Document 0LkjK8Zv6nDpQV26aw36K7zEM

COMPANY CONFIDENTIAL l ANNISTON ARQCLOR CLEAN'UP Engineering Parameters end Recommendations for Eliminating PCS Loss to the Environment Johnnie Etheredge v DEFENDANT'S EXHIBIT 53 April 26, 19H DSW 01350? WATER_PCB-SD0000067113 Aroclor Removal Devices 1. i Curbing around drumming and blending areas V, 2. Use buckets and pans for small leaks until repaired . 3. Use adsorbents to clean up spills -- Anniston uses Oil Dry (trade name) 4. Use bucket* at sample ports '. 5. Do not use detergents for clean up 6. Segregate contaminated and uncontaminated water 7. Carbon towers to remove PCS from product RCl acid f B. Brink mist eliminator* in off-gas lines drop PCB back into process 9. Condensers in off-gas lines, PCB recycled . 10. Catch tanks in vapor lines ` 11. Drowning jets for vapors before-emission to atmosphere 12. Keep vessels buttoned up 13. Use a sump in effluent line 14. Limestone pit -- KC1 is present in effluent 15. Carbon adsorption of Aroclor from plant affluent 16. Evaluation in progress -- Aroclor adsorption on a less expensive adsorbent v than carbon - ` DSM 013506 WATER PCB-SD0000067114 JUTOCLOR WASTE SUMP The purpose of an Arcelor waste sump Is to separate and collect entrained Aroclor from the waste effluent. Aroclor (PC3) existing as a second phase pay be removed from the waste stream through the uee of a properly designed and operated sump* teaks and spills are generally major contributors to effluent contamination. Because Aroclor la heavier than, and almost Insoluble In water (solubility of 300 to 400 ppb}, a correctly designed sump will efficiently collect entrained Aroclor. A sump presently used at Monsanto's Anniston, Alabama plant in the Aroclor manufacturing process effluent stream yields an effluent below Aroclor solubility level* The sump operates with an inlet stream flow of approximately 350 gpm containing HC1, Aroclora, process water and grit washed through the sewer system. The Aroclor removed (plus the solid grit material washed in through the sewer system) is collected in the bottom portion of the sump and pumped out at three month intervale, unless of course a major spill should occur. The siaing of a sump is usually done by one of two methods or a mixture of . both. The classical theoretical approach of determining settling velocities requires that both particle else and density must be known. The classical approach becomes complex because each type of Aroclor hes a different particle slue and density. For this reason a generalized approach, applicable to the range of Aroclor products produced st Anniston, hss been developed for sizing a eump to collect this range of Aroclore. The generalized approach combines these variables in a constant Hk" called the sizing factor. The sizing factor along with the flow rate will give a surface area sufficient for settling Aroclor if the flow is evenly distributed along the inlet end of the sump. Space availability, terrain, and other physi cal limitations can determine the width and length appropriate to the calcu lated surface area. Remember -- for efficient operation the inflow must be evenly distributed along the inlet end of the sump. , Formula i S.A. m jt * __ w *" Wherei *5 S.A. Surface area in ft. F.R. Flow rate in gallons per minute . gal. k 1.66 Min. ft.1 " sizing factor -'7 =i i DSH O I3 5 0 9 WATER PCB-SD0000067115 Ex'ample: Anniston sump design . F.R. 2S0 gpm \. * ' 3*1* 250 nun. Therefore* S.A. - 1#66 qil, fturrTt. .. S.A. - ISO.6 ft.2 . . * Anniston sump is 10 ft. by 15 ft., or S.A. 150 ft.2. Three important factors to be considered In determining the depth of the sump arc maximum possible spill, frequency of clean-out end turbulence created by incoming flow. The maximum possible Spill can be determined by examination of the processing unit. Frequency of clean-out can be determined by'available manpower and equipment. Correct distribution of the inlet flow across the inlet side of the sump will minimise the turbulence. There are several methods of distributing the flow. The Anniston sump has three inlet streams entering below the liquid level. An examination of the cut-away, sketch II in Appen dix A will explain the principle. - A minimum vertical separation of 2 to 3 feet should be maintained between settled material and Influent stream. The inflow enters the sump below the liquid surface to prevent mixing of floating organics that may appear. The operation of a sump is simple and for that reason the necessary precautions for efficient operation are often overlooked or conveniently pushed aside for later consideration. However, to maintain efficient removal of Aroclor, caution should be exercised during operation of the sump. A few potential problems that may occur are listed below. _ Potential Problems * t . .1. Solids washing into sung* will be collected and, depending on'character ,. of solids, could be a problem in removal. A. t - .. . . 2. Regular cleaning is raquired to avoid overfilling the storage capacity for Aroclor. ' 3. Introduction of. detergents or emulaifying agents (e.g., floor clean ing) will have a serious deleterious affect on sump efficiency. .4 Prolonged period* of operation at flow rates higher than design capacity will result in decreased efficiency, 5. A lump alone will not remove materials lighter than water. 6. Care must ba taken to prevent stirring Of the settled Aroclor if cleaning li attempted while the pit is in operaticn. 7. A floating organic film with a high Aroclor content may appear on the sump surface. . These are only a few problems that must be'considered If a continuously efficient operation is to be achieved. _ -=- ' DSW 013510 WATER PCB-SD0000067116 Construction Details ; The solids that are washed into the sump create a problem when an attempt is made to remove the collected Aroclor. A sump pump that will handle the solids should be Installed. Anniston uses the services of a commercial septic tank cleaner (Honeyvngon). Neither a sump pump nor a Honeywagon removes all solids -unless the pit is stirred. Therefore, a periodic shutdown of the sump is. needed to achieve a thorough cleaning. . ' To prevent floating organics and trash from leaving the sump an underflow arrangement is used (see sketch II, Appendix A). Because the floating film has a high Aroclor content a surface type skimmer is used in the Anniston sump. The surface skimmer used at Anniston is a model 610 Brill skimmer manufactured By Oil Skimmers, Inc., Cleveland, Ohio (see Appendix 3). The tubing used by Anniston in the skimmer is Tygon R-3603 manufactured by U. S. Stoneware end lasts approximately four weeks per tube during continuous 24 hour service. The Anniston sump has an acid brick and leak-proof membrane lining because the waste stream is slightly acidic. If the waste stream Is not acidic, leak-proof concrete walls and floor are sufficient. ACI Standard Building Code was used for all reinforced concrete. A description of the acid brick and leak-proof membrane follows. . - a DSN 013511 WATER PCB-SD0000067117 1 iS/ e& * . -- ' -- - ' y. ... . _ . . . . ; /i fT .. ........... ............................... P&fli ~ /d .... - . ' .. Ac7b7ed by dnpjl t>i OmTu^, /.vi'/venl p* ad fadfirs $7ated ^arl'S. ry if CC/j&TrocT/ptJ* Z~~~7'- ... . rfc/d brick. JfMeA ret# forced c<p/yc.re.Tz. tufirfy zrf /Pad rcsis'TQNT M&Mbrofife. . bc.7/oc.cfj br/ck qxd ccvcrzTe. ............................... ., . fad 3nck . ... ... ... . . ............. / p/t/d rttu>7anT MorTaC - flawtoff /ruw /sa'J.: ' -/;,ar <^paI 1)7/& T33~o~n~n Vtr .T1r7-;.zy;.