) Cannot feed
1. Treating temp,
desired rate
too low-high
thru absorbers
viscosity
2. Pilot plant s
scale-up wrong
3. Pumps under
sized
4. Packing charge-
out time too
o *-
.....J,*NS0 "'.... ..
long. Low on ..................... ........ ------ stream time.....
' CO
1. See #1 above. 2. Accept Risk 3. Accept Risk 4. Absorbers flexibly
piped up
1. Manually con Lab analysis
trol tempera indicates off-spec
ture.
material
2. Dry packing
with nitrogen
prior to start
up.
3. Modify filter
and/or change
cartridge micron
retention size
Change absorbe r
support screen size
4. Check results
laboratory
5. Change packing
1. Raise treating Flow controller
temp. to reduc e indicates below .
viscosity. May i design feed rate
also need to
change electri- Low on stream time
cal property specs.
.
2. Run more than one
absorber at a time
3- Change pumps
4. Install spare
absorber _
TOWOLDMONOQ45501
10
Potential Problems
Likely Causes
j Prevention Take Preventive Action or Accept Risk
Protection
Set Contingent Action or Accept
Risk
JProvide for Information Trigger Contingent
3) Cannot meet free chloride
1. Bad Porocel 2. Clean-up filter
1. Accept Risk 2
soec.
leaking thru
1. Change packing Lab analysis
.
2. Change cartridges indicates off-spec
material
6. Therminol Furnace
1) Coil Failure
1. Flame safeguard system failure
2. Air pockets in
coil 3. Therminol de
gradation products
1. Set'up spare coil.
2. Fill system
under vacuum . 3. Analyze ther
minol monthly
1. Changeout coil Coil leakage
2. Accept Risk
Lab analysis
3. Replace Therminol indicates off-
spec FR-2
' '
2) Cannot provide 1. Therminol feed 1. Motor alarmed.
1. Changeout pump Cannot obtain
adequate heat
pump failure
Flow recorded
2. Notify utilities 25M#/yr. still
for stills
2. Low gas pressure on panel.
dept.
rate
3. Line pluggage 2. Low gas pressure 3. Isolate problem
4. Flow controller
shutdown.
& resolve
failure
Pressure gauges 4. Repair controller
5. Furnace under
in field
5. Install still
sized
3. Low flow alarm
feed preheater
4. Accept Risk
15. "
"
!
7. Housekeeping
1. Processing
[1. All pumps except 1. Accept Risk
Low ratings in
1) Unable to
problems
achieve accepta - 2. Inadequate
1 for one on ground 2. Modify Facilities housekeeping
| level. Drain pans
inspections
ble level
workforce
j provided for each
| pump
|2. Trench sewers
| provided on j ground level
i
it
o
;3. Ground level
i
*-*
rOs
CD
-------- --
-
I-----curbed & j sloped to
floor-----trenches
4i -----
-- -
'M. Open structure des: lign
-.... - -
......-
ip. Equipment layed-oul i with
[ housekeeping problt ans in
> mind.
1
TOWOLDMONOQ45502
Potential Problems
7i Housekeeping (Contd.)
Likely Causes
11.
Prevention Take Preventive Action or Accept
Risk
6. Dumpster ramp for changing absorber packing provided
7. Provision made for draining transfer lines, sample points & catch tanks into drums
8. HC1 emission sources tied into drowning jet
9. Housekeeping time alloted in work force study
10. Complete utility stations located at critical points
Protection
Provide for Information
Set Contingent Trigger
Action or Accept Contingent
Risk
'*
........................
oPoC*
IV JOS-........
.............
I
'
i1?
