Document 06weRRXomNELXj45Bwx8O4J5M
ASARCQ
EXHIBIT I EI Paso Plant
October 7, 1983
ENVIRONMENTAL IMPROVEMENT PROJECTS 1970 - 1983
fthvr /yppao*r/0tv Numm&es 1970
&U, 5Yo
-5V
Hoods on Dross Reverb Matte Launder Hoods for Cottrell Dust Handling Cottrell Expansion Model 92 Tennant Sweeper No. 2 Anode Afterburner Zinc . 8 Holding Furnace Ventilation Sinter Plant Scrubbers Calcine Loading Ventilation
Total for Year Running Sub-total
Cost
$ 5,000 Est. 5,000 "
1,500,000 8,000
17,000 55,000 115,000 10,000
% 1,715,000 % 1,715,000
1971
SSf Weather Stations SiC RSR Flue Dust Conveyor System
RSR Draft Improvement SS 2 Calcine Loading Ventilation SS/ No. 1 Anode Afterburner SC o Rectifiers for Converter Cottrell
Total for Year Running Sub-total
% 5,000 58,000 23,000 8,000 16,000 11,000
$ 121,000 $ 1,836,000
1972
Ventilation of Receiving Dross Kettle
$ 2,000 Est.
Ventilation of No. 27 Conveyor
2,000 "
SC7 Blast Furnace Baghouse Stacks
72,000
Ventilating Top Floor of DSL Building
13,000
Additional Rectifiers for RSR Cottrell
25,000
-5*7/ 2000-Gallon Water Truck 57/ Elgin Street Sweeper ^79 Cadmium Unloading System --- &?*+>*** RA trdr s~t>~7 SCI Blast Furnace Baghouse Dust Enclosure S*7 DSL Baghouse Dust Enclosure
s*n Baghouse Dust Trestle Enclosure sso Addition of #1 Acid Plant (for Copper
6,000 11,000 155,000 12,000 14,000
4,000 14,291,722
Process Gases)
Total for Year Running Sub-total
% 14,607,722 % 16,443,722
DMART 320
c ENVIRONMENTAL IMPROVEMENT PROJECTS (cont'd)
1973
S7? Deleading Baghouse Extension S7? Zinc Track Hopper Cadmium Unloading
Ventilation S~)? Zinc Kiln Ventilation
Matte Tap Ventilation Relocate Calcine Vent Pipe Dross Reverb Launder Ventilation
Total for Year Running Sub-total
Cost .$
316,000 316.00
123.000 204.000
2,000 Est. ________ 10,000
$ 971,000 $ 17,414,722
Sn 0t/
1974 ___________ Reverb Crossover flues Converter Secondary Hood Local Emission Controls, which include:
$ 15,000 Est. 67,000
480,000
1. Blast Furnace Elevator Ventilation
2. Cadmium Plant Ventilation
3. Dross Plant Ventilation
4. Sinter Plant Ventilation
5. Dross Cadmium Plant Crane
Ventilation
c Pneumatic Conveying System for Silica Dust Total for Year
%
110,000 672,000
Running Sub-total
$ 18,086,722
6/0 &/(
1975
Rebuilt Cottrell Floor
Converter Building Fume
Control (Building Enclosure)
Mobile Sweepers
_
Cottrell Improvements
Total for Year Running Sub-total
1976
____________________________
Zi
Major Renovation of Lead Smelter In cluding new facilities for Unloading,
Sintering, Acid Plant (Cont. through 1982)
/fpf
Total for Year Running Sub-total
1978 & Reverb Cottrell Rehabilitation
c /0 Ventilation of Reverb Furnace Return Launder G>/0 Enclosure of Calcine Charge Area 6/0 Hoods for Zinc Matte Tapping
Total for Year Running Sub-total
$ 25,000 Est. 6,605,000
.10,000 38,000
$ 6,678,000 $ 24,764,722
ooo^
$ 83,486,881
3/bV " S'*/ 7 yG^ooq
$ 83,486,881 $ 108 ,251,603
$ 664,000 10.000
21,000 ________ .23,000 $ 718,000 3 108,969,603
I
ENVIRONMENTAL IMPROVEMENT PROJECTS (cont'd)
1979
*/*/ Compliance Facilities for OSHA Arsenic Standard *
Cadmium Dust Loading G>SX> Street Sweeper
Engineering Study - Converter Secondary Hoods
Total for Year Running Sub-total
Cost
$ 1,830,000
37,000 38,000 18,000
--2//
$ 1,923,000 $ 110,892,603
These projects were primarily related to OSHA Standards. The projects have been included on this list because the projects had some effect on reducing fugitive emissions.
6jT7
1980
Environmental Computer Up-Grade Matte Ladle Hoods Hi-Pressure Wash System Roaster Siding Repairs Mill Siding Repairs Lead Stack Transmissometer Modify Blast Furnace Settler Hood
Total for Year Running Sub-total
Cost
$ 16,000 97,000 10,000
157,000 160,000
23,000 Est. 3,000 "
$ 466,000 111,358,603
1981
Movable Kettle Hood
Lead Kettle Hood 8 Duct
Extension of E. Helena Dust Unloading
Building
RR Flue Bulk Head
RSR Flue Door
66*? Cottrell Transformers
6,70 Blast Furnace Ventilation
&73 6>7%
Converter Gas Crossover Flue Environmental Computer Upgrade
Total for Year
Running Sub-total
67 6 ffD 6?3
1982
Roaster 6 Converter Transmissometers Tymco Sweeper Water Blaster D6L Ventilation Baghouse Modification
Total for Year
c Running Sub-total
$ 6,000 5,000
80,000
133,000 110,000
30,000 730,000 170,200 110,000
--
$ 1,374,200 $ 112,732,803
*
$ 44,000 78,000 34,000 12,000
$ 168,000 $ 112,900,803
ENVIRONMENTAL IMPROVEMENT PROJECTS (cont'd)
1983
6S& Computerized Process Gas Handling System-
CfiC 6*7
Gas Reformer for Anode Furnaces Converter Cottrell Modification
<Z>2-5 Zig/Zag Blender Building
Sprinkler System
Ventilation System for "Down" Roasters
Acid Plant Projects (to reduce screening,
lower tail gas)
List:
Catalyst
Mist precipitator Inlet Duct
Modifications
Preheater Retubing
#5 Heat Exchanger
Blast Furnace Modifications for Slag Hauler
Blast Furnace SOj Monitor
Dross Plant Ventilation Systems
Cost
155.000 600.000 1,902,000 200.000 Est. 100.000 "
50,000 "
400.000
150.000 Est. 50.000 " 30.000 " 50.000 " 25.000
250.000 Est.
Tota.1 for Year Running Sub-total
$ 3,962,000 $ 116,862,803
tfajS: TOTAL AnTMO/JY PLArJT C.OS7S 7 pec'rs ' Cfi>PrP0^/47oJ