PLANTS
Puget Sound
' , ,
DEPARTMENTs
RP&& - Docks .
" ,
.. ..
CLASSIFICATIONS Pumper Helper A . ' . TRAINEES
1111 lilt I IT1I--nailBitin ifTIT^w'-^^^n.flWIT-r--IVl^-l. ,*
------------ -r* f.
--------V m-miflT iumpr-n... ,...-. [,^^11 n,T-V--t
B n . ON-. THE JOB TRAINING - . ' ;
DATE . ' .
: 1, Load tank ears . : . . ..
NAME uCmaiMiq
.20 Load, tank trucks.
''
: ; 3o Load, tank oars, LPS.and Butane ,
'`
4. . Load tank trucks; LP8
.
..
' % Unload tank cars ' a, Refinedoil and slop oil
,
b0 Petrox
;
c,, Additives
.
60 Unload tank cars IPO and Butane
- . To Unload tank trucks LPG- .
8. ' 9o
Handle Records and Reports
Charge odorant and methanol drums .
{LFG shipments)
.
10o Assist with meter proving - Truck Rack ilo Petrox trailer.truck
12. Inject Petrox in gasoline shipments
a. Tank trucks
. 13 o ' Unload TEL fluid tank cars
`
14, Sample Spheroids
,
15o ffauge tanks
l60 . Prepare pumpa for repairs
27o Ullage gauge cargoes
l8. Assist at Blending Plant
WA-TEX 001802
.
.......... .
JOB CONTENTS
' PLANT; : ` 1 7,, \/. Puget Sound .'; DEPARTMENTS . RP&S ~ Docks ; ;
CLASSIFICATIONs Pumper Helper A ..
Bo ON THErJCB- TRAINING
TRAINEE
t.iiwilmn
--
: ' DATE
Jrr-kjtTFnmfiB'
NAME
Adju-stpumpand mixer packing
;SIop oil /system
;
21 o Slop, oil injection, 22 10" utility. system
.
"t- /; -
2$^.' Ship.;spent .caustic to N*W* Petro~. . '
chemical -
' *
... ' ' ,,
.24 o Deliver-t 0FL
'
,:
25o Operate' automatic crude sampler
NOTE; Bumper Helper A also required to perform all items " ""r"\ listed on the Job Content- of the Pumper Helper ,B,,
Employe Qualified
Signed;
Date (Foreman)
WA-TEX 001803
JOB -BREAKDOWN
tmi'i'-'i ^iTM'rn**
PLANTS: , ; - : Puget Sound- v.-- - DEPARTMENTS 4 RP&S - Docks CLASSIFICATIONS Pumper Helper A OPERATIONS. . B-r Load Tank Cars
^ 'j^ORTANT:iglSPST`T**'*"' V ''. " ""...ICY
-- 11 i^D
n i^--w#'him n>~rrrTf*"*^~"^* ' m.fim 11
1 * m 1 ' mf
I4v-- Ofen'eT'aT XhfbrMatlon- Tajik-- chfsttto toe ;loaded.'?-wi;iijivEe^s^pt^ed'' :
v ' "'
' ' on.;th0:
'?
sd< that - loading. spout^':eEh^toe;;^Stocl!
in dome ,6f cars for!-:Ti,iiirig0i Tankf'cars .
will toe.. of different. siaesv. j-/. /, _. '
Always load cars with-the.outlet cap '
off. .and only a dripping of the liquid '
is .permissible,,
.
\'- / -- '
26 Safety Equipment : '
The tank car rack is equipped- with'the following equipment't-0 prepare .and load cars in a safe manner :
Safety Toe Boards to be, used-, as a means of reaching the' car .dome,,
DO NOT JIMP FROM RACK ONTO OARS,
b, Q-as mask* with breather hose,, .safety harness and safety line to be used by' the loader when a ear has to be
entered for cleaning.or internal inspection made of the outlet valve
and seat, NEVER ENTER A-TANK CAR which has omnmrmmmm--
MillPfSriOTWI*rTOlTOTlfe
;""
sTatX6Hed~orTTHe"outside of the car
at the dome,
'"
C o A wooden or aluminum ladder equipped with safety feet approximately 8 feet long to be used inside'the-car which affords a means for the man to enter oar for cleaning and inspection,,
a, A bucket made of ep&rk proof material
e,, A small broom,
fo A vapor proof permissible type flashlight,
.
/
WA-TEX 001804
m
" - V,`:i 11V-: V? '" : . JOE-BREAKDOWN
PLANTS-'-
J Puget Sound - "
1,
DEPARTMENTS
RM-S - Docks
PLA$,SI^C&TX6N{... /Bjaagajf Hklfcei? ;A . . ' OPERATION s ' Load Tank cars (jonty)
mA`r me 2
4*r-
IMPORTANTSTEPS iih f wUjjjjil
KEY.POINTS :
gvA . bottle;-o'Pt.N9^og-P<aii?''-.oiA.anirig;'" lenses in gas mask, . . y-'o
3-' Rrspare to Load
'hi An explosidn-"pJ?dof .signal-hpnn cf . the self-powered type tc summon 'help, in'case/of <emergen6yi;v:-- Ik.N
a. Place BLUE PLAO near' switch point V. beyond"'head. qiT~rack and open block'valve to'rack'. ' : Vv ;.,:
b. Check form R-84 and identify cara
to be loaded.,
. '. . -
Co Lower safety toe - boards or* to car,'
using care that the board is secure^
ly supported.
' -
do Remove dome cover and. swing to top
side .of dome.
.
'
e. Inspect car to see if it IS empty,, If more - than-4" of product is found
in the car,, notify your supervisor before taking the next "step." /, . ' '
fo Inspect-car for cleanliness. If usual inspection from top of dome reveals the oar is clean and no: water present* not. necessary toenter ear for cleaning. If oar . appears'dirty it will be necessary to enter and clean.
g. Check outlet valve in closed position.
,h,,.Loosen cutlet cap by unscrewing a couple cf threads to release any pressure which may be in the outlet 3 eg.1
1. Remove cutlet cap from leg as soon
as pressure le released.
'
( WA-TEX 001805
JOB BREAKDOWN
PLANT? .
` .Puget Sound
..
DEPARTMENTS; RP&S Docks .
CLASSIFICATION s Pumper* Helper A
OPERATIONS
B"i: Lead Tank Cars (Cont*)
B-l
: Page. 3.;<;
IMPORTANT STEPS/.
WIOTI n -iiirMn--gl--<1 IWn
KEY POINTS -
3,, : Prepare to Load:
j * Open outlet valve using handle or V: -
/---- y;:. ^heel- inside.'. ciar.'dbme.'ailpwing:. car'. /
to 'drain; off into sewer.
= ' k* Close outlet valve, after . car has ' 7 ;\
' Vdrained*
'
v;"
. 1* Place loading arm over dome of car*.
m. Place loading spout inside car and. '. -
then connect to loading am*
',
n* Cover dome with vapor shield on all
. gasoline cars*
.
4* Load Car'
` . a. Open valves on rack riser and loading arm and fill car*
b* Lead all ears ahel.l-full *
'
1
e* All, ears filled MUST he loaded at least, to shell^full* ,
d* Lay car seal in relief valve hous- . ing of car on dome,
.. '
. e. Fill out sample tag and place on
' "grab" rail of dome while car is
loading*
,
'
' -
f* Replace undercap on outlet leg* . after car is loaded* Cap not to be replaced if excessive .leakage occurs *
.,
g, Remove loading spout and swing loading arm clear of car*
5* Prepare Car for Shipment
a* Gauge car with Dorris gauge stick which is provided on rack*
, -
b* Place thermometer in car and allow
to remain at least two minutes and then take temperature*
WA-TEX 00180$
, V- 7,
'V
7 '-'job breakdown . - 7 '
777,' . V
' ..'/ ,:Page; '4 "v v'7
.....FMNTs : :
; Puget Sound:. , . ......
.. 7.:7\?.7. V;7;: ;"} 77;7
DEPARTSfeNfs - ' RP&S-Doeks
' '
CLASSIFICATIONS Pumper Helper A
/:
........................ ..... '
OPERATIONS
B"1 Load ^ahk C&ra (Confc. ) .
.
; .' .. v
.IMPORTANT STEPS
,
. KEY POINTS
<:.
7 5o :Prepare Car7for
7 o.' Thief car .'for water
!
7.-7 7 shipment" (Cont.) "; -; -
. ; .,7''; '7- -':7!
.7;7-7;
', '/77.7' 7 '.7; ;/ ; -7'77 . : do Record gauge temperature and water 7 :
77'" .
. . thief on R=>84.
7: ' -7'7-7 -; " '7
''
: 7 e* Take one 4^^ average sample fr.om;--. 7 ' -7
.
' car.and .tag bottle*
.
: 7, ' .;
.
.
. . .! .
.NOTE; Samples are to be. protected,! ... 7
, , from sunlight until taken,tip ; ..
Laboratory,,
''
'
'
" ''
.
'. '
f. Close dome cover and bolt or screw
down securelys noting that dome
gasket is in good condition.
.
. -
g. Seal dome cover and record seal ' number on R-84.
h. Pinish filling out R~84 in required
captions.
.
i. Place "Dangerous" placards In holders on both ends and both sides of car if loaded with gasoline.
j-. Inspect car for any leakage,, especially the undercap.
k. Notify Pumper that car is loaded.
. The Pumper is to inspect the car
as to sealing* placards and any
possible leaks.
.
NOTE? Cars are not to be shipped In a leaking condition.l.
l. Pumper to sign R~84 for "General Inspection.''
m. Close block valve to loading rack.
'i it
WA-TEX 001807
M7'" /'7 -W5.)/
7 -7V"
7?,.7-' 7 . - '
*' .:~rT`rT^7T... , P?tge 5him in in iim 111 ii Min pup in mill i ' ; . . ;. ,., ' -
' ,
: '
; v-'-v-^/ 7 7:7^77:^..=,,...
