Document 0Vxj5rj18VxGMMDNDXRarE5b

% i E. J. DU PONT DE NEMOURS & COMPANY KREBS PIGMENTS DEPARTMENT 256 VANDERPOOL STREET NEWARK, NEW JERSEY Serial No. Copy No. 7 Period Covered NEWARK PLANT PIGMENT COLOR RESEARCH REPORT NEWPORT PLANT Final Report PHTHALOCIANINE PLANT ASSISTANCE JANUARY,, 1949 - JANUARY, 1950 FILE: DATE: 223.4 6/27/51 i N4 87*7 DUP050068670 Serial No Copy No7 KN-5X-39 Copy Tos X. Numerical File 2. Research Office (223*4) 3. Library File (223*4) 4. J. N. Tully/A. Siegel 5* Jackson Lab. Orchem 6. P. 3D. Graham - Newport 7* V. H Chalupski Newport 8. J. H Cooper 9* Extra 10* Extra 11* Extra r> s Hf mmLABC f il e NEWPORT PLANT PIGMENT COLOR RESEARCH REPORT FINAL REPORT PHTHALOCIANINE PLANT ASSISTANCE JANUARY* 1949 - JANUARY, 1950 SUBMITTED BY? APPROVED BY s DATE SUBMITTED? 6/8/51 DATE ISSUEDs 6/27/51 DUP050068671 TABLE OF CONTENTS INTRODUCTION 1 HISTORICAL 1 SUMMARY AND CONCLUSIONS 1 "MONASTRAL" BLUE LB 3 Manufacture of 4"Chlorphthalic Acid Synthesis of Blue LB Sulfation Solvent Milling' Finishing Operations and Quality 3 4 5 5 6 MOMASTRALis BLUE BG . 6 POLYCHLORO CPC 7 Chlorination Reaction Violence Sulfur Chloride Removal Extraction of Crude Polychloro CPC Solvent Milling and Quality Extraction of Solvent-Milled CPC 7 9 9 10 10 II CHLORINATION - OPERATING CONDITIONS EXHIBIT (1) 13 QUALITY OF POLYCHLORO CPC EXHIBIT (2) 16 QUALITY OF MOKASTRAL* BLUEBG EXHIBIT (.3) IS QUALITY OF ,!MQKASTRAL" BLUELB EXHIBIT (4) 20 DUP050068672 INTRODUCTION Operation of the Newport CPC plant was started in April, 1948 under the surveillance of a Color Research Group temporarily assigned to this work* This arrangement was continued until January, 1949, at which time a Plant Assistance Group was established for the purposes of improving and standardising the process, reducing costs and increasing production per unit investment This report covers the work of the Plant Assistance group for the year 1949# HISTORICAL The Newport CPC plant was designed to produce two phthalocyanine pigments, "Monastral" Past Blue LB and "Menastral" Green, at rate of 22,000# and 15,.500#, respectively, per month in a five-day week. The processes are based on developments by Imperial Chemical Industries and the Organic Chemicals Department, as well as numerous modifications and additions resulting from work of the CPC Color Research Group at Newark, The manufacture of Blue LB at Newport is based on the reaction, in a specially refined kerosene, of phthalic anhydride, urea and copper chloride, catalysed with ammonium molybdate, A predetermined portion of the phthalic anhydride is replaced with ehiorphtha lie acid to produce a low chlorine CPC (4-5$), which is stable to crystal growth in aromatic paint solvents* Concentrated sulfuric acid is added to the reaction slurry to sulfate the pigment and facilitate the separation of the kerosene, Following hydrolysis and a weak alkali extraction and drying, particle sisse of the pigment is reduced by shot milling in acetone to a standard strength level. The milled slurry is distilled to recover the solvent, and extracted with both weak alkali and acid. The finished product is shipped to Newark as a 15# slurry for the manufacture of toners, lakes and dispersed pastes. In the manufacture of polychlor CPC ("Monastral" Green) the Blue synthesis is essentially the same as for Blue LB, except that 4-chlorphthalic acid is not used in the initial reaction* The crude CPC is chlorinated with sulfur chloride to 47-48.5$ chlorine at elevated temperatures and pressures following which the crude Green is extracted, dried and acetone milled. Provisions were not included in the original plant design for the production of "Monastral" Blue BG, which is solvent milled chlorine-free CPC, It was first produced at Newport in March, 1949, using Blue LB equipment with no revisions. The omission of ehlorphthalic acid in the synthesis of Blue BG is the only major difference of operating technique between LB and BG, SUMMARY AND CONCLUSIONS A, "MONASTRAL" BLUE LB The most serious problem encountered in the manufacture of 4-chlorphthalic acid, which is used as an ingredient for synthesis of Blue LB to provide the desired 4.0-4.5$ chlorine content, was foaming DUP050068673 2- ~ during final acidification., the problem was greatly minimised by adjustment of pH and standardisation of the quantity of sodium hy droxide used in preparing the solution of disodium pht.Ualate prior to chlorination.. Production of Blue LB was frequently hampered by oxidation of the kerosene and the resultant failure of the CPC synthesis* The use of an anti-oxidant, such as Paraaox 441 ex Esso Standard Oil Company, has been effective in preventing oxidation and is now stan dard practice. A peroxide number Is determined on the kerosene prior to each synthesis and the specification requires that kerosene showing any measurable oxidation should not be used. Several trials, involv ing the substitution of a cheaper fuSl grade of kerosene for the deodorised grade failed, because of operating difficulties. A significant overall improvement in the sulfation operation was effected during 1949 by standardizing the volume prior to acid addition and adding the acid in 1-1/2 hours. A rather extensive study disclosed the acid requirement to be 