RETROFILL REDUCES LIABILITIES RESULTING FROM A NETWORK TRANSFORMER FAILURE
Martin L. Hartlay p. E. Knoxvilla Utilitias Board Knoxvilla, Tannaasaa 37921
I. INTRODUCTION A, Historically SpaaKing B. Fadaral Ragulations and Othar PCB Raaoval Prassuras
IX. SYSTEM DESCRIPTION AND DETERMINATIONS A. systaa Cradantials B. Evaluations and Datarainations
III. TRANSFORMER FAILURE EXPERIENCE A. Post Raquiramants B. Transfornar Failura and Evants
IV. CONCLUSIONS A. Cost of Claan Up B. Lassons Laarnad
ABSTRACT
Knoxvilla Utilitias Board's activa PCB raaoval program has indigenous sida offsets that hava rasultod in saving costs that otharviso may hava baan catastrophic.
1< Transformats that had, haratofora, un-noticed 1start problaas such as broken bushings, failing contacts, raducad BIL, ate. vara discovarad and rapairad.
2. Tha initial raaoval of tha AsKarel, Insrtaan, or othar highly PCB coneantratad fluids iaaadiataly lovarad ths liability of a PCB fira or spill. .
1. A transformar avaluation program allovad tha coaplata raaoval of oartain undarloadad transforaars. With tha rstrofill program in full swing, a transformar failura in tha high-voltage switch compartaant rasultad in aa PCB spill of 21 gallons of Unison's TF-X fluid. Thara was a rasultant briaf axplosion and axpulaion of a smoko cloud. Tha now, 23,ooo ppm fluid, producad no maasurabla PCB contamination axtarnal of tha underground transformar vault from tha smoke cloud. Claan up was restricted to only tha liquid itsolf that ascapsd tha switch compartaant.
6-18
HONS Q20234
RETROFILL REDUCES LIABILITIES RESULTING FROM A NETWORK TRANSFORMER FAILURE
INTRODUCTION
There was s tins whsn ths Power Opsrstions Supervisor could rsst
reasonably comfortably at night Knowing that all was being done
that is technically possible to aseure the power systen was safe,
was oparating in a safe manner, and was not virulent or
unfavorably iapacting the environment.
Along with the
Technological Age has come the burden of assuring that what nan
creates Bust not uncreate nan. The disaal stories of PCB
transformer failures has done little to appease the electric
utilities* conscience and state of well being.
*
Hiroehima was the United States neaeeis on Japan, however, Japan's Yusho rics oil incident on Kyushu Island has probably
returned the favor. Since that incident the United States has become engulfed in Federal Regulations and controls that have reached colossal proportions involving a molecule termed PCB for short. From that infamous occurrence in 1968 till the present,
Federal Regulation piled on Federal Regulation to ,*assure" the electric utility industry clean up it's act.
Employee epprehension, public opinion, the news media, and
actually just being a good neighbor added to the pressure of dealing with PCB's. Some individuals react with horror if
threatened with the presence of this material. And, undoubtedly the news media has made some very good mileage out of malting the worst out of, many times, very marginal situations. In any case the preesure still persists and most utilities are reacting.
scare stories - which became actualities with several transformer failures and fires around the country pre-empted any risk management studies and provided all necessary motivation to stamp out the PCB. If the electric utility was not convinced by July of 19BS, the Federal Government issued the rinal Rule of FA # 40
CFR PART 761. This Rule, for all practical purposes, eliminated
PCB Network transformer from existence.
For thoee utilities who had their heed in the sand, it was then time to rise up and do something about the PCB dilemma. RETRO-
FILL, REPLACE, or RETIRE?
SYSTEM DESCRIPTION AND DETERMINATIONS
Knoxville Utilities Board (XUB) has actively pursued the removal
of PCB's since the mid 1970's.
It became our goal to remove
all PCB's by a combination of replacement and/or reclassification
which ever proved to be moat economical,
6-19
MQNS 020235
KUB's downtown network consisted of 112 transformers In service with a storeroom stock of 7 units. Tha units ranged in alias
from 167 kva to 2500 kva and wars aithar on a 208 volt continuous natwork system or on 480 volt spot natwork systams. All thasa units wars of Inerteen, Pyranol, or Chloraxtol Insulating fluids. Mona of thasa aakarals wars lass than 348,ooo ppm PCB ranging up to 850,000 ppm with tha low ranga unit baing a 1966 500 kva g, e, tranaformar and tha high ranga unit baing a 1970 500 kva w. e,
transformar. Tha oldast natwork unit was manufseturad in 1939.
Each unit was avaluatad individually. Basically, units oldar
than 25 yaars would ba raplacad and units lass than 25 yaars old
would ba retro-filled and raclasaifiad,
(Saa Appandix A)
Howavar, as lata as March, 1985 wa still had not discovered a
company which would guarantaa a raclasaification procass that
would laava a unit with lass than 50 ppm,
Unison Inc. announcad in tha aummar of 1985 that thay had succassfully raclasaifiad PCB tranaformars balonging to Union
carbida. By Novambar of that yaar wa had contractad with Unisorj to raelass aavan of our nawast tranaformars which wars connactad in two 480v spot natworks sarving critical loads: A high rifa bank building and tha City-County building, both buildings vary
axpanaiva.
This dacision was prafacad by two othar major considarations:
1. What dagraa of liability is raducad with ratro-fill?
(Appandix B)1 2. whst impact doas transformar failura rata affact tha
dacision? (Appandix C)a
During tha fall of 1985 wa continued to evaluate for tha bast
methods of PCB raplaeamant.
Studias ware mads on total
raplacamant vs. total ratro-fill. Tha final outcoma was a
combination approach. (Saa Appandix A) Howavar, with competitive
bidding on tha ratro-fill procassas, tha much lower than expected
costs, encouraged us to include more units into the retro-fill
program and less in tha raplacamant.
This dacision paid
dividends in several ways: 1) Much quicker approach to
eliminating tha liability of PCB'a. 2) Tha ratro-fill procass
required us to raplaea gasketing materials and as a result we discovered transformar problems that spalled tranaformar failure
sometime in tha not-to-distant future. 3) A transformar failure
that did occur after tha first retro-fill was not nearly
traumatic as it could have bean.
This is tha crux of this
presentation.
6-20
HONS 020236
transformer failure
Before you ever have a PCB transformer failure xa the time to make all the neceeaary precautions and plans on how to deal with the failure. Among the items to be considered are:
1. Are all EPA Requirements satisfied?3
2. Is your emergency response plan adequate?
3. Are your personnel trained?
4. Is there a procedural understanding with the local law enforcement, the Fire Department, the News Media, the cititens, and all the regulating bodies?4
5. Do you immediately know who to call to: report the problem, aide in containment, test, and clean up?*
If you can answer "Yeel" to these questions without hesitation,
thsn you are somewhat ready for that call saying you have had a
transformer explosion.
/
on February 19, 19s7 at 9:52 A.M. XUB received a call from the Fire Department that there was an explosion in the underground vault adjacent to their Fire Hall and Control Center in downtown Knoxville.
The first crew responded to the scene of the explosion within 2
minutes after the initial call. This crew was in the process of
getting the next transformer ready for retrofill and happened to
be in the vicinity of the failure. Since the explosion was
adjacent to the Fire Department they were the ones who called us
to put out the firel
Fortunately the protective relaying
responded quicker than either of us and cleared the circuit upon
the initial explosion, so, only one cloud of smoke was all that
was involved as far as the fire was concerned.
The Fire
Department would have reacted to contain the fireif fire and
smoke had continued.
The first crew on the scene did make a quick assay of the vault
and noted the resulting spill appeared to be contained. This crew was not prepared to taka any further action except to secure the area. The spill control team arrived moments later. During the next few minutes many things began to happan;
-Communication to the Fire Department and the Police Department that we would be securing the area involved. This included blocking the street, sidewalk, grassy side area, and a portion of the Fire Hall.
homs gq23?
-Ml vehicles in this srss wars impounded and tha complete araa ropad off.
-Our Risk Management Group was callad in to handla public contact, such as dealing with tha ownars of tha vahiclss.
-Tha Spill Control Team began thair work. -EPA Hotlina was notifiad. -Tast and Sampling Laboratory was aummonad. -A nswa ralaasa was praparad and issuad. -Clean-up craws wars baing outfittad.
Tha spill control taam upon arriving suitad up fully including tha wearing of protective clothing and breathing equipment which supplied air. Thair initial work consisted of putting down vinyl and cardboard ahaata and applying abeorbants to prevent any further spread of spill and to capture tha spilled liquid. Normal precautions ware taken at tha work site to eliminate environment contamination by tha worker's operations.