DEPARTMENT?
RP&S - Docks 7
,
CLASSIFICATION? "Pumper; Helper A '
.
: : . ... V ,,
>;;OP3SRfel?ipN>,-i:
B-1' Load Tank Cars (Cpnt.) - ;.
;7;v.!7 7
7: ^;.^cMP0iCTAjra^^^
.
__ *.r- -
- *'-......................... -' in- -
riniiMiifr iwn-imrnrmiMii rinimMrf'iHi ir~'-iiiiirirrT`inm-~nr"-`T rr-~tnTTti
---------------- i**--*--1 ""
; ;`'3 o
-i= -= '`--ii'i' iVp^La^e^^acsltf
' - gk^ptne:nt; (Cent.,, :)/ 7'7 < 7eturningtooM7e^
.
,, 777' 77'7'7777777. , use.d;;`br.: l-pa^lng^to;^
.777%'
- ":'7
locations. ' 77;. 7'7: 7'':'7'`
V:--7-7.-7 7 ] \ 77' ... V - p.-;.Wash';ciowp;any qilr^romuleaks otf .7.
.777 , .
spills into the. rack sewer..
7.777y,'
v p. Remove-. Bite Flag. 7. 7/ ' '
7 ' " `7
7.77
.
- ;--- . >' q. Take R84 card arid sample to
.-
Laboratory.
.
,
7777j .V. , >/. "/'%-U
WA-TEX 001808
JOB BREAKDOWN
PLANT*
r;- ' , .! Puget Sound
DEPARTMENT*
RP&S'- Docks .
CLASSiHCATIONs ' Pumper Helper A : !
QpBf&TlbN?:^ /. -;B.-2 Load [Bank' Trucks,
B~2 ' ' page. 1
- IMPORTANT STEPS
- -iTWi^miii ii ^ihi^ii ijin i hi-inrTTil' ,ii ith.imimi
i in -- ii - --
1 ,>> ,prepbre: Truck: to . ... a o
Load :
'
: KM
-- ----1
*--
Spot .truek with
desired loading
POINTS " T~~~"--...
. { f, ----
dome hatch .under
spout.
'.-r
r^-
A.
- v/..
bv Shut 'of .'truck motor,'" ' i-~;S' " '/r-r!-'
. c,,. Driver to set, brakes.-
'/
' '
`
do Lower, safety toe board.to truck,--.
- , ,1; ' - . . V '' '
e, Connect static wire to body of- ' truck.'
f. Throw, switch on grounding circuit to "5S," and cheek grounding light,
. , g. Remove cover from loading hatch,
.
., . ' \
h. Inspect compartffient(s) for cleanTM linessd If truck last loaded gaso~
, line and is to load with Burner Oil or'Diesel9 a small amount of product is . to be flushed into truck' ooraparfcment and drained out, Gasoline will
' lower the flash point on products mentioned above.
'. . -.
1* Caution driver that all truck outlet . . ' valves are to be closed and truck
. lights off.
'
. 5..Caution driver to keep hands off '
meters,
.
. .' .
.
k,.Caution driver to do no work on
truck.
.
1, Lower loading spout and place inside . loading hatch.
ra. Insert ticket In meter and record ' "opening" on ticket with hand lever.
n. Set stop meter for desired amount. .
/ WA-TEX 001809
V
JOB BREAKDOWN' " '/ ^
;
' .:' /
. /. '"'7'' 'I... \
M\
=Page %,
. PLANTS
Puget Sound
. ,"7' 7/.
DEPARTMENT2
; RP&S - DdckS
` < ,-- > ,
< ClA'iSBIFICATXON i '' Pumper Helper4 A . .
: .: ;
:-
OPERATION'S B-&;3^'dvTankv.Trueks, (Ce>ht;r);.7 . ' .7.'
;
. ;.
'' ;sMPom!BtT^
:[
/ 3 7
; s2V;^';Doad: T?^ote%;-;.' /V-y; 'av\Open;yalye,'ena>;ioad;.ti?uek:' to;..they 7.7
:7'
''/''/artourxt' shpw4V-`ofe;^^'o|vv-Th'JLs can
. :
' '77'.77-.. y .
77 /
be .idete^in^d;:b5r;yr%a4iLpgy,the counter 7.. =.
/ V. .-
; ' / ' ''
or. r.egiister/ott''*' f!>7 '' 7/
V; ; '
' : ''
. / - ;
Remove./loading: sp.put's'and' Replace7
' ,/. hatch cover. - -7/.
.
.
c. Record closing;. pit meter ticket with -
hand lever and. remove ticket.
..
d. dive truck driver copy, of ticket : which will also serve as a Bill of
` Lading.
e. Throw grounding switch, to "OFF"
position.
'
f. Disconnect static wire.
g Pull up toe board..
h0 Record truck number* product loaded*
amount metered' and time, on the truck
loading report. ' '
-
NOTE; Heavy Fuel Oil trucks will be weighed in arid out in stead of . metered.
3. Sealing Trucks . .
There may be cases when truck compart merits and outlets will be` required to be sealed. In such, cases* record seal
numbers on truck loading report.
c WA-TEX 0018X0
\
.PLANT? .
DEPARTMENTS ... CLASSIFICATION s OPERATIONs: '
JOB. BREAKDOWN-.
Puget Sound ,; RB&S - Docks, . \ pumper Helper A B~3 Load Tank Cars,
PRge^I. LPG and .Butane
.; -. :; important" steps^^ :.? V'T:;'/-. Wpoints "
^
I ' >SenegalV,inforfliatlon: .C^^feAin . Regulations
C' :: - ^uf,eauiOf ;..E^^lp3ive% re<|nii?fe'.l5hnt; ;':^
- v-v-t
; .-." . -. .tfeV .cheeky "dll-- joarsiKe&c&e;
>Li> `i
. -'"
" ' them' 'toil? oydvQ.vd tasting; Sates ,,;y "'V;/'
. ..
.
These are found on the right hand
. end: of -the car as you face it from
.-
,'
eithef .sideo. You will .find; there
. . the date-.the car,was!built and' last ,
.............. . ... ' . ; date; ,car: and'pR.'s. were teBted..
, :. ' .
'
A' check, list will be. issued and from
this you can determine when the next
' testing is due. if overdue-., we do-,
. not load the car 6
.
-
.` .
Check car carefully before you start to lead to see that all fittings are. visibly in good condition - plugs are present and in place, etc, -
.
., .
.
' . ..
If after starting to load, any leaks
occur that y6'u cannot repair, shut -' . down- loading and advise Pumper or .
Foreman.
2,, Prepare Car for
a. Erect barricade at each end of .
Loading
' loading rack and place Blue Flag
. across track and open cock (block
. valve) on loading line. -
': ,
b. Set car brakes.
..
' . c,, Lower safety toe board from rack
..
on to car.
..
-5 -
d. Remove metal cover or plate on
\ steel housing at top center of . tank car.
m-TEX 00X811
-i
'' ;
JOB BREAKDOWN "
' B~3. '
- . . PLANTS-
... ,-.v..Page.2' -;
' Puget Sound i. .'
. ....1
. DEPARTMENT.?,
RP&&-!Docks
'
:`
;
CLASSIFICATION 5 . Pumper..Helper Ay /
` ;
OPERATION? . . B^3 Load ,.Ttek: care --LP0. and. -Butane .'-(fiont..-)
V' : ;v , ,,
:
.. . important-.Steps 2, Prepare car far: ' v Loadirtg' (Coht;). ;:
3,, Connect Loading Hose
y.y,y
^.KEY .POINTS';:, : :
e, Remove' plugydndyopenV/l/Vl' valve on > . ,: y,
''samplingscannedtloh which<:e&$endiC'v'y::.;'Ay'/V;-:
- -thranghcvhe -ljinanboie: -dOver', &o>-;the*'.yC;
. sump in theybottomof .the. 'car.
': "v ' \yy
. Allow enough vapor or gas to "blow"
to empty the sump in bottom of carpv . :
and of. any water:.which occasionally
/
may be in the sump when .ears have' . `.
. beep unloadedwith air#
' . .
NOTE; '
L0P,G (Propane) vapors remaining. in an empty car
normally are dry,, however, some tank cars are returned containing vapor saturated with moisture This is particularly true when butane has been shipped in a propane
car the previous trip,
. .
f, Exhaust wet gases thru the.1/4" bottom' sampler connection,
a. Connect the. 2" liquid and the 2" vapor, hose to the liquid and vapor connections Inside the tank dome,
NOTE? These' are 2" screw angle
globe valveswhich are
'
flanged to the dome cover.
The 2".liquid eductor valves
.
are connected to 2" lines, ."
which extend to the bottom of-
the tank ear shell. These
' lines are used for unloading
as well as^loading, In each
line, there is a plug type ex-
cess flow check valve, which
is not affected by loading
. operations, but which will
close to prevent escape of
In event a valve or
line is broken, or if the
valve is opened suddenly.
If an excess flow check valve
closes, the 2" globe valve
WA-TEX 001812
' ' '' " / ' '
JOB BREA,KDOWN
-
`' '' '> C`
...
; .... ,
Pag 3:
r,-
PLANTS
;
Puget Sound;
; ' fv -''V'O'
DEPARTMENTS
RP&S - Docks
'
: , ' - " '
v- <
CLASSIFICATIONS . Pumper**. Helper A ;,
......." ;.
; ' ' : ;
OPERATIONS
B-3: Loa^'Tank .Oars: -:LPO. and- Butane -(Gopt*
: V.'
IMPORTANT. STEPS - .= ' .-oV-- '</.\,\",KEr POINTS.:' /' >
: 3> .: connect .Loading
Hb.se (Cont e)
"
. . : . :
.
' .
.'
, : '.i,.4p\UMb^s \,(0bnfc,j,,);' :
;-
; h/./t'pgjjb'uiik'bexcib&edi^
: . '
/-fis#.;<jli4iS,K",Vs3!ve.sM'l3lAli-
as the pressure equalizes In the
t
line6 .