1600 pounds 96$ sulfuric acid per synthesis of 1071 pounds phthalic anhydride. Several plant attempts to use-93.0# sulfuric acid, which would offer a significant saving, failed because of unsatisfactory pumping and filtering characteristics of the slurry, The solvent milling capacity was increased in 1949 in three steps to 102.5$ of the designed project loading. The finishing yield (solvent milling through extractions) was improved approximately 5$ in 1949 by an intensified personnel training program and standardization of operating procedures. The quality of Blue LB was satisfactory versus Newport shipping standards as'shown in Exhibit (.4). B. "MOHASTRAL* BLUE BO The first plant production of the green shade chlorine-free phthalocyanine. Blue BG," which was made in March, 1949, was essentially equal in quality to the Semi-Works standard, BT-297-D. A total of 28,900 pounds of Blue BG was produced in 1949* A quality deficiency occasionally encountered in subsequent production was found to be due to inadequate cleaning of equipment, which resulted in contamination , , with Blue LB* A 17$ increase in milling capacity was realized is the latter part of 1949 by increasing the mill loading 5$ and decreasing the milling cycle from 36 to 30 hours. 0- POLXCHLQRO CFG The polyehloro CPC unit was not operated from February 17 to April 1, 1949, because the process was not standardized and .west of the"production was exceedingly dull. It was also shut down from September 24 for the remainder of the year because of the inadequacy of fume disposal facilities. DUP050068674 3 The quality of po.lych.loro production in 1949 was uniform in strength, but varied considerably in hue and intensity, ranging from blue to yellow and dull to s* intense versus standard GT-4&6-D* Serious operating difficulties and Inadequate control of the chlori nation procedure were largely responsible for the fluctuations in quality* It was determined that sulfur chloride reflux during chlorination is necessary to produce the desired yellow shad. A number of chlorination at pressures significantly below the designed 300 psi resulted in products considerably bluer than standard GT-4B6-D; however, the reflux condenser was not.in service at the time. A rather violent exothermic reaction in the chlorination step between antimony oxide {catalyst) and sulfur chloride {chlorinating agent), which was extremely difficult to control, resulted in a build-up of solid material in the reflux condenser and occasionally rupture of the autoclave safety disc. This difficulty was partially overcome by very careful addition of sulfur chloride. A process change involving discharge of crude CPC Green from the rotating dryer directly into a hopper, rather than slurrying with water, resulted in a significant increase in rate of production* Extraction of crude CPC Green was changed from sodium hy droxide to sulfuric acid and later to a water Tactually acid) extraction during 1949* An increase in yield, less thixotropic presscakes and elimination of foaming resulted. Production equal to goal strength, G3 100 versus GT-4&6-D, was obtained &5% of the time in 1949* The dullness of Newport pro duction appeared to be associated with solvent milling. It was possible to develop a fairly good correlation between dullness and lack of sodium chromate at the end of milling. An increase in the quantity of chromate resulted in a significant reduction in the number of dull lots. A sodium hypochlorite extraction, in addition to the standard sulfuric acid and ammonium hydroxide extractions, improved quality significantly? however, it was necessary to discontinue the hypo chlorite extraction at Newport, since the equipment was not suitable for such service* wM0MSTRALn BLUE LB A. MANUFACTURE OP 4-CHLORPHTHALIC ACID Chlorphthalic acid, which is used as an ingredient in the synthesis of Blue LB, is prepared at Newport by chlorination of a solution of disodium phthalate. A number of operating difficulties in the manufacture of 4-chlorphthalie acid were corrected during the year 1949* DUP050068675 4 The major difficulty, severe foaming during the "salting outw and acidification steps was minimized by adjusting the pH after ad dition of chlorine to 4.5-4.8 and standardizing the sodium hydroxide solution prior to solution of the phthalic anhydride. The use of two ffiols excess of sodium hydroxide, measured to 3$, was found to de crease the foaming tendency as well as to facilitate filtration of the slurry. The quantity of sodium chloride used for wsalting out" the 4-chlorphthalic acid was reduced fro 238# to 200# with no apparent loss of yield. Two attempts to use 4-chlorphthalic acid slurry instead of presscake were made on a plant scale, thus eliminating the filtration step and a very undesirable fume problem. The first attempt failed, since the crude CPC produced by this modification was solvent milled directly after Blue BO, and was seriously contaminated. The second attempt also failed since pellets were formed after sulfation, probably as a result of inadequate removal of kerosene. A number of operating difficulties in addition to the above items indicated the desirability of postponing any further work in the plant on elimination of 4-chlorphthalic acid filtration. B. SYNTHESIS