Document 0JK1wLeoxb0zVo87wK14x8kk

ABERDEEN MISSISSIPPI OVERVIEW AND SPECIAL PROJECTS Facility The Aberdeen Terminal is currently officed in a trailer set inside the PVC Plant adjacent to the Plant office building. This trailer provides office space for the Terminal Manager, Assistant Terminal Manager, and Clerk. In addition, the Transport Repair Facility is located in a leased facility on the outskirts of Aberdeen approxi mately two miles from the Plant. Volume The Aberdeen Plant produces PVC resins and compounds which are shipped primarily to customers in the eastern half of the United States. These materials are shipped both in bulk form and packaged. In addition, a small volume of liquid plasticizer also moves out of Aberdeen. For 1975, the outbound PVC is projected to be split about 57% bulk and 43% packaged. PVC resin production at Aberdeen is expected to increase to an annual rate of 335 million pounds in 1975. It is expected that most of the increased output will be moved via rail. Special Projects 1. Improve Safety record. To be accomplished through better planned, structured safety meetings, through use of visual aids, special guests, etc. Special emphasis to be placed on driver and mechanic participation through making safety pre sentations, etc. 2. Develop a structured minor maintenance and trouble diagnosis school for transport drivers to be presented by maintenance supervisor on a regular basis, continuous beginning January 1975. 3. Improving fuel cost. A continuation of current projects to test effectiveness of radial tires, airshields, P.T.O. driven blowers, clutch fans, etc. on fuel savings, continuous. DTH 000029026 ABERDEEN, MISSISSIPPI Special Projects (cont'd) 4. Begin major change-out program. Hold in inventory such major components as an engine, transmission, front and rear differentials, etc. This will reduce costly downtime to a minimum, January 1975. 5. Improve tire performance. Test various types of tires in an effort to determine if a particular brand or type of tire will be superior in our operation for better performance and lower tire cost, June 1975. 6. Find a workable alternative to petty cash fund. A great deal of time is spent each day working up money pouches and re conciling the petty cash fund, which could be put to more pro ductive use in other areas. If there exists no practical al ternative then a second part of this project will be to determine an appropriate petty cash fund amount, March 1975. * 7. Evaluate feasibility of a second fuel pump at the shop. At certain times there exists considerable congestion and time loss because of only one fueling point. A second part of this project will be to look at cost of building a cover over fueling area, July 1975. 8. Evaluate feasibility of installing larger fuel tanks on all transport units. We can save about 8 per gallon on every gallon of fuel supplied from our bulk storage tank vs on-the-road purchases, March 1975. 9. Develop new revenue sources. Evaluate feasibility of hauling light oil to various points from West Memphis and Meridian. Develop additional petrochemical liquid hauling business, March 1975. iO. Conduct a shop economics study to determine how our shop costs compare to those of other shops in the area. A second part of this project will be to determine methods by which our shop costs can be reduced, July 1975. DTH 000029027 ABERDEEN, MISSISSIPPI VACATION SCHEDULE - NUMBER OF WEEKS.BY MONTHS January February March April May June 0 5 0 0 12 15 July August September October November December 14 15 2 1 2 1 Total 67 MANPOWER FORECAST The Aberdeen Terminal will employ 34 persons in permanent position at the beginning of 1975. These positions are the terminal manager, assistant manager, clerk, maintenance supervisor, 3 mechanics, a yardman, and 26 drivers. During 1975, it is anticipated that we will add two drivers for the additional power unit projected to be put in service about midyear. \ In addition to the above, assumption of the shipping and warehousing function will transfer about 19 positions from the Plant to Trans portation. These are a warehouse foreman, inventory control clerk, and 17 hourly positions. EQUIPMENT LIST The Terminal will operate 14 power units during the first half of 1975 and 15 thereafter (14 COE, 1 Conventional). There will be 10 bulk hopper trailers, 18 van box trailers, and 1 liquid tank trailer in operation throughout the year. The current fleet is as follows: Unit # "iJl 1 1318 1319 1320 1322 1323 Year 1973 1973 