International Technology Corp. was summoned to make PCB tests on all tha parked vehicles, on specific locations on tha sidewalk^ grounds, and tha Fire Department Building. Theee tests ware dona on an emergency basis with tha results back in hand before nightfall. Tha results of these tests resolved some of our anxieties as all teats exterior to tha vault showed very low and acceptable PCB levels with a maximum of <1.0 ugram / loo sq. cm.
CONCLUSION
The fluid in the vault, however, tested 23,000 ppm which was down from the initial contamination before retrofill of 760,000 ppm. In extrapolating tha test results, according to research done by Unison in co-operation with Battelle Columbus Laboratory and a resulting paper presented in a 1985 Doble Conference "Simulated Building Tire study Using Retrofilled Transformer Dielectric Coolant" by W. K. Martin, the PCB products (contaminants) that were produced were 1/35 to what they would have been had tha original askaral bean in the transformer. Had this bean tha case it ie highly likely there would have been contamination external the vault. Tha result would have bean major clean-up of tha street, the sidewalk, grounds, and building. To what proportion would be somewhat difficult to ascertain. But, it is evident it would have been a far more extensive procedure than the Internal claan-up of the vault, which, in it's self was costly. The Laboratory fees, alone, exceeded $20,000. Clean-up costs were approximately $30,000,
Considering these events and the transformer failure, it is my recommendation that if one plana on having an Askaral transformer failure, it is best to have it with reduced PCB's.
6-22
MONS 020236
beferences
1, "Simulated Building firs Study Using Retrofilled Transformer Dielectric Coolant" 19*5 Dobla Engineering Conference prssantad by w. H. Martin.
3. "Transformer Lit* Expectancy" by Dr. Stavan C. Vic)c, Union Carbide Corporation, Tarrytown, Maw YorX 10591
l. "Polychlorinatad Biphanyls (PCBs) Manufacturing, Processing, Distribution in commerce, and Usa prohibitions" Fadaral Ragistar NO. 40 CFR PART 71.
4. "Guidance Document for TITLE III of ths Suparfund Amendment and Reeuthoristtion Act of 19*6" produced by tha Tannassaa Emergency Management Agency.
5. PCB Eauloment. Operations * Management Reference Manual. Washington, D. C.: NRECA Research Project S2-7, March 19S3. Prepared by: SCS Engineers, Inc.
6-33
MONS 020239
UNIT EVALUATION: REPLACE vs. RECLASSIFICATION
Askirel Network Trineformer .* Unit 1911 from 1939 - 1975
2Q6Y Unltl
3 - 167 kvi 36 - 500 kvi
2 - 600 kvi 30 - 750 kvi
2 - 1000 kvi
480v Unlti
10 - 500 kvi 6 - 750 kvi
10 - 1000 kvi 11 - 1500 kvi
9 - 2$00 kvi
1984 ESTIMATES FOR REPLACEMENT:
$30/kvi for replicesent Included: - Purchise Tnnsformer - Cost to Rsbovs Old 8 Instill Nsw
- Cost to Incinsnts PCBs - Cost to Lindfill - Cost to Tnnsport
1985 &CZUAL QUOTES WERE Approx. $50/kvi for REPLACEMENT, or (102,701 kvi)($50) - $5,135,000.
1984 ESTIMATES FOR RECLASSIFICATION:
$70/9il for Rstrofill Included:
- Retrofill Process (Includes Destruction of PCBs Tnnsportition Costs)
- Cost of Support Personnel - cost of Finil Fluid (Mey be Oil, Silicone, etc)
1985 ACTUAL QUOTES WERE. Approx. $S8/gil (Askirel fluid) or (37,981 gel)($58) - $2,202,900
FINAL DETERMINATIONS:
- REPLACE 17- 208V UNITS W/ 18 NEW (Resiled) 20SV UNITS. - RETROFILL 102- 208V 8 480V UNITS.
(APPENDIX A) 6-24
HONS 020240
RELATIVE MAXIMUM RISKS-- RECLASS-50 VS. ASKAREL
1-1----------------------
'i
"
--------
i
D IO X W /F U R A N F O R M A T IO N : > IL L S /L F A K S
(APPENDIX B)1 6*25
HONS 0202<tl
Tabls 1 shows ths comparison bstwssn ths IEEE 197 3-1974 and ths 1979 survsy rssults for ths total failurs rats for all liquid fIliad powsr transformsrs.
TABLE 1
SURVEY YEAR
SAMPLE SIZE
NO. OF
FAILURE RATE
funit-vsarlFAILURES ffallurs/unit-vaar'
1973-74 1979
15210
63
0.0041
17996 111 0.0062
In this tabls, ths failurs rats was obtainsd by dividing ths numbsr of failurss by ths nuabar of units timss thsir sarvica lifs. It is elsar from this data that ths failurs rata incrsassd by 50% in just six ysars.
TABLE 2
UNIT ACE
FAILURE RATE (fallurs/unlt-vaar)
1-10
11-25 >25
0.0072
0.0053 0.0060
Tabls 2 confirms that ths nav transformsrs do indaad suffsr from
high "infant mortality", middls agsd transformsrs display grsatsst rsllability and only a slight indication of dacraasad
raliability is sssn with ths oldsst ags group. This is a phsnomsnon which has baan eallsd ths "Bathtub curva" (figura l)4
fail rats
*
*
A<?* of unit
A
Figura l
Figura ona shows graphically that ths daeislon point for schsdulsd rsplacsmsnt of transformsrs to minimita foread outagss is point A - ths point whsrs ths failurs rats for an sxisting inplacs transformar aquaIs ths failurs rats of a nsw rsplacsmsnt unit. Rsalacsmsnt prior to this point will actually rasult in
hiahsr ovarall failurs rats for ShY qiYtn BYBttltt. Sines ths failurs rats for any givsn transformar is unknown, statistical
data must bs rslisd upon to dstarmins ths axaet shaps of ths
"Bathtub" curva.
(APPENOIX C)J 6-26
HONS 020242
HONS 0202^3
> $
I
Clor-N-011 Test Kit at a Risk Management Tool - An Update
Klrt W. Rhoads Utah Power A Light Company Environmental Services Department
1407 West North Temple Salt Lake City, Utah 84116
ABSTRACT TM *
The Clor-N-011 PCB Screening Kit can be considered an effective risk management/' tool only If the probability of a false negative Is sufficiently small. Utah Power A Light Company has used the Clor-N-011TM Test Kit on over 123,750 transformers and has classified them as negatives or positives. A random sample of the Clor-H-011 negatives (those testing less than 50 ppm PCB) were tested by gas chromatograph (SC) methods to evaluate the probability of a false negative. ApproxImetely 25 of those testing negative with the Clor-N-011TM kit tested 50 ppm or greater by GC methods. Therefore, use of the Clor-N-011TM kit as a screening tool to reduce the risk or probability of a PCB spill Is effective.
RESULTS Utah Power A Light has Clor-N-011TM tested approximately 123,750 transformers, with 135 testing positive (over 50 ppm PCS*) and 875 testing negative (under 50 ppm PCBs). In order for the kit to be an effective risk management tool, the rate of false negatives (Clor-N-011TM tested under 50 ppm PCBs while GC testing over 50 ppm PCBs) must be low. A random sample of 937 Clor-N-011TM negatives were GC tested. Of the 937, 2.135 were false negatives.
6-27
HONS 020244
TABLE 1 CLASS INTERVAL {PPM)
Total Percent
il 1-5 6-15
761 93 46 81.22 9.93 5.12
Less than 46 ppm 97'U7r
16-25
5 0.53
26-46
10 1.07
47-99
6 0.64
100-475
6 0.85
476-999
2 0.21
Greater than 46 dmi --zrm------------
1000+ 4 0.43
Heari - 19.94
Mode .01
Median 1.5
A 2.131 rate of fait* negatives means that 2153 transformers contaminated with PCBs have been left In service and have the potential to leak or rupture, thus putting UP4L In violation for Improper disposal. Disposal, cleanup, environmental costs*' and health effects Increase dramatically If PCBs are present. Therefore, what Is the probability of possessing a contaminated transformer, given It has been Clor-H-OllTM tested and found to be lest than 50 ppm (negative)?
HONS 020245 6-28
TM p/A - Probability of transformer being Clor-N-01I'" tested P/B Probability of transformer being manufacturer-certified
a* non-PCB
TM
P/1 Probability of a Clor-N-Oll'J; Positive
P/2 - Probability of a Clor-b-OHNegative
P/3 - Probability of a False Positive
P/4 Probability of a True Positive
P/5 Probability of a True Negative p/6 Probability of a False Negative
Probability of possessing i contaminated transformer, given It is a Cl0r-N-OnTB negative
FIGURE 1
.75
.25 .13 .87 .57 .43 .98
.02
6-29
HONS 020246
UP4L expects .051 of ell transformers to fill per yeir, That corresponds to 83
flllures. Whit Is the probability of i contimlnited transformer filling, given It Is Clor-N-011TM negitlve?