Off BLUE IB Blue IB was synthesized throughout the year with no serious operating difficulties, with the exception of several syntheses in which reaction did not occur. It was found that partial oxidation of the kerosene {Sonneborn8s "DaoBass?' or Esso8s "Bayol P*) prevented formation of CPC. The molten reactants solidified in the kettle on cooling, and removal had to be done manually. Oxidation of the kero sene was prevented by the addition of an anti-oxidant, such as Baranox 441 ex Esso, and the use of ammonium bicarbonate (later carbon dioxide) to blanket the kerosene. The specification now requires that the kerosene for CPC synthesis shall contain no measurable peroxide. The yield, as measured by the weight of crude CPC and based on phthalic anhydride input, varied from 71.3$ to 79.3$ of theoretical for the year 1949, the highest yield being obtained in December. The improvement appears to be the result of intensified joint efforts of Production, Engineering Service Division and the Chemical Division to realize the specified conditions of reaction and minimize mechanical losses. The substitution of a relatively inexpensive fuel grade kerosene for Esso8s "Bayol D" was studied in the plant. Five batches were syn thesized with fuel grade kerosene during the year. Although several operating difficulties were encountered, the final plant quality by rubout was essentially equal to normal production. In the first synthesis, severe foaming occurred, perhaps as a result of the use of a larger quantity of kerosene to compensate for the higher losses anticipated with fuel grade kerosene. Filtration of the slurry was found to be sig nificantly slower than slurry made with Bayol D, resulting in ineffi cient washing since presses were not completely filled. As a result of heavy demands upon LB production, it was necessary to refer the fuel grade kerosene study to the Newark Semi-Works. DUP050068676 --5 C. SULFATION Several significant modifications to the sulfation operation, which have permitted increased production rates, were adopted in 1949. Plant experimentation showed that better operating conditions resulted when the synthesis slurry was diluted with kerosene to a specified volume| consequently, the addition of fresh kerosene to a volume of 900 gallons prior to sulfation was adopted as standard practice * The rate of acid addition was varied over a fairly wide range from 3/4 hour to three hours- A cycle of X-l/2 hours ms found to be the optimum period. A lengthy evaluation of the quantity of sulfuric acid showed that 1200-1600 pounds of sulfuric acid per synthesis resulted in fine particles of CPC sulfate, from which kero sene could not be separated easily. When 1600-2000'pounds sulfuric (per synthesis of 1071# phthalie anhydride) were used, the CPC sulfate tended to become progressively pasty*3 ? however, separation of kerosene was not inhibited, but transfer of the slurry was rendered impractical with existing equipment. As a result of this variable study, 1600# of 96$ sulfuric acid per synthesis was adopted as the standard quantity. At the request of the Production Division, a laboratory evalu ation of commercial 93$ sulfuric acid for sulfation was made* The use of 93$ sulfuric acid offered an ingredient savings in addition to the savings in installation of tank car facilities, since 93-0$ acid does not require steam heated storage and transfer equipment as does 96$ sulfuric acid. The laboratory studies were sufficiently promising to attempt a plant evaluation. Two plant sulfations with 93*0$ sulfuric acid resulted in a number of operating difficulties as compared' to 96.0$ acid. Since removal of kerosene and ease of pumping, filtering and washing were adversely affected, the idea was abandoned. In laboratory studies variation of the slurry temperature prior to sulfation indicated that more satisfactory results were ob tained at temperatures below X00C. than at 125-150C. (temperature of plant sulfation). The CPC sulfate tended to remain in suspension at 80100C. during sulfation, while at 150C., severe settling occurred after addition of approximately half of the acid. The lower temperature of sulfation was not adopted,in the plant, since cooling of the synthesis slurry below 100C, would b expensive and time consuming. A study, designed to determine the capacity of the solvent milling operation, resulted in an increase in mill loading from 314 pounds to 362 pounds per 21 hours actual milling time, with no detec table degradation in quality. This study was accomplished in 5$ increments, followed by a thorough quality evaluation prior to attempting the next increase. This quantity appears to be near the upper limit that can be pumped satisfactorily from a mill, since dilution to the full mill capacity is required at the 362 lb. loading. A similar study DUP050068677 -6- was attempted in the early part of 1949, bat failed* sire weakness to the extent of 5-6$ versus standard BT-264-B was encountered. The success of the more recent study is believed to be attributable to lower kerosene content of the crude as a result of increased dryer efficiency, higher acetone concentration through improved'distillation and several process improvements in extraction and washing of the crude pigment. The milling rate, 362#/21 hours, is equal to 102.0$ of project design capacity* E. .