1 TOWOLDMONOQ45503
santo '
NAMt . IOCMION! SaUget , JH ,
June 27, 1968
Messrs. J. R. McClain
J. W. Molloy
Start-up Expense Budget for
R. D. Williams
Aroclor Expansion Project (CEA 1800)
R. S. Yates
R. M. Kountz
Mr; W. A. Kuhn (2) General Offices
Attached for your approval is the Start-up Expense Budget
j
for the Aroclor Expansion Project including estimates of Preparation
Expense and Operation Expense. These estimates have been pfeparecP
To conform to policy given Tn Controller's Bulletin 12-06 and Organic;
Division Bulletin No. OA 5-1*
]
The totals for Preparation Expense and Operation Expense are summarized below.
Preparation Expense - j>82,000
Operation Expense
- 33,000
Total Start-up Expense-$115,000
I
The total start-up Expense of $115,000 is approximately 7-^% of i the estimated capital provided on CEA 1800 for this project. The i
basis for the timing of the start-up is Revision No. 5 of the Master
Project Schedule dated 5/20/68.
The attached pages give a detailed breaK-down of expense esti mates by type and an estimate basis for major expense items.
Service Account Number 916.55 will be used to collect Preparation
Expense charges. These charges will be closed out to the division
start-up account (715.00) monthly.
%
1
Starting in July, a variance report comparing actual start-up expenses viith budget will be sent to you monthly.
ghw
/l .
..
Approval^ / . (sU ' ' (
v7' OTTUolToy
'
P. Ray Mfg. Representative
X. ^ 1
0199787
TOWOLDMON0045504
Preparation Expense 3udget Aroclor Expansion (CEA 1800)
Job No. 916.55
.
-2-
N
O
Budget Item
Factory Expense Totals
Chemicals (505)
7,000
Utilities
5,150
Mfg. Wages (570)
5,790
Mfg. OH
(573)
810
Salaries (575) 16,450
Salaries OH (578) 2,950
Factory Supplies
(590) ' 8,000
Laboratory (610)
3,300
Clothing & Laundry
(614) 2,900
Safety Equiranent
(613)
400
TSD (621) 3,000
Mech.Expens e(694) 20,000
Sub-Total - 75,750
3rd 4th 1st Phase' I 2nd Phase I Phase I Phase II 3rd Phase II 4th
Qtr. Qtr. Qtr. June Qtr. July
Aug.
Sept.
Qtr. Oct.
Qtr.
1967 1967 1968 1968 1968 1968
1968 1968
1968 1968
1968
000
0
0 0 0 1000
0 0 0 100
000
15
600 900 1500 1200
100 150 250 200
0 1000
100
15 2200
350
01000
965 140 1200 200
0 0 0 0 1650 300
0 0 0 0 4200 650
0 1000
965 140
7050 1150
7000 3150
4725 655
4200
650
7000 3150
4725 655
5200 300
000 000
0 0
0 1000 2000 3000 0 1000 1000 1300
6000 2000 ' 2000
3300 0
0
0 00
0
0 100
0
0
100 2800 2800
000
0
0 100
0
100
200 200
200
0 0 500 500 500 1000
0 1000 2000 0
0
000
0
0 1000 1000 8000 10000 10000 10000
Other Exnense
Vendor Fees (715) 5,000 0 0 0 Meetings (798) 1,000 0 0 0 Office Supplies (814) 250 0 0 0
Sub-Total -
6,250
0 0 0
0 0 1000 1000 2000 3000 3000
00
0 500 500 500 . 500
0 100 0 100 200 50 50
- TOTAL - 82,000
TOWOLDMONOQ45505
Estimated Preparation Expense for
Aroclor Expansion (CEA 1800) Job No. 916.55
3-
1. Chemicals
.'
$^,000
~~T*hase I
-
Since only storage tanks and associated equipment
are involved, it is anticipated no start-up cost for
;
chemicals will be incurred.
$0
Phase II
process simulation on new process equipment using
Aroclor 1242 -10,0000. @ $0.70/gal.
2 Utilities Phase I
Steam @ 15$ Std. Electricity @ 10$ Std
6/68
$100 $105
7/68 j`900
$100
,1W0
i5J50
Phase II . . 10/68
~mreaSr@ 40$ Std. -
P5'00
Electricity @ 25$ -
250
Purchased Water @ 50$ Std. $400
F3T50
3- JffiB.
