Document 0gVNnza8nVRvDabGM82DEdxBd

In re: A ll Asbestos Litigation Filed by The Simmons Firm, Circuit Court, Third Judicial District, Madison Cty., IL ; 8/28/03 o oo. INSTALLATION / ASSEMBLY Brake Overhaul 3 Drum Installation The following instructions are general. For your specific application, follow manufactur er's instructions. 5. Adjust and lubricate wheel bearings. Refer to vehicle manufacturer's instructions. 6. Verify proper drum installation and lack 1. Verify that drum is serviceable. Refer to Section 2, page 12. of drum-to-dustshield (if so equipped) interference. .2 Prior to drum installation, verify proper 7. Adjust brake. Refer to Section 2, page 13. .2 positioning of shoes, cam rollers, and springs. 3 Verify that slack adjuster has been backed 8. Perform brake operational check. Refer to Section 2, page 15. off to allow drum installation. 4. Verify proper lubrication of wheel A CAUTION: Do not release vehicle with s bearings. Refer to vehicle manufacturer's instructions. out adjusting and verifying proper operation of brakes! tr a e: <*> Key Dimensional Specifications 2 I Maximum Anchor Pin Groove Depth: 0.031" (.79 mm). <y Minimum Lining Thickness: 1/4" (6.35 mm) or 1/16" (1.59 mm) from rivet heads. Camshaft End Play (Axial): 0.005"-0.045" (.13-1.14 mm). Camshaft Radial Play-Maximum: 0.020" (.51 mm). Air Chamber Face to Clevis Center: See page 14. Maximum Free Stroke: See page 13. Desired Free Stroke: See page 13. Key Torque Specifications Dustshleld Attachment Screws: 11-16 Ib-ft. (14.9-21.6 N-m). Air Chamber Bracket to Spider Nuts: 65-85 Ib-ft. (88-115 Nm). Air Chamber Mounting Nuts: (7/16-20) Nuts 35-40 Ib-ft. (47.5-54.2 Nm). (5/8-18) Nuts 110-115 Ib-ft. (149-156 N m). Lining Bolts/Nuts: (3/8-16) 170-200 Ibs-in. (19.21-22.6 N-m). 26 EAB001137