-FINISHING OPERATIONS AMD QUALITY - BLUE LB The monthly finishing yield for the year 1949 (ie*, from milling through extraction steps) ranged from 91.6$ to 96.5$ of theoretical with an average of 95.6$. A reasonably steady increase, which was maintained throughout the year, is believed to be attribu table to improvements in operating technique of the filter presses and slurry transfer equipment in addition to a reduction of foaming during extraction. 5 Severe manganese contamination, which ranged from 0.010 to 0.015$ of the pigment weight, {specification is 0.001$ minimum) was prevalent during the first part of 1949. The contamination was traced to a portion of the water supply, which was obtained from a plant well and mixed with purchased water. Discontinuance of this source of water and replacement of it with purchased water was respon sible for a reduction of manganese content to within specifications. As a result of a customer complaint of grit in finished LB pulp, a study was opened to determine methods of minimising grit. It was found that mechanical methods, several of which were in use at the Chambers Works, were not entirely successful, but that precautions could be taken to minimise the formation of grit. An intensified campaign was undertaken at Newport to prevent drying of the pigment in process, and the grit content was reduced to the point that a lake prepared for linoleum usage was acceptable to the customer* The quality of Newport production is shown as Exhibit (4) averaged by months. With the exception of a few weak batches produced in July and August, the quality was satisfactory compared to Newport shipping standards. The weakness of these lots was traced to inef ficient washing in the filter presses following acid extraction and was corrected by frequent inspections and repairs of the presses. "K0KA3TBAL* BLUE BG A total of 26,900 pounds of Blue BG was produced in the year 1949. Since the same finishing equipment is used for BG as for Blue LB, production of BG was conducted on a campaign basis, supplying Newark with approximately three months requirements each campaign. The quality of the entire 1949 production of Blue BG is summarized In Exhibit (3) DUP050068678 7= Blue BG was produced for the first time in the plant In March, 1949 The quality of the initial production, which consisted of two mill charges or 375# commodity weight * was XQOilOO and ws green versus the goal standard, ST-297-D, SW 373. Mo operating dif ficulties were encountered in this production* The second production of Blue BG, eight mill charges or 2203#, was made in April, 1949* Quality evaluation showed that the first 40% of this campaign was contaminated with residual Blue LB as the result of inadequate cleaning of equipment. The quality of the reraainder of the campaign compared favorably with standard BT-297-D, 8W-373* The third BG campaign in July, 1949, Which resulted in 2920#, was less successful 1 han the second from a Quality standpoint as indicated by the red hue and relatively high chlorine" content (1*5 to 0*3$) versus BT--297-D, SW 373< Some weakness, 2-6$ versus standard, was encountered and could not be explained? however, based on in-process sampling, it was shorn that the desired strength was developed during milling, but apparently not realised in the subsequent extraction steps. The fourth and fifth campaigns, which were made in August and December, respectiveiy, yielded 10,409 and 12,993 pounds, and both were significantly more successful than the preceding campaign. How ever in the latter half of the fourth campaign, weakness to the extent of 4*4$ was again encountered and could not be explained, although the weakness is believed to be associated with variations in production of the crude CPC, Three lots were milled an additional 12 hours (46 vs 36 hours), but did not result in any significant improvement in quality. Two variables, shorter cycle and increased mill loading, were studied during the fifth BG campaign* A 5$ capacity increase was realised for 76$ of the campaign with no apparent quality deterioration. The cycle of six mill charges was reduced from 36 to. 30 hours and quality essentially equal to normal production was produced* A com bination of these two variables, which will be used in future campaigns, amounts to a 17$ increase in capacity, based on the original standard procedure. mssssdmj^si A * CHLORINATION Polychloro CPC was produced at Newport on a production basis the first part of 1949, but was discontinued February 17, 1949, to prevent an accumulation of large stocks of substandard color. Two chlorinations, C.l-104 and Cl-105, were made in March to provide the Newark Semi-Works with crude Green for variable studies* Starting in April, the chlorination equipment was operated on a controlled experi mental basis under the direct surveillance of the Chemical Division until August, 1949, at which time the responsibility for operation if DUP050068679 was accepted by the Production Department. The chlorination ' operation was discontinued 3/24/49, since a serious community fume problem had been created as a result of inadequate fume disposal facilities. The operating