Wages
Phase I Repairman Second Operator Std. Operator
cSwingman
No--.
5 2 1
Vac. & Hoi. @ 12 .824$
Hate
5T755 3.540 3-405 3.855
Phase II
Premium Operator 4
Still Operator 4
Second Operator 4
Swlngman
1
Swingman
' 1
3.660 3.620 3-540
3.855 3.620
Vac. & Hoi. @ 12.824$ -
Hours " 24
180
48 12
Cost
-"90 635 165 45
5 130
$T0S5
24o 880 480 (1) 1735
48 170 60 230 320 (1) 1160
Pi?5
550 $4725
$5,790 '
:
(1) New classifications. Will receive training on straight time. All others are regular department
personnel and will be trained on overtime.
4. Mfg. Wages O.H. (13.993$) '
$810
TOWOLDMONOQ45506
5. Salaries (Training, Start-up Planning, Preparation
for Start-up) Phase I
a. Mfg. Representative $300/mo. - 8/67 thru 12/67, $500/mo.
' . 1/68 thru 8/68'-
b. Production Supervisor
$250/mo. 6/68 thru 8/68
c. Production Foreman ` $450/mo. 6/68 thru 7/68
$5,500 j$750 . $900
$7,150
Phase 11
a. Mfg. Representative $500/mo. 9/68 thru 10/68
$l;ooo
b. Start-up Foreman
$900/mo. 8/68 thru 10/68
$^,700
v00n
c. Production Supervisor $250/mo. 9/68 thru 10/68
d. Shift Supervision 3 men $850/mo. 9/68 thru 10/68
6. Salaries OH (17.75#)
7. Factory Supplies ` aT' SouFeKeeping Equipment
b) Safety Signs c) Equipment Tags dj Safety Equipment ej Laboratory Equipment f) Miscellaneous Start-up Supplies
,
$5,100 ^$57500-
4^550 $&,000
! .
8. laboratory "~a) Develop routine methods for electrical property
measurement based on Organic Research Work.
$3, 300 r
b) Analyst Training
9. Clothing & Laundry (5% of Wages)
$2,900
10. Safety Equipment
, $^00
11. Technical Services eT~~Training Assistance b) Materials Engineer
c) IFO Review
$3,000*
019929(>
TOWOLDMON0045507
12. Mechanical Expense ' Phase I - f 2,000
TKascTTl - SH8.000 ---------------
- |5 -
$20,000r-
Includes:
.
ej 'Equipment, Instrument and Electrical checkout prior
to start-up (beyond nominal service provided by
Engineering).
b) Alterations to equipment prior to and during process simulation (water batching).
c) Maintenance coverage during start-up. 13. Vendor Fees 1*). Meetings
$^,000 T -----
15. Office Supplies FSO/mo'. - 6/8 thru 10/68
$250
Total -
$82,000
TOWOLDMONOQ45508
9929Z
-6-
Operation Expense Budget Aroclor Expansion
C Over-and-Above Standard )
Budget Items
Totals
Utilities Salaries Salaries OH Factory Supplies Laboratory Mechanical Expense
3,000 5,100
900
2,000 2,000 20,000
TOTAL -
33,000
Phase I Phase I 3rd Qtr. Phase I Phase II Phase II 4th Qtr.
Aug.'68 Sept.'68 '68
Oct.'68 Nov.'68 Dec. '68 1968
1000 0 0 0 0
0
1000
0 0 0 0 2000
2000 0 0 0 0
2000
1000 0 0 0 0 0
0 2,550
450 1,000 1,000 9,000
0 2,550
450 1,000 1,000
9,000
0 5,100
900 2,000
2,000 18,000 .