:V [,']_[ /[''; V.
.; .
- > ...
.
,
bo Check and make sure that liquid and
vapor hose are made'up tight tothe
. tank ca^ioQnnee.ftons and i.support;. .
- hose If necessary o
' - - . .; . ' ' , . .
;
c'o Close vents on gauge and bottom ,
.
. sampling.connectionso
;'
.
. `
-
-
'
Notes Due to tank car spotting In
relation to our rack' cennec-
tions it is very possible '
that 2" nipples and ells
- . will be used to make a satis-.
factory connection of the.'
liquid and vapor hose,. The
nipples and ells.of various.
lengths Will be available
. on tank car rack.-
d,, Remove plug and lower thermometer
in thermometer well of ear.
'
4. Start Loading Tank Car -
.
a0 Check form R-84 for all necessary information such as correct car number, outage gauge and destlna-
tion.
-
b. Open 2" liquid valve in dome of car.
Co Open 2" vapor valve in dome of car*
do Record pressure in car on R"84.
e. Open vapor line on rack.
f. Start loading pump.
g. Open liquid line on rack.
h. Throttle flow with rack liquid . line valve as desired.
A -
WA-TEX 001813
V
.......JOB BREAKDOWN:: " ' ' - -
- B-3 ~r:r/.
'r^r;, y -t;
...
., - . page '4-
PLANT?s
Puget Sound , . . :
.:-V . . ; -
v!/w
DEPARTMENTS , RF&S - Docks
.
. ,;
>
CLASSIFICATIONs Pumper Helper A . . . ; ;
,
OPERATIONB~3 Load Tank Cars - LPG arid Butane (Cent.),
"
IMPORTANT STEPS
5. Check Car While . Loading - V
KEY POINTS
a. Check car while.filling In order -feo . de^ej^h"-;i^:-1;hia-i-har'^ ':heirig:':ihadedi'> . at the' desired t^te\:;;;A^hlS;-Achec,kf''ari: be made by first, opening the valve . onther.sample/Xirie.y and;: bleed, bffy. . making' sure;- that 1'ig.uid' is- ehterit^ . the car,. Then^' second., to determine the rate at which; tbe. car l'S; loadingis- to nse .the..slip tube' onV-the;-gating device , . The- gauging slip tube does not extend into the .well at. the. bottom of the car/.so when ,appraxl., mately.12" Of liquid is, in the car' the slip tube'can be lowered as far as possible and then vented . When liquid appears it is known that, car la filling. Be sure to close 1/4" vent when finished checking.
6. Apply Odorant
'.' . .
.
a. Open connections.on odorant drum into
the liquid filling line arid supply ,
' the required amount of Ethyl Mercaptan
while the car is filling'. When com
pleted, close off .on odorant, drum and
liquid line connections..
`.
.
. .
NOTEg
Odorant required can be added
to L.P.G. at any time, but it
is preferably added soon after
loading starts, as the odorant
becomes well mixed by the
agitating action caused by
loading the remainder of the
car.
.
. 7 Filling the Car
.
b. Methanol is to be added - October 1
to April 30. .
a. Grasp the slip tube firmly with one hand and unlock the hold-down latch with the other hand.
' b. Raise the slip tube slowly to about' the half-way point of the car capacity.
WA-TEX 001814
PLANTS DEPARTMENTS CLASSIFICATION s
OPERATIONS
JOB BREAKDOWN
B~3
Page 5
Puget Sound
RP&S Docks
Pumper Helper A
B-3 Load Tank Cars - LPQ and Butane (Cent.)
IMPORTANT STEPS
7. Filling the Car (Cont.)
KEY POINTS
e* Open 1/4'* valve on gauging tube and vent when it Is expected that the ear should be approximately half full, .
d Raise or lower the slip tube at a
very slow rate until liquid starts to discharge from the vent valve.
e. Close vent valve and read outage gauge opposite the fixed pointer.
NOTES DO NOT HOLD FACE OR ANY PART W W"BODY mUcTL'f M1 THE
8. Topping!Out Car
a. Check outage gauge shown on the R-84* when the car is over half full.
b. Raise slip tube to a point where the tube will read an additional 4" of outage than the outage shown on the R~84. As the car fills bleed off at vent valve often enough* so that the car will not over*=fill.
c. Set the slip tube at the same outage as shown on R-84 as soon as the car has filled to the first setting.
d. Stand by ear with vent on slip tube open.
e. Close off liquid line on rack as soon as liquid starts to discharge from the vent tube.
f. Close off vapor return line on rack and liquid* and vapor loading valveson car.
! WA-TEX 001815
PLANTS DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
Page 6
Puget Sound
RP&S - Docks
Pumper Helper A
B-3 Load Tank Cars - LFG and Butane (Cont.)
important STEPS
8. Topping Out Car (Cont.)
KEY POINTS
g,, Reeheck outage gauge on car with that on R~84 If outage is more than that shown on R-84* open rack valves and bring car up to required gauge. If outage is less than a half Inch of that shown on R-84* notify your super visor.
h. Insert gauge and pressure readings on r-84.
i. Shut down L,,P,,G. pump. '
9. Take Temperature of Car
a. Remove thermometer from well and quickly read temperature.
b. Insert temperature on R-84.
NOTEs
The Shipping Department may require a temperature when car is about half full. In such cases take temperature and phone to office..
If the temperature on the car at the half way point is lower
or higher than the Shipping Department used to figure the _ outage gauge* the contents of ' the car will have to be re - figured and the outage gauge changed on R-84.10
10. Moisture Test ,
After the car is loaded and depending on
customer specifications* it may be re
quired to test for moisture by the cobalt
bromide method to be sure the product is
satisfactorily dry before shipment. If
the test shows that the L.P.G. is web*
it may often be dried by venting for a
few minutes. If ear remains wet after
venting for a reasonable length of time*
notify your supervisor.
WA-TEX 001816
PLANT? DEPARTMENTS CLASSIFICATION s
OPERATIONS
JOB BREAKDOWN
Puget Soured RP&S - Docks Pumper Helper A B-3 Load Tank Cars
B"3 Page T
LPG and Butane (Cont.)
IMPORTANT STEPS 11. Sample Car
KEY POINTS
a. Attach flexible tube from sample bomb* furnished by Laboratory onto the sampling connection In the dome housing of the car.
b. Open valve on vent line of car and Inlet valve on bomb.
c. Slowly open the outlet valve on the bottom of bomb and allow bomb to fill.
d. Close off bomb and tank car valve when liquid appears at outlet of bomb.
. e. Disconnect bomb and slowly bleed
small quantity from outlet for two seconds to allow space for liquid expansion.
f. Tag sample bomb showing the date*
product* tank car number and sphere loaded from. Store bomb in a pro tected or shady location until taken to Laboratory.
12. Disconnect Hose From Car
.a* Check that all valves and vents in
ear dome are closed and the liquid and vapor line valves on the rack
riser are closed.
b. Open vent valves on rack risers into the venting system and release the liquid and vapor return hose of product and pressure. The venting system ties into a vent stack* located a safe distance from the
loading rack.
e. Disconnect hose and fittings from
tank car and store hose on rack as
provided#
WA-TEX 001817
PLANT? DEPARTMENT? CLASSIFICATION? OPERATION?
JOB BREAKDOWN
B~3
Page 8
Puget Sound
.
RP&8 - Docks Pumper- Helper A
B-3 Load Tank Cars - LPG and Butane (Cent.)
IMPORTANT STEPS
12.,, Disconnect HOse From Car (Cont.)
KEg POINTS
d. Replace screwed plugB in all valves
in car dome including thermometer
well,,
"
' e. Check slip tube to see that it is not leaking*
f. Replace slip tube gauge housing.
g. Check carefully to see that no valves or connections are leaking.
h. Lower dome housing and attach seal.
1. Fill out all necessary captions on form R84.
j. Place placards* labeled "DANGEROUS-
LIQUIFIED PETROLEUM GASES" in all placard holders on tank car.
k. Close off block cock to tank car rack.
, 1. Remove toe board.
ra* Remove "Blue Flag" if no other loading at the rack Is taking place and remove barricades.
n. Notify Pumper to make general inspection.
WA-TEX 001818
JOB BREAKDOWN
PLANT? DEPARTMENTS CLASSIFICATIONS
OPERATIONS
Puget Sound RP&S - Docks Pumper Helper A B-4 Load Tank Truck L.P.G.
B-4 Page 1
IMPORTANT STEPS J,, Safety Precautions
KEY POINTS
a0 Do not allow any motor driven vehicles to approach rack while truck is loading.
b. Shut down loading and any venting of truck if another truck is re quired to be spotted for loading. When second truck is spotted and motor turned off o.k. to again
start loading first truck.
NOTEs If area is gaseous do not permit any truck to enter or start motor.
2. Loading Order
a. Check loading order issued by Shipping Department. Do not load without order.
3. Prepare Truck For Loading
a. . Weigh truck on scales and stamp tare weight on weigh ticket,
b. Spot truck on rack for loading,
e, Shut off truck motor.
d. .Set hand brake.
e. Open vent valve on truck and determine that truck is empty
and free of moisture.
f. Connect liquid and vapor hose to truck connections. Be sure hose is made-up tight.
Load Truck
a. Open truck loading connections.
b. Start loading pump.
c. Open both liquid and vapor lines on truck rack.
d. Regulate loading valve on rack .liquid line as required.
WA-TEX 001819
JOB. BREAKDOWN
PLANTS DEPARTMENT?
CLASSIFICATIONS OPERATION;
Puget Sound
RF&S - Docks Pumpe'r Helper1 A B-4 Load Tank Truck L.P.Or.
(Cont.)