performance and quality by laboratory finishing methods of the chlorinations mad under Chemical Division Supervision in 1949 are shot as Exhibit (l). A .review of Exhibit (1) shows that unusual difficulty of operation and frequent equipment failures prevented a controlled evaluation of variables under study in the majority of the chlorin ations. However, considering only the chlorinations which were made under satisfactory conditions of operation, the quality as finished by standard laboratory procedures ranged from 30?100 to 91?100, blue to vs yellow and dull to intense versus standard GT-436-D, The sulfur chloride reflux system attached to the autoclave was a constant source of difficulty, particularly during the periods of intermittent operation. After numerous inspections of both the reflux {Andale) and tail condensers in 1943, which showed the con densers to be almost entirely plugged with solidified material, it was agreed to operate with refluxing. Chlorinations C1-1G9 through C1-122 sere made accordingly, but were all significantly blue versus standard GT-436-D. Consequently, the reflux condenser was reinstalled 6/17/49, and an improvement in hue became very obvious as can be seen in Exhibit (1) starting with batch Cl-123* The reflux condenser, which was inspected and cleaned after 2? chlorinations (Cl-123 through Cl-149h was found to have 59 of its 61 tubes completely blocked with a granular material, which was found by analyses to contain large quantities of antimony, ammonia, chlorides, sulfates and iron. (This difficulty was essentially elim inated in 1950 by the substitution for antimony oxide (catalyst) of aluminum chloride, which greatly reduced the blockage in the reflux condenser.) Chlorination operating conditions were varied throughout the year in search of optimum conditions. Although the results of these trials are undoubtedly inconclusive, it is evident-that as the pres- ' sure and temperature are increased, an increase in chlorine content and a subsequent yellower hue are obtained, at least, within the range of conditions studied. Insofar as pressure alone is concerted, it appears that the most desirable products were made in the 250-300 psi range. All products synthesized at 16$ and 200 psi were considerably bluer than standard GT-436-D. However, this may not be significant, since the reflux condenser was not in service during the lower pressure runs. The temperature variable was not studied further to any great extent in 1949, since in the earlier work at the Newport plant, it was demonstrated that temperatures of 170C. or higher were required to produce the desired tinctorial properties. Although it would DUP050068680 "9" appear desirable to study temperatures in excess of 17BC. tbs Kewport plant is limited by the available plant steam* .Five .chlorine tions were made using pulverized erode Blue, but did not appear to offer any tinctorial improvement compared to suitable controls with regular lump crude. The standard extraction procedure for preparation of the crude Blue prior to chlorination consisted of an alkaline extraction with 3$ sodium hydroxide solution at 95C* for two hours* Five chlorinations, which 'were made from crude Blue that received an acid extraction with 2% sulfuric acid in addition to the standard alkaline extraction, ex hibited no advantage in tinctorial properties as compared to normal production. 8. REACTION VIOLENCE The reaction between the catalyst, antimony oxide, and sulfur chloride proceeds rapidly, converting antimony oxide to antimony tri chloride. In a number of cases, this reaction could not be adequately controlled in the plant and resulted In excessive pressure in the auto clave. The problem was solved by a revision in plant procedure which permitted the antimony oxide to react with a small quantity of sulfur chloride prior to introduction of the remaining quantity of sulfur chloride to the autoclave. A second reaction, the introduction of the first eight mole of chlorine into the phthalocyanine molecule, also proceeded rapidly in plant equipment and, in a number of cases, resulted in rupture of the autoclave safety disc. This problem had not been encountered en a laboratory scale, since an oil bath was used for heating the laboratory autoclave and permitted excellent control of heating rates. However, the plant autoclave was heated with high pressure steam* The reaction violence was reduced to a point which permitted satisfactory operation by specification of a maximum allowable heating rate* line chlorinations, Cl-152 to C1~160, inclusive, were made under the specified conditions prior to the plant shutdown with no significant reaction violence. C. SULFUR CHLORIDE REMOVAL The rotating dryer, which is designed to remove sulfur chloride from the CPC Green slurry by distillation, was operated with increasing success in 1949. The major difficulties, which were largely mechanical, were overcome to the extent that a satisfactory cycle was obtained for the existing production rate. One of the most serious problems was severe leakage of the ro tating dryer packing glands, both process and steam. The situation was improved considerably by several mechanical revisions, improved type of packing and realignment of the rotating