=Tcr=r w . rrr1 / * ' **< LCCffcrcTc. r&j/hrz>.d tada>r er waff ~ Groo7 tf tfC-sdd ., - fr/Mcr ''femtfrme y/if er *ju%l CcoTt/scj - fkwct'aj *;>! er l ~~ -nCin tpur>W. t hT' ftxvf/y */u cr jy/ ~Ccq.T/n^ - /kfif/fZbiT er jjiw/ ^4^ OSH 013512 WATER PCB-SD0000067118 ' ; '! 'Awisnu ftXOCLOK WASTE SUMP /\ WATER PCB-SD0000067119 nsu 013514 WATER PCB-SD0000067120 \......................... -- / iey /rL _______ L*------------ l<r\ VI --4-- 7'Ai---------------------------- PART NUMBERS AND NOMENCLATURE J. DRIVE WHEEL la. DRIVE WHEEL CHAIN 3. PRESSURE WHEEL 3. BASE 4. SCRAPER 5. COLLECTOR TUBE 6. REDUCER 7. ELECTRIC MOTOR. W hp/ 1775 rpm/TEFCBB * 230/440 volt. 3 pl>. 60 eyelet 1)5/230 volt, 5ph. 60 eyelet B. TUBE GUIDE * 9 OUTRIGGER FEATURES AND SPECIAL INFORMATION Compact, fugged conltruelion, designed to (I! into 'mill areal. Self-regulating, will celled esvy greases end pilt *t an aver age rata of BOO gallant per day. f Removes Booling oily ICUm containing high concentrations of grtije. oilcoetedTfirt, lint, paper, metal chip), and detergent gum. * The MODEL 610 BRILL SKIMMER It tturdity mounted, being bolted to a 4* a 4* ingle iron, which it secured to the edge ol the tump or collection pit * To delermina the length of collector tube needed lor you* application, Ihia armpit formula it recommended; DOUBLE THE AMOUNT OF HOSE NEEDED TO EXTEND FROM THE BRILL SKIMMER UNIT, TO THE LOVIEST AVER AGE LIQUID LEVEL IN THE PIT, THEN ADD 17 AOOITIONAL FEET, Ihit will allow adequate lube surface when the liquid led fluctuates. pe"ni(ting lube to Ikrai over and around debris, (rath pr any floating objects in the p'l without tangling. distributed by OIL SiCITViiViERS liMC. division ol THE D. BRILL CO.. CLEVELAND, OHIO 44147 Phone: 216-237-6161 316-946-7747 LA l/J Q WATER PCB-SD0000067121 The MODEL 610 BRILL SKIMMER is assigned i;j s:i>?r end remove oils, greases end Heeling oiJy scum from (he surface of water, coolants or cleaning liquips. This unique process permits the re use of there solu tions, thereby etlecting substantial savings. It also assists in complying with government regulations concerning the disposal of greasy, oily or gummy con taminating liquids directly into sewers or natural watersheds. , HOW IT WORKS The MODEL 610 BRILL SKIMMER gathers floating oil and grease, and elevates it to minimum of forty feet from the liquid Surface of scale pits, sumps, settling pond> or streams. . This effective process Is accomplished with a closed loop of special tubing, constantly moving and floating on the liquid surface. Floating greases and oils adhere to the outside of (he tubing, and are conveyed uo to a separator, where ail greasy end oily contaminates are removed and drained into storage tanks. The cleaned portion of the tubing continues its orbit and returns to the jump or reservoir Id repeal the gathering process. The MODEL 610 BRILL SKIMMER fulfills a three-fold purpose, first, the original coolant Is cleaned lor re-use, second, oily wastes are consolidated with minimum water ao that disposition is greatly facilitated, third, a substantial amount of fine solid contaminants are removed with the oily scum. SLUDGE S 0<O Ml !M115 P3 S Manufactured by OIL SKIMMERS INC., a division of The G. Brill Co'., Cleveland, Ohio 44147 WATER PCB-SD0000067122 INSERTING TU3ING IN MODEL 6>0 DRILL SKIMMER A. Remove baekpiate. apply power end cheek direction of rotation. B. Squcctc new tubinj under tube guide lift up helical scraper@md wind in tubing. A. Place tubing between outside sprocket teeth on drive wheel (D B. Rotlle motor coupling unlit tubing passes ' under pressure wheel Insert lube between Inner and outer rows oTtecth on drive wheel up to the next pressure wheel A. Press down tubing between sprocket teeth, end continue to rotate drive wheelQ)ln proper direction until tubing is past second pressure wheel S k 0 1 3 5 7i CHECK LIST ' Tubing In proper opening at right of spout -- under tube guide-through hel ical scraper--between inner and outer teeth ol drive wheel-- firmly held in place by lour pressure wheels--piece tubing in opening on right side, enend along outrigger through the guide yoke, and over the outboard wheel. Unit Is now ready lor operation ... be certain that motor will drift unit jn proptr direction. 1803 W. ROYALTON ROAD CLEVELAND, OHIO 44147 A DIVISION OF THE G, BRILL CO. * CLEVELAND. OHIO . -9- WATER PCB-SD0000067123 AROCLOR REMOVAL - HCL LIMESTONE NEUTRALIZATION PIT Introduction! The Monsanto, Anniston, limestone neutralization pit serves a dual role -- neutralization of waste Muriatic Acid (HCl) and removal of both dissolved and entrained Aroclor, Limestone neutralization is satisfactory in Anniston's case since the HC1 does not form insoluble salts with the limestone. The limestone quarried and crushed within 30 miles of the plant site represents the most economical alkali source in Anniston's particular case. Neutralization of the waste KC1 is accomplished by gravity feeding aqueous HC1 through a bed of limestone rock. The removal of Aroclor is effected in two methods. First, the limestone pit serves as a large settling basin to collect entrained Aroclor. Second, the soluble Aroclor is apparently adsorbed by finely divided inert residue freed from the limestone rock during neutrali zation of the aqueous HC1. 1 The effectiveness of the limestone pit in removing Aroclor was determined by laboretory analysis. Analysis of samples taken daily over a four month period of both the influent and effluent revealed a very significant drop in Aroclor" levels across the Anniston limestone pit. At the present time, daily analysis of the pit effluent Indicates average Aroclor levels far below the solubility level (300 to 400 ppb) of Aroclor. However, the low numbers cannot be main tained if detergents, emulsifiers or solvents are present in the effluent. In other words, any agent that increases the amount of soluble Aroclor in the waste stream decreases the amount of Aroclor removed by the limestone pit. Size and Analysis of Limestone t , Anniston uses, two sizes of limestone -- 12 and #6. The #6 is small: St passes through a 3/S in. screen and lOOt passes through a 1 in. screen. The'small rock (16) neutralizes the HC1 quicker than the 12 limestone because it has more effective surface area. However, if the 16 is not handled with caution it will compact in the pit and a loss of pit size and life will be realized. The (2 limestone is 1 in. to 2 1/2 in. in size. Neutralization takes a little longer but the compaction problem is minor. At the present .time Anniston is using the snail t6 limestone in the firit 20 ft. of the neutralization chamber and the large 12 limestone in the rest Df the neutralization chambers. A chemical analysis of the limestone used in the Anniston HCl neutralization pits Is as follows: " 1 . S10j Plus Insolubles CaCO^ Mg COj 2.446 ' .. 