B-4 Page 2
______IMPORTANT STEPS
4. Load Truck (Cont,,)
KEY POINTS
e* Driver sets dial gauge on truck to determine if product is loading correctly#
' ' NOTE; The gauging device on a truck includes a dial with pointer
and can be set to load to any desired outage0
Extended from the pointer Is a vent valve and operates on the same principle as the tank car vent on the slip tube,
f. Check gauge on truck while loading to establish the loading rate,
g. Open connections on odorant drum and inject necessary odorant.
h Repeat operation adding Methanol (when required).
I. Set truck gauging device to desired outage.
j. Vent gauging tube until liquid L.P.O. starts to discharge from vent valve.
k. Shut down loading by first closing liquid line on rack and then vapor
line on rack.
l. Shut down loading pump.
m. Close off truck loading connections.
5. Moisture Test
a. Check truck for moisture If required by the cobalt-bromide method.6
6. Sample Truck .
a. Sample truck if required, using
special bomb container as described
under Loading Tank Cars L.P.0.
-
\I WA-TEX 001820
JOB BREAKDOWN
PLANTS DEPARTMENTS CLASSIFICATION s OPERATIONS
Puget Sound RP&S - Docks Pumper Helper1 A B-4 'Load Tank Truck L0F.G.
(Conb.)
B4 Page 3
xmpMtant STEPS
7p Disconnect Hose From Truck
KEY POINTS
' ' 7Z1~
a. Check and make sure all valves and vents on truck are closed and liquid and vapor line valves on rack are closed o
b Open vent valves on rack risers into the venting system and release the liquid and vapor return hose of product and pressure,,
" ' Co Disconnect hose from truck and store at loading spot as provided.
d. Replace and make up tight any caps or plugs on truck connections,
, s, Weigh truck and stamp gross and net weights on weigh-ticket.
f. dive one copy of weigh-tieket to driver.
g. Record truck number, product loaded, amount loaded and time on the truck loading report.
h. Attach weigh-tieket to truck loading report =
I WA-TEX 001821
PLANOJs
DEPARTMENTS CLASSIFICATION? OPERATIONS
JOB BREAKDOWN
B-5-A Page 1
Puget Sound
.
RP&S - Docks
pumper Helper A B"5 Unload Tank Cara (a) Refined Oil & Slop Oil
^ IMPORTANT~STEPS '
.... . KEY POINTS ~
1, General Information The RP&S Department wills at times he required to unload bad order and offtest tank cars5 and in addition* cer tain additives such as Petrox and Rust
' Inhibitor which will be received in tank cars for unloading into RP&S storage* Cars to be spotted at Blend ing Plant.
2. Unload Tank Cars ,
a. Place Blue Flag and light across track.after car has been spotted at unloading connection*
b* Set hand brake on car.
c. Break seal on dome and record on . Form R-84 along with car number.
d. Gauge, temperature* thief and ' sample car and record on R-8A,,
e Check outlet valve handle in the closed position.
f. Loosen outlet cap enough to release any pressure on outlet leg and then remove cap.
g. Connect unloading hose to outlet leg and to suction of unloading pump,
h. Open outlet valve on car.
1. Determine where to pump and set right-of-way to receive.
j. Open suction valve and start pump* then open discharge valve on pump manifold.
k. Unload car and when car is empty* shut down pump and close manifold.
l. Notify Assistant Pumper and close off right-of-way.
WA-TEX 001822
PLANTS DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B5~A
Page 2
Puget Sound
RP&S - Dock#
Pumper Helper A
.
B-5 Unload Tank Cars (a) Refined Oil & Slop Oil)
(Confc.)
IMPORTANT STEPS
2,, Unload Tank Cars (Cont,)
KEY POINTS
m,, Close outlet valve on tank car* replace dome cover on car and bolt r screw down and turn placards (if present) to empty or blank side,
n. Disconnect unloading hose and store
and replace outlet cap on leg of
car. '
'
o. Remove Blue Flag if no other opera tion taking place at rack.
p. Fill out all necessary information on R-84.
q. Notify Assistant Pumper to record 1 information on pumping record.
WA-TEX 001823
JOB BREAKDOWN
PLANT? DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound
RP&S - Docks Pumper* Helper A
B-5 Unload Tank Cars (b) Petrox
B-5-B Page 1
IMPORTANT STEPS (b) Petrox
KBT POINTS
a, Place Blue Flag south of the Petrox unloading spot (Blending Plant Area}.
b. Notify assistant pumper to line-up and gauge Petrox tank to receive.
c. Break seal on car dome and record number on R-84.
d. Gauge car with Dorris gauge stick*
temperature* thief and sample record this information on R-84.
e. Check outlet valve in closed position.
f. Loosen outlet cap enough to release any pressure on outlet leg and then remove cap.
g. Connect unloading hose to outlet leg and suction of unloading pump.
h. Open outlet valve on ear.
i. Open suction valve on pump manifold and start pump.
J. Open discharge valve on pump and unload car.
k. Close off on pump manifold when car goes on air and stop pump.
l. Close outlet valve on tank car* re place dome cover and bolt or screw down.
m. Disconnect unloading hose and store.
n. Replace outlet cap on leg of car and cap on suction line at unloading ' pump.
j WA-TEX 001824
PLANT.: DEPARTMENTS CLASSIFICATIONS OPERATION:
JOB BREAKDOWN
B-5-B
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B"5 Uhload Tank Cars (b) Petrox (Cont.)
IMPORTANT STEPS
(*) Petrox
(Cont)
KEY POINTS
o. Remove Blue Flag if no other tank car operation taking place on this spur.
p Fill out all necessary information on R-84.
q. Notify Assistant Pumper to gauge
receiving tank and record informa tion on Pumping Record.
WA-TEX 001825
JOB BHKAXaOiffi v l it ww<uii>
PLANT?
Puget Sound
DEPARTMENT
RP&S - Docks
'
CLASSIFICATIONS Pumper Helper A
OPERATIONS
B~5 Unload Tank Cars (c) Additives
IMPORTANT STEPS
KET POINTS
) I It "--,l
" 1
ii r n I' II raW-y,
f rwr i .fji?f^iigtM%wirtntiTMr.
*"=--' ii r iw r
/
(c) Additives
The unloading of additive tank ears, such as Rust Inhibitors will be handled the same as unloading Petrex tank cars at same location.
WA-TEX 001826
PLANTS DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B-6
Page 1
Puget Sound
RP&S Docks
Pumper Helper A
B-6 Unload Tank Cars, L0F,G. and Butane
IMPORTANT STEPS
1, Prepare Car For Unloading
KEY POINTS
a. Install Blue Flag at north end of tank car rack and erect road barri cades at each end of rack.
b. Set oar brakes,
c. Lower safety toe board on to car
and make secure,
,
d. Break seal and record on R-84,
e. Remove metal cover or plate on steel housing at top center of car,
f. Unscrew housing around slip tube gauging device,
g. Gauge and temperature car and record on R-84, being careful
that slip tube does not spring up and strike face or body when it is unlocked.
h. Connect unloading hose and neces
sary fittings to the liquid and vapor valves on tank car, being sure these connections are made up tight,
1, Sample car with required sample
bomb connected to the 1/4" sample valve on riser.
2, Unload Tank Car
a. Notify Assistant Pumper and make line-up at sphere and at Blending Plant,
b. Open block valve and suction valve, at unloading pump manifold at tank'
car rack.
c. Open vapor line valves on manifold, rack and tank car dome.
WA.-TEX 001827
PLANT? DEPARTMENTS CLASSIFICATIONS OPERATION?
JOB BREAKDOWN
B"6
Page 2
Puget Sound
RP&S Docks
Pumper Helper A
B"6 Unload Tank cars, LoPodp and Butane
(cont.)
IMPORTANT STEPS
2. Unload Tank Oar (Conto)
REST POINTS
d,, Open valve on liquid riser line and crack open the liquid line connect tion on tank ear*
e, Start unloading pump and then crack open discharge valve on pump manifold
f The liquid valve on tank car can be adjusted In the open position along with the discharge on the pump manlfold to a point when the ball check inside tank car connection can be heard, making a rattling noise0
g. Should ball check lock on tank car connection, close the liquid line valve on tank car rack .and allow ball check to unlock. Then open the liquid line valve on rack until the ball check starts to rattle. This indicates that liquid is again leav ing the tank car,
h. Use slip tube gauging device to determine the unloading rate,
i. The suction valve in tank car dome
and the discharge of the pump will have to be adjusted as the car un loads in order to maintain the' maximum rate.
j,, When only vapors escape from the slip tube lowered all the way down
into the car, then start testing for liquid with the sampling connec tion.
k. When only vapors escape from the sampling connection on the car, close off both liquid and vapor lines on rack and stop pump.
WA-TEX 001828
PLANTS DEPARTMENT; CLASSIFICATION! OPERATIONS
' JOB BREAKDOWN
B-6
. Puget Sound
Page 3
RP&S - Docks
Pumper Helper A
B"6 -Unload Tank Cars, LoP0C and Butane
(Cont*)
IMPORTANT STEPS
3,o Disconnect Car
v5* , ,
,, '
KEI POINTS
a* Close off liquid and vapor valves on tank car,
b0 Vent hose into venting system*
..c* Disconnect hose and fittings and storeo
do Replace all plugs in connections
on car dome* screw housing around
sampling device and close dome
cover*
.-
e* Raise toe board
f* Notify Assistant Pumper to close off unloading system to sphere*
g* Close off pump manifold and block . valve to rack*
h* Turn placards on tank car to
blank or empty side*
-
. i* Remove Blue Flag and barricades*
Fill out all required captions on R-84 and notify Pumper for inspec tion*
k* Take sample and R-84 to Laboratory*
1* If car or fittings are found to be defective* notify RP&S Foreman by note or phone*
WA-TEX 001829
PTJVKFP **
DEPARTMENT; CLASSIFICATION: OPERATION;
JOB BREAKDOWN
Puget Sound RP&S - Docks Pumper Helper A B-7 Unload Tank Trucks,
L.P.G.
