Document 0gQ7gRZpoNbNp5XqMrpyN5XKR
VALERO
REFINING COMPANY
INTEROFFICE MEMORANDUM
SUBJECT:
Asbestos Removal, Demolish Buildings #48 & 53 Project, AFE 15422
In connection with the TACB notification you had requested, in June 1, 1989 memo to Jim Cherry, certain information related to asbestos removal on the subject project. This information as received from the demolition contractor. Bay, is attached for your use.
The contractor plans to commence the asbestos removal work the week of August 28, 1989 and complete it in five weeks.
If you need any further information, please let me know.
NDrdrr Attachments
cc: E. Loosemore R. Hays J. Hohnholt G. Kain Files 8.1 AFE File
w/attach
*
JUi
fiVi'/. ** *-.
VALERO/MOAKE 63
INC P.O. Box 9908 1414 Corn Products Rd. Corpus Christi, Texas 78469-9908 (512) 289-6600
July 17, 1989
Mr. Nandu Delvi Valero Refining Company P. 0. Box 9370 Corpus Christi, Texas 78469 RE: Asbestos Removal, Buildings 48 & 53
at Valero Refining Company Dear Nandu:-
As you requested. Bay, Inc. has received the following information from the Gilman Insulation Company, Inc. concerning the asbestos removal for the subject buildings:
Wet methods of removal will be utilized. Negative pressure enclo sures and glove bag techniques of abatement will be used. Waste ACM will be wrapped or bagged in 2 layers of 6 mil poly and placed in a demarcated area until completion of the project. Labels on waste containers will be of OSHA/EPA requirements.
Browning Ferris Industries will be used for waste transport and disposal (BFI Disposal Site/Sinton, TX).
If I can be of further assistance, or if you should need additional information please do not hesitate to call on me.
Sincerely, BAY, INC
G. E. Cook, P. E. President gb
VALERO/MOAKE
VALERO/MOAKE 65
VALERO
REFINING COMPANY
INTEROFFICE MEMORANDUM
DATE: TO: FROM: SUBJECT:
June 1, 1989
Jim Cherry
Norman Renfro
DEPT/EXT:
Building 48 and 53 Demolition
Environmental/328
The following EPA requirements apply to demolitioning buildings that contain asbestos.
A. TACB must be notified at least 20 days in advance of demolition and the following must be provided:
(1) Name and address of owner or operator.
(2) Description of the facility being demolished or renovated, including the size, age, and prior use of the facility.
(3) Estimate of the approximate amount of friable asbestos material present in the facility in terms of linear feet of pipe, and surface area on other facility components.
(4) Location of the facility being demolished or renovated.
(5) Scheduled starting and completion dates of demolition or renovation.
(6) Nature of planned demolition or renovation and method(s) to be used.
(7) Procedures to be used to comply with the EPA requirements.
(8) Name and location of the waste disposal site where the friable asbestos waste material will be. deposited.
B. The asbestos must be disposed of properly; this means:
(1) The material must be wetted to prevent visible emissions while handling, packaging and disposing of asbestos material.
(2) After wetting, seal all asbestos containing waste material in leak-tight containers while wet; and
(3) Label the containers as follows:
Contains Asbestos Avoid Opening or Breaking Container Breathing Asbestos is Hazardous to Your Health
16.58.16
VALERO/MOAKE 66
I will prepare this report for submittal, however, I will need the above mentioned information.
NOTE: These are only the EPA/TACB Requirements. OSHA requirements are also applicable. Check with Ed Loosemore for the OSHA rules.
NR/pm
xc: T. D. Higginbotham George Kain John Hohnholt Ed Loosemore J.B. Toland