Document 0gbwD7yRJrxmmv1Nx6pLvJYvn

PROGRESS REPORT TECHNICAL SERVICES DEPT. -W.G. KRUMMRICH PLANT JOB NO. 91570:3285 REPORT NO. 1 Pinal DATE 12/ 22/ 65 W.G. KRUMMRICH PLANT *[jj H.C. CARDER J. J. Qj.m. CONNAUGHTON Q T.W. DALTON 0P.E. HEISLER .0 D. E. Harris [3 H.B. PATRICK 0 J. R. McClala *gg V. Brawlej^** t) RESEARCH GENERAL OFFICE Luecken g) D. UANNA (4 ) * P.W. EDWARDS gjj D.B. HOSMER f{3 C.E. ANAGNOSTOPOtf'Z/g H.L. MINCKLER ' . : - 0 J.A. MULLENDORE L.E. KLEIN' gg R. E. Soden *0 N. L. Sample OTHERS SO. 2ND. * L.L. FELLINGER jro * J.E. SMITH Q W.R. KELLOGG ANNISTON * UC* FUHRMEISTER AVON * Ks ELLINGSON Anniston *m V. R. Haupt ^3 R. H. Taylor *1x1 D. C . Arm- * strong *Q 0. E. Dolin TO RECEIVE DETAIL SECTION TITLE: AROCLOR: Redesign Chlorine Sparger personnel: D. R. Middleton (J. R. Savage) problem: Report status and job closing. . summary: The purpose of the new ring sparger (SK-3285) was to provide more uniform distribution of CI2 in the ehlorinator. It was felt this might result in more stable Aroclor. The ring sparger was installed in NO. 4 ehlorinator 10/64. At that time, no satisfactory method of analyzing its effect was available. In May 1964, all the chlorlnators were sampled for low-boiler content of the crude and a designed experiment was run to determine what chlorination variables effect this low boiler content. These tests showed no significant difference between No. 4 ehlorinator and Nos. 1 and 5> which contained a pan-caike and a pipe sparger respectively. Chlorlnators 2 and 3 produced crude with less low boilers than 1, 4, and 5 but further test indicated no correlation between these measurable low boilers and stability. (See TSD Reports 91570:3198 Nos. 2 and 3.) In the latter part of May 1965, the test sparger was removed from No. 4 ehlorinator. The higher pressure drop (necessary for uniform gas distribution) across this sparger slowed the chlorination rate in No. 4 ehlorinator.- Chlorination rate is the bottleneck when making 1248, 1254, and 1260. DSV\I 311628 CONFIDENTIAL INFORMATION This document in the property of Monsanto Company and the recipient is responsible for its safekeeping and disposition. It contains confidential information of Monsanto Company which must not be reproduced, revealed to unauthorized persons or sent outside the company without proper authorization. Either retain in secure files or destroy. ________________________ ______ -- ______ FORM WGK BOO REV-t/OB STLCOPCB4071614 91370:3935 (1 Pinal) 2 December 22, 1965 Future Work At this time, TSD recommends that any future work concerning chlorination techniques and kinetics be. done by laboratory or pilot plant studies. This job is closed. DRM:gg D. R. Middleton Technical Services Department OS'N*16*' STLCOPCB4071615 91370:5285 (1 Pinal) APPENDIX A JOB SEQUENCE Item ^ Job'Opened Work Order 5-5695 ($350) Project Package Submitted Project Installed Evaluation Job Closed December 22, 1965 Date 7/8/64 7/15/64. 7/17/64 10/15/64 5/65 12/23/65 DSW 311630 STLCOPCB4071616