Drafted Date:2 July 2021
Finalized Date:27 July 2021
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
The Woods at Farm Road Construction
From:Andrew Spejewski, Enforcement Officer
Thru:Stephanie Tougas, Enforcement Officer
To:File
I. Facility Information
A. Facility Name:The Woods at Farm Road Construction
B. Facility Location: Farm Road
Bolton, MA 01740
C. Facility Contacts: James Hryniewich
Rhino Construction Company, LLC
171 Newtown Road
Acton, MA 01720
978-502-0702
james@rhinoma.com
D. NPDES ID No (s).: MAR10034L
II. Background Information
A. Date(s) of inspection: July 1, 2021
B. Weather Conditions: Cloudy, scattered rain during the day
C. US EPA Representative(s):
Andrew Spejewski
Rachel Olugbemi
D. State / Local Representative(s):
Rebecca Longvall, Conservation Agent, Town of Bolton
Valerie Oorthuys, Town Planner, Town of Bolton
ED_019088A_00019722-00001
E. Federally Enforceable Requirements Covered During the Inspection: NPDES
Permit for Discharges from Construction Activities (" CGP ")
F. Previous Enforcement Actions: No enforcement known by EPA.
III. Type and Purpose of Inspection
Evaluation of compliance with the CGP requirements.
IV. Facility Description
The site is a residential development, south of Farm Road and east of Berlin Road,
covering one to two acres. The area is fairly flat, with a slope down just south of the west
end of the site, and a gradual slope down to the south and east off the site in other areas.
At the time of the inspection, the site had been partially cleared, with the pre - existing
meadow grass remaining on the eastern part of the site. The western portion was mostly
bare dirt with the loam removed. Construction entrances led to Farm Road to the north
and Berlin Road to the east. One concrete foundation was in place in the west part of the
site.
V. Inspection
Mr. Spejewski phoned Mr. Hryniewich the day before the inspection (June 30) and
arranged to meet at the site.
A. Opening Conference
The four inspectors arrived at the site at about 10:00 AM. Present were Mr. Hryniewich,
of Rhino Construction, and Seth Donohoe, of Dillis and Roy Civil Design Group. Mr.
Spejewski presented his credentials to Mr. Hryniewich and provided a copy of the Small
Business Information Sheet. Mr. Hryniewich explained the project, saying that Rhino
Construction was not the owner, just hired to do site work. Mr. Donohoe said his firm
prepared the SWPPP and he carried out the operator inspections of the site erosion
controls required by the NPDES permit. Mr. Hryniewich said the project began in March
2021, and that work was currently stopped to address concerns from the Town. He said
the site was previously mostly a field, with a small maple sugaring shed that had been
removed.
B. Records Review
Mr. Donohoe produced a paper copy of the Stormwater Pollution Prevention plan
(" SWPPP ") and paper copies of site inspection reports. The SWPPP was not signed. It
identified Rhino Construction as the operator. Inspection reports included reports for
3/25/21, 4/1/21, 4/8/21, and many others through 6/18/21 and 6/24/21. [see pictures 19-
22]. Inspection reports noted specific issues and some included photographs of relevant
spots on the site.
2
ED_019088A_00019722-00002
C. Facility Tour
The western end of the site was cleared and bare soil with the loam / topsoil removed. The
only significant erosion was leading into the foundation area (with no drainage leading
away from it). Along the north side of the site, a small area of white deposits appeared to
be concrete wash - out onto the bare dirt / grass.
Both construction entrances had fresh gravel and no significant mud deposits. A short
slope down to the south was mostly undisturbed and had silt roll and silt fence at the
bottom; there was no sign of concentrated flow or deposits. A stockpile (apparently loam)
stood in the center of the site. Mr. Hryniewich said it had been hydroseeded. The area
around it and to the east was apparently undisturbed pre - existing grass. A line of silt
fence ran around the perimeter, in the middle of undisturbed grass. One small shallow
gulley led through the grass to the south past the silt fence. There was no sign of
significant erosion or deposition. A plastic tank and spray nozzle were lying in the grass,
next to a five - gallon plastic bucket with the lid on. Mr. Hryniewich said the tank was just
water. The site sloped slightly down to the east, with a line of silt fence in undisturbed
grass.
D. Closing Conference
Mr. Spejewski noted that concrete wash - out should be done in a designated spot; he also
noted the small gulley would be the most important place to keep an eye on in the future
for erosion. The group then arranged to meet at Keyes Farm (another site in Bolton
operated by Rhino Construction) for an inspection there, and all left the site, at about
10:30 AM.
Picture List:
IMG 2317.JPGSWPPP cover page
IMG 2318.JPGSWPPP contacts page
IMG 2319.JPGOperator site inspection 3/17/21, page 1
IMG 2320.JPGOperator site inspection 3/17/21, page 2
IMG 2321.JPGOperator site inspection 6/24/21, page 1
IMG 2322.JPGOperator site inspection 6/24/21, page 7
IMG 2323.JPGDetail, slope near foundation
IMG 2324.JPGWest edge of north border of site, showing concrete debris
IMG 2325.JPGSite entrance, west side to Berlin Road
IMG 2326.JPGSite border, south of west end of site
IMG 2327.JPGFacing southeast from east part of site, over stockpile
IMG 2328.JPGFacing east along south border of site
IMG 2329.JPGNortheast edge of site
* END *
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
3
ED_019088A_00019722-00003
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.