dryer. DUP050068681 10* Hear the end of 1940* the method of discharge of the crude pigment was changed from a 5%etK.to ^dry13 procedure* A water slurry of pigment and Turkey Bed Oil (as a wetting agent) could not be com* pletely discharged (pumped) from the dryer* since adequate dispersion of the slurry was not realised with the relatively slow rotation of the dryer* In addition, the use of water in the rotating dryer compli cated the procedure* since it was imperative that the dryer be dried completely prior tc charging the following batch. Consequently, the "dry" pigment discharge method was adopted and used successfully* D. EXTRACTION OF CRUDE POLYCHLORO CPC The alkaline extraction of the crude Green pigment prior to solvent milling was troublesome from both quality and operating stand points. The procedure as used in January, 1949, consisted of an alkaline extraction of the pigment with sodium hydroxide and Turkey Red Oil for on hour at 9.5-lO0C* At completion of the extraction period, ammonium sulfate was added to a pH of 6006,,5 to facilitate filtration* The major objections to such a procedure were foaming of the charge, considerable yield loss end thixotropy of the presscake* Consequently, a rather comprehensive study of the extraction procedure was started in the laboratory* The first plant change in procedure, substitution of sulfuric acid for ammonium sulfate, improved plant operation to some extent in that less thixotropic presscakes Were formed and there was no difficulty in reaching the specified pH, in contrast to previousexperience with ammonium sulfate. Additional laboratory and Semi-Works investigation gshowad that m acid extraction or simply water (acidic from hydrolysis of the residual sulfur chloride in the pigment) resulted in quality at least equal to that obtained with the alkaline extraction. On the basis of this work, the plant procedure was revised in April, 1949, to include a water extraction with Turkey Red Oil, The major problems of extraction appeared to be solved with the exception of foaming as the temperature reached 95C , Extraction at 90C* did not affect quality and decreased foaming, compared to extraction at 95C, JE-, SOLVENT MILLING AND QUALITY A compilation of all lots of Newport synthesised Polychloro CPG and quality compared to standard GT-486-D are shown as Exhibit (2). The most serious tinctorial problem in the year 1949 was the inability of the plant to obtain consistently pigment of satisfactory intensity* Although practically all of the lots in Exhibit (2) appear strong versus standard GT~4$6D, the goal strength of $3*100 was obtained in only about $5% of the production. The standard milling conditions for Green at the beginning of 1949 specified 400 lbs. crude pigment and 360 gallons of acetone milled for 24 hours* As a result of an apparent satisfactory rate of strength development, six batches were milled in January, 1949, for 36 hours using a 628 lb, loading. Satisfactory strength was obtained, but rubout evaluation indicated the products to be duller than expected from laboratory control grinds. Consequently, the charge and cycle were both reduced to the original conditions. DUP050068682 -11- Although the reason for dullness of Newport production was not firmly established, it appeared to be associated with plant con ditions of solvent milling-. Sodium chromate, which was used to the extent of 5% of the pigment weight during solvent milling to prevent reduction of the pigment, could not be detected at the end of milling on a number of -plant charges.-, A reasonably good correlation was devel oped between dullness and lack of sodium chromate at the end of the cycle| however, dullness existed in a number of plant grinds even though an excess of chromate was found* The quantity of sodium chromate was increased to 7*1/2% of the pigment weight with a subsequent reduction (but not elimination) of the number of dull lots* Since the ultimate plant quality appeared to be unpredictable from the observed operating conditions during manufacture of the crude, a sample of each crude batch was solvent milled in the 'laboratory prior to plant processing* The crude batches which appeared unsatisfactory in the laboratory were processed in the plant on a campaign basis, thus .minimising the amount of dull sub-standard material produced. Operation of the Newport chlorination unit was discontinued 3/24/49 as a result of numerous complaints from the adjacent communities of fume conditions, which were a result of inadequate waste disposal facilities. Consequently, in order to continue a supply of polychloro CPC t.o the Pigments Department customers, Orcheaj eutectic crude Green was purchased and solvent milled at Newport during the latter portion of 1949* Lots E-624-X03-113, 122-163, and 173**202, produced in 1949, were solvent milled eutectic Green. The average quality of Lots 1-624-10$ through 113 and 122 through 163 was $3s100, s intense and vs yellow compared to standard GT-436-D, On November 16, 1949# a new standard goal GT6?4b, lot 430, which was made from solvent milled eutectic Green and, obviously, much more real istic for comparison with eutectic production, was established. 