` and
B~7 Page
Butane
1
IMPORTANT STEPS
l, Prepare Truck For unloading
KEY POINTS___________
a. Weigh truck on platform scales and stamp gross weight on scale ticket*
NOTE;
If truck has been loaded at another point and coming into our plant, driver should pre
sent bill of lading before
unloading *
b. Spot truck at L.P.G. truck rack.
a. Notify Pumper to line-up sphere and lines to receive truck.
d. Connect liquid and vapor hose to
truck,
e. Gauge, temperature (and sample truck if required) and record this information on the truck unloading report,
2. Unload Truck
a. Open block valve and suction valve at unloading pump manifold at truck rack.
b. Open vapor line valves on manifold, rack riser and truck.
e. Open valve on liquid riser line and
crack open the liquid line connec
tion on truck.
.
d. Start unloading pump and then crack open discharge valve on pump mani
fold .
e. Adjust the liquid line valve on truck and the discharge of the pump to obtain maximum flow without lock ing the ball check valve on truck.
f. Gauge truck to make sure unloading is taking place.
W&-TEX 001830
PLANTS DEPARTMENT? CLASSIFICATIONS
OPERATIONS
JOB BREAKDOWN
B=7 Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B-7 Unload Tank Trucks, L#P#G# and Butane
(Cont #)
n IMPLANT STEPS 2# Unload Truck
(Cont.) '
3. Disconnect Truck
KEY POINTS
'
g When pointer is turned to empty on truck dial gauge and only vapor is
. discharging with vent valve open, truck is then empty.
h,, Close off liquid and vapor valves on risers and stop pump.
a* Close off all unloading connections on truck#
b Vent hose and disconnect#
c# Replace all caps and plugs on truck unloading and gauging connections *
d # close off unloading manifold.
e# Weigh truck on platform scales and stamp "tare" weight on ticket#
f# Give driver one copy of weigh ticket#
go Record truck number, product "IN" and "OUT" times on tank truck un loading. report and attach weigh tieket to same.
h# Notify Pumper to close off unloading system to sphere#
j WA-TEX 001831
PLANTS
DEPARTMENTS CLASSIFICATIONS
OPERATIONS
JOB BREAKDOWN
B-8
Puget Sound
Page
RP&S - Docks
Punier Helper A
B-8 Handle Records and Reports (a) Tank Cars
"important steps
~~ *
-- KEY "poSIts
1- General '.
' ' '.
.
There are certain records and reports
to be handled by the Pumper Helper A
which are necessary to carry out his
' duties,
`
2, Prepare Form R-84 (a) Form R-84 Tank Car Loading Report
When tank cars are to be loaded the
R-84 is furnished by the Shipping Department showing the car number, product to be loaded, destination and order number. The tank car loader uses this form to record the required information such as gauge* temperature, outlet valve, inspection
seal number and condition of car.
The R-84 is also used when unloading
tank cars,,
.
O
WA-TEX 001832
PLANT? DEPARTMENTS CLASSIFICATIONS
OPERATIONS
JOB BREAKDOWN
B-8
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B=8 Handle Records & Reports (b) Tank Trucks
IMPORTANT STEPS 1. Meter Tickets
KEY POINTS
a. Gasolines, Jet Fuels, Diesels and Burner Oils Will be metered into trucks.
b A meter ticket Is used to record amount of product loaded. When a truck is to be loaded, the ticket is to be placed in the meter and stamped "IN" or opening,,
c. When the truck has finished loading
the meter ticket is to be stamped "OUT" name f product loaded inserted, time "IN" and ''OUT" recorded, and ticket signed by loader and driver.
d. One copy to driver and the other two copies are to be kept in rack office
1 and then taken to the Blending Plant control room at the close of the day's
business.
e. The meter ticket is also used as a bill of lading.
2. Tank Truck Loading Report (R-207)
a. A record is to be kept of each truck loaded, listing the truck number, product loaded, amount, destination, . seal numbers and times "IN" and "OUT".
b. This record will also be taken to the Blending Plant control room at end of
day's business.
3. Seale Tickets
a. Trucks loaded with L0P6G. and Bunker Fuel will be weighed "IN"
and "OUT",
b. A scale weigh ticket will be used to record tare and gross weights of these trucks.
c,, The scale ticket is also a combined bill of lading and is to be handled exactly the same as the Truck Meter tickets.
| WA-TEX 001833
JOB BREAKDOWN
PLANTi DEPARTMENTi
CLASSIFICATIONS OPERATIONS
Puget; Sound
RP&S - Docks Pumper Helper A B~8 Handle Records and Reports
B-.8 Page 3
IMPORTANT STEPS
lo Gauge Book -
,
'
2. Report of Ship's Tanks Form R-68
KEY POINTS
a. All "hand gauges", taken with regular gauging tape, temperatures taken with hand thermometers and water thiefs are to be recorded in black gauger's hand book at the time gauge is taken. This includes ullage gauges on ships and barges.
b. Should an Incorrect gauge be in serted in gauge book never erase, bub circle gauge and initial, then write in correct gauge.
c. Insert time gauges are taken in gauge book.
do Sign for all gauges taken in gauge book,.
e. All gauge books will be picked up and returned to Blending Plant con trol room.
a. Report of Ship's Tanks, Form R-68 are to be filled in completely by the person who has taken the ullages.
bD Make out three copies of this form; one copy (original) for Stock and Shipping Dept., one copy for ship and one copy for RP&S Department.
o. Form R-68 will be required for car goes received, before discharging and after ship is empty.
d. Form R-68 will also be required on ships coming in empty to load out. r-68 is to be made out before the vessel starts to load and again
after ship is loaded.
e. When R-68 properly filled out, have Mate sign.
f. Have Mate or Captain sign Notice of Readiness report.
'
WA-TEX 001834
PLANT t
DEPARTMENT; CLASSIFICATION % OPERATIONi
JOB BREAKDOWN
B-8
Page 4
Puget Sound
.
RPSeS - Docks
Pumper Helper A
B8 Handle Records and Reports (Cont*)
IMPORTANT STEPS
3o. Bill of Lading .
KEY POINTS
a. All tankers loading out will require a Bill of Lading* This form is made up by Shipping Dept* in 3 copies.
4* Vessel Loading Report -
Form R-253
b* Have Master of vessel sign all 3 copies In Ink* The Master keeps one copy and the other two copies are to be turned in to the Blending Plant Control Room along with the gauge books*
a. All barge loadings require Form 253
b* Make out 3 copies of this formj one
copy (original) for stock and. Ship**
ping Dept.s one copy for barge and
one copy for RP&S*
.
a* After R-253 properly filled out,
have barge Captain sign*
'
d* This form to be turned in to the Blending Plant Control Room*
5, Declaration of
Inspection Prior to Cargo Transfer
a. All vessels required to make out in duplicate*
b. Original to vessel - copy to RF&S office.
O
(
i WA-TEX 001835
JOB BREAKDOWN
B-9
PLANT? DEPARTMENT: CLASSIFICATION:
OPERATIONS
Puget Sound
RP&S - Docks Pumper Helper A
B-9 Charge Odorant and Methanol Drums T/C & T/T
. IMPORTANT STEPS
___________ KEY POINTS
1* General Information Ethyl mercaptan is delivered to the
Truck rack in 5 gal. cans and is used
throughout the year to odorize LPG
. shipments
.
Methanol is delivered to the truck rack in 55 gal. barrels and is used in LPG shipments to protect against freeze-ups of moisture which may accumulate from October 1st to May 1st,
Requirements for tank car rack are delivered there by RP&S Department in 5 gal. cans.
Two SO gal, drums* for mercaptan and methanol* are provided at each location.
At the truck rack* the methanol is transferred from the 55 gal. barrel to the 20 gal. drum using a standard barrel pump.
The mercaptan is poured from the 5 gal. can to the 20 gal. mercaptan drum-.
The same operation Is performed at the tank car rack.
2. Safety Precautions
Methanol is a toxic compound and requireb careful handling.
Rubber gloves and a face shield are required when transferring this prod uct from one container to another as when it Is handled openly.
If splashed in the eyes, flush immedi ately with water, and send employe to the First Aid room.
Avoid inhaling fumesii
If splashed on the skin; flush with water immediately.
Remove contaminated clothing immedi ately and wash skin with water.
WA-TEX 001836
JOB BREAKDOWN
B-10
PLANTg DEPARTMENTS CLASSIFICATION s
OPERATIONS
Puget Sound
'
.
RP&S Docks
Pumper Helper A
B-10 Assist with Meter Proving-Truck Rack
IMPORTANT STEPS
KEY POINTS
General Information
All products loaded Into tank trucks for shipment will- be metered with the
exception of Bunker Fuel Oil and L.PoGo which are weighed.
Proving Meters
At certain Intervals the product meters will be checked for calibration to
determine their accuracy0 The pumper Helper A will assist with this opera tion as directed by the Pumper.
-'i
WA-TEX 001837
JOB BREAKDOWN
PLANTS DEPARTMENTS GLASSIFICATION s OPERATION s'
Puget Sound RP&S " Docks Pumper- Helper* A B"ll Petrox Trailer Truck
B"ll Page 1
IMPORTANT STEPS
KEY POINTS
lo General Information Only a portion of our gasoline ship raents will contain Petros when leav ing the plant.
' On tanker loadings for Seattle and Portland Terminals, gasolines will
he shipped WITHOUT the addition of Petrox. On"TaFge "loading of all gasoline for the local area, Petrox
will be ADDED to these shipments and for these deliveries a trailer truck
is provided, to handle the Petrox supply.
The trailer truck will be placed at the Petrox loading spot In the Blend ing Plant area, loaded and hauled to the Dock,
2. Pill Petrox Trailer
a. Connect static wire.
NOTE; Necessary to use static wire
while filling trailer because gasoline will be mixed with the Petrox In storage to cut viscosity account of cool weather handling.
b,, Open trailer hatch and gauge amount
of product and record in gauger's ' hand book,
c. Notify Assistant Pumper to gauge and open tank suction line to loading pump.
d. Open loading valve to trailer and suction valve on pump manifold,
e. Start pump and open discharge valve,
f. Pill trailer and close off discharge
of pump and stop pump.