TOWOLDMONOQ45509
.4 7 -
Estimated Operation Expense for
Aroelor Expansion (CEA 1800) (Over-and-Above Standard)
Following Is the basis for estimating Operation Expense for the Aroelor Expansion Project. These costs are for over and above standard costs for chemical operation. All other costs were assumed at standard. '
Utilities (Tank farm on line prior to Mfg. Plant)
" "Phase I . Steam @ 15% Std. - 900
Elec. @ 10% Std. - 100 1555/mo. 8/68, 9/68, 10/68
Salaries (Shift supervision on start-up)
*" Phase II Shift Supervision 3 men @ $850/mo. 11/68 & 12/68
$9,100
Salaries OH (17.750%)
j$9QQ
Factory Supplies
''
" ~ $'lOO'0/mo. over-and-above standard 11/68 & 12/68
1^000
Laboratory ' !pT000/mo. over-and-above standard 11/68 & 12/68
Mechanical Emense ~~ phase I -
v Phase II -
$2,000 $18,000 $5U,CTO(3
$*-1,000" $2b,000
Includes:
All mechanical expense required for minor modifications and correction of facilities to obtain smooth and trouble free operation at design rate, quality and cost.
TOTAL - $33,000
Ol^93 TOWOLDMON0045510
_______ 1 ___________
CslD,* ,,j
______________ __________________________ __________
\t-Z J*c><4 4 ***** fATCt ffW;lg
/?*.?- *. - AtoeZ 4. s_
u.-/ errstPH o*n /'A* ______ _________ .
.
^.Ci^w
_ ... ___ .
>J rrlATtr'**. r>S>'e: ; CipM&trt t_?**._&**?*'?_ -y.i^_''}c,7^Pu._,nbJa - /*.<>*> /'/*/
_j
1 5; I)*P-<ArtC* CUltLl 6* /lt-A.rr~< ,/.$w A>w 'Al-.rr*. y>/V
C-Ap.______________
iw~f|p'rtw c* *U*T*
'+n*-J.'f****J^pyr--_______
~j
|
l
|
'
CREDITS RASEO ON:
J
rj'r:;: .";/~
r>.
P?00l!CTiCN COST ESTIMATE
tilt-nr.
/<H*o
rirn,p*<-Ooi 0<r
333*fCioc
fer&K fti-De i,mP
&!.. __
(j-A$ _
/]s. -L-* >2iz - //a
jSlffiL.. 7T'<j"'"p<rfe,*2]i4.5
55 S^ft*oS3/_____ <;./***<*** _. _____
s ________
_/?S<- ?//o.3
f*&______ C_4_io<_ey_*_________
GROSS TQT AU_V A-*COJ_L%_________
$-Z2.o \ _ .02,-7* <o! 020 _ _ CSZp'J
_
,o2- 2'o _j. c_3.i_jo_ o __ ..G&S)S_
/>6-~/go'~ ~j
.41.0,0_____!
- ei'/7
0S-52S'
a-,c.
7. //>*/
/-?6o _5. 7/
jLjMf*.
WtX7CTION 0RAOCET
STEAM
Mte.<?7>>
ELECTRICITY CKWM
COM. MR MC=
WATER U*CH. M0E m (JAt.
SERVICES ANNUAL OUAN itv USEO
unit ,2^1 r?v/c**r , "T
2-
4-0 j
4Zr*
: 04a:
(,00 1 //?<<
,<3/o_i_ 2.002
J___ /
/V !
i jaS
! 1
; 1
WATER RLANT M GAL.
REAtEGERATtON L*GOR MRS. LABORATORY MRS.
--
.370 --
4.2*
,
l ! \
--
-- -- /7?
;
1 1 i
.?* !
.1
RAOKING COST
1 s /%*, a c*. 1
-- ,725
-- 27/7 t. ?
11
:; j
i
OTRREd Ation
CAPITAL S
-.'YR. 1 VYR.
PKG. NET WT. LtfS
1 ^'7 : ieCO /..^o , 5.433 .
j Rl Of;
|i
/ 6/3
COST RER COMTATMER AMMJAl V. CONTAINERS
: 3.2:7 1 t.445
* REPAIRS
,:
rAPITAI t
*./YR. ! S'YR.
