PROGRESS REPORT
TECHNICAL SERVICES DEPT. -W.G. KRUMMRICH PLANT
JOB NO.
91570:3285
REPORT NO.
1 Pinal
DATE
12/ 22/ 65
W.G. KRUMMRICH PLANT
*[jj H.C. CARDER
J. J.
Qj.m. CONNAUGHTON
Q T.W. DALTON
0P.E. HEISLER
.0 D. E. Harris [3 H.B. PATRICK
0 J. R. McClala *gg V. Brawlej^** t)
RESEARCH
GENERAL OFFICE
Luecken
g) D. UANNA (4 ) * P.W. EDWARDS
gjj D.B. HOSMER
f{3 C.E. ANAGNOSTOPOtf'Z/g
H.L. MINCKLER
'
.
: -
0 J.A. MULLENDORE L.E. KLEIN' gg R. E. Soden *0 N. L. Sample
OTHERS
SO. 2ND.
* L.L. FELLINGER
jro
* J.E. SMITH
Q W.R. KELLOGG
ANNISTON
* UC* FUHRMEISTER
AVON
* Ks ELLINGSON
Anniston
*m V. R. Haupt
^3 R. H. Taylor
*1x1 D. C . Arm-
* strong
*Q 0. E. Dolin
TO RECEIVE DETAIL SECTION
TITLE:
AROCLOR: Redesign Chlorine Sparger
personnel: D. R. Middleton (J. R. Savage)
problem: Report status and job closing.
.
summary:
The purpose of the new ring sparger (SK-3285) was to provide more
uniform distribution of CI2 in the ehlorinator. It was felt this might result in more stable Aroclor. The ring sparger was installed in NO. 4 ehlorinator 10/64. At that time, no satisfactory method of analyzing its effect was available.
In May 1964, all the chlorlnators were sampled for low-boiler content of the crude and a designed experiment was run to determine what chlorination variables effect this low boiler content. These tests showed no significant difference between No. 4 ehlorinator and Nos. 1 and 5> which contained a pan-caike and a pipe sparger respectively. Chlorlnators 2 and 3 produced crude with less low boilers than 1, 4, and 5 but further test indicated no correlation between these measurable low boilers and stability. (See TSD Reports 91570:3198 Nos. 2 and 3.)
In the latter part of May 1965, the test sparger was removed from No. 4 ehlorinator. The higher pressure drop (necessary for uniform
gas distribution) across this sparger slowed the chlorination rate in No. 4 ehlorinator.- Chlorination rate is the bottleneck when making 1248, 1254, and 1260.
DSV\I 311628
CONFIDENTIAL INFORMATION
This document in the property of Monsanto Company and the recipient is responsible for its safekeeping and disposition. It contains confidential
information of Monsanto Company which must not be reproduced, revealed to unauthorized persons or sent outside the company without proper
authorization. Either retain in secure files or destroy.
________________________ ______
--
______
FORM WGK BOO REV-t/OB
STLCOPCB4071614
91370:3935 (1 Pinal)
2
December 22, 1965
Future Work At this time, TSD recommends that any future work concerning chlorination techniques and kinetics be. done by laboratory or pilot plant studies.
This job is closed.
DRM:gg
D. R. Middleton Technical Services Department
OS'N*16*' STLCOPCB4071615
91370:5285 (1 Pinal)
APPENDIX A
JOB SEQUENCE
Item
^
Job'Opened Work Order 5-5695 ($350) Project Package Submitted Project Installed Evaluation Job Closed
December 22, 1965
Date 7/8/64 7/15/64. 7/17/64 10/15/64
5/65 12/23/65
DSW 311630
STLCOPCB4071616