0.60 93.459 3.116 Sizing of Limestone Fits: The shape and size of limestone pits used by Monsanto, Anniston, were developed for e specific set of variables and conditions present in the Anniston Plant. No known set group of theoretical equations will logically fit the sizing of the type of pits used by the Anniston operetion. - 10 - DSW 013516 WATER PCB-SD0000067124 The numerous variables to be considered in sizing a limestone pit requires methods other.than theoretical formulas. Flow rate, HC1 concentration, Aroclor concentration, length of pit life desired, available property for pit, chemical analysis of limestone, size of limestone available, efficiency desired for Aroclor removal, HCl neutralization efficiency and material other than MCI and Aroclor in the effluent stream are a few of the many variables involved. An effective and efficient limestone pit operation depends entirely on a thorough investigation of each variable. Therefore, It is recommended that a pilot model be operated before a full scale operation is installed. Although it is not recommended to use the Anniston operation as a proportional method of sizing other operations, it may be of value to know a few Anniston variables. These items may give an idea of what to expect. 1. Haste influent a. Flow - 700 gpm avg. . , b. HCl concentration - It approx. 2. Retention time for neutralization - IS to 20 min. 3. Total pit retention time - 25 min. avg. 4. Effluent from limestone pit a. Solids (1) SO ppm avg. (2) 1.5 to 250 microns b. 100 ppb PCR avg. t Description of Facility; \ 1 ., Monsanto Anniston has two limestone pits designed and located for continuous operation. A flow diagram (fig. 1) shows how the pits are arranged and connected together for simultaneous or individual operation. For clarity in description the pits are numbered pit II and pit #2. . Reading the description of the two pits will reveal a discrepancy in size and arrangement of baffle walls. Although the pits are not identical they both worV reasonably well. Experimenting in the field as to the best method of size and arrangement caused the discrepancies. Presently the recommended approach is pit II for operation and efficiency. - 11 - DSW 013519 i I WATER PCB-SD0000067125 7 WATER PCB-SD0000067126 Limestone Pit *1 ' . ' Fig. 12 Dwgs. D1300-C1-A > . DlJOO-Cl-A Limestone pit VI originally built for HC1 neutralization only is presently, after minor revisions, used for neutralization and Aroclor removal. The physical dimensions and characteristics of pit VI are as follows) The influent flow measurement weir is a 6 ft. by 7 ft. acid resistant bricklined reinforced concrete box with a 12 in. wooden 90* V-noteh veir. The grit chamber measures 32 ft. wide by 20 ft. long at the top with 1:3 side slopes. The depth of the grit chanber is 4 ft. The walls and bottom are reinforced concrete. Baffle "A" 1* an overflow baffle that forms the downstream end of the grit chamber. The baffle is made of reinforced concrete 1 ft. thick by 32 ft. long by S ft. deep. The neutralization chamber is 120 ft. long by SO ft. wide at the top with 1:3 side slopes and 7 ft. deep. The neutralization chamber is the only portion of pit II to be filled with limestone. Baffle "B" is an underflow baffle, see drawing D1300-C1-A for description. The settling basin has two compartments. The first compartment is a 17 ft. continuation of the neutralization chamber void of limestone. The second compartment is a reinforced concrete box 14 ft. long by 27 ft. wide and 10 ft. deep. The second compartment is sloped 1 ft. in 7 ft. from upstream to down stream end of the basin. A perforated suction pipe is used at the low end to pump inerts coated with Aroclor from the pit. Effluent leaves the pit in an overflow standpipe. The elevation of the standpipe controls the level in the Pit- ". The entire pit Is coated with Lion C4t asphalt. - The neutralization chamber has a 12 in. protective sand cover over the asphalt.. See Appendix for Lion Technical bulletin CA fpr subgrade preparation and application of the asphalt. - 13 DSW 013521 WATER PCB-SD0000067127 OSW 013522 Mjmcii Imi Ik Vi fttum H 1jnmlt Ctr.riflr *frf "nil l MtWMl vUfttitt fttrrttt' tiM *r fupfltiMfl, *L l hr (>t * n?n ft'tvttl tul In tut 4#*t { e:-thliah at ft *r`^ 11 fth. H'ltit ip im r:u<4i>h iru# ric m^, it muit ti reni.f i>ir;r<Tj unutlw *f fii* ivr t ir.r iai ii;ui wf! unit* n tv [A* *;ji $t |;i. tuif f"l nun Hit co^Jriitiii, is! ncjifi hii un intern u m? cth&stmrt. lm tr.iwm::eh w,n~u* ***, CO.hflDimiH f^i <ri-.*<h| It tr tf Jb!a.njtt- yy r-j -ur 94 Htt'.hhJ itt. iitlsrmtMsn ftirm i t`'Ur\ i* i\ **Mil Mi.'tv*t4t>ntarr*s^ysrj. n*f Hri 14 tnm'. s*i t title thATYh iT /?lQ T60 - MONSANTO COMPANY - anniston, ala. V //^tSTSW r; , ^ !&?!* 14 - //'<r ||ArhftOYtd `P/T lCh(.t Dt*T, JAOUBTHN,ON.O. TS-A WATER PCB-SD0000067128 Limestone Pit 12 rig. 13 Dwg, 1300 pit *2 is 200 ft. long by 60 ft, wide at the top with 1:4 side slopes and approximately 6 ft. deep. The influent stream is distributed across the width of the pit through an IB in. perforated Flextran pipe. The Flextran pipe, product of Johns-Manville Company, was perforated by Anniston personnel for the expected flow in the Anniston Plant. The perforations are 2 in. holes 1 ft. apart. . Baffle "a", 66 ft. 6 in. from the distributor, is an overflow baffle. Baffle "B", 66 ft'.' 6 in. downstream of "A", is an underflow baffle. See drawing 1300 for details. All of the pit from distributor to baffle "B" is filled with limestone. The last section of the pit from baffle "S" to the overflow has 30 ft. of limestohe and 36 ft. of settling area. - Effluent leaves the pit through a wooden 12 in. 90* v-notch weir. The entire pit, dirt surfaces and exposed, concrete, are coated with asphalt. , - 15 - Ds* 013623 WATER PCB-SD0000067129 OSW013524 Kfflltl. Th,\ iuLf| It tti privity if I'ninaii C**n*r Ml *vl l rtlflPMi tMftwl nmdue* *!'****>/mCf#'.^Aut'n- jmjh,-'4Mi rifftm1.-frt'aifftt./leilnMtiul,ll l9ol tIu*:Mc'ri/munaTt i#mt cifi?i;hj'*.mjI f*ijvii\u*!'*M%*r irJicm> itiA'iAtliAMiurl, ImM mIkiv.*Ol itMhint (InL)|.j*/?t*i|li|Um (< iktvjtn) It lr |*i th</Ifflt/ja,mIfncii*r*<c;"-U<rjha4ivhitffkftmn. C6MpA.iv ceririocriTiii : ilnViuill m| < fcitrfiaj<n^\nmiir'.tuUi.ifrCrtmyUdiinil*tUfmtronimiAMhinutiw.3^u-r:111-r1-lrir:m*iiui:: iit( |;U?: w cvinr pru y:`.'c. ev TSD ~ MONSANTO COMPANY - ANNISTON, ALA, TITLE ^ - 16 -2 P/7~.. /m^F5TO/V oka*** #y 1 A^rtovts Ml ' ' -vi-.'