Document 0JJzYer76Xz5LGN71rB49gpzV

CELANESE SPECIALTY OPERATIONS TECHNICAL CENTER Corpus Christi, Texas To Prom Management Safety Committee 0. S. Pruchey B. L. Smith September 11, 1986 OSF-137-86 BLS-39-86 Documentation Procedure for Safety Shutdown System Tests ABSTRACT The Laboratory Safety Committee and the High Pres sure Laboratory Governing Committee developed a documentation procedure for safety shutdown system tests. Details of the procedure are contained herein. Ke ords Sa ty Shutdown System Audit S-000 QUALITY IS OUR BRAND OP BUSINESS 008982 OSF-137-86 BLS-39-86 -2- September 11, 1986 DISCUSSION The recent safety audit at the Tech Center iden tified the need for a procedure to document testing of safety shutdown systems. A joint meeting between the Lab Safety Committee (LSC) and High Pressure Lab Governing Committee (HPLGC) was held to develop the protocol and form required for this documentation procedure. It is recommended that the following procedure be adopted as Tech Center policy. The following situations will require safety shut down system testing of lab units: 1) Initial startup or reactivation of a unit. 2) Whenever any wiring changes are made to the shutdown system. 3) Anytime a problem with the shutdown system is suspected. 4) All safety systems must be tested on an annual basis. Safety shutdown system testing can be performed by maintenance and/or laboratory personnel. The individual performing the test will obtain a test form from the Mainten ance and Engineering (M&E) secretary. This form must be completed and returned to the M&E secretary before the unit can be operated. The method used to test the shutdown system will be left to the discretion of the unit supervisor. Hie M&E secretary will maintain both a hard file and a VAX file of completed test forms. The VAX file will be a reminder program that notifies the chairmen of the LSC and HPLGC when a unit's annual safety system test is due. The chairmen will then notify the unit supervisor that he must test his shutdown systems within the next month. The documentation form (Appendix I) will identify: - the unit, - unit location <e.g. hood in 410), - supervisor, - technician/operator, - shutdown systems tested, - person performing the test, - type of test (i.e. instrumental or empirical), - set point - date test performed, - whether the shutdown system works, and - any comments 008983 OSP-137-86 BLS-39-86 -3- September 11, 1986 The shutdown system test policy will also be on the back of the form. h B. L. Smith mv 008984 SAFETY SHUTDOWN SYSTEM TEST FORM UNIT: ___________________ LOCATION: _____________ UNIT SUPERVISOR: ____ TECHNICIAN/OPERATOR: SHUTDOWN SYSTEMS TESTED SET POINT TYPE OF TEST INITIALS PASS 1) 2) 3) 4) 5) 6) 7) 8) 9) COMMENTS: __________ ________ ________ ________ _________ ________ __________ ________ __________________ ____________ ______ __________________ ____________ ______ ________________ ___________ _____ ________________ ___________ _____ ________________ ___________ _____ __________________ ____________ ______ ________________ ___________ _____ ____________________ ______________ _______ ___ _____________ ________ (SIGNATURE OF PERSONS PERFORMING TESTS) DATE RETURN COMPLETED FORM TO MAINTENANCE & ENGINEERING SECRETARY 008985 / SAFETY SHUTDOWN SYSTEM TEST POLICY All lafcr units at the Tech Center will require safety shutdown system testing during the following situations: 1) Initial startup or reactivation of a unit. 2) Whenever any wiring changes are made to the shutdown system. 3) Anytime a problem with the shutdown system is suspected. 4) All safety systems must be tested on an annual basis. Safety shutdown system testing can be performed by maintenance and/or laboratory personnel. The individual performing the test must obtain a test form from the Mainten ance and Engineering (M&E) secretary. This form must be completed and returned to the M&E secretary before the unit can be operated. The method used to test the shutdown system will be left to the discretion of the unit supervisor. 008986 OSF-137-86 BLS-39-86 CCTC R. J. H. Voorhoeve R. R. Graham E. B. Hackman D. R. Cassady L. L. Henderson J. P. Lieck R. P. Lowry L. E. Wade 0. S. Fruchey L. 0. Wade S. B. Glancy M. Singh G. J. Vaughn T. H. Shockley S. K. Arensman L. R. Johnson D. Starr D. L. Keene E. G. Zey X. Nicolau B. L. Smith J. M. Buchanan F. R. Galloway D. Havelka A. Aguilo L. Hinojosa G. P. Torrence T. Muniz J. B. Shelton Central Files (4) INQUIRE September 11, 1986 008987