Document 0JV0nnL3k601p4YgynMb4kZjm
J. U Savage
General Office
June 23, 1971
POOLING OF VARIANCES - AKOCLOS
BCC
B. Papageorge
A. J, Koenig A. E* Leisy
- KGK
J. L. Corner Anniston Plant
Aa you know, our strategy of maximizing WGK Aroclor production with Anniston essentially down has created a distortion in cost of 1221 and the blends made from it, since the large unscheduled capacity variance flows against very few pounds. The result has been that the 6000 series blends have shown a loss on the tio. 6 report when they are actually profitable.
He had considered pooling the Unscheduled Capacity variance between WGK and Anniston. However, this would have created a distortion in the opposite direction because of conversion variances which partially offset the Unscheduled Capacity. Therefore, accounting has implemented a new system, effective YID ou the May No. 6, which all variances are pooled between WGK and Anniston liquid Aroclor. This is doae as an adjustment to the input to the No. 6 Report and is not reflected in the Production Cost Reports. Aroclor 1221 and the 6000 aeries now show Gross Profits ranging from 30 to 40% which is about righ t.
In an effo rt to accomplish a partial correction in this same
direction, we have been transferring Toxicological Expense froi
Arc!hton to WGK, on the basis that we wore protecting WGK
P roduction , rather than Anniston, to some degree. This has
bad the di sadvantage that the quarterback who pays the bill is
not able t o examine the validity of the eharges. Now that
variances are being pooled, the need for this transfer of
charges is gone while the disadvantage remains.
Therefore,
this pract ice should be stopped and a correction made to the
June Cost Report to pull back the YTD transfer*, jfc'he latter
because ea ch month's so. 6 is a new YTD calculation.
i
As a corollary, I want you to become familiar enough with the Toxicological Expense situation to confirm that the rest of the year will be on budget.
J. R. Savage
CKi
OS^
3
3
STLCOPCB4085193