-i# s/w/if . ' "' IC1LI " AUTH, NO. JOS NO, TS-A0 ChT. .............................. WATER PCB-SD0000067130 /V 3 . A Ciftrt up *ir* ft tough and fluiMe ^iOt "CJI" aipMl m#mbr#n llnlnf applied on larga ceml proiiet *n Wyoming Technical IvfWtlA Cr< Poblifhed by Un Oil Company, II Derada, Aikensei The old cliche thgt "History repeats Itself*' J| certainly true In record lo Ihe use ol otpholl down through the years. The Baby* Ionian and Sumerlon civilisations of 2500 B.C> native asphalt* the only answer to waterproofing problems In their tem- . pfn ond polocti, Mon Of the 20th Century oiw It finding asphalt the moit tQlUfaetory and economical ow^fr to tom# of hit greatest problems. Modern Improvement* in petroleum refining end intensive rtjeprth hove dev# loped petroleum asphalts of mony types, end front them her* com# OlpheltiC product! ftp#CioNy de signed to serve mony needs In the wgrld of todey. On# of the newest developments from tha petrochemical toborolory it eololyticolly blown asphalt, or *'001** gipholt ot It It commonly colled. Originated and developed by the Uon Oil Cam* pony under potent No.1 2,450,756, catofytieofly blown asphalt, using phosphorous pentoxide ct Vh catalyst, hoi been widely adopted throughout th# Unir#di5ioUs at a principal material for controlling seepage in irrigation canals end woltf supply Oh*-*f`th# moit torivus problemj of lha modern world It tha drying up of and the constgutn! lowering of water tables, nacttiitaling construction of irrigation Cartels, wOttr storage pits, 9*d th# domming of riven to i#rv# oi reservoirs, Before the dis- cc*try of "cat** osphatl, irrigation engineers found o greot deal of wottr being tost through SMpogt, ond They tried many methods Wi on ffor-1 to control thf WQtfoge, The wait? which seeps from eonolt ond Irrigation ditches ri not Only lost, but usually colleen In lower ground ortoi, rendering Such oreot unproductive or nectivtoiinp the ImtoUotion of expensive droinoge lystem*. In 1949. tn U. S. Bu'aow of Ractomotion tImo<*d that of th# 15,450.000 ocrt*U*l of voter supplied for irrigation, 3,900.000 ocre-ftit, or 25 Pr cant, ware loft in tronail. With- the Odvnt of MC#rt" oiphplt os th# Ideol law-cost canal liner, much of this waste hoi bcn tllminatfd For canal linings, "tot" asphalt Is used to produce o Thick, rough, waierprpaf membrane, formed by spraying th* very hoi M00*F,I otpholt on the lorth'i surface. This type of otpholt, now manufactured by o number of licensed, hot been applied to over 6.5 million iQuo't yards of conoU and rfSfrvoM for tefooo* COnirol during Ih* past fi*e years, 0d ill ulr it eonslonily expend ing pi new needs art found for this verioiilt moitrlol. Citrnsivt lens mod* by the U. S Bureau of Reclamation in connector wmK tonal lining ccmtrwclion, usmg th# L'on coiolyueollv blown osphoh, Kqv( shown the product to ho** unusuol durability eher* octeriitiei as well oi o toughness and rrxfejNty which mok# it unucpHtd for this purpose, E^ericnci hoi shown (hot, not only 'H this ryp* 6l construction prebobty one ol th# most jffiei*nt meons over developed for th* control qF seepage, but it It the moil economical bath in fnlliol cost ond In length of service. Although originally developed for the control of mooge el irrigation water In Canals ond reservoirs, newer uses includt con trol of fndusnio! wostes, preventing pollution of ground wa**fi Ih# taok*prooting of ifwopa disposal ponds, the lining of m*r* vpirs for the jettfemenf ond filtration of municipal water supplies, ond erosion control on beaches ond form fends. A most Interesting application of "col" asphalt it in connec tion with tha fascinating development of underground storage for butorrt-prppone hydrocarbons. In 5curry County, Tejrci, naar Snyder, the underlying soft domes become excellent gei tio-ojc reservoirs by tha simple expedient of pumping water into th toit domes, dissolving the soft, end bringing tht brine bock to the iur. ioce ro be stored in pin lined with "cal" asphalt. Thu brine eon be Injected bock Into the reservoirs to lift the stored goiai to the surfaci for commercial use during th* periods of heavy demond Lion OH Company, Survey Oil Compony, Scurry Butone Produefs Company end Phillips Petroleum Company or* omong rhoia who ore using '`cat" asphalt os o liner in such brine ponds. This m thod of storing the b<in prevent! the pollution of thf surrounding soil , ond cover precious water for reus*, making patiiblf on sc&nam^* ally feasible operation. One of tha tales) developments In the use of membrone otpholti <i the sioblliiotion of noturof ipili under highway o-id oiHiafd pavements by enveloping or "wropping up" iheit toih in mambronas of **cotM asphalt. Simple, efficient and dufcbl# btyond H normal raguiremenM. yet low In cost, this method pf povemeni design promises to revolutionist Ihi work of lha highway eng.ntcr, ptfowinp the eonttruclfon of fait, smooth, high IOad*cor*vmg h>eh wpys ond 0<r fields at 0 frociion of lodpy'l COST. Tha rtauir*pr,nts for membrona osphoti oi sp:f>4d by U, S, Bwraou of Radomotion oi foMowi: Tha oiphplt fpr the ospholne m#mbront si'oll be eotoir'^c1'/ blown asphalt crmtnl and hoM conform to the following spccit.. tolionl-- lol Metexlili--Th# material! lupphtd under th>i ir'c-l-ro- lion tholl b esphohs preportd Only by the coio'yf:* Lf, 5. P.ftnj Numktr 2,450,T3< * 17 - DSW 013525 i j I WATER PCB-SD0000067131 bowing treatment of ospholllc pelrpfeum, Alphaltic moleriot* for which ferricchloride Dr other compound* of Iren have been used oi colotyMi In the blowing operaHon, will not be oeeeploble. lb) Cens/aJ ruvlremenh--The asphalt tholl be homoge nous, free from wo tar, end theft net foom whan beefed to 3477. , it) Dt1*Hd requirements---Cdletytfcolly blown oiphelt Shall meet tht requirement* ihown below: Flaih Point fC.O.O. min..__ ____________ 425*F. Softening Point .............. 175* to 2Q0*F. Penetration cl 77*F., 100 g.( 5 we.--..,--.. 50*60 Ptnfitolion ot 32*F,, 200 g., 60 we , min-- 10 Penetration of 115*?., 50 9,, 5 tec- men. 120 Ductility 01 77*f.. 5 cm, per rrurtule, min__ 9.5 Cm Loti of 12$*F.t 5 houn, meit.,.__________ 1.0% Penetration offer fen on healing, 77*F.t too C-i 5 uc>, % of original, min,.....-. 60.0% . Bitumen j soluble in corbao tetrachloride) rmin. 97,0% APPLICATIONS--oMtrution requirements ore considered under A ptncrol'cleitcK 111 Seepage Control, f21 Seepage end Erosion Control, 13) Erosion Control, and 14) SaM StobiliioHon, SEEPAGE CONTROL CfMcient, rconomicef seepage control can be obtained by the me of thv simple "cot" asphalt mambtone. Thu membrane it constructed by iproying the hot 'cat" piphell directly on the prepared, smooth lubgrpde, and then covering the cooled membione with a layer of toll or travel, PfttFAJATION OF iUIGKADE--.New canals and reservoir* mutt be e*ca*atcd to a Maw for it* thickness of the to* th cover over the membrane. Many old eonoli ore already oversite 01 e result el ttovon, to Ihol frequently no over-excavation u necttldry, For application purposes l i* not necniary 10 trim (hi conol IP eny oet eren-ieetio*, JO that In many coses much earthwork ten be saved by using ctsentioUy the nuting canof or reservoir. Howmr, In both eonah pod ttarpgt pr s. tide .slopes must no I be iteeper than I *3/4:1; otherwise. Sloughing af the soil COvtr over the membrone mor occur. In some coset, if the cover toil u oorjiewforly unsJobh, 1topet of 2:1 are deuraLrl* 5ubgodes should be smooth be lore applying the hot aiphoti. It <l important thal the subgrade be free ol clods or lotge pebbles nn<e it ji difficult (0 eoat oraoerty `ouch prajeclions. Smooth surfaces require ten asphalt in the pro duction of o perfect memb'on* Conversely, 0 rough surface re- outre* more oiphofr end greatly increom the difticulfw in obtainbig a completely woter-tight membrane. An adequately imeolh turface moy be obtained by dragging firs) with a nee* beom to knock down forge