! mae
:1
AAMUAL CONTAINER COST AAAHJAL RACKING LABOR </V1A?
*-OTA
(x, l-I.eiurl-iA
11
'
INVENTORY VALUES
i SLOG.
1 AREA RECCL
1i SG ST.
IrAw MATERlALS S
IN PROCESS S R93ARKS
EINISHED GOOOS S
!<JV./ / -
'i*,-r*A frr 2-5)8:
UNI " COST AMOUNT U`!` T ~>V
MATEWM.S____________ V ; -- ---
Electricity co'f'oes-.rn Am
, >/ V-
</*/ yCj
/r,y
14S fe^2-
'
; `
233; Jj?6 . '035i
-2
_23S
/ //'ro _ > 2 s
a
^eckservices; T ; - . /ooO
07p*-,-ni*r4*._________, F , ~ _ _
__ L
Ztfe______ i r ; -- , /i>_ k
t**_-*5_/e*V*A*i __ ^ ^4-- __/OjJ ___^
ftr &:***,.4 \ F ~ / ZCo
TgfL DIBECT COW ~ _ 2 Jot,/ _
(> OEPECATIQN mt___ I?__; - ; 2 ?z ?t
i3.L _2f.
-C>'95^
gAAcroRv.Nc.BEc^ex>-. ; g " -
TQTA4. ***o*ect cowv. . roTAI. pqooucriov CO^I
. --. ' - ___<0/
,C*s, ji- ~ S* . / 4-11. S74(,7___
'-O'- At. POOOWCT COST
j
1
0199294
TOWOLDMONOQ45511
PREPARED BV O AT P RFVTSEO
1 APPROVEO BT 1 OATF !
! APPROVED BV i DATE :
PREMISES
cr>e
*tr\ um.t
Cof*t.-UM`T
TS/AJ* vM.r C.sr
Stf
/ 474
(,.Z,0
&*** 8,1 0%
4.bSo 4.S47
1.444 1.44?
0-/77 U o4U
SuoS
4.4,4 "
1.444
S-9>4 '
_____Stins2_'5_~__o_3_/______?~_5_7_ ________ _/_4_4_i __________ 4T.S*39a
1 CWEPITS BASEQ o
------- 1 .
1 ! t
Wo?SACTO Ch> Ml* Al CoiMPANY
PRODUCTtON COST ESTIMATE
-iecd on o,e//~*>i. <?7.a - tmi
viEL0 onCJWRflw ..
- rH(
'/tftfif'i*. ` ' " .
i
&*
_ _ _j_
/opT_ _ _ cth/.2S*eo**r__"_`S _ ; /24.03o
^sejSSSb^eil. 43.*eo
Sr*Z7.............. Crttr**M>e_
/is. 33o'
5 &>_**_>_/z,,3*__-JjV'/v`pst-i*"r_i.__._._.._.._.___'_1. _ __ 4o44o_
f pnSf
oka*-** _
_t
5 fi**i77 '' '&&** 7.7."'7. i...
< _2i?7 - A foA>*cr`ffct <jnc- C/trDWSj.
* ___ ' __; _ Sun' t
_ &33W944.47|_S4''
___ _84h434[>*_
____ e 11______ ......#/*s;.
44.Z44 r
>-*y .1.7
. .. ...................g//*si_
2 ef 4-
LS/todj____
; <Vco*r.P5.C^__
7, _. ..'. k2~.3B7r~b\ _^_7. :' ' ' 2.>yg____
5&/ - 721-'
'ML
o QEP^eci ation was ___ OCPPECI AT ION BLOG 1 Q FACTQOV INOIOeCT EXP.
TQTAC WCWfCT '^ONV, TOTAL PRODUCTION COST
5 Shipping COST
TOT AC PROOUCT COST
0199295
TOWOLDMONOQ45512