.
g. Close off loading valve to trailer and suction on pump manifold.
j WA-TEX 001838
JOB BREAKDOWN
PLANTS
DEPARTMENT? CLASSIFICATIONS OPERATIONS
Puget Sound
. RP&S - Docks Pumper Helper A B-ll Petrox Trailer Truck (Cent*)
B'-ii Page 2
IMPORTANT STEPS
20 Fill Petrox Trailer (Cont.)
KEY POINTS
h Take gauge and temperature of trailer and record in gauger's book*
i Disconnect static wire*
Notify Assistant Pumper that
trailer is loaded and Petrox
storage tank can be gauged and
Information recorded on Pumping
Record.
.
( WA-TEX 001839
PT.ANT
DEPART!NTs CLASSIFICATION? OPERATIONS
JOB BREAKDOWN
6-12
Page 1
Puget Sound
RP&S - Docks
Pumper- Helper8 A
B-12 Inject Petrox In Gasoline Shipments
(b) Tank Trucks
IMPORTANT STEPS
KEY POINTS
1. General Information Petrox will be injected in all grades of gasoline. The concentration of gaso-
, line in the petrox may vary from time " to time thus the amount of mixture added to the shipment will vary. (Consult Additive Book and Operating Instructions
for latest quantity.)
2. Safety Measures
. 3. Prepare to Inject
PetroX
Since gasoline is mixed with Petrox in varying degrees, it will have a very low "flash point" and high suscepti bility to static generation. It Is* therefore, essential to treat it with the same care in handling as you would Avjet or gasoline.
a. Set "Stop Meter" on product riser for desired amount of gasoline.
b. Open 1" block valve on Petrox line (at switch station) to desired riser (north or south side).
c. Turn selector switch on panel to N. or S. to correspond with i" block valve selection.
d. Start Petrox pump by pushing start
button.
.
4. Inject Petrox
a. Start flow of product to truck com partment by pressing down lever on Set Stop meter until it locks.
b. Petrox mixture will flow at a pre set rate into the product until meter reaches the desired quantity to be loaded and shuts off. (Petrox pump will continue to run until
shut down manually.) If further Petrox injection is required in other compartments, move spout to ' desired compartment, re-set Stop Meter and press down lever on meter until it locks and flow Is resumed
through meter.
WA-TEX 001840
W
PLANT* DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B~12
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B-12 Inject Petrox In Casoline Shipments
(b) Tank Trucks (Cont.)
IMPORTANT STEPS
"
iti'i i n hupiiii > ira'liii iiw ml rt-rtti~~*~TnrMgi
'--
XBI POINTS
'
5 Shut Down Injection a. When Petrox Injection is completed on a truck -
Shut off pump by pressing stop button,
b, Close 1" block valve on Fetrox Hne"at Petrox Injection Station,
6, Check Operation
. "
a. Daily, compare meter reading (open and close) on Petrox line at least once per day. Cheek Petrox meter on each system to
see that proper amount is being injected. Chart at rack shows amount to inject per 10 ga.1^ 50 gal., 100 gals., etc.
W&-TEX 001841 I
JOB BREAKDOWN
PLANTS DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound RP&S - Docks Pumper Helper A B-13 Unload TEL Fluid
Tank
Cars
B-13 Page 1
IMPORTANT STEPS
w-C-|TrtrnTM--~
-4~t '
2. General Information
.
H..M m nii.Tmi uln
KEY POINTS im i
............
___ _
iwm i
Special training will be given to each
member of RP&S Dept, expected to handle
unloading of TEL cars, etc, and the
following Breakdown is a guide in the
order 'best suited to do the job here
at Puget Sound. As an example, the
DuPont standard instructions require
washing the tank car with gasoline
after the car is unloaded. Here at
Puget Sound we will not wash the car
with gasoline and will return same to
DuPont containing a small amount of
TEL which will be credited the refin
ery. This is in accord with special
instructions from DuPont. Regulations
are posted at TEL plant governing the
handling of Tetraethyl Lead Compounds.
o, Prepare to Unload Car
a.. Place blue flag on track at South end of car.
b. Set brakes on car.
c. Check weigh tank in lead room and be sure there is ample room to re ceive the contents of the car.
d. . Change to white clothing provided for wear while unloading TEL.
e. Put on protective gloves and have gas mask ready,
f. Break seal on dome and remove cover.
g. If any TEL fluid has leaked into dome from car, let car stand and
report this to your foreman AT ONCE. A lead spill or leak would be recog nized by a yellow stain or a
"sweetish" odor from the tetraethyl lead.
j WA-TEX 001842
'
PLANTS DEPARTMENTS CLASSIFICATION s OPERATIONS
JOB BREAKDOWN
B-13
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B-13 Unload TEL Fluid Tank Cars (Cont.)
IMPORTANT STEPS
2. Prepare to Unload Car (Cent.)
KEY POINTS
h. A yellow tag will be found Inside the dome with net weight of car written on tag. Save tag as a guide to check weight of lead re ceived when car is unloaded.
NEVER SAMPLE A TEL CAR.
i. Read Weight-O-Oraph or scale and make record of opening weight.
J. Close vent on weigh tank,
k. Start eductor pump and circulate gasoline through the eductor* pulling vacuum on weigh tank.
3,, Connect Hose
a. The unloading hose is of flexible metal and supported on a swing arm*
which can be raised or lowered to make connection with either a 6000 gal. or a 3000 gal. tank car.
b. Swing hose from, side of lead bldg, to a position Just above the dome of the car.
c. Crack open unloading valve on metal hose and all valves back to tank.
d. Remove cover or plate on end of hose and .also remove cover or plate from unloading connection in dome of car.
e See that ground Joints are free from any dirt and connect securely* the
unloading hose to the unloading out let in dome of car,
4,. Unload Car
a. When 10" of vacuum obtained on weigh
tank* open valve on unloading line
.Into weigh tank.
b. Then open unloading line on car. After flow is established open the vent on car.
| WA-TEX 001843
PLANTS DEPARTMENTS CLASSIFICATION s OPERATIONS
JOB BREAKDOWN
B-13
Page 3
Puget Sound
RP&S - Docks
'
Pumper Helper A
B-13 Unload TEL Fluid Tank Cars (Cont.)
IMPORTANT STEPS
4, Unload Car (Cont,)
KEY POINTS
e. Watch for increase in weight of weigh tank as car is being un loaded ,
' d* When weigh tank indicates that car is within 5000 lbs. of being empty, close down on the discharge valve
to the weigh tank. This is to slow down the lead leaving the car and
will give the inside walls of the car a longer period to drain off
any TEL into the small amount re maining before ear goes on air.
5, Disconnect Hose
a. When car goes on air, gauge will show slight decrease in vacuum on eductor manifold, indicating that air is passing from the car.
b. Install vacuum gauge on vent nozzle.
c. Allow vacuum to build to approximately
5", (Car must have a minimum of 3" of vacuum when shipped,)
d. Close valve on weigh tank.
e. Close vent on car, and at same time . close valve on end of unloading hose,
f. Close unloading valve on car.
g. Disconnect unloading hose and re place blinds on end of hose and
over discharge valve on car.
h. Remove gauge and plug nozzle.
i. Replace dome cover.
J. Shut down eductor pump,
k. Close all lineups.
I# Reverse ear placards should read "Dangerous Empty".
WA-TEX 001844
PLANTS
DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B-13 , Page 4
Puget Sound
RP&S - Docks
'
Pumper Helper A
B-13 Unload TEL Fluid Tank Cars (Cont.)
IMPORTANT STEPS
a----mii-- mm i iimmrfr
5. Disconnect Hose (Cent.)
KEY POINTS
m. Remove blue flag from track and store,
n. Fill out TEL tank car unloading report. Send card to RP&S office.
6, Special Rules and Regulations
a. Special training will be given by Manufacturer's representative on regulations for unloading and handling of TEL AntlKnock compounds.
b. The latest rules and regulations pub
lished by the DuPont Corporation shall be adhered to, in regard to handling tetra-ethyl lead compound,
e, No operator is to be involved in the handling of these compounds unless he has had a physical examination by a doctor authorized to give TEL
physicals.
| WA-TEX 001845
JOB BREAKDOWN
PLANTS DEPARTMENTS CLASSIFICATION s OPERATIONS
Puget Sound
RP&S - Dooks Pumper Helper A B-14 Sample Spheroids
b~i4
IMPORTANT STEPS
KEY POINTS
1. General Information Spheroids are pressure type vessels and extreme care is to be exercised
when sampling* They are provided with ground level sampling stations*
2* Safety Precautions a* Use gloves to protect hands from freezing*
3* Prepare to Sample - a* Slowly open valve on sample bleeder to blow foreign material from sam ple nipple, then close valve*
b. Screw one threaded end of bomb to sampling connection* The free end of bomb pointed up*
' c* Open wide both valves on bomb*
d * Slowly open valve next to bomb on permanent sampling .connection*
e. Allow flow to pass through bomb until only liquid flows from open valve*
4* Take Sample
a* Close valve on outlet of bomb* Close valve on Inlet of bomb.
Finally, close valve on permanent sample connection and slowly dis connect bomb*
b. Bleed small amount of liquid from bomb by opening one valve a very small amount then closing* (This allows room for expansion of product*)
e* Tag sample bomb and deliver to Laboratory*
I WA-TEX 001846
JOB BREAKDOWN
PLANT? DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound, RP&S - Docks Pumper Helper A B-15 Gauge Tanks
B-15 Page 1
IMPORTANT STEPS
KEY POINTS
1. General Information All tanks In RP&S tank farm are equipped with automatic remote con
trol gauging equipment and ground level reading gauges at each tank. However* it will be necessary at times to "Hand Gauge" in order to check the automatic equipment. Hand gauging is also required when
receiving foreign crude both by tanker and pipe line* and in special
cases on finished products.