projections, following with 0 smooth-faced itief roller to crush clods and push pebbles Into the tubgrodcs. Usually a roller weighing 50 Ibl. per Kntol inch of width is specified, ' To guard cgolnir undue weed growth, gfl weeds, torles, coi> tolls or Willows should bo grubbed prior to beginning th dragging and vnoothing operation*. Where weed growth ia excelsTM*, ii will be wit* to apply a good commercial soil mrifonl cento ning odium chlorate and borax. This material may be applied dry or in water solution, not less than 8 ounces to the souor* yard, in (he Infested area*. The iierifenf should be applied offer dragging and rolling hove bean completed. Dry, dusty oreot of tubgrode mult be sprinkled wth weiei immediately prior ro application of the hoi otpholi. Unlei* this It done, holiday! moy form m the membrane due to the surfoce tension of the hoi asphalt. Pomp, wet, end cold toil htta*. rpihfr thon hinders. the farmoUfio. gf q oood membrone APPLICATION OF MlMBRAHt--The asphalt is sprayed directly On the lubgroda ta produce e membrane of uniform thicknw fie* from holes or holiday!. The usual rote of oppUeolfen is 1,5 to 2 0 gallon* per square yard, with heavier application* prefmtd for mervoin and chomicol pond* where leokoge may be erihcol. and for other mitollatfem whtr* ih* subgrade I* gnovoidobly rough. Aaphatf may be applied by bond tprayt or by distributor bar* con. nocted to 0 distributor with e flexible metal hose end tuopc-ned br suitable Cobin or ropes. All poitii of (he spray* thau'd he tapped to ovoid thin Of bore Onoi AppUcatlen* an .d< iiapts ere usually made prior to covering the bo I torn of the canal or rxs*r*oir. 5ueh opplication in ivrat ponci will ovoid v*:r*v*t run-down ond puddling of (h- aieholt in the bottom The impratur* ond prc*Sv* of the OSphqli qi lh< spray not*1* Shov'd be contrafled to maintain 0 flat uniform teray. An application lemporatv't of 350* ta ^007 (S tecommended Ftope support* or cfeated plonki should b* orovi'ded <z` ?rk. Ing an t* ii slop** if the subg'od* wMl be odvt'tf<v J'tru'beC when such means ore not used Roughened pr d<i'urbrd orci should be smoothed before oppl'-codOn of the Qiohpli areas to which lh* membrone fs to be bonded ihpwid t>e a-i free pf iooir molenpl. and the aipheh lhould be opp'icd to -- moltfy twice lh# normal thlckneu. taper.ng t noimol gr a distance of approximately i inches from the edge of th* Crete tf atmo<oh*rc lemoerpturi r io--, or if fh* i slightly dompJ primrng w.lh 0 thin qsphqH culbotk >S rrcpm'-*r*dcrf before oppHtolion of lh* membrpn#. . DSW 013526 WATER PCB-SD0000067132 Ad< quote safely devices such ai goggles, laMy beovy gloves should be used by workmen and tp'y m*n. Md Spray fqulpmoni and !h* distributor must be flushed with distillate prior to ihut*doM or itorog*. Th* dUMHot* used (or flushing tht Iproy equipment should nOf come in contact with tht completed membrane, and all distillate Mull be removed from th* ipfoy lystem before beginning membrone opplleotloftf* ,C9VIK MATtRiAl^Th* primary purpose of cav*r material It to hold tht mambtane j* plot* to prevem tilling and destruction by mb-surface hydrostatic farcei or flowing woteri, tn Addition, the COvfr protects th membrane from weathering pnd f'MA mtchflm<el Injury wch at may rtwll front Ihr hooves of livestock, In general, on aorth cow not lets then 12 inches In Ihicknesi Is recommended, Graded tends ornf 0'd*#ll generally form the matt t(Qbl* cover malarial. Waler.depasited tilts or* ih least noble. or pro**I which wfll bl tuf/iotnrly "optn" 1o permit pn* rotion by iha ospholt opphtd ro th* furfoc*. After the rock or gravel hot been orefully pfoetd. It ft bound together ond cemanted 'th o haavy aopkeotian af **601^ otpholf. The eiphofr must be opp`<*d ilowly, with o "flooding" action, o Meure deep ponoirolion of th* rock layer. If tha asphalt ii epplied fait r with l*ghr sweeping lUokei, il wll build up an tht tuHoee nd deep panalrohon ton not be obtained. From l-Vi la 2 gallam af asphalt per *Quir< yord are required for thorough ptnetrqtian of the rook l#y*r. If o smooth iwrfaet is deiind, a fin* ogpreooto posing Vk-lnch ond retained en a '/(.Inch >i*vt eon be opplWd t tht fort of 25 pounds per square yard and keyed In by Jighi roll-ng while tht asphalt ll itHI hot, Such construction con be in or mare teyen ta provide e blanket *f add*Hanoi weight if ircHei conrfitom en very severe. Where water uoloerirti eitceed oppraaimorily 1-5 feel per Second. or wh*r twMonct or wave action osJtt, grovel Monketi of ptf-run aggregate placed 3 Is fi IiuKii deep tor ml Mr iht earth COvyr art advisable The greater Iht arotiv* pOSItbilltfet, rha lorger ihould be tha meatmum sic* af tht aggregate. ff send*lions ort lever*. th um of oiphoit macadam, at described. in the v"' following wetioni. t* recommended. ` Cover moltriol J| generally placed by coining hr- drpglinat, but in forge rtwrvoirc roadways af eovtr materiel ' r ba built e**r tht membrane and tht sail heuW and tpreed from within Iht ro. Doling of sail ce*ar <itr the barm li usually ObfKhavu obit *inc sliding toil or ratling rock may injur* fh* membrane. COiTS*--Tha cast of buried Asphalt Membrane witt e*t wish rh*type of imrollofion, th* availability af proper backfill materials, and ofhtr famn. Cetll n Iht aorago type of prated. which include all uuovption end backfill for o completed job, art from dOc la 70c per square yard SEEPAGE* AND-EROSION CONTROL CANAL] AND DKAiNASl OtTCHtJ--In cartel. oM *orr**j, dichi uht tha water velocities art high, on osphalt-penetraled macadam emtr can ba pioetd dirocthr on iht **cai" ttphoit msm- bront ta prt-tnt tretan, In ftuntiit, h# giphoH'Ptn*ri**d maeedom aio may b wild IP prtvtnt rfiipJaetmtnr of Iht cotr mortrtol by wpt (KI ion at tht broth lint. Tt product iht mad adorn eovtr, a uniform cavtrtno f grtvtl having thickntii of 3 to 1 inchti it ploctd avr iht asphaltic mtmbron* Th* grovtl should bt uniformly grad*d with ?5T# r*. IgintJ on a 4*irn;lt Witt unJ ICvp/e pun-ny Ihiuvyh o un*'>nch urtm. Thii grading ii ntctllgfy in erdtr to product 0 loytr J rock MIMHANf SIAU IN tAkTH PAM COHSTAVCTiaN^Tnc utr of membrono asphalt on the upstream face of dom, an the bnti under the fill, ond on tho reservoir float ppeni up new paii'biNhfS *n construction of earthen domj an liras that be fere *en nor ecpnorNcdty feodble. * In the "Pacific luitder and Engineer" for October, 19$ l there appears on interesting description of plant for on *0'th. fined dam oppreeimatafy 3.