165000(.0005)(.75)(.87)(.02) *1.1
Whit Is the probability of contimlnited transformer filling If the C1or-N-011^M kit Is not used?
165000(.0005)(.055) 4.5
(5.5* Is the totil number of positives)
Of the 20 filst negitlve simples, 13 were Clor-N-011TM tested igiln it centril
facility. Six were positive md seven were once igiln negitlve. All 13 simples were GC tested igiln. Those which Clor-H-011TH tested positive (6) hid i GC value
ringing from 53 to 265 ppm PCB. The discrepancy from negitlve to positive is probibly due to sampling error or simple traceiblllty. The seven simples thit were/ Clor-H-011TM negitlves both times eich hid GC vilue of less thin 1 ppm PCB when GC tested i second and third time. Therefore, the Clor-N-011TM test kit correctly predicted the GC result. All 20 simples were first Clor-N-011TM tested in the
field rather thin tested it i centril facility. The lick of quality control over Clor-H-011TM testing In the field Increases the probability of an inaccurate
Clor-H-011 TM result.
CONCLUSIONS The Clor-H-011^ kit can reduce risk by is much is 761, is simple to use, and Inexpensive. By Clor-H-011TM testing rather than GC testing transformers, UPAl has
saved approximately 51*550,000. Any equipment that ruptures or spills oil will be GC tested, but UPtl believes only l in 83 will be over 50 ppm PCB. By not using the kit, 4.5 out of S3 would be over SO ppm PCS. UPtL believes that using the Clor-N-011TM kit will save on disposal and cleanup costs and reduce both
environmental and health effects associated with PCBs.
6-30
HONS 02024 7
COMPARISON OF ESTIMATED AND ACTUAL PCB VAPOR EXPOSURE DURING A SOIL EXCAVATION PROJECT
James Neely, C1H end Colin Hoy Ecology tnd Environment, Inc.
160 Spear Street San Francisco, CA 94105
A risk assessment was conducted for a chemical processing plant which had used the PCBs Aroclor 1248 and 1254 In Its heat exchange fluids. Concentrations of vaporized PCBs were measured at levels one to two orders of magnitude greater than had been calculated in the risk assessment. Further, the PCBs detected consisted of the lighter Aroclor 1232 or a related compound. Because dust was shown to be adequately controlled, the discrepancy between projected and actual vapor-phase PCBs could only be explained by the unforseen formation of lighter, more volatile PCB species from partial evaporation of Aroclor 1248 and 1254, or fallura to detact Aroclor 1232 In tha original soil samplts. Partial photolysis of the heavier PCBs could also contribute to the formetlon of the lower-chlorine ted PCBs detected in air.
Background
The subject hazardous waste facility was a chemical processing plant which utilized heat-exchange fluids containing PCB 1248 and 1254. Following demolition of the plant. It was determined that the original PCB products or residuals had apparently leaked Into surface soils throughout the 3-acre site. Soil was sampled based on a grid pattern that divided the site into roughly equivalent sections. Sampling was continuous, from surface to 6-foot depths, and analysis continued until the vertical extent of contamination was resolved. Additional surface samples were collected and analyzed to delineate the areal extent of contamination. A total of 321 samples were analyzed.
Soil Analysts
Soil semples were analyzed it a laboratory certified by the State of Callfomle for hazardous-weste analyses. The contents of each sampling sleeve was homogenized and analyzed according to EPA Method Ho, 8080, Up to 11 of'the Aroclor peaks were used to quantitate the sample. The results of this sampling program revealed that site soils contained variable concentrations of PCBs. The average PCB level In the most heavily contaminated soils located within 12 inches of the surface was 326 ppm, with a range Of <1 ppm to 4,40U ppm. The chromatograph from soli samples most closely approximated PCB 1254 (see Figure 1).
6-31
HONS 020246
Exposure Guidelines
For worker exposure to PCSs, the California OSHA 8-hour Time Weighted Average (Twa) Permissible Exposure Level (PEL) as well as the American
Conference of Governmental industrial Hygienists' TWA Threshold Limit Value (TLV) are the same: 1.0 mg/m3 for PCBs containing 42* chlorine by weight (PCB 1242), and 0.5 mg/m3 for PCBs containing 54* chlorine (PCS 1254). The National institutes for Occupational Safety and Health, citing the
potential for carcinogenic effects from PCBs, has established a recommended exposure guideline of 1 ug/m3 (0.001 mg/m3) as a 10-hour TWA for any PCB
exposure.
A risk assessment was performed to evaluate community health hazards arising from direct ana Indirect human exposure to the site. Because there are no
standards for allowable levels of PCBs in outdoor air, the risk assessment proposed a safe exposure guideline of 0.101 ug/m3, for off-site community
exposures, based on a calculated allowable dally Intake of 2.5 ug/day for children. This guideline was extrapolated from a mortality study (1) and was designed to maintain a lifetime risk of cancer at less than 10'$.
Exposure Estimation
PCBs In soils may reside In the vapor, liquid, or adsorbed phase. Olrect
evaporation from surface soils, diffusion of vapors from underlying strata,
and wind-born dust may result in airborne exposures. Many physical and
chemical properties of the soil and the contaminant, as well as external
environmental factors, affect the rate of evaporation. Examples of physical
properties of soils Include tortuosity, porosity, and exposed surface area.
Chemical properties include moisture content, organic carbon content, vapor
pressure, and solubility.
Important environmental factors 1nc1u?e
insolation, temperature, and wind speed (2).
In determining vapor amissions, rate-limiting parameters such as organic carbon adsorption and effective pore space are Ignored when developing worst-case exposure assessments. The authors of the risk assessment applied Henry's Law In estimating vapor exposure levels In the limedlate site vicinity.
According to Henry's Law:
Cv He Cl
He 1.73 * IQ"7 20*C (3)
Cl 325 X 10*$ (g PCBs/g soil-water) X (MW water/MW PCBs)
Cv 2.3 X 10-12 mole fractions
Using the above values and Henry's Law, one calculates that the near-surface contamination will contribute 0.022 ug PCBs/m3 of air. (Oaytlme temperatures at this site averaged 20-25 C).
6-32
NQNS 020249
Air Sampling
An air-sampling station was positioned at each of the four perimeters of the site. Samples were drawn at a fixed rate (3.5*4.0 liters per minute) by a vacuum pump through a 37-nm glass-fiber filter, followed by 400/200 mg Florlsi 1 tubes. Pumps were calibrated dally using a bubble meter.
Sample-collection procedures were based on established NIOSH protocols for PCB air sampling (Method 5503) with modification of the tube ana filter site to Increase the flow rates and thereby reduce detection limits. This method has been validated (4).
A total of 72 area samples and 11 employee breathing-zona samples were collected. The front section of the Florlsi1 sampling sorbent and the f11 tar were extracted together and analyzed according to NlOSH Method 5503. Aroclor standards and hexant blanks were analyzed periodically during sample tests as required by the method's quality-control protocols. Similar quantitation and Identification methods were repeated from the soil testing.
Dust Monitoring
Dust was monitored with a GCA Mlnlrs* direct-reading aerosol monitor (detection lint of 0.001 mg/nr) at upwind and downwind positions throughout the site. If the wind was negligible, readings were taken at each of the four perimeters. Readings were taken approximately every 45 minutes throughout the shift. Downwind readings were compared to upwind readings to determine site-related dust concentrations.
Wind speed and direction were also measured, with a wind vane ano anemometer placed on a six-meter pole at the perimeter of the site.
Results
Analytical reuslts of the PCB air samples showed significantly higher
levels of PCB vapors than had been estimated In the risk assessment.
Downwind concentrations within tha sita boundaries averaged .553 ug/m3,
with a median concentration of .766 ug/m3. Employe* exposure levels
averaged 1.645 ug/m3 with a median of 2.160 ug/m3.
In addition,
results were being reported as PC6 1232, basad on tha chromatographic
comparison to standards, rather than the expected PC8s 1246 and 1254 (see
Figure 2). Throughout the project, dust readings on the aerosol monitor
were Insignificant (<0.01 mg/m3).
The emissions were therefore
believed to be associated with PCB vapor. This assumption was supported
by analyzing selected filter and tube sections separately. Three of the
four samples analyzed contained PCBs In the tuba section only.
6-33
HONS Q202&0
Discussion
Risk analysis and estimation are valuable methods of assessing health hazards at hazardous-waste sites. This study demonstrates the limitations associated with estimating risk based on soil analysis data: such risk projections may not describe accurately the dynamic field conditions affecting overall airborne exposure levels. Dn*slte air sampling is therefore a critical adjunct to the risk assessment process for PCB remediation.
Three possible reasons for detecting only PCB 1232 In anfclent air at a site which was believed to contain only PCB 124B and 1254 are 1) partial vaporization of the PCB mixtures; 2) masking of the PCB 1232 in the soil sample chromatographs and 3) photodecomposition of the heavier congeners during soli excavation.
Partial evaporation of the PCB 1246 and 1254 mixtures could also result In vapors characterized only as PCB 1232. The more volatile Cli to CI4 biphenyls which constitute 95X of PCB 1232 are also present In PCB 1254 and PCB 1248 at approximate concentrations of 60X and 20X, respectively (5).
Masking may occur when the concentration of the undetected species Is much lower than the quantitated species. Soils containing high levels of PCS 1246 and 1254 and low levels of PCB 1232 could produce vapor emissions identifiable only as PCB 1232, since Its vapor pressure Is 10 to 100 times greater than PCB 1254 and 1246.
The need to Identify adequately all of the PCB congeners present in soils at a given site Is Illustrated In studies performed by Farmer, et al (6), which showed that extremely low soil concentrations of a semivolatile pollutant could produce maximum saturation vapor density at the soil/air interface.
Photolysis produces quaterphenyls, biphenyls and, in the case of hexachloroblphenyl, chlorinated dlbenzofurans {5). These studies dealt with photolysis In water columns where breakdown rates were less than 5X per year. Photolysis rates In exposed, aerated soils could be much higher. The health Implications of exposure to photolysis breakdown products warrants careful examination of these mechanisms.
References
1. O.P, Brown, H. Jones, "Mortality and Industrial hygiene study of workers exposed to polychlorinated biphenyls," Arch. Environ, Health 36: 120. (1983).
2. W.A. Jury, w.F. Spencer, w.J. Farmer, "Behavior assessment model for trace organics In soil: model description," 0. Environ. Qua!. 12: 55B. (1983).
6-34
HONS 020251
3. W. Plver and F. Undstrom, "Waste disposal technologies for PCBs," Env. Health Persp. 59: 163. (1985).
4. T.H. Miller, "Sampling nd analytical method* for PCB* In air: One Market Plaza, San Francisco," unpublished report submitted to California Department of Health Services, (1963).
5. M.A, Callahan, et al, Water-Related Environmental Fate of Priority Pollutants, EPA * 440/4-79-QZ9*. U.S. Environmental Protection Agency, wash. O.C., (1979).
6. w.J. Farmer, et al, "Volatility of organochlorln* Insecticides from soil; effect of concentration, temperature, air flow rate and vapor pressure," Soil Scl. Soc. Amer. Proc. 36: 444, (1972).
6-35
HONS 020252
TIME
RESPONSE
FIGURE 1
6.36
MONS 020253
statistically valid sampling strategies
FOR PCS CONTAMINATION
E. Ublnger IT Corporation 2790 MostIda Boulavard Monroeville, Pennsylvania 15146-2792
ABSTRACT
Tha sampling data taken during an assessment of buildings allegedly contaminated
by polychlorinated biphenyls (PCBs) are often required to meet many different
Intended ends. Because of this, the design of sampling strategies for building
contamination assessment Is a complex task. Through the use of appropriate
statistical techniques, the optimal sampling plan may be developed to meet a set/
of site-specific objectives.
-7
INTRODUCTION
The common use of PCBs In electrical, hydraulic and heat transfer systems has created substantial contamination problems. Because the remediation or disposal of PCB-contamlnoted materials can be very costly, the source, extent and haaard presented by contamination must be carefully ascertained through extensive sampling and analysis. Generally, sampling strategies are Implemented for one or more of the following reasons;
Preliminary site Investigation Determination of spatial distribution of contamination Identification of sources of contamination Risk assessment Decontamination support/confirmatory sampling Closure sampling.
Sampling buildings for PCB contamination Is a complex problem requiring a sitespecific sampling strategy predicated on the objectives of the Investigation, for example, the type of sampling strategy that Is consistent with the objectives of a preliminary site Investigation may be Inappropriate for those of a risk
assessment,
The overall aim of any sampling strategy Is to provide the most cost-effective approach to meeting the objectives of the Investigation while maintaining a high degree of confidence, precision, and accuracy. A well-planned, statistically valid sampling strategy can help to achieve these goals. Although statistical design Is not the only strategy available, without It the risks of falling to detect contamination cannot be quantified, and the costs of sampling and analysts versus unnecessary remediation cannot be rationally balanced.
6-37
MOMS 020254
Preliminary Site Investigation
A preliminary site Investigation utilizes all available historical and physical Information to develop the Initial scope of remediation. In the absence of historical data, the areas around the suspected source and potentially contaminated adjacent areas must be sampled to determine if a contamination problem exists. Potentially contaminated areas can be Inferred from the mode of contamination. Clearly, It Is easier to demonstrate the presence of contamination rather than Its absence. If little or no contamination can be found, it may be reasonable to conclude the Investigation. The correctness or this conclusion Is largely a function of the adequacy and density of preliminary sampling. There Is a direct relationship between sampling density end the quality and precision of the resulting estimates. Figure X graphically presents the Increasing risk of failure to detect contamination with diminished sample size. Although the determination of "no contamination" requires a fairly Intensive sampling effort, compositing of samples for analysis can be used to achieve a greater sampling density without Increasing analytical costs. On the other hand, a single high sample can ba construed as evidence of contamination. When a preliminary site Investigation Indicates that contamination Is present. Its spatial distribution throughout the facility must be carefully resolved.
Determination of Spatial Distribution of Contamination
Many sampling strategies Involve Judgment sampling, a process by which experts select what they believe to be representative specimens. In a recent sampling campaign, sampling locations were chosen by both random selection and Judgment sampling. Random sampling locations were selected by a two-part grid scheme, while Judgment sampling locations were based on physical characteristics such as areas of obvious staining. These two methods produced virtually Identical rasults, as presanted In Figure 2. Judgment sampling was no more effective than simple random sampling In detecting areas of high PCB contamination and. In fact, was potentially biased. The absence of bias adds strength to the belief that the samples taken by a particular sampling method are representative. In addition, the risks of falsely declaring a contaminated area "clean* cannot be quantified If the sampling scheme does not result In representative selections.
Identification of Sources of Contamination
PCS contamination may be present In and around fluorescent lights, air handling system bearings, elevator hydraulic systems, paint, equipment lubrication oils, generators, transformers and capacitors. Representative sample material from each of these sources Is required to ascertain the presence of other aroclor contamination. The sampling objective Is only to ascertain presence or absence of sources of PCI materials--sometimes a particularly Important consideration from a liability standpoint. A nonrandom sampling approach may be used to Identify possible sources of contamination by sampling oil and grease found In and around equipment locations.
Risk Assessment
Selection of sampling locations for health risk assessment may be based upon a probability quota sampling design. A quota sampling design Is a stratified sample with a nonrandom selection of sampling units within strata (King, 1965). The facility Is divided Into activity zones to develop strata based on logically
6-38
HONS 020255
related activities, resulting In decreased visibility of PCS concentritIon within streti. Within eech zone, i quote of simple types end locitlons Is developed, besed on the desired relitlve precision of estimated PCB concintritlon.
Additionally, since the quote verleble (e.g., surfece type) Is related to PCB concentration, reletlvely homogeneous selection units ere produced. To the degree thet homogenlety cen be echleved, selection bles Is eltmtneted, end verlence Is greetly reduced. Selection of precise sempllng locetlons within quote groups should be rendom, thereby echtevlng unblesed estimetes within those groups. If groups ere to be combined In the computation of exposure, the combined estimate must be weighted by the probeblllty of contect with thet source. Only If sempllng locetlons ere chosen with probeblllty proportlonel to frequency of contect cen en overell estlmete of exposure be formed without eppllcetlon of externel weights. The formetlon of meenlngful contect probeblTitles cen require extensive observetlon of delly plent ectlvlty.
Stetlstlcel Besls for Semolina Stretcqles
Convent1one 1 trensformttlon of the dete often fell to echlevt normellty,
-
precluding the use of perimetric stetlstlcel methods. Beceuse the dete ere soa
highly skewed, the meen end stenderd devlet Ion ere ertlflclelly high. Rather*
then ellmlnete certeln dete points from the enelysls or meke unsupported
essumptlons ebout the underlying distribution of the dete, order stetlsties such
es the medlen serve es epproprlete meesures of centrel tendency (Lehmann,
IB75). Besed on renklng of the dete from low to high megnltudes, order
stetlstlcs meke no essumptlons ebout the distribution of the dete. The medlen
characterizes the typlcel observetlon without being overly Influenced by
outliers. Use of renk stetlstlcs does not preclude the cherecterlzetlon of
uncertelnty In e risk essessmont. A greeter emphesls on the Inherent uncertelnty
of these estimetes Is required. With cleer, meenlngful precision objectives, the
necessery number of simples cen be determined to echleve the desired level of
precision.
Decant eml net Ion Support/Confirmatory Sempllng
First, potentlel remedletlon units ere Identified besed on known or suspected eontemlnetlon erees. These erees ere divided Into remedletlon units. The seme is done In locetlons edjecent to the eree where cleenup Is to be inltleted. These edjecent locetlons ere sempled to test for possible lateral spread of contamination.
Each remedletlon unit Is then divided into approximately equal blocks. Areas thet ere highly contaminated require less Information to make the remediation decision. Conversely, trees thet ere not heavily contaminated or may contain only smell Isolated trees of residual contamination require more extensive sempllng to Increase the probability of finding these hot spots. Additionally, large portions of trees thet ere not heavily contaminated mey require no remediation, end, beceuse they were extensively sampled, the decision not to remediate can be made with confidence. These results mey quellfy for Inclusion in the project closure date base if the clean tree cen be effectively isolated during cleaning of contaminated areas.
Semple locetlons mey be selected at rendom within blocks, e procedure easily accomplished with e random number table.
609
HQNS 020256
If the decision criteria Is based upon a mean or other measure of central tendency, at laast two composite samples must be formed from samples taken within a remediation unit to obtain an estimate of variability. When the decision rule is to remediate if even one sample Is greater than the action level, all samples taken from within a remediation unit can be composited as long as the product of the detection limit and tha number of samples forming the composite does not exceed the action level.
Closure Sampling
An alternative approach to closura Is to use order statistics. A closure guideline based on order statistics does not require the assumption of asymptotic normality but still allows probabllty-quallfled decisions. For example, a random sample of size 22 provides 90 percent confidence that no more than ID percant of subsaquent samples taken from the feelllty will exceed the maximum value observed In the closure data base. If the maximum value observed Is less than or equal to the negotiated cleanup level, closure has been demonstrated. There are nonparametrlc tests of central tendency equivalent to the Student's t-test, such as the Wllcoxon signed rank test, which can be used to demonstrate closure (Wllcoxon, 1945).
REFERENCES
1. Cochran, W, 1963, Sampllno Techniques. John Wiley and Sons. New York, pp. 36-44.
2. King, B, F., 1965, 'Surveys Combining Probability and Quota Methods of Sampling," Journal of the American Statistical Association. Vol. 80, No. 592, pp, 690-696,
3. Lehmann, E, L., 1975, Nonoarametrlcst Statistical Methods Based on Ranks. Holden-Day, Inc., San Francisco.
4. Shapiro, S. S. and M. B. Wllk, 1965, "An Analysis of Variance Test for Normality (Complete Samples)," Blometrlka. Vol. 52, pp. 591-611.
5. Wllcoxon, F,, 1945, "Individual Comparisons by Ranking Methods," Biometrics. Vol. 1, pp. 80-63.
mAtiONimo * t** fnooahutt or ruin* to outer
PCI CONTAMINATION AMO IAMPUM IFFOAT
m mm Mt ****** wp tc
6-40
t rftfMNcr nitjnbution of imialc ftftvirt
HONS 02025 7
PART 7; PCDF AND RELATED COMPOUNOS
HONS 020258
ANALYTICAL AND SAMPLING TECHNIQUES FOR THE DETERMINATION OF ULTRATRACE QUANTITIES OF POLYCHLORINATED DIBENZOFURANS AND DIBENZODIQXINS
t>y
Marcus Cook#, Joeseph A. Hatchel, Jean M. Czuczwa, nd Karen Degner Battalia Hemortil Institute 505 King Avarua Columbus, Ohio 43201
INTRODUCTION
Combustion of Askarel or polychlorinated biphenyl (PCB) containing matarlals can produca polychlorlnatad dlbenzofuran (PCOF) or polychlorlnatad dtbenzodtoxln (PCDO). Ratrofll transformar liquids (silicones) that contain 50 ppm (w/w) or lass PCB hava Tow convartlon ratios for production of PCOF/PCDO In flras. Tha combustion of PCB In ratrofll1 transformar liquids was studltd In modal fira experiments by Battalia and ratrofllllng was found to ba an afflclant way of ramovlng PCB and potantlal * furan" contamination from transformars In servlca (I),r Various tachnlquas to ramova PCB or raduca PCB Tavals In transformars balow tha fadarally ragulatad 50 ppm (w/w) limit hava baan Investigated. Ratrofllllng is a cost-effective alternative to replacanant, tspaclally in situations where transformar location makes removal difficult, or other situations where switch-out Is economically unattractive.
Tha U.5. Environmental Protection Agency (U.S. EPA) promulgated tha aF1ra Rule* to addrass tha risks posed by uncontrolled fires that Involve high levels of PCB, situations where PCDF (or PCDO) might ba formed In significant amounts (2). Exposure of PCB to a building fire can occur whan Askarel-containing transformers are present at the fire site. Recognitionof the risks posed by formation of PCDF/PCDO has promoted most utilities to remove PCB from active service by either replacing or ratrofllllng existing appliances.
To demonstrate the environmental safety of a recently designed facility for handling large amounts of PCB, a Toxic Substances Control Act (TSCA) demonstration test wit conducted In September 1966. This paper describes the sampling and analytical procedures that were used to measure PCOF/PCOO levels in the liquid process streams handled at the plant and gaseous emissions generated in the decontamination process.
FIELD FACILITY ANO SAMPLING
During September 1966, a demonstration test on a model PCB decontamination facility was conducted. This facility required TSCA compliance tests that ware approved and monitored by both state regulators and the U.S. EPA. A formal Work Plan and Quality Assurance Plan were submitted for approval before actual tasting was initiated in 1966.
The decontamination process Involves separation procedures that Isolate PCB from other liquid constituents. To meet the goals of tha TSCA permit application, liquid and gaseous plant streams were sampled and analyzed for PCDF/PCDD concentrations at several locations in the feed, recovery, and discharge streams. A schematic diagram of the main process streams sampled Is given In Figure 1.
7-1 MQNS 020259
Charcoal Bed
P=-*Vent !t]
t
Feed
Residue
Product
Figure 1. Schamatic Diagram of Procats Stratus Samplad.
Tha plant Is datlgnad so no PCB amissions will ba dlschargad outs Ida tha plant, total fugltlva organic amissions from tha plant will ba lass than 400 lb/yr, and no PCDF or PCDO omissions will occur from operations in tha plant. To o11minat gaseous omissions of PCB/PCDF/PCDO, tha final gas straan for tha plant is vented through carbon adsorbers. The plant Is designed to process large volumes of Askarel and Aroclor-contalnlng liquids. Tha analysis strategy for this study required highly selective analytical methods because tha organic compounds found in these samples can interfere with the determination of PCDO/PCDF.
SAMPLING
Both liquid process streams and vent gases were sampled during this program, a list of the measurement samples and quality control samples is given in Table 1
Liquid samples were collected through sampling valves built Into the transfer piping. Sample valves were well flushed at the time of collection, and liquid samples were stored at 4C In amber glass bottles fitted with Teflon-lined caps until analysis.
The gaseous emissions collected at the exit of the carbon vent system were found to be the most difficult matrix to sample. A schematic diagram of the gas vent sampling system Is shown In Figure 2. The gas samples were collected in resin cartridges containing 20 g of XAD-2. Samples were collected under positive pressure and sampling system data such as gas flow, gas meter Inlet and outlet temperature, system pressure, and XAD-2 column outlet temperature, were recorded for each run.
ANALYTICAL PROCEDURES
Liquid Samples ffead. Product, Residual
Liquid process samples were composited by mixing D.15 g each of the triplicate samples taken at equal time Intervals in the 6-hour tests. The composited liquid samples were stored In glass vials and were spiked with 5.0 ng of the internal standards listed In Table 2.
7-2 HQNS 020260
TABLE 1
SAMPLES AND QUALITY CONTROL SAMPLES COLLECTED DURING THE TSCA DEMONSTRATION STUDY
Samole
Moulds
Feed Stock 1
Food Stock 2
Product 1
Product 2 Retldua 1 Rtsfduo 2 Laboratory Blank
Laboratory Spika Sampla Gftaa
Vant 1 Vant 2 Laboratory Blank
Flaid Blank Spika Sampla
SamDl* Tvoe
Laballad Soikattl
Grab Grab Grab Grab Grab Grab
Solvant
Solvant
Yat Yas Yat Yat Yat Yat
No
Yat
XAD-2 XAD-2 XAD-2
XAD-2
Yat Yat No Yat
Native Spikes
Yat Yat Yet Yat Yet Yet
No
Yat
No No
No
No
HONS 020261 7-3
Flgurt 2. Gas Vant Sampling System.
TABLE 2 PCOF/PC0O LABELLEO INTERNAL STANDARDS*
2,3,7,B*Tatra-CDO*13ci2 l,2,3,7,B*Panta-CDO-l3Cl2 l,2,3.6,7,e-Hx-CDO-l3C12 l,2,3,4,6,7,B-H*pt-CDO-13c12 l,2,3,4,,7tB,9-Octl-CDO*l3C12
2,3,7,6-Tatra.CDF.l3Ci2 l,2,3,7,8-Panta.CDF.l3C12 l,2,3,*,7,8-Haxa*CDF-l3Ci2 l,2,3,4,6,7,8*H*pti*CDF-lJCj2 *CDC chlorlnttad dlbtnzo-p-dloxln; CDF chlorinated dlbtnzofuran.
Tha samples war* diluted with hexane and analyzed using a high rasolutlon gas chromatograph couplad to a high rasolutlon mass spactronatar (HRGC/HRMS). A laboratory blank, 5 mL of haxana, was analyzad using tha sama Intarnal standards llstad In Tabla 2, and 10 natlva PCDF/PCDF compounds ara llstad In Tabla 3, Tha purposo of adding natlva standards to tha laboratory blank was to damonstrata method rtcovarlas In a cl tan matrix.
7-4 HONS 020262
TABLE 3 NATIVE PCDF/PCDD STANDARDS*
2,3,7,8*T#tra*CDD 1,2,3,7.8-P*nta-CDD 1,2,3,4,7,8*Hexa-CDD 1.2,3.4,6,7,8-Hepta-CDD l,2.3,4,6,7,8,9*0cta-CD0
2,3,7,8-Tetra-CDF 1,2,3,7,8-Penta-CDF ),2,3,4,7,8-Hexa-CDF 1,2,3,4,6,7,8*Hepta*CDF 1.2,3,4,6,7,8,9-Octi-CDF
*CDO chlorinated dlbenzo-p-dloxln; CDF - chlorinated dlbenzofuran.
Vent Gas Samples
*
Th* two XA0*2 resin samples collected for PCOO/PCDF analysis and two XAD-Z field blanks wort oxtractod with bonzono using a Soxhltt apparatus. Tht samples were splktd In th* Soxhltt extratlon thimble with 2.0 ng of *ach of tho Internal standards llstod In Tabl* 1.
Sami* Preparation
Th* dlluttd process liquid samples and th* *xtract*d v*nt gas samples w*r* prepared
for analysis by fractionation through multilayer chromatography columns. Two sorbent media, silica gel and alumina, war* used to Isolate the PCDF/PWO from
interfering species. The silica gel columns contained alternating silica gel layers of differing pH: NaOH treated, neutral, and H2SD4 treated. Final eluates were spiked with the Internal staiuUrd for recovery and quantification, 2,3,7,Btetrachlorlnated dlDtnzo-p-dloxIn l37Cl4].
Samolas Analyses
The sample extracts were analyzed for PCDD and PCDF by HftGC/HRHS. A Carlo Erba Model 4160 gas chromatograph Interfaced to a VG Model 7070 high resolution mass spectrometer (HUMS) was used for these analyses. The mass spectrometer was operated In the Multiple Ion Node (MID) to increase sensitivity, and a 50-K CP Sll-
SS fused .silica capillary chromatographic column was used to achieve compound
separation.
Th* following criteria wore used for positive identification:
(1) Correct retention time ( Z seconds) relative to an authentic, synthetic standard (If available), or within th* time window defined by the analysis of mixed CD0/C0F standards,
(2) Simultaneous response at two principal Ion masses,
(3) Chlorine isotopic ratio within 10 percent of the theoretical value.
PCDF/PCDD quantification was based on relative HRMS response ratios of th* native analytes and three reference internal standards.
7-S HQNS 020263
RESULTS
Proetss Liquids
Tht process liquid samples were found to have traces (low ppb) of PCDF In tho feed
stocks and no measurable PCDO/PCDF In the product liquids.
This result
demonstrated the efficiency of the decontamination plant to separate any low level
PCDD/PCDF contamination from the feed stocks without causing contamination of the
product liquids. Table 4 shows results of the duplicate, composited field samples of feed, product and residues collected during plant operation. In Tables 3 and a
the numbers in parenthesis are the estimated detection limits for each analyte or congener class, 8y Including detection limits the method sensitivity for each
measurement can be estimated. When the estimated detection limits are exceeded for any measurement, the actual values are given In the tables of data.
TABLE 4
RESULTS OF PCDD/PCDF ANALYSES OF PROCESS LIQUID SAMPLES lng/g).*>
SiMElfi Feed 1
Feed 2
2,3.7,8-
Tetra* Tetra-
--CM-- -Q_
19 38
11 45
Penta-
CDF 21
26
Hexa-
140 25
Hepta-
CDF
530
25
Octa_fl
97
33
Product 1 Product 2 Residue 1 Residue 2
(0.14)
(0.10) 120
87
(0.14)
(0.10)
590 190
(0.035) (0.08) 350 490
(0.17) (0.51)
(0.20) (0.24)
400 520
240 ,.c
(0.098)
(0.22)
880 ..c
Laboratory
Blank
(0.12)
(0.12)
(0.20)
(0.026) (0.046) (0.094)
*CDO - chlorinated dlbenzo-p-dloxtn; CDF * chlorinated dlbenzofuran.
^Numbers In parentheses are estimated detection limits for the analyte or congener class.
cNot measured.
Vint fin Sirolti
No measureable PCDF were found in any of the vent gas samples. Residual hepta- and octaehlorlnated dlbenzo-p-dloxlns were found at near ambient concentrations, however, field blanks showed equivalent levels Indicating that these measured levels were due to contamination in tho field operations, shipping, or laboratory operations. The results of vent gas analyses for PCDD are given In Table 5. which snows the analytical sensitivity obtainable by the methods employed In this study.
HONS 020264 7-6
Quality control
t 'in the analytes conducted for this program, a large number of laboratory blank*,
field blank*, end spiked reference (ample* were analyzed to demonttrate freedom from contamination and method performance. A* mentioned In the prevlout section, trace* of hepta- and octachlorlnated dlbenzo-p-dloxln were found In the vent gas field blank*. Thl* Quality control check averted reporting a false positive analysi* for PCDD In the discharge vent gat. Table 6 give* recoveries of labelled ],2,3,4-TCD0-`3Cj2 tplked into the XAD-2 resin trap* used for vent gat sampling. The** spikes were administered to the XAO-2 trap* before shipment to the test site. If a low recovery were found In these spiked samples, losses during sampling (e.a.. sample breakthrough}, handling, or sample workup would have been suspected. The true recoveries were all above 94 percent.
TABLE S
RESULTS OF PCDO ANALYSES OF VENT GAS SAMPLES*
Sample Run 1
Units
2,3,7,8Tetra-
CDS--
Tetram
PentaQQ
pg/ft3 (0.14) (0.14) (0.22)
Hexam
Hepta- Octa-
(0.15) 1.0
2.6
Run 2
pg/ft3 (0.026) (0.028) (0.055) (0.050) 0.38 0.73
Field 81ank 1
ng (0.007) (0.007) (0.009) (0.006) 0.04S 0.1
Field Blank 2
ng (0.006) (0.006) (0.006) (0.005) (0.010) 0.067
Laboratory
Blank
ng
(0.012) (0.012) (0.016) (0.016) 0.092 (0.10)
*COO - chlorinated dlbenzo-p-dtoxln; CDF chlorinated dfbenzofuran.
bNumbers In parentheses are estimated detection limits for analytes.
TABLE 6
RECOVERIES OF 1,2,3,4-TETRACHLOftINATEO DIBENZO-p*D10XlN-13Ci2 SPIKED INTO THE XAO-2 RESIN TRAPS USfO IN THIS STUDY.
Samele Run 1 Run 2 Field Blank 1 Field Blank 2
Amount Sp1ked
(no)
3.75
3.7S
1.25
1.25
Amount Found
(no)
3.73
3. S3
1.26
1.25 7-7
Recovery (X)
99.S 94.1 101 100
HONS 02026 5
CONCLUSIONS
The results of this program demonstrated the sensitivity and rellablity of ultra trice sampling ind milytls methods to determine PCDF/PCDO concentrations In th liquid process streams ind gaseous discharges from a demonstration pcb decontamination facility.
In addition to proving the validity of the measurement techniques, the plant was found to operate efficiently to remove any rtsldual PCDF/PCDO from process feed stocks, rendering a 'clean* product. No PCOO or PtDF compounds could be found in any of the product samples, even at the ultra-trace concentrations measured by the HUMS technique. Also, no PCDF or PCDD vent discharges were measured above the blank levels found In XAD-2 cartridges used to collect vent gases.
The plant met the design criteria for PCDF and PCDD removal and was further found to net the environmental goals established by local and national regulators.
REFERENCES
-
1. Cooke, W.M., DeRoos, F.L., Rising, 8., and Martin, W.M, Safety of N&i-PCB
Reclassified Transformers In Fire Incidents: A Building Scale Engineering Study. Proceedings: 1885 EPRI PCB Seminar. EPR1 CS/EA/EL-4480. March 1986, pp.7-11 to 7-19.
2. federal Register, ifl (137), July 17, 1985, pp. 29170-29201, 'Part 40 CFR, Part
HONS 7-8
HONS 02026?
PYROLYSIS MID COMIUSTION Of PCI AMD TCI AS CONTAMINANTS IN TRANSFORMER FLUIDS
C. tadon, R. Nareng, A. Narang and K, Swaml Wadaworth Cantar for Laboratorlaa and Raaaareh
Naw York. Stata Dapartaant of ttaaith Albany, NY 12201
ABSTRACT
Numaroua laboratory aiauiatlona and raal world avanta hava daaonatratad tha thermal eonvtralon of naat or high concentration PCBa into tha much nor* toxic PCDFa| tha eonvereion of coneantratad trl and tatraehlorlneted banaanaa (TCIa) into PCDDa and PCDFa la elmllarly wall aatabllehed, However, aa PCI and Aakarelfill ad traoafomra ora removed from aarvlea, tha thermal bahavior of tranaforaar fluida eontalning PCBa and/or TCBa at 30-5000 ppm baeonaa of lneraaalng internet. . Thia papar daaerlbaa tha pyrolyeie (by haatlng in an opan tuba at SS0C) and " ' combuation (by injection into a natural gaa fualad flame) of dlluta Aroelor 1231 and TCI aolutlona in ainaral oil, ailieona oil and tatrachloroathylana (TCI), and moaeuramant of tha raaultlng ylalda of PCDD and PCDF, In all asparlmente, dilu tion of PCI or TCI dreatleelly dacraaaad tha aaaa of PCDF formed par graa of mixture, Alternatively, tha ylalda axpraaaad at aaaa of PCDF or PCDD par graa of chlorinated pracuraor exhibited modeat but lntaraating veriatione with eoneantration providing aoaa meehenietlc inolght Into tha formative and daatruetlva procaaaat undarway.
INTRODUCTION
Abundant laboratory data and eataatrophie raal world avanta daaonatrata that coneantratad PCBa aubjaetad to high tasparaturaa can form alovatad concantratIona of PCDFa and that coneantratad tri and tatrachlorobanaanaa (TCIa) can, undar tinllar condition!, fora bath PCDDa and PCDFa, ttowtvtr, tha bahavior of aolutlona containing low eoncantrationa (laaa than 3000 ppa) of PCI or TCI ia laaa ttudltd and of aoaa practical interact. For example, an aatinatod 2,000,000 ainaral oil tranafomaro hava inadvertantly bacoaa eontaalnatad with PCIa at 30 ppa or higher and 200,000 auch traneforatra hava bacoaa eontaalnatad above 500 ppa, Furtharaore, tha ratrofilllng procaoa producea aubatantlal volunaa of waota dielectric fluid containing low PCI/TCB eoncantrationa, Since tha facility of PCDF/PCDD formation in ouch dilute aolutlona could ba a algnlfleant factor in evaluating the haterde aeoociatad with operating eontaalnatad or ratroflllad tranaforaara, In aaaoaolrgc tha viability of tha ratrofilllng procaaa and in government regulation, EPRI aponaorad a atudy in thia laboratory to aeaaae tha ability of 3000-30 ppa Aroelor 1234, ]24-trlehlorobantena and 1234-tatrachlorobontana in ainaral oil, alllcona oil and tatrachloroathylana (TCE) to fora auch coapounda.
METHODS
At tha outeat, it waa recognltad that no finite aat of laboratory axparlnante could aiaulata tha full range of rail-world thermal avanta, Conaaquantly, two thermal regiment were aalactad to ba different from one another end dlttlnct from
7-9 020266 HONS
the aoat widely uead literature methodologlae. Pyrolyaia vat conducted In vertically-mounted glee# tubee (SO X 0-4 ca l.d>) eealad at thalr lover and and mounted In a themoataticelly controllad furnace. Conbuation vat eccoapllahed by eyrlnga-drlve Injection of the eubject fixture Into a natural gee (lent, paeetge of the conbuation producta through e three tone thernoetetlcelly controlled furnace end into a collection device.
Each eaquanca of experlnenta proceeded in two etagae. riret, preliminary expen se nte vara performed on relatively concentrated aolutlona (ueually 5000 ppn) to develop condltlone capable of producing maximum PCDD/PCDF yield#. then, rune ware performed with laaa concentrated aolutlona (ueually 300 and 50 ppm) under identi cal condltlone.
RESULTS AND DISCUSSION
The raault of graataat practical lntaraat la the obaarvatlon that for both pyrolyala and coabuatlon, for all three aolvanta, and for Arodor 123b. trlchlorobantane and tatrachlorobancana dilution aharply dacraeaaa the aaaa of PCDFa formed par gran of Mixture. Tlalda from the pyrolyaia of Arodor 125b in mineral oil and , elllcone oil, axpraaaad now aa aaaa PCDF formed/aaaa of chloroeroaatic conaiaad, * trended alightly upward In the 3000-30 ppm range. Thia raault euggaat that a procaaa blmolacular In PCS and probably Involving one or more eolvant molecule# ' may be cone wing PCS and PCDF. Formation of PCDF could not ba damonatratad in pyrolyaad 3000-50 ppm aolutlona of Arodor 125b In TCE; acenning GC/MS axparlmanta damonatratad fadla reaction between biphanyle and TCI to add C.Cl. group#. Pyrolyaia of neat TCBa forma aubatantial ylelda of PCDFa and PCDDo; however, reaction of 3000 ppn aolutlona of varloue TCIa In mineral oil, elllcone oil and TCE ware not productive. Thla raault euggeate that the rata limiting and yield limiting etap in PCDF/PCDO formation ia hinatically eecond order in TCI.
Conbuation of 5000 ppm aolutlona of Aroclor 123b In mineral oil, allicona oil and TCE ganaratad aubatantial ylalde of PCDF. leeulte obtained on 300 and 50 ppm aolutlona ware conalatant with the hypo thee le that ylelda (maee PCDF fomad/maae PCS combuatad) vara unaffected by dilution In 5000-50 ppm ranga.
Conbuation of 5000 ppm aolutlona TCB in mineral oil, haxana or allicona oil either did not produce detectable PCDF or produced PCDF that waa detectable only through heroic maaauraa. Ihie ia probably a further manlfaacatlon of the feet that PCDF formation from TCIa la proceeding through a rata and yield limiting etap that le eecond order In TCI. The yield of PCDF from 5000 ppm aolutlona of TCB ia TCE, though etill low, waa at laeet an order of magnitude higher. Thie raault may Indicate the exlptencm of a pathway of PCDF that la not kinatically eecond order in TCI. For example, TCB nay lnatead react eequentlally with three moleculee of TCB and oxygen to form PCDF. TCB ltoolf forme varloua PCDFa when combuated. although at much lower concefttratlona chan whan 3000 ppn TCB le preeant.
7-10
,,QNS 0*0*>9
Ultra Sanaltlva Bloaaasy for Dioxin
Mohan) T. Sohuman and Xsnneth V, Buntar Vsstlnghouss Blo-Analytlo Systsss Co.
20^6 Caltbar Bond, Rookvllls, Maryland 20850
ABSTRACT
2,3i7,8-tatraehlorodlban*e-p-dloxln (TCDD) haa boon shorn to lnduoa ethoxyrssorufln*0*dssthylats (EROD) aotivlty or othor blologioal responses in a number of oall oulturas. Using a new oall llna, VBAS 86-163B, an ultra sanaltlva bloaaasy for tha dataotlon of TCDD and ralatad ooapounds has baan devised. Tba targat oalla oan dataot TCDD conoantratlons as low as 2 Z 10""m, wbloh is st laast 1.5 logs aiora sanaltlva than othar bloassay systaas. with tha VBAS oall llna, an InduoUon rasponsa oan ba obtalnsd eftmr traataant of tha targat oalls for only 18-2A hours, four to 10 days lass than required by other bloasaaya. Thaaa oalls havs baan usad suoooafully to dataot TCDD In soil and water saaplas.
Several dlbenzo*p-dioxlns, ohlorlnatad phanols and polyohlorlnatad blphanyls vara tastad for thalr abllitlas to lnduoa IROD In tba targat oalls. TCDD was at laast savarsl thousand fold aora potant In allloltlng a rasponsa than vara tha othar ohaaloala. TCDD was 8 tlaas aora aotlva as an EROD lnduoar than tha naxt most sffsotlvs ohaaloal, 2,3,7,8-tatraohlorodlbantofuran.
UtTRODOCTICi
2,3,7,8-tatraehlorodlben*o-p-dloxln (TCDD) oontaalnatlon In tba anvlronaaot has baooaa an major public haalth lsaua. TCDD and and ralatad ooapounds suob sa polyohlorlnatad dlbantofurans ara produced as byproducts of tha aanufaotur* of Industrial organlo ooapounds (eg. 2,A,5-T) and also as tha result of several ooabustlon prooaduraa (1*3). TCDD Is an extreaaly stable ooapound vhloh has besn shown to oausa liver sod kidney daaaga, chloraona, autaganasls of baotarlal and aaaaallan oalls as wall as laaunosuppraaslon in alee (l,*-7). Thus, rapid and reproducible assays ara needed to aaat regulatory requlreaents for tha dstaotlon of TCDD.
Several bloaaasya for tha dataotlon of TCDD have baan desorlbed, Including iji_ vltro systaas based upon Inhibition of oall division, altered oellular morphology and enhanced differentiation of spaolflo oall types, as wall as Induotlon of enyaea In vivo and In vitro (2, 8*10). In this paper vs dasorlba a dataotlon method for TCDD which Is quicker and aora sanaltlva than othar bloasaaya. Tha assay has a dynaslo range of 0.060 pg/al to 1.0 pg/al and has baan used to dataot TCDD in vtier saaplas, sedlaent froa watar saaplaa, and banaana extraots of soil saaplea.
METHODS
Tarxot Callst VBAS oall oultura 86-16SB (patent pending) was used In all txperiaants. Tba parent oall llna was dsrlvsd from sous# llvsr oslls. Aftsr sutsgenssis and olonlng, oalls wars isolated baaed upon the lnduoibillty of tha emyne ethoiy raaorufln-O-daatbylaaa (EBQD) by TCDD. Tba oalls vara grown In Vllllsms Hedius t (VME) with 105 fetal bovine aarus (FBS), 2 sM l-glutaalne and 10 sM Rapaa buf.'er (pH 7.*).
7-11
HONS 020270
Chsaiosls and Staple Preparation! TCDD was obtained froa the Rational Bureau of
Standarda (Gaithersburg, HP) or Caabrldge laotopa Laboratories (CIL} Woburn, ha)
Other dlbenBO-p-dloxins, chlorinated phanola and polyohlorlnatad biphenyls war
purohasad froa Chaa services (Vest Cheater, PA) or ware aynthaalaad at W'bas*
2,3,7,8-tetreohlorodlbentofuran (TCDBF) was obtained froa CIL.
'
Aaaar: VBAS 86-163B ealla ware planted into 35 aa tleeue eulture dlehea 2o_j* hours before traataent. The aedlua wae then reaoved froa the oelle and they ware
refed with 3 al VUE aa daeorlbed above, exoept that the PBS oonoentratlon u raduoed to If (if VME). For ooaparlaon of lnduotlon of EBOD, the oelle ware
treated with atook aolutlona of dibenao-p-dloxin and 12 aeleotad ohlorlnatad ooa. pounda prepared In DMSO. Duplicate walla were treated with 10 ul of aaapla and an additional 10 ul of DM30, resulting In a final DMSO oonoentratlon of 0.67f. * atandard ourva waa fanerated by treatlnc duplloete walla with appropriate oonoantratlone of TCDD to yield final doaea of 1, 0.5, 0.25, 0.125, 0.0625 and 0.0 Pf/ai, all In a final oonoentratlon of 0.6Tf DMSO.
RESULTS
Parforntnoa of the Assay! In a typloal bloaaaay a atandard ourva, senerated fro*; the lnduotlon of EBOD by known aaounta of TCDD, la uaed to quantitate dioxin if teat aaaplea. Eaoh atandard point la the averase of two to throe replloatea. The r2 valuea are generally above 0.950. To deaonatrate the reproducibility of the ayatea, raaulta froa eevan aeaaya wera noraallsed with reapeot to the luaineaoenee reaponae of the 1.0 pg/al TCDD oontrol aaapla, aettlng this value to 1005 (Table 1). ill other valuea were deterained by dividing the lualneeoenoe at eaoh doae by the luaineaoanaa at 1.0. (eg. if the luaineaoanoe at 1.0 pg/al waa *00 and at 0.25 pg/al waa 130, the relative reaponae at 0.25 pg/al was 0.325). The r2 of the data la 0.M9; the aidpoint of the ourva la approxlaately 0.5 pg/al (approxlaately 1.6 X 10"*`M). Xnolualon of valuas for 2.0 pg/al (vhloh la outalde the dynaalo range of the ayatea) lowera the r2 to approxlaately 0.900. However, if the 2.0 pg/al point la Included, t-paraaeter logietio analyais oan he ueed and an r2 of 0.990 oan be obtained (not ohown). Oenerolly, tbe loweat oonoentratlon of TCDD uaed ae a atandard la 0.0625 pg/al. However, in .pro11 Binary etudlea the lnolualon of 0.03125 pg/al does not adversely effeot tbe r* of the standard ourva. TMa look of effaot on the r2 indleates that the 0.03125 pg/al atandard le within the dynaalo range of the curve, it present, 0.0625 pg/al (epproxlaotaly 5 X 10*13K) la uaed aa the Halt of deteotion. Saaplea felling below that level are rateated at higher oonoentratlona.
Coaotrlaon of Induoarai Thirteen ooapounda have been tested for their abilities to induoe EBOD in target oelle (Table 2). Tbe oonoentratlon of eaoh ohealoal needed to Induoe an EBOD reaponae la ooa pared to the aaount of TCDD needed to Induoe a alallar response (Table 2). For axaaple, 20,000 pg/al of 2,8,5-trloblorophanol (2,1,5-TC?) Induoea a response equivalent to that Jnduoed hy 0.063 Pf/al of TCDD. By this aethod, TCDD la outlasted to be 3<2 X 10s aore potent (20,000/0.63) than 2,4,5-TCP aa an induoar of EBOD In tbe VBAS target oelle. Table 1 shows that none of the dlbenao-p-dloxlno, polyohlorlnatad biphenyls or ohlorlnatad phenola are nearly aa effeotlve aa TCDD In provoking a reaponae In the target oello. Only XCDBF la within a log of TCDD in Its ability to Induoe the entyae In tbe target
oells.
7-12
HONS 020271
'DiSCUSSIOi L C In thin papar wa daaorlba a rapid, aanaltlva and raproduolbla bloaaaay for tha auantlfloation of TCDD and othar MOD ioducara In anvlronaantal aaaplaa, tha tarfat oall*, VBAS 86-163B waa aalaotad for lta hypar lnduolblllty by TCDD. Lika othar oall oultura-baaad aaaaya for TCDD (2,10,11), ralatad ooapounda alao laduoa a raaponaa in tha targat oalla. Exoapt for TCDD, TCDBP waa tha aoat potant lnduoar
of MOD in tha VBAS oalla. Approxlaataly an 8-fold lnoraaaa In TCDBF, ooaparad to TCDD, waa raqulrad to obtain tha aaaa raaponaa. Thla la alallar to tha data raportad by Olarthy and Crana (2) ualng tha *flat oall aaaay" (TCI) and by Safa (10) ualng H8IIE oalla. Bowavar, tha aanaltlvlty of tha VBAS tarfat oalla la graatar than raportad for othar avataaa. Tha aldpolnt of tha dynaalo ranga for our oall* la approxlaataly 1.6 X 10*1ZH, aa ooaparad to 1.9 X 10*:oM raportad by Safa
(10). Tha 11 alt of dataotlon In tha FCA la lO^'M; with tha VBAS oalla It la balow 2,0 X 10*1*K. Anothar advantaga of tha VBAS bloaaaay la tha rapid turnovar rata, tha bloaaaay data praaantad hara ara for 20-28 hour axpoauraa, or 3 to 11 daya laaa
than for othar vitro bloaaaaya. Tha bloaaaay, whlla not *bla to dlatlngulah batwaan alallar laoaara, provldaa
aany advantaga* not avallabla In traditional aathoda of analyala. In gaaaral, tha aaay doaa not raqulr* highly aklllad paraonnal or ooaplax aqulpaant. Tha aaaay la Inaxpanalva and rapid, allowing raplloat* taatlng of aaaplaa at aultlpia dilution*, Although laoaar apaolflolty la not provldad by tha bloaaaay la a alngla taat, tha praaanoa or abaanoa of toxlo ohaaioala whloh lnduoa MOD, oan ba dataralaad and axpraaaad aa *TCDD aquivalanta*. Slnoa aoat of thoaa ooapounda ara toxlo obaaloala, tha data obtalnad fro* bloaaaaya oan ba uaad to aatabllah prlorltlaa in toxlo
ohaaloal daoontaalnatlon prograaa within lnduatry and govarnaaot.
Tabla 1
Cuaulatlva Bloaaaay Raaponaa to 2,3,7tt TCDD
TCDD (pg/al)
Balatlv* f Lualnaaoano**
1.0
0.5 0.25 0.125 0.0625 0.0
100.0
89.6 22.2
9.5 8.3 0.0
1.0 pg/al raault. Valuaa rapraaant tha avaraga of aavaa aaaaya, Avaraga lualnaaoanoa at 1.0 pg/