Document 0JjOkYdnRbLb7jYpG6M8n1M9V
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
* *REGION 1
ENVIRONMENTAL
AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12
100
PROTECTION
Drafted Date:19 November 2021
Finalized Date:1 December 2021
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
Airport Auto Parts
From:Andrew Spejewski, Inspector
Thru:Alex Rosenberg, Region 1 1 MSGP Enforcement Coordinator
To:File
I. Facility Information
A. Facility Name:Airport Auto Parts
B. Facility Location:56 Crawford St
Leominster, MA 01453
C. Facility Contacts:Dan LeVeille, Owner
Dan.aap@hotmail.com
D. NPDES ID No (s).: N / A
II. Background Information
A. Date(s) of inspection: November 17, 2021
B. Weather Conditions: Overcast
C. US EPA Representative(s):
Andrew Spejewski
D. State / Local Representative(s): None
E. Federally Enforceable Requirements Covered During the Inspection: EPA's
Multi - Sector General Permit for Stormwater Discharges from Industrial Activity
F. Previous Enforcement Actions: none known
ED_019088A_00019812-00001
III. Type and Purpose of Inspection
Unannounced Evaluation of compliance with the Multi - Sector General Permit for
Industrial Stormwater.
IV. Facility Description
The facility is an auto parts store and small (1-2 acre) auto salvage yard.
V. Inspection
Mr. Spejewski arrived at the site unannounced at about 12:30 PM. Entering the store, he
asked for the manager, and after a short wait, met Dan LeVeille, who introduced himself
as the owner.
A. Opening Conference
Mr. Spejewski presented his credentials, provided a copy of the Small Business
Resources Information Sheet, and explained the purpose of the inspection. Mr. LeVeille
said that he was not completely familiar with the EPA stormwater permit, but that an
environmental consultant had told him that the site was not subject, because there was no
runoff from the site, as it had a berm around the auto storage.
B. Facility Tour
The two then left to tour the site. The front of the building is a parking lot which drains
down to the main street. The rear of the building is used / junked automobile storage. A
driveway led from the parking lot to the storage area. Mr. LeVeille pointed out an
asphalt berm across the driveway to keep stormwater on site, and a pump against the
building near the driveway that he said pumped water from this area to the center of the
site. A several foot - high earth berm was in place from the driveway, completely around
the auto storage area, and back to the building on the other side. There were no signs of
flow over or through the berm.
C. Records Review
No records were reviewed.
D. Closing Conference
Mr. Spejewski thanked Mr. LeVeille for his time and departed at approximately 1:15 PM
Photo Log:
[Note that the camera was set to Eastern Daylight Time, and the inspection took place
during Eastern Standard Time, so the timestamps are one hour later than the actual (EST)
time.]
2
ED_019088A_00019812-00002
IMG 2573.JPGDriveway between front parking lot and rear storage, showing
berm
IMG_2574.JPGArea next to building and driveway, with pump
IMG_2575.JPGEarth berm around auto storage
IMG 2576.JPGEarth berm at rear of auto storage
* END *
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
3
ED_019088A_00019812-00003