(00 feet long end 36 feel high at th* volley floor, The use if calofylicolly blown oipholt membrane over 1h# entire upstream foci of the dom ond on tht boat under rh till will make possible wottrtiQht sterpge oM0,000 atieJ*ct of water. The Prtd far the reservoir had been considered iivt'af nmit m iht past by engineers, tut was not canuderto feavb'e mth either a day-core wqll or sheet ptKng, In such CdnsIrvOion, o membrane completely covering the lace of the dam prevents Mtooge from the reservoir from big the (til a( the dam; the membrane on vh.ch th* U! ^ ecn. Strutted prevents the wet*/ rising by hydrostatic p'fssur* <nro rh* fill; The membrane **landed upstream on the *a*fey Moor, lo* varying distances at CPnditleni r*ouir#`, prochcullr *hm<nn;ef i'Ut through iepag by Increasing the dlsrance wpier must rra*#i Tha evambrem on the fact of the dom should be *vtrtd by 0 select eorth or sand cushion which in turn should be Cd<-#>*d bv cempo<ld P'1'run fill. The top lave* should b* lop. or iio-i riarap. ' esphattic coneren Th* membrane on ih* bat* of ''f Pom {upon which rha fill is 10 r*itl lhautd be pieced an precg'td subprada o^d protected by a select edrth or tend cushion end >n the reservoir by an earth cover, With th* gvoiluliiltty vf vutuhlk mvmbione Oiuhu'l. Cun< tlruchon of doms Is possible In preoi wh** only pprouS n-'s C*l m" SO h*'T0heM >mrn**me*rnt<wtrle*v*ettwtt(lw*n>r II****1*f1i snojtd ob**'n1i0**> 'v <i* *e-*"c Ii 1 oiel* at if iier el wsiir me teljr MAfrh | vr : **( e*m piui thi membrene ueilrvsm hem in* **m *n ir-t ,j < ' " 3 ^ n iis ? ? WATER PCB-SD0000067133 V / .Her# 4 1*1 on** Mar Cedy. WyOmin*. tSheshone Proied I li tn vm efiar ifiMnf with P^ "l" IlfPult ( prevent leu of vjlucble water bruPUr ovolloblo. Expensive clay core-well or sheel*piling methods ON no longer necessary when the membrane lining ti used. . EROSION CONTROL If ih* seepage problem It not Important,, *ration control may be obtained readily ' ditahes and on spillway* by the us* of on ospholi-perwiroted mocodom cover ei described In the previous Mellon, second poiogvoph. The lubgred# should be emoothed before the application of the layer of Qrovel (the placement of the Initial membrane being omitted! The "cal" asphalt is then Slowly "flooded" to properly penetrate the grow*!. - SOIL STABILISATION Lliei of osphatllc membranes In soil stabilisation Include (g) enveloping the 10H bote, fbl at a capillary barrier, and Id or a shoulder or a shavlder-ond'dltch membrone. In these oppUcohent the catalytic osphalt serves as a wettr-tight barrier to mountain 0 tow or q constant, predetermined, molt lure content In the soil material ond thus to Stabilize the Ipqd-beoring capacity, . Soils wllh appreciable contents of day havi high bearing sltsnqihi If their moisture Content Is maintained 01 a low value. The bearing strength of such soils under such conditions It usually mare than sufficient for their use os a base material in pavement construction. Loti in strength and troublesome volume changes ore prevented by . the membrane envelope, which maintains the moisture content at a conitent predetermined 'value. The use of ogprepan bote courses Is minimised or iJimLneted, depending on the supporting value I the enveloped soil. In such construction a membrane k forayed upon o prepared pion surface a% on a fin, or in on ixcavaied trench with sloping sidet. The membron* should not be 1*11 than H*inch thick to provide a reasonable factor of safety With the construction methods end itreuri applied 12.1 pal. per sq. yd.I, The membrane should be cctfuJIy Inspected prior to covering and all thin areal and void* (holiday*) should be corrected The first taytr of Soil, placed to a minimum 6*inch depth aver the membrane by drag* line or by deter, ii'compacted by o pn#umqlc.|ired relief 0/ by Q tfa<V.>laymg troctar After the initial layer has been cam. pocted, the remainder of the fill it placed ond composud by eon* vrnhpno' miont. The moisture content of Ih# soil should conform ta normal eompociion prpetices. On completion of the fill, the top ond iidet ore icKoyed with membrane to compleii the envelope, "(in certain cotes Ihe lop membrone may not be necessary if on odrquoit woiti.tight wsonng surface is placed in ill itiodV Woh the top membrane in position, bote CPMtrucliOn is plocid os re* purred, with o Cushion course directly ovrr the membrane fly meem of such simple melhods, existing sails con be mode into stable bases* Membranes eon be used as coptllory breaks under bases upgrades Subfeet to saturation or frost option through the presence of water immediately below these elements. The barrier will n. trol both coplHory and vapor moisture. With such # eef, the use of bote moteriolt having a high content pf 0.02 mm. tiie focti*t It practical in areas where frost susceptibility It a problem. Layers of grovel customarily usrd os capillary brooks but vhlch frequently M become of fitting with capillary soil materiel, ond which p*r. mil vapor phase postage f moisture, ore replaced by a nmpk, readily applied, otphaltie membrene. Side ditches ore sometime* the source of destructive moutur* In the subgrqde and bose. The*ui of asphaltic membtanti in such application Is entirely similar to that in cartels. Thus Don's new catalytic oipholt. o product of petroleum re March, hot been found efficient ond odoptoble in controlling water ond solution icepoge, end for maintaining mdiMurr content at rh# desired level in engineering construction. COVtRACt ftXQUUKMIHTS FO* MlUlftAKl AJFHAlT Weight, lbs,/gal. ct 604F._........... ............ ,.............. 15 Gallons al 60*F., per ton ........... ,,...... 235 Film thickness at 1,5 gollom at 60*F/iq.yd......... 0 2? inches Film thickness cl 2.0 gallons ot 60*F/*q-yd........ 0 36 inches Film thickness at 2.5 gallons ot 60*F/sq.yd. 0-45 Inches Tons Pr acre at 1.5 gallom at 60*F/sq.yd ....... . 31,0 Toni per acre ot 2 0 pollens flt 60*F/iq yd....... 4|.< Toni per oer* ot 2.5 gallons at 60*F/sq.yd......... .. srt Multiplier for volume reduction to 6D*F. from 350^ 0.9024 Multiplier for volume reduction to 0*F. from 375F,,________________ ____ 01944 Muitlpll*r for volume reduction to 60*F. from 40O3f.......,.... ................. ........ ... 0 1654 Mutt>pRr> for volume reduction to 60F. from 425-F,,._............. 0 gigs For further Informslton about ih# utilisation pt lining in specific tout, odd'tit your mquir.ti to LION. OIL ASPHALT 1ALIS DIPT. COMPANY L DORADO. ARKANSAS - io - OSH 0 1 3 5 2 8 WATER PCB-SD0000067134 AROCLOR ADSORPTION ON ADSORBENT OTHER THAN CARBON A study is presently In progress to evaluate the removal of Aroclor by adsorption on a less expensive adsorbent than carbon and then removing the adsorbent by flocculation. . * - 21 DSW 013529 WATER PCB-SD0000067135 . ' , . . MONSANTO - ANNISTON . ;PR,D h'OP.K PUN ' DATE: ' SUBJECT: DEPARTMENT: JUSTIFICATION: 1 ` January 11, 1971 Aroclor Pollution Study 916.07 ' Pollution Abatement . ' . BCC: C, L, Ar'r.et: J, T, B:ll L, Brovn .. L. Corder I.. EtKeredje R. Haupt G, 1. Jessec ,. . J. C, Lcnd'vahr . W. F. Taffec E. c: Wright P. 6. DeCarrao - C.O. P. B. Hodges - G.O. W. B. Papageorge - C.O, V. R, Richard - C.O, J. R. Sjvage * C.O'. COST: . . . Estimated Per' Diem PR6D Cost : Experimental Expense ' PR&D Cost to-date (1570) Estimated PR&D Cost 1971 $100 $11,000 $16,083 $10,000 BACKGROUND; . ' '' The filtration and column adsorption phases of the work plan Issued 9/9/70 have been completed. A report on the filtration study will be Issued by 1/15/71. The data generated In the .column study Is being compiled for a cost estimate. Thi following conclusions were drawn from.the filtration study: . ... . Aroclor levels of the plant effluent were reduced to 10 ppb by filtration of the neutralltation pit aollds on which Aroelor was adsorbed and by adsorption on the filtering media. - <l b. The removal of 200-1000 ppm of solids in the slant