TO G.K. Jordan/L.W.Carter/D.E.Wiley DATE
August 16, 1977
FROM W.E.Cleary
SUBJECT Reliability Study - Overview of Per-Tri Plant
During July, an overview study of the Per-Tri operating unit was made by W. Cleary and A. Howerton. Study results were discussed with M. Clary, J. Gustin and D. Holliday on 8/4/77 and 8/5/77, and again with J. Gustin and D- Holliday on 8/10/77 and 8/11/77.
Even though the mechanical flowsheets used for the study had been recently updated, enough discrepancies were found to indicate that some graduated checking process by operating personnel in theTuture will be necessary to verify the updating drafting work done by Levingston Engineers.
%'0 ?
Certain questions regarding entering and exit manifolds for the organics preheaters were discussed and the Operations personnel advised that this entire system was being revised under a current project.
]NCrTi ^.
HiO
The No. 1 Per Neutralizer system has not been operated in some time. It appears that some refurbishing will have to be done (around the C-6 and C-12 columns) to make this sytem operational.
It is recognized that once an in-depth study of the reactor chemistry of this unit is made, a number of significant potential hazards will surface that are not covered in this overview study.
GENERAL
ia j-
^ ' 1 /^Vessel grounding protection needs to be reviewed.
V
~ 2. Steam user pressure ratings should be checked againstair failure positions of
400 - 250 psig and 250 - 150 psig steam reducing stations.
r-- _ \<c i ic i
N/V 0 O i
Vo ' UC
. o iw V i
kf-
I 3(j^3/Vessel overpressure protection design needs to be checked. One vessel (DH
L- Still Feed Tank T--138) has already failed because of faulty piping design.
a 4.*^ Not all glass sight glasses are protected from occidental breakage.
-on p/JcTT! 5."^ A better system for manifold labelling is needed as a deterrent to operator valving error.
SL 050207
'~y *
16/ 1977 geli'abilify Study - Overview of Per-Tri Plant
Page Two
REACTOR AND VENT SYSTEM
-iWt'1 CrT^ l.iyl/`" A stand I eg is needed on top entry nozzle to organics recycle tank.
yiiHLt-.-pr: 2.^/ Organics vaporizer reboiler shells do not haveSRVs and can be subjected to steam pressures higher than the shell working pressure.
I 3L7/8)MI FCVson chlorine vaporizer shutdown system are bypassed - need close '-- control on bypass sealing practices.
4L*//^JCan organics back into the chlorine surge drum? If so, what are consequences?
Organics vaporizer drum SRVs relieving capacity should be checked for backing --N chlorine into the vapor drum.
! 6(^2/) Automatic double block and bleed arrangement separates reactor oxygen feed
I lines and nitrogen header. A similar system should be used on the mixed feed I headers.
7JfK Some redundancy may be needed on degasser level control loops.
Per-Tri Startup Scrubber C-115 probably needs a methane addition line.
-O "
Condensate level loss in dowtherm steam drums leads to a crash shutdown. An auxiliary makeup line or flow meter is probably needed.
IT! r^U' ^ ./yr Tr~ Snuffing steam valve to dowtherm heater should have operation checked on
regular schedule.
_ </;> pL&> 1'" 11. Some piping should be replaced on natural gas bleed line between two Maxon
valves to dowtherm furnace.
V?7 0C-H.-Ur* -- 12. Is a pressure controller needed between TCV 5034 and the dowtherm furnace
burner to prevent flame flash back?
STILL LINE
."
I 1^--^Valving revision is necessary to use E-184 cooler with both drying still feed tank
I------
headers.
JCEi-I-FC. 2. * 1 Drying Still Reboilers (E-33 and E--125) are not protected against steam line pressure and need to have working pressure ratings checked.
D 3. Per-Tri Still BottomsEconomizer (E-159) needs overpressure protection.
SL 050208
Reliability Study - Overview of Per-Tri Plant Page Three
4.^31 Per-Tri Still Condenser (E-127) may need overpressure protection.
05. ' Some on-the-run piping tie-ins have been made inside control loop block valves and should be changed on a-scheduled shutdown. (Example - take off next to ILCV 8064 on Dwg. 63A-1172-6)
^ v '3 T5r 6. Tri Reflux filters may need overpressure protection- Equipment not currently
protected in pump discharge lines should have working pressure checked against maximum shut off head now present in the system.
STABILIZER AND STORAGE AREA
1
nn
Five
crude
Per-Tri
storage
tanks
In
the
process area
have
no
visible
grounds.
rap/. FTP; . 2. Batch stabilizing sheets need to be revised.
qiL
--2; There are no visible grounds on No. 1 and No. 3 Per-Tri Dock Storage Tanks.
* There is inadequate grounding on Per-Tri Barge Loading Pump. 1 5MZ Steps should be taken to eliminate small line size connections directly to larger nozzles on the bottom of storage tanks.