CHECKLIST (ATTACHMENT!)
Applicable n/A
JLS
fL
Consult piping and equipment specifications.
Perform Reactive Chemicals testing. 2/15/94ln-Progres$? Add materials involved to Toxic Substanoe Control An (TSCA) inventory.
Calculate impact on F&EI and CEI
Comply with Engineering Practices.
Comply with Technology Center guidelines.
Comply with Dow LAD Environmental Project Checklist.
Comply with Safety and Loss Prevention requirements.
Consult maintenance. (Name)
...
Consult instrument and electrical technician. (Name) __________________
Consult parts technician.(Name)_________
Evaluate and modify relief system.(Name)
Contact Industrial Hygiene.(Namc)_______
Contact Process Engineering. (Name)..
Complete required reviews. (Name them).
Other ............ ..... ............ .................
Post-Modification Checklist: (Before startup)
-------
Perform pr^-startup audit. Instrument loop drawings.
Electrical drawings.
Complete or update training program.
Job procedures written and approved.
P&ID's, process flow sheets and plot plans updated.
Personnel trained on the change.
Critical instrument checklist updated.
Computer code and documentation changed.
Checklist Follow-up
Originator..
_______________
Date of Origination:
Proposed Date of Change ._._..._.._.__________________
Area:
Permanent Temporary
From
Description and Location of Change (Scope)
Technical Basis for Change:,,
To
Safety
Loss Prevention
Environment | |
Health (...."|
Alarm [
Shutdown Point 1 1 Instrument [ 1 Process Computer Control | | Addition or Removal of Equipmer
Piping Modification | [
Equipment/Material Modification 1 | Chemical | | Job Procedure}
Expected Completion Follow-up__________________________________________________________________________
Date Complete
Follow-up
Follow-up
Follow-up Follow-up
Follow-up
Follow-up
Follow-up
Approvals: Originator____ _____ __________ First Reviewer_________________ Department Head/Superintendent