effluent is a primary concern In any final clean up system. '" The line of research proposed in this work plan is based primarily on these conclusions. In the flocculation Jar test run on the plan: effluent, 15 ppm of SPV bentonite fila-y'l'ir.d 1.5 ppm of Beta'i 1170 poiyeleetrolyte gavs the best settling floe. Experimental: 1, Define the following parameters in a flocculation study on the plant effluent. a. Flow rate b. Height of sludge blanket e. Bentonite clay feed DSU 013530 \ .1 (1) Product of Aneriein Colloid Company WATER PCB-SD0000067136 p?,6D l.'or* Plan 1 Aroclor Pollution Study Pat 2 . \ Object: To determine the operational parameters at vhlch the solid end Aroclor concentrations are reduced to a minimum (i.c. 0-20 ppm solids A 10 ppb Aroclors). Since the bentonite cloy is only a weighting agent for the floe, its concentration will be increased to some practical limit if necessary, in order to provide more surface ere* for adsorption. Estimated Beginning Date: Mandays ' Target Completion Date: 2/1/71 40 4/1/71 . Experimen tal XI. . . Demonstrate Aroclor removal'in a semi-continuous adsorption study. Define optimum.conditions: ' -` a. Retention time b. Adsorbent loading capacity c. Recycle ' Object: To utilise some less expensive adsorbents then carbon end . provide ah alternate design. The same reactor clarificr (Pert I) will be used in this study. Provision will . be made to recycle the settled adsorbent to premix arei. . SATETYj .' . 't . . .' , Mandays 40 Target Completion Date; ' 5/28/71 '1 * v ' The HC1 and HyPO^ In the plant effluent art normally , neutrallied In the limestone pit. Occasionally, there Is some residual acidity which should be guarded against. _ Any area exposed to the waste vater should be washed thoroughly ' with copious amounts of v*ter. This will ilso remove any Aroclor present. ' The flocculating agents (3*t* polymer 1170 tr.d American 1 Colloid's S?V bentonite clay) are neither flammeble, corrosive, or toxic, 'hence, their handling requires no particular precautionary measures. ' . An operation manuel containing all safety procedures will -'.be issued to personnel operating the elarif icatloh unit. Ishmeal Kansav jv OS# 01353^ I WATER PCB-SD0000067137 u-Z) LJ L2=\ tABORATDFIIES, INC. lr.pVON r!C)AC.'. VF.eVOS,']. ^u.'IK'BVLVANIA -.Hi ^7 L?Ap,j.', IAS . - December 29, 1970 * Monsanto Company' P.- O. BOX 24? Anniston, Alabe-ma 36201 ' " . ' V' .1 ' ' , * -; Attention: Mr, W, F. Taffee ` . Engineering Supervisor ^ '; , f ', ; / . *' Re: Clarification of Neutralisation ' Pit Effluent Gentlemen: . - .1 , . . 1 Enclosed are the results of,the laboratory clarification and analytical testing of your neutralisation pit effluent, The tests were conducted in accordance with your letter of November 2, 1970, from Mr, W* F. Taffee and conversations without Mr, M. E. Mitchell and local representative, sMr. A', S,' Freeman. ; ... ' . - Our laboratory test results lead* us to recommend a treatment consisting of a bentonite clay and a strongly cationic polyamide pqlyelectrolyte at a cher-.icci cost of approximately two cents per.thousand gallon*. The laboratory jar tests showed that the addition of these chemicals followed by a four to ter. minute rapid mix at 100 rpm and one minute of settling immediately after rapid nuting i '* , . produced the following quality of supernatant. . . ' ' , ; i Initial Suspended Solids Initial Turbidity Initial Organic Carbon , ' a' ; 'i - *, ** . ppm 532 ' 7 2 04 52 om_ 1076 400 70 * OSH 013532 WATER PCB-SD0000067138 .1 . , I *". 3 MJfi. '* I ' Supernatant Suspended Solids Supernatant Turbidity Supernatant Organic Carbon 2S2L . 16-26 2-7 1-2 E5L 6-26 1.5-6 .2-3 'The suspended solids and turbidity in the jar test supernatant a.re a result of some floating solids which are normally present due to insufficient turbulence . at the waters'.surface during mixing. In actual practice this problem should .Vi not occur due to improved mixing and the mechanics of a solids contact , clarification system, t* ' '' ' 1' * 1, , . ' "Analytical Data Sheet (ADS No, '1) shows the analysis of a gallon plant ** * *. effluent sample collected on Oetober.27, 1970. Your November 2, 1970, letter indicates that the analysis of this sample should adequately describe the quality of the four one-gallon neutralization pit effluent samples submitted for the clarification tests, ADS No, 1 shows that the sample contained high" s'* \ concentrations of calcium and chloride, 220 and 224 ppm respectively. The . 170 0.1 ppm phosphate and 0.2 ppm iron are low, Thet? ppm of-orginlc carbon in the sample was reduced to only 8 ppm by laboratory filtration. The sample of neutralization pit sludge contained sixty percent solids. ' " Initial Screening Test ' * In order to conserve the sample* of neutralization pit effluent, the initial jar testing was conducted on a waste solution produced by miring a portion of . the sludge sample with demineralized water. This prepared waste sample had DSW 013533 WATER PCB-SD0000067139 "(Mii'O'S fi < , a pH of 6,7, .turbidity of 220 ppm, and approximately 500 ppm suspended , solids, The 500 ppm solids concentration was selected since it was midway between the 0.01 - 0. 1 percent solids concentration anticipated in the ' neutralisation pit effluent. ' # * ' . ' ,4 . .. ; - k ' [ _ The initial jar test screening evaluations are summarized in ADS No. 2, ' Alum and ferric chloride at concentrations up to 50 and 25 ppm, respectively * . t ' ' did not produce satisfactory flocculation and solids removal, The use of a . high molecular weight anionic polyelectrolyte with the primary coagulant resulted.in additional solids removal; however, the lowest turbidity level found in the highest quality supernatant was 58 ppm. The initial screening tests indicated that the maximum reduction of ' suspended sdlids and turbidity could be obtained with 15 ppm of SPY bentonite clay and 7,?' ppm of a liquid strongly cationic polyelectrolyte; Eetx Poly-Tloc 11". The chemical treatment combination in test Ho, 20 was utilized in test No. 22 but with additional rapid mixing and no flocculation.mixing at 30 rpm. The solid* reduction to a turbidity of 11 ppm in test No. 22 appeared economical and was the basis for the tests summarized In ADS No. 3. * The tests and results shown In ADS No, 3 employed two different types of bentonite clay and a strongly cationic liquid polyelectrolyte. The Coaguloid clay has a higher cost per pound and thus lower concentration was used in the test In o,rdor to permit comparison of the two clays on an equal cost basis. . .* ' .! . DSW 013534 WATER PCB-SD0000067140 , ,,1 f * -v .'.V*11 '* i : . ' J\ r . ` Comparison o the results from tests 1 through 6 indicate that at a neutral pH ' the treatment using the Coaguloid clay reduced the turbidity to levels similar to but slightly lower than with the SPV clay. The initial solids concentrations ' /. * ranging from 200 to 800 ppm did not adversely affect the results v/hen the same '. *' * ` ' * * concentrations of treatment chemicals was employed. * ` ', ' . Comparison of the results from tests 7 through 12 show that at the lower pH of 5. 