2. Definition .
The term gauging' includes the measure ment of the height of the oil surface above the tank bottom* the amount of water at the bottom* and the tempera
ture of the oil.
3. -The Tape "
The steel tape used generally is marked in feet* inches and eighths of Inches. It is wound on a hand reel. A brass plumb bob Is fastened with a snap to the bottom of the tape.
Inage Gauge
a. Ground body by firmly grasping the steel hand rail or touching the
roof of the tank with the bare hand.
b. Remove gauge hatch slowly and stand to windward* in order to avoid breathing escaping vapors.
c. Wipe tape clean and lower into tank until tape gauge lightly
touches bottom of tank. The steel tape should touch the side of the gauge hatch at all times* bo as to avert formation of static electricity* which may Ignite vapors in tank.
d. Rewind tape until oil level marking on tape is brought up out of tank.
WA-TEX 001847
JOB BREAKDOWN
PT.ftWT
DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound RP&S - Docks Pumper Helper A B-15 Gauge Tanks (Cont.)
B-15 Page 2
IMPORTANT STEPS
4. Inage Gauge (Cont.)
KEY POINTS
e. Read oil cut, the exact place of the oil marking on the tape indi cates the height of Oil in the tank, and this is called the tank gaugec
f. Record gauge in gauger's hand book*,
5 Outage Gauge
a. Ground body and remove gauge hatch slowly.
b. Wipe tape clean and lower gauge bob
until a short length of the tape is in the oil.
c. Read the tape at the bench mark in the hatch and rewind tape.
d0 Read the oil marking on the tape and subtract this reading from the reading taken at the hatch marking.
e. Subtract this difference from the posted tank height and the result
obtained is the measurement of the oil in the tank,.which is the "tank gauge".
6, Ullage Gauge
a. Ullage gauge is taken exactly the same as the inage gauge, however, the empty space in the tank is recorded instead of the amount
of product.
b,, Ullage gauges are used on tankers.
To Water Gauge (Thief)
a. Coat tape or thief rod with approved water detector paste.
b. Lower tape or thief rod to bottom of tank.
c. Hold tape or rod motionless for a few seconds (longer in heavy oil), then withdraw.
! WA-TEX 001848
JOB BREAKDOWN
PLANTS DEPARTMENTS CLASSIFICATION %
OPERATION;
Puget Sound RP&S - Docks Pumper Helper A B-15 Gauge Tanks
(Cont.)
B-15 Page 3
IMPORTANT STEPS
7, Water Gauge (Thief) (Cont.)
KEY POINTS
,
do Read water cut oh tape or rod at point when paste has changed color,
e. Record In gauger's hand book,
8 ,, Temperature
a. When it is necessary to hand tempera ture a tanks a thermometer mounted on a metal scale, inserted in a
brass tube is used,
b,, Lower thermometer to approximately midway into the oil in tank.
c. Allow thermometer to stay in this position for one minute (longer for heavy oils) and then withdraw from
tank.
dD Read quickly the temperature.
e. Record In gauger's hand book,
9, Sign Gauge
a. When complete gauge has been re corded, then initial gauge and show time gauge was taken.
b. Should a mistake be made when inserting gauge in book, do not erase, but circle and write In correct gauge on line below.
WA-TEX 001849
JOB BREAKDOWN
PLANT? . DEPARTMENTS
CLASSIFICATIONS
OPERATIONS
Puget Sound RP&S ~ Docks Pumper Helper A B-16 Prepare Pumps for Repairs
B-l6
IMPORTANT STEPS
.. T.-a*jn.' > , Tyrant
1 Safety Precaution When Pump Comes Down for Repairs First
KEY POINTS
a. Open switch on master control panel In the "Off" position,,
b. Place safety pin through slots across the starter buttons at pump base and lock out.
c. Block all valves on suction and dis charge sides of pump.
Open all bleeders to oily water sewer only and allow pump to drain as much as possible.
e Inform Machinist or fitter as to
pump's service In order that he may take necessary precautions to pro tect himself from leaded gasoline,
caustic or acid In pump, also as a guide in the use of correct packing when pump is not equipped with seal
rings,
2, Major Repairs
a. All pumps which are to be removed from operating areas for repair work to the shops, or open areas shall be made free of flammable
gas or liquid,
b. Attach Safety Work Permit Form R-241-A to pump showing it Is gas free and safe for hot work, if nec
essary, This precaution shall be taken to eliminate the possibility
of an accident occuring should It be necessary to perform hot work on the
pump while It is in an "open" area,
and to eliminate the Issuance of a Hot Work Permit,
3, Minor Repairs
a. If minor repairs are to be made and pump not moved from operating location. It will not be necessary to "gas free" pump.
WA-TEX 001850
JOB BREAKDOWN
PLANT;
DEPARTMENTS CLASSIFICATION; OPERATION;
Puget Sound RP&S - Docks Pumper Helper A B-17 Ullage Gauge Cargoes
B-17 Page l
IMPORTANT STEPS 1, General
KSg POINTS
When vessel is properly secured at berth* gangplank out and static wire connected* the ship's ullages can then be taken.
2, Prepare to Take
Ullages
.
a. Note docking time and draft of vessel and record on R-68,
bo Contact Mate and find out if any**
thing unusual should be noted re garding the cargo* such as one ,, compartment leaking into another
which would change the ullage gauge on both compartments from
the figures shown at loading port.
. c. Inquire if any free water is pres ent in cargo to the best of Mate's knowledges If so notify Pumper0
3o Take Ullages
a Ship personnel to loosen covers.on
all gauge hatches,
`
bo In the company of the deck officer* Ullage gauge each ship's compartment containing cargo and record in gauger's hand book,
c. With flashlight or mirror Inspect
, those compartments which may be
'
emptyo
'
d Thief each compartment for water,
e. Take temperatures of compartments and record in black gauger's book,
f* Compare Ullages Just taken with those of loading port. Mate has a copy in his possession.
g. If there is a noticeable difference in the gauges on any compartment* '
recheck the ship's tank in question.
I WA-TEX 001851 l
JOB BREAKDOWN
PLANT? DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound. RP3?S Docks Pumper Helper A B-17 Ullage Gauge Cargoes (Cont*)
B.-1J Page 2
IMPORTANT STEPS
KEY POINTS
4, Fill Out Form R~68 a. Fill out In triplicate Report of Vessel's Tanks, showing all Ullages taken, product aboard vessel, name
. of ship and all captions for a com plete report*
Original copy for stock and shipping department, one copy to Mate and one copy for RP&S office.
WA-TEX.001852
JOB BREAKDOWN
B-l8
PLANTS
DEPARTMENTS CLASSIFICATIONS
OPERATIONS
Puget; Sound
,
RP&S - Docks
Pumper Helper A
B-l8 Assist at Blending Plant
IMPORTANT STEPS 1, General
REST POINTS
At times the Pumper Helper A will be required to assist at the Blending Plant in the unloading of TEL cars* handling of dyes and additives, operation of valves as directed by the Assistant Pumper and such other work as the Assistant Pumper or Pumper may direct.
Must have TEL physical0
m~TEX 001853
PLANT? DEPARTMENT? CLASSIFICATION?
OPERATIONS
JOB BREAKDOWN
B.-19
Puget Sound RP&S - Docks Pumper Helper A B-19 Adjust Pump Packing and Mixer Packing
IMPORTANT STEPS
KEY POINTS
HWBi*aaBKBnaanEpp*M
1. General Information Pump rods on reciprocating pumps and some shafts on centrifugal pumps and mixers pass through packing material
. secured by packing glands much the same as valve stems,
Leaks around the stem or shaft will occur as wear on the packing increases
This must be stopped to prevent waste and a potential source of fire.
To do this, normally, a degree of snugging up on the packing gland
is required.
If this does not stop the leak, re port It to the Pumper.
2. Adjust Packing
a. With a suitable wrench or other tool, pull the packing gland snug a thread at a time = till desired result is obtained.
b. Check operation for 5 minutes by carefully placing bare hand, against packing gland. If un comfortable to the touch, the gland is too tight, causing heating which may result in damage to the parts or may. In extreme cases, cause a fire. If the packing is too tight, loosen the packing aB it was tightened that is, one thread at a time and check for heating as before.
WA-TEX 001854
JOB BREAKDOWN
PLANTS DEPARTMENT t CLASSIFICATIONS
OPERATIONS
Puget Sound RP&S - Dpcks Pumper Helper A B-20 Slop Oil System
B.-20
IMPORTANT STEPS
KEY POINTS
1. General Information The 6" slop oil line system is actually - a gathering system with many connections and used for many purposes. Sections of this line are insulated while others are
not, so it is well to remember that if it Is used for the transfer of heavy oils, it must be flushed out as soon as . possible after the movement.
The original purpose of this system was to transfer recovered oil from the
Effluent Plant to Tanks 12 & 13 or to the Crude tanks; or from Tanks 12 and 13 to the Slop tanks at the Effluent Plant,
Two slop pumps (21N-G4 and 21N-G7) are so manifolded that they can take suc tion on the two slop tanks or any one of the three FC Chg. tanks. The dis charge from these pumps terminate at
the crude tanks (via 16" T/M system)
another section extends to the Blending Plant where it branches. One of these extends to the Effluent Plant, the
other terminates at the Receiver Trap at the Dock, (See Slop System Drawing
In RP&S Lines & Manifold Book.)
With the many connections on this line, the operator must be very cautious in making right of way line-ups.
WA-TEX 001S55
JOB BREAKDOWN
B-21
PLANTS DEPARTMENTS
GLASSIFICATION? OPERATION s
Puget; Sound
RP&S - Docks
Pumper Helper A B-21 Slop Oil Injection
IMPORTANT STEPS
KEY POINTS
TT General information In Puget Sound Plant* slop oil is inje'c-
ted into the crude suction line in the 100* P/W just before the 12" crude charge line goes below ground.