'Compared to the original standard GT-436-D, the new standsrd/flt in masstone, 3.31100, s yellow and & intense. Plant production during the latter part of 1949 (E-624-173 through 202) averaged 103i100, vve intense and vs yellow versus standard GT-674-D, lot 430. G, EXTRACTION Of SOLVENT-MILLED GREEN The standard extraction procedure subsequent to solvent milling consisted of an extraction at $5C* for two hours in 3% ammonium hydroxide solution followed by an extraction at 95C for two hours in a 2$ sul furic acid solution. Following each extraction, the slurry was filtered and washed to a conductivity endpoint of 2000 mhos* In the acid ex traction, sodium chromate, equal to 35$ of the pigment weight, was added prior to the extraction. This procedure was used throughout the year with no significant changesj however, in view of the extreme dullness of a number of finished lots, an additional extraction with sodium hypochlorite was used starting in April, 1949* The hypochlorite extraction, which was first tried on ;/|||!||:.! i. ' DUP050068683 -12- lot N**624-75, consisted of frequent additions of sodium hypochlorite and sodium hydroxide solutions as required to maintain the'pH above 9*0 during a nine hour extraction period at 45-50**?. The slurry was then acidified with sulfuric acid to a pH of 5.3* boiled for an hour, filtered and washed both chloride and sulfate free, As Judged from hourly inproeess samples, a very significant improvement in quality occurred progressively as the hypochlorite extraction was continued* The hypochlorite extractions with several revisions, reduction in extraction period to four hours and use of a final pH of 2,0 instead of 5*3, was continued as necessary (determined by in-process quality evaluation) as shown in Exhibit (1). In June, 1949, the regular in spection of the acid extraction tank, which had been used for hypo chlorite extraetions9 revealed that the brick lining was severely damaged as a result of using hypochlorite* Consequently, since no other equipment was available in the CPC plant for service with hypo chlorite, subsequent sub-standard production was shipped to Newark for extraction* A total of 937$# of N-624 (dry basis) and 2593# green CPC toner GT-674-D was recovered by hypochlorite treatment at Newark on a campaign basis. After June, 1949, hypochlorite extraction of sub standard green production was continued at Newark as necessary* DUP050068684 CTWBHL.m -13 ammmm. Lot Cl 109 Press. 031 175 Temp. oc 170 Hrs.*.at Temp. 3-1/2 0pe^tij;..Perfpmaac@ Unusually long autoclave cycle (3o hrs.) Laboratory Finished Qua liti- vs OT-y&b4) 84U00 blue dull no 165 in 165 160 3-1/2 O.K. Performance 160 3-1/2 Rapid pressure rise to 260 psi 83*100 Mm intense 63*100 blue intense 112 200 173 3-1/2 Ruptured scale tank safety disc 80*100 blue s intense 113 200 175 4-1/2 Low chlorine in Sclo (57.8$) 83*100 very blue 114 200 173 5 Lost pressure to 150 psi 83*100 very blue M15 200 173 4 O.K. Performance 80*100 Mw , 116 117 1.18 200 200 200 175 3-1/2 Rapid reaction to 220 pel 80*100 blue s Intense 175 3-1/2 O.K. Performance 80*100 blue intense' 175 3-1/2 Rapid reaction to 320 psi 83*100 blue vs dull 119 200 175 3-1/2 Long autoclave cycle (20 80*100 blue B dull hrs ) 120 300 175 3-1/2 O.K. Performance 83*100 blue dull 121 300 122 200 175 3-1/2 O.K. Performance 176 3-1/2 O.K. Performance 83*100 blue dull 83*100 blue 123* 300 170 3-1/2 Lost pressure to 170 psi 86*100 yellow 124 300 170 2-1/2 Lost pressure through packing gland 83*100 dull 123 250 170 2-1/2 Lost pressure through 86*100 s intense autoclave discharge valve 126 250 172 3-1/2 Lost pressure to 210 psi 83*100 s blue dull " 127 250 175 3-3/4 Lost pressure to 160 psi 855100 blue duol 128 200 173 3 Violent reaction 83*100 vs dull DUP050068685 Press. Lot osi Cl 129 300 Temp. C 172 Hrs.at Temp,.. 3-1/2 130 300 170 4-1/2 131 260 172 4 132 250 175 3-3/4 133 250 176 3 134 250 173 2-1/4 135 250 175 2-1/2 136 250 175 3 "1/2 137 300 175 4-1/2 136 250 175 4 ' 139 300 175 3-1/2 \. 140 250 175 3-1/4 141 300 175 5 142 300 175 5 143 300 179 4 144 300 176 5 145 300 177 4-1/2 146 300 175 5 147 300 163 3-1/2 146 300 163 5 149 300 175 1/2 150 300 176 5 >* 151 300 176 5 ' 152 300 176 5 153 300 176 5 154 300 179 5 14' Omrati^PerJormaiice laboratory Finished Quality vs 6T-406-D Rapid initial reaction. 661100 dull Lost pressure to 220 psi Lost pressure to 170 psi 65*100 dull O.K. Perfonaance 65?100 dull 0.K, Perfonaance 90*100 dull 0..K, Performance 91?IDO vs yell vs dull 0.1, Performance 65?100 dull O.K, Performance 65*100 dull O.R, Perfonaance 60*100 blue dull Slight pressure loss 64*100 intense Lost pressure to 150 psi 65*100 blue dull O.K* Performance 65sXOO blue dull O.R. Performance 65?100 blue dull O.K. Performance 66:100 Trs yellow O.K. Perfonaance 65:100 dull Lost pressure to 230 psi 63*100 blue intense O.K. Performance 00?100 s blue intense O.K. Perfonaance 631100 dull O.K* Performance 60:100 blue s intense O.K. Perfonaance 60:100 blue s intense Autoclave gasket blown 00:100 blue intense Ruptured disc 03?100 blue intense O.K. Performance 66:100 vs blue intense Violent reaction to 335psi 05:100 dull O.K. Performance 03?100 blue intense O.K. Performance O.K. Performance 05?100 blue intense 07*100 blue intense DUP050068686 Press.. Temp firs*at Lot si OC Temp, - Cl 155 300 176 5 156 300 175 5 157 300 177 5-1/2 15# 300 176 5-1/4 159 300 177 5-1/4 160 300 0 >15' . Operating PejrfoxmnG& 0.K, Performance 0.K, Perfrrmance 0.K, Performance 0,K Performance O.K. Performance Ruptured disc Laboratory Finished Quality vs ......