0 the Coaguloid clay and polyelectrolyte was less effective. The SPV clay and polyeloctrolyte produced excellent results under the same test conditions . Final Testing and Recommended Treatment C ' The results of final testing are shown in ADS No, 4. This exhibit summarises the recommended clay and cationic poly electrolyte' treatment. These test$ were conducted on neutralization pit effluent samples mixed with '500 end 10QO ppm of solids from the sample of neutralization pit sludge, All samples were mixed for'four to ten minutes at 100 rpm in order to produce good flocculation and a rapid settling floe. , _ Although the additional fast mixing improved the performance and rate of * a floe settling within the one minute settling period evaluated, a five minute ' rapid mix followed by a short flocculation mixing and settling in a solids contact clarifier should provide an effluent with alow organic carbon concentration end a .suspended solids concentration lower than.the values shown in the laboratory testing results. It is recommended that you equip your pilot plant clarification facility with an external vapid mice basin to further evaluate this parameter. . OSH 013535 WATER PCB-SD0000067141 WAV E K A h* A l -Y S3 S S3 ranf Monsanto Company Anniston Alabama 3 C:ees^,. ^=L TREVOSE, PENNSYLVANIA 19047 SA.HPL.IHC POINT ; Gallon Sample Plant Effluent Total Hardnesj as C?.COj, ..PAUL___________ 310 Calcium as CaCOj, 270 Magnesium as ' CaCOt, ppm ' 90 Phenolphthalein Alkalinity as CaCOj, pop i 0 ` Methyl Orwge Alkulimtv a.s C&COi. cnn 44 .... * Sulfate as SO*, ppm 60 Chio ride. a^Cl^^m___ 224 Silica as SiOj, ppm TotaT'PhosphatV as " * PO,, ppm Ortho Phosphate as ^^,,-PJpm_____ '__ J____ 13, 5 0.1 0.1 ph Total Iron as Fe, ppm Biochemical Oxyjen Demand, (BOD). ppm Chemical Oxvgen Demand, (COD), opm 6.6 . 0.20 16 ' 42 Total Carbon, ppm N jij i__ Inorganic Carbon, ppm 12 11 Organic Carbon! com Specific Conductance Micromhos, 18C Total Solids, ppm 98 650 708 Total Fixed Solids, ppm 296 Suspended Solids, ppm Suspended Firmed Solids, ppm 10 1` Color Units 10 . ' SAMPLE DATED: October 27, 1970 -- . . . ------------------------ :------ " - --'------------- -- ------- -- . tl) Shaker Sample * CZJ-Filter ad Samole -- f OSH 013536 .. 1 1 * 1 I l I WATER PCB-SD0000067142 ` \smarm 9. '"C. ^' ' ' ' ' "': '' Under separate cover we are submitting waste, supernatant,' and sludge '1 * l * _ .... 1 * sample's collected during the tests shown in ADS No, 4. We thank you for the opportunity to provide these services and trust ` * ' `* . that the test results meet with your approval. If you should have any questions regarding the information presented, please do not hesitate to contact this office or our locel representative, Mr. A. S, Freeman. ` . 'i _ '*' . Very truly yours, . WJS/abd Enclosures $ cc; +2 Consulting Division - 5- QSW 01353? WATER PCB-SD0000067143 ANALYSIS Analytic?! Data Sheet yc. 2 ' rtm Monsanto Company Anniston A1 abamft \ SOrO'Si t<iivM. vj*nia, tS3*fr SAMPLE DATED: Coagulation Jar Testing.. ` sample identification; Prepared Waste Sample! Distilled water mixed with 500 ppr * of solids from the neutralisation pit sludge, pH* 6,7 ' * Initial Screening Evaluations ^<cJ. ` 1 ' ' - No. Treatment Chemicals / ; Type of Supernatant TurWell 1/ Mixing - after one minute of5 ettl: * 0 T i ' None 10 ppm Alum * 4 * * . * ' ` . ' - .. ' ' . * * . * ' ; '' ` . , 220 ppm . A .'110 ppm 2 3 >' 4 '5 25 ppm Alum 50 ppm Alum 10 ppm FeClj 25 ppm FeClj . *' `A ,. ' A ' . .' A .A , 70 ppm , 74 ppm ' . . 137 ppm 150 ppm 6 1 ppm Poly-Floe 1160 ` 'A ' ' . 58 ppm 7 10 ppm Alum, 0. 5 ppm Poly-Floe 1100 B 99 ppm 8 25 ppm Alum, 1,0 ppm Poly-Floe 1100 B 65 ppm 9 25 ppm Alum, 0. 5 ppm Poly-Floe 1100 B, 88 ppm 10 ' 10 ppm FeClj, 0.5 ppm Poly-Floe 1100 B 115 ppm 11 13 ppfn SPV Clay, 0. 5 ppm Poly-Flee 1160* B ' . _ 137 ppm .12 15 ppm SPV Clay, 1, 0 ppm Poly-Floe 1160 B 13 25 ppm Alum, 1.0 ppm Poly-Floe 1100 C 121 ppm ' 1 117 ppm 14 25 ppm SPV Clay, 1,0 ppm Poly-Floe 1160 C '95 ppm 15 , 15 17 . 18 19 25 ppm SPV Clay, 2, 0 ppm Poly-Floe 1160 25 ppm Alum, 2.0 ppm Poly-Floe 1100 15 ppm SPV Clay, 5.1 ppm Poly-Floe 1170 15 ppm SPV Clhy, 1.0 ppm Poly-Floe 1160 15 ppm SPV Clay, 5`, 1 ppm Poly-Floe 1170 C c c c c 9 5 ppm - 58 ppm 35 ppm 114 ppm 55 ppm 20 21 . 22 15 ppm SPV Clay, 7, 7 ppm Poly-Floe 1170 C IS ppm SPV Clay, 3, 8 ppm Poly-Floe 1170 c 15 ppm SPV Clay, 7.7 ppm Poly-Floe 1170 D 23 pprn 92 ppm 11 ppm .Type of Mixing " OSH 013538 A 5 minutes at 1D0 rpm and 15 mi..utes at 30 rpm. B - 2 minute* at 100 rpm'for primary coagulant, 3 minutes at 100 rpm for flocculant (polymer), and 15 minutes at 30 rpm, _ . C, - 1 minutr at 100 rpm for alum or clay, 5 minutes at 100 rpm for * flocculant, and 15 minutes at 30 rpm. ' D - 10 minutes at 100 rpm for fTocrulant pftcr first adding clay. No slow n , t e' Flocculant s : , Beta Poly-Floe 1100; anionic organic copolymer of acryl amide, white povdc Betr, Poly-Floe 1150; cationic organic copolymer of acrylamide, white pv."' r,*i. Ts.i,. Men. organic uolvrmide, amber liquid. WATER PCB-SD0000067144 ANALYSIS FOR Monsanto Company . , , , , Anniston . ' '. ' Alabama Analytical Data !i.',-V' 3 1AeVD||.^6miVLVA^iA IDQ4> . * : ; Coagulation Jar Tasting_______ SAMPLE DATED; ~_____________ ______ /. . sample identification! Prepared Waste Samples: Distilled water mixed with . ....................... neutralization pit sludge at solids concentrations of .. .' 200, 500 and 8.00 ppm and pfi adjusted, where shown, to 5 Comparison of 5PV and Coa^gulo"idT C~ layf s, *' " . Test No.' 1 2 3 ` , "' v * ' . ' Waste Sample Analysis ' Treatment Suspended Turbidity, Chemicals {1} Solids, ppm ppm 1 . 15 pprn SPV Clay /200 ' -and 500 . 7.7ppmFbly-Hoc 1170 600 `6.8 6.8 6.8 % . 102 ' 220 ` 380 : Supcrnata'' Turbidity, p 1 Minute Sett `* ' .`11 12 ' 13.5 4 5 5 ppm Coaguloid 200 Clay and 500 . 7.7 ppm Poly-Floe 1170 800 6.8 102 6.8 220 . 6.8 380 ' 11 ` '7 8 7 8 .. 5 . 10 11 12 5 ppm Coaguloid * ' Clay and 7.7 ppm Poly-F1 loe 1170 200 500 800 15 ppm SPY Clay 200 ' and 500 7.7 ppm Poly-Floe 1170 800 5.0 5.0 5.0 a 102 . 220 ' 380 . 24 16 . . . .9 . 5.0 5,0 5.0 102 220 ` 380 ` 5 4 3 Cl)" All samples mixed for ten minutes at 1001 rpra followed by one minute `,of settling prior to collection of supernatant sample for turbidity measurement. .. . ` * OSH 013539 WATER PCB-SD0000067145 . ANALYSIS /.nar/ncai LJatft_a::cci . ' ron Monsanto Company Anniston . Alabama , l SSTfS SAMPLE DATED: ' Coagulation Jar Testing sample lOEiiTiriCATioM: Effluent and Solids from Neutralization Pit Final Testing and Recommended Treatment (1) ; 1 ' ' pH Turbidity, ppm Suspended Solids, ppm WASTE SAMPLE; 500.ppm 7.1 204 Supernatant Sample Analyses (2) Test No. ' . Rapid Mix at 100 rpm 1 4 Minutes 2 7 Minutes ` 3 . 10 Minutes ' - ` ' * * 7. 6 2 532 , *, 24 26 16 Organic C_avbon; ^2 52 2 *1 WASTF SAMPLE; 1000 ppm '7.4 'Supernatar.t Sample Analyses (2) ` , 400 * 1076 *' Test .No. Rapid Mix at 100 rpm 4 5' 6 .' 4 Minutes 7 Minutes 10 Minutes 6 ' 26 - , 3.5 . 1.5 16 6 70 2 ' 3 (1) All samples treated with 15 ppm SPV Bentonite Clay and 7,7 ppm of a cationic polyelectrolyte; Bets Poly-Floe 1170, (2) Samples collected after one (1) minute of settling. _ DSW 01354G tf>cni if 4i I II WATER PCB-SD0000067146