1973 1973 1973 1973 1973 Engine Type 350 CUM 350 CUM 350 CUM 350 CUM 350 CUM 350 CUM 350 CUM Description Kenworth COE Tractor Ken-worth COE Tractor Kenworth COE Tractor Kenworth COE Tractor Kenworth COE Tractor Kenworth COE Tractor Kenworth COE Tractor DTH 000029028 ABERDEEN, MISSISSIPPI EQUIPMENT LIST (cont'd) Unit # Year 1324 1i On ocU. 1326 1S531353 2059 1973 1973 1973 1973 1974 1974 1975 1966 1965 Engine Type 350 CUM 350 CUM 350 CUM 350 CUM 350 CUM 350 CUM 290 CUM 2161 2162 2177 2303 2304 2305 2306 2308 g9nr~ 2312 2313 2317 2318 2319 2320 2321 1965 1965 1969 1971 1971 1970 1970* 1970 1971 1970 1970 1970 1971 1963 1966 1968 1971 1971 Description Kenworth COE Tractor Kenworth COE Tractor; Kenworth COE Tractor; Kenworth COE Tractor Kenworth COE Tractor Kenworth COE Tractor Kenworth Conv. Tractor Trailmobile Van Trailer Pennsylvania 7, 680 Ga|. 3 compartment, stainl^s steel Tanker Trailer Gindy Van Trailer Gindy Van Trailer J & L 1, 500 cubic ft.. Hopper Trailer Trailmobile Van Trailer Trailmobile Van Trailer Dorsey Van Trailer Dorsey Van Trailer Dorsey Van Trailer Trailmobile Van Trailer Dorsey Van Trailer Dorsey Van Trailer Dorsey Van Trailer Trailmobile Van Trailer Butler 1, 500 cubic ft. Hopper Trailer Butler 1, 400 cubic ft., Hopper Trailer Butler 1, 600 cubic ft.. Hopper Trailer Butler 1, 500 cubic ft., Hopper Trailer Butler 1, 500 cubic ft.. Hopper Trailer DTH 000029029 ABERDEEN, MISSISSIPPI EQUIPMENT LIST (cont'd) Unit # Year Engine Type Description 2322 2325 2351 2352 2353 2355 2361 2362 2363 1968 1972 1973 1967 1967 1968 1964 1965 1970 Butler 1, 600 cubic ft.. Hopper Trailer Trailmobile 1,500 cubic ft Hopper Trailer Fruehauf 1, 570 cubic ft.. Hopper Trailer Fruehauf Van Trailer Fruehauf Van Trailer Butler 1,600 cubic ft.. Hopper Trailer Fruehauf Van Trailer Fruehauf Van Trailer Great Dane Van Trailer ASSUMPTIONS \ Warehouse It is anticipated that the operation of the packaged resin warehousing and shipping operation will be transferred from the Plant to Transportation about mid-year 1975. The exact date will depend on final installation of the pallet-racking equipment. Additional information can be found under the Aberdeen Warehouse tab. Revenue Revenue was arrived at by applying our forecast volumes against the current level of rates for Aberdeen. We projected a 2% increase for van shipments on 1/1/75, and an additional 2% on 9/l/75. We projected a 6% increase on bulk rates on 6/1/75. MAJOR REPAIR FORECAST Unit # Month Description Amount 1317 July June May Major OH Trans. OH Front Diff. $1,800 760 800 DTH 000029030 ( ABERDEEN, MISSISSIPPI f. MAJOR REPAIR FORECAST (cont'd) Unit # Month Description 1317 1318 1319 1320 1321 1322 1323 1324 1325 1326 April May October March June October November February May August August January February July September March April July August February April May July January February March June March May August September September October November November Rear Diff. Inframe OH Trans. OH Trans. OH Rear Diff. Front Diff. Major OH Front Diff. Rear Diff. Major OH Trans. OH Inframe OH Rear Diff. Front Diff. Trans. OH Rear Diff. Inframe OH Trans. OH Front Diff. Trans OH Front Diff. Major OH Rear Diff. Trans. OH Major OH Front Diff. Rear Diff. Major OH Trans. OH Rear Diff. Front Diff. Major OH Trans. OH Front Diff. Rear Diff. Amount $ 325 1,100 760 * 760 325 800* 1,800* 800 325 1,800 760 1,100 325 800 760 325 1,100 760 800 760 800 1,800 325 760 1,800 800 325 1,800 760 325 800 1,800 760 800 325 DTH 000029031; ABERDEEN, MISSISSIPPI f. MAJOR REPAIR FORECAST (cont'd) Unit # Month Description 1327 1352 1353 2046 2310 2311 2312 2352 2353 2354 2361 2363 April June June October March May November April September December March March June June June May May July July ` April April April August August September September October October October November November Trans. OH Major OH Front Diff. Rear Diff. Inframe OH Front Diff. Trans. OH Inframe OH Front Diff. Trans. OH Floor Suspension Floor Roof Suspension Floor Suspension Floor Suspension Floor Roof Suspension Floor Suspension Floor Suspension Floor Roof Suspension Floor Suspension TOTAL Amount $ 760 1,800 800 325 1,100 100 450 1,100 100 450 866 315 866 240 315 866 315 866 315 866 240 315 866 315 866 315 866 240 315 866 315 $51,959 V DTH 00002903! ABERDEEN, MISSISSIPPI 1975 vs. 1974 OUTLOOK; Net Profit Down $51,156 Freight savings generated at Aberdeen are expected to be down due to decreased hauling as a result of a downturn in the P. V. C. market. DTH 00002903.15