Slop is continuously accumulated in tanks 12 & 13 from the units and recovered oil Is occasionally transferred to these tanks from the Effluent Plant#
i
2# Prepare to Inject Slop
When sufficient slop has accumulated in one of the tanks (some where between 15* and 22') the water Is to be drawn down from water draw off to Effluent Plant until oil shows#
a# Switch unit stream (4" & 6") into the remaining tank#
b# Gauge tank and record in gauger's hand book#
c# Take 1 average quart from the tank to the lab# for Grav# & BS&W#
3, Inject Slop
a# Notify operator at VPS & establish rate of Injection (after receiving
. lab# results)#
b# Open suction from selected tank#
e# Open bleeder on pump casing; to
flood impeller#
' '
d,, Close bleeder*
*
e# Push start button#
f# Open discharge until desired rate of flow is reached (shown by meter at pump site)#
g# Check with units and adjust rate at their request (usually 50-100 BPH)#'
h# Notify units - shut down pump and block valves when tank pulled to gauge of 6* or as directed by orders#
WA-TEX 001856
JOB BREAKDOWN
s-2a*
PTAM^ *
DEPARTMENT i CLASSIFICATIONS OPERATIONS
Puget: Sound
RP&S - Docks pumper Helper A B22 10" Utility System
IMPORTANT STEPS
W POINTS
lo General Information A 10" line has been provided in the 100' P/W with its East end starting, about
200' west of the slop pumps (21N-G4 &
, 21N~G7) At that pointy it is rnanifolded to some of the unit run-down lines with provisions made for other
connections if needed in the future* Separate manifolds for middle distil lates and gasoline components are pro vided* The line extends west past "b" St0 and terminates east of the Blending Plant*
At "b" St,,s the same provisions are made to manifold to the suction lines from the Intermediate Tankage as were made at the East end of the 10" line.
Also, at the West end of the 10" line are 10" lines manifolding the 14" 448
Diesel and the l4" 431 Burner Oil lines and the 20" Bunker line to this system*
There is also a 6" line manifolding the 448 Diesel blend line to this system.
At the East end of the 10" Utility line is a 10" line running North to an In Line pump at Tank 15 which In turn is provided with suction lines to tanks
15 & 16*
From this 10" branch to the FC Charge tanks is a 6" line connecting this system to the S*R* Gasoline rundown line from VPS to tanks 11 and 17* (Refer to "RF&S Manifolds & Lines"
drawings.) *
j WA-TEX 001857 {
PLANT? DEPARTMENTS CLASSIFICATION 2
OPERATIONS
JOB BREAKDOWN
B~23
' page
Puget Sound
RF&S - Docks
Pumper Helper A
B-23 Ship Spent Caustic to N,,W. Petrochemical
IMPORTANT STEPS
KEY POINTS
1* General Information Spent caustic from the FCCtI is pumped by them to tank 303 in hatches averag ing about 100 bblSe When we have accumulated 61 to f level in this
' tanks we sample it and the Laboratory runs tests. When results are known and it is approved to ship, the Pumper contacts N.W. Petrochemical people and arranges time and gives them an idea of amount we intend to pump.
There is nearly always a layer of oil on top of the spent caustic which we take great care not to pump,
2, Safety Precautions
This is a chemical which can be highly Irritating to the .skin and may severely injure the eye* nn contact. Always wear w-vjvaj, gloves., goggles, and face shield
when you are working around this product such as sampling, bleeding lines, etc.
3. Preparation
a, "Water cut" tank at gauge hatch and write figures in gauger's hand book.
b. Draw sample below oil level of sight glass (wearing- fW'oe shift1*, goggles and rubber gloves) and tag for
''Before Delivery to N. W, Petrochemical".
Test - "Acid Oils".
c. Determine quantity of caustic that
can be pumped safely before oil reaches pump suction, (Leave 3" margin or "heel" of caustic).
d,, Contact N,W. people (when approved by Lab) and give information that they need and make arrangements for
starting time, r
e. Make proper line up from tank 303 through Spent.Caustic pump 35Q=G1 and through 2 line up C St, and check 2" block valve open at $th
and C St,
-
WA-TEX 001858
PLANTS
DEPARTMENTS CLASSIFICATIONS OPERATION?
JOB BREAKDOWN
B-23
Puget Sound
Pag6 2
RP&S - Docks Pumper Helper A
B=23 Ship Spent Caustic to N.W. Petrochemical (Cont,
IMPORTANT STEPS
3 Preparation (Cont.)
4. Transfer
BEST POINTS
f0 Close FOOT line up to caustic tank and notify them0
a. Start pump and check seal and pump operation,,
5** Shut Down Transfer
b. Check gauge 1 hour after starting and calculate finish time.
e,, Draw 1 quart sample from pump bleeder fusils; g3ove,, goggles and face shield) and tag "Delivery to
"No W. Petrochemical for Acid Oils".
a. Shutdown pump when there is still approximately 3" of caustic in tank 303 (by water cut).
b,, Record closing gauge on tank 303 in gauger*a hand book.
c. Block off valves used in transfer.
d. Open FCCU lines up to caustic tanks that you closed.' Notify FCCU operator.
e. Calculate barrels of caustic shipped by strapping sheet on tank 303 at Blending Plant and enter on R~67~A.
f. Notify NoW. Petrochemical.
| WA-TEX 001859
PLANT %
DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOS BREAKDOWN
WTTwfciTif' .ijMUTwftPumiawa
Puget Sound RP&S = Docks Pumper Helper A B~24 Deliver to OPL
=24 Page 2
IMPORTANT STEPS
KEY POINTS
1, General Information OPL (Olympic Pipe Line) is an "outside11 : company that takes delivery of all types of finished products (except Bunker and LPG) from our plant, as well ' as from other plants.
' ,,
These movements are scheduled and one of these schedules is sent to the Blending Plant informing the operators of the
time, quantity and source.
The timing and quantity may change- -"mid
delivery" due to unforeseen problems, but you will be advised if at all possible,
. Remote controlled AOVss (Air Operated Valves) are located In the field to direct the flow of product as required.
These air valves are controlled by buttons located on a panel at the Blending Plant and there is no "mid point" position for controlling the flow.
Should the air pressure be discontinued to the system or any individual valve, ' any open valve or valves so effected will close,.
Open valves are indicated by green , lights and closed valves by red lights
on panel at Blending Plant,
2, Preparation
a. Call OPL dispatcher on OPL phone and establish starting time,
b. Give information required, gauge, spec,, etc,
c. Cycle valves in order of transfer to , be sure valves are operating proper
ly, (Check the lights on panel to see that no other tanks of that grade of product are open to OPL at that time,,)
WA-TEX 001860
JOB BREAKDOWN
TJTATOT s
DEPARTMENT ? CLASSIFICATION? OPERATION?
Puget Sound
RP&S - Docks Pumper Helper A B-24 Deliver to OPL (Cent.)
B-24 Page 2
IMPORTANT STEPS
- --t
fHmilMIW 7,nr-m
2. Preparation ' (Cont*)
KETf POINTS
d* Open valves from tank to be used first to OPL 1/2 hour before de livery* (This gives you time to operate valve from the field in case it does not operate from the panel*)
e. Record opening gauge on form R-Sl-A.
f* Check gauge on opened tank in 5 min utes to see that gauge is not dropping.
3* Deliver to OPL
a* After OPL starts pumping* they will
give you "Opening Time"* Check gauge tank "on the line" 1 hour later and compare loss to OPL schedule to check rate*
b* One-half hour before completion of
this tender* repeat operations d* e* and f above for the next tender,
c. Close out first transfer after you are notified by OPL that they are moving on 2nd tender.
d* Gauge first tank closed and record on R-61-A*
WA-TEX 001861
PIANO? s
DEPARTMENT % CLASSIFICATION s OPERATIONS
JOB. BREAKDOWN
B-25
Page 1
Puget Sound.
RP&S - Docks
'
Pumper Helper A
B-25 Operate Automatic Crude Sampler
IMPORTANT STEPS
--...... "KBS' POINTS.... ............
""
lo General Information At 9th St. north of tank 7 is a sampling station designed to sample the crude stream at regular periods throughout
the crude deliveries and store them in
' a pressure cylinder. At the termination of the delivery to any tank you will he
required to pull the samples and deliver
them to the Laboratory.
A manifest will he sent to the Blending Plant prior to each Trans-Mountain de livery giving rates and timing.
Each division on the time selector rep resents 1 hour and cannot be set for over 24 hours.
When empty, the rod on the sample con tainer is extended to full out position and moves in as the container fills*
Start samples when delivery begins ex cept t tank 3 which must have 20s level before sampler will operate. .
2. Start Samples
a* Check sampler - empty (plunger rod
3* Draw Sample in 75oo Bomb
b* Line up valves through sampler*
c* Check delivery time on manifest*
d* Set timer for desired time.
e* Turn switch to "Auto" position and check motor to see that it is driv ing. (Solenoid will click at short intervals *)
a. Attach 75<*c sample bomb to threaded connection on sampler*
b. Open valves on sample bomb*
WA-TEX 001862
PLANTs
DEPARTMENTS CLASSIFICATIONi OPERATIONS
JOB BREAKDOWN
B25
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B-25 OperateAutomatic Crude Sampler (Cont*)
IMPORTANT STEPS 3o Draw Sample in
75cc Bomb (Conto)
40 Draw Sample in Gallon Can
5. Shut Off Sampler
KEY POINTS
Co Turn switch to "Manual" until bomb fillSo
d,, Close valve at upper end of bomb close valve at lower end of bomb0
e,, Shut off switch and disconnect bombo
f. Mark tag for "Chromatograph"*
a* Connect hose to sample connection,
b* Place end of hose in l gallon sample can,
c* Turn switch to manual*
d* Allow sampler to pump dry into can => (plunger handle will move to full out position about 14".)
a. Turn switch to "Off" position*
b* Leave valve open to and from sampler*
WA-TEX 001863