-0T-46.6D_._ ,,.... _ 63i100 s blue intense #7?100 s blue intense 63s100 blue intense #3*100 blue intnnse #3*100 blue intense 65*100 very blue * Reinstalled Undale) reflux condenser. DUP050068687 ~16~ Packed lot N624' 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 56 59 60 61 62 63 64 65 66 67 66 69 70 71 72 73 74 75* 76 77* 78* 79* $0* 61 82 S834 85 86 87 88 QUALITY OF POLTCKLORO CPC Quality vs Standard GT-486-D 80 : 100 vs blue ws intense 81.1100 8 blue ws intense 881IOO blue 86 >100 blue 83:: 100 blue 84:100 blue 841IOO 3 blue 8?1100 vs blue 89?100 ws blue ws intense 89 >100 ws blue 85:100 yellow dull 841IOO a yellow s dull 84s100 a yellow dull 861100 yellow dull 86:100 yellow dull 83:100 ws dull 92:100 yellow 83l 100 we yellow 84 $100 t o yellow ws intense 821100 ws; dull 821100 equal 82:100 ws yellow 83:100 vs yellow vs dull 831100 ws yellow s dull $2 s 100 ws yellow vs dull 83?.100 TO yellow vs dull 83:100 ws yellow vs dull 85 MOO vs yellow s dull 83:100 ws yellow vs dull 84:100 vs yellow vs dull 86i100 dull 83:100 ws yellow ws Intense 105?100 blue s dull 83:100 vs dull 83 ? 100 ws blue vs dull 89:100 ws yellow a dull 94:100 vs blue vs dull 93 $ 100 vs blue dull 84:100 vs blue ws dull 82:100 blue 83:100 blue 81:100 blue 83:100 blue 80:100 v blue 82:100 v blue 80:100 v blue DUP050068688 17" Packed Lot 09* 90 91 92* 93 94 95 96 97 96 99 100 101 102 103 104 105 106 107 114** 115 116 117 116 110 120 121 164** 165 166 167 166 169 170 171 172** Quality vs Standard 60s.100 blue s dull 60s100 blue s dull 63?100 blue s dull 63:100 blue t v s dull 64? 100 s blue vs dull 93:100 s blue s dull 9oso00 s blue dull 91:100 s blue dull 91:100 dull 65:100 vvs yellow dull 65:100 vs blue dull 67:100 vve yellow dull .66:100 dull 63:100 v dull 60:100 v dull 60:100 v dull 60:100 v dull . 60:100 v dull 03:100 v dull 63:100 s blue dull 03:100 vs blue ws dull 00:100 s blue s dull 60s 100 s blue dull 63:100 ys blue s dull 61:100 vs blue dull 61:100 blue s dull 03 s 100 blue 62:100 blue s intense 02:100 blue s intense 04:100 blue intense 01i100 blue s intense 03:100 blue vs intense 03:100 vs blue vvs intense 05:100 blue vs dull 01:100 v blue 04:100 v blue * Extracted with sodium hypochlorite* ** Lots N624-100 through 113, 122"163 and 173"202 were produced from eutectic crude green in 1949* DUP050068689 -16- siaffiiiii Packed Lot H657-* 1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 16 19 20 21 22 23 24 25 26 27 26 29 30 31 32 33 34 35 36 37 36 39 40 41 42 43 44 45 46 QUALITY Oi? ^MOKASTRALst BLUE BG PRODUCED AT MSWPQRT 1M 1949 Month Produced Quality.vs StsndarcL BT-297-Da ? *,*. March April n n st pi July n August n 8* ft it ft ft ft It n j* i? St a m St.. ti SI SI tt December n M tt n n n n it it 100s100 vts green 95:100 s red vvs dull 99 s 100 vs red ws dull 100*100 equal 100:100 equal 105:100 vvs dull 96s100 red vvs dull 99*100 vs red 102s100 equal 105s100 vvs red 104s100 equal 106s100 vvs intense 100*100 vvs green vvs intense 102i100 equal 101s 100 ws green vvs intense 101:100 equal 101:100 vvs green 102s100 vvs green 106*100 vs green ws intense 100 s ICO vs green ws intense 100 s 100 vs green ws intense 100:100 vs green vs intense 106s100 vs green 1051100 vs green ws intense 1051100 vs green 105*100 vs green 101:100 vs green IO61100 vs green 104:100 vs green ws intense 105:100 vs green vs intense 106:100 vs green ws intense 107:100 vs green 104:100 vs green vs intense 106:100 vs green ws intense 107:100 vs green 96:100 vs green 100:100 vs green vvs intense 102:100 vs green vs intense 103:100 vs green vvs intense . 102:100 vs green vs intense 97:100 s red dull 100:100 vs green vs intense 100:100 vs green vs intense 102:100 vs green vs intense 102:100 vs green s intense 101:100 s green vs intense DUP050068690 Packed Lot N657- 47 48 49 50 51 52 53 54 55 56 57 56 59 60 61 62 Month Produced December Vi IE n I! n t? r? ft t! N .51 R -19- Quality vs 101?100 3 .green ve intense 101?100 s green ?rs intense 98?100 s green $ intense 100?100 vs green 96:100 3 green s intense 98?100 s green s intense 98?100 s. green s intense 102?100 s green s intense 102?100 green vs intense 103?100 ,green ro intense 104?100 green s intense 99*100 green vvs intense 104:100 vs green s intense 103?100 green vs intense 102:100 S green vs intense 103?100 green vs intense DUP050068691 20~ EXHIBIT (4l Month January February March April May June July August September October * November* December* QUALITY OF "MQNASTRAL* BLUE LB PRODUCED IN 1949 AT NEWPORT **#<* .sunwiNN' iiitinii uunKt'iiKi <! `'tmWVf* Packed Lots N623-XB5 to 210 N623--2X9 to 250 .15623-259 to 299 1623'-300 to 329 H623 -330 bo 350 N62>-351 to 373 N623'"374 to 394 N623 -395 to 400 M23-409 to 426 N623--427 to .460 N623-"469 to 503 N623 c.504 to 522 Average Quality Standard BT~2:L-r 100100 vs red 99s100 vs red 99 s.100 vs red 90s100 VS red 100!100 VS red 100s100 VS red 103s100 vvs1 red vi 103s100 wsi red 101s100 S Isd vvs 99s100 vrs> green 99s100 V3 99s100 s green * Replaced BT-204-I) Kith BT-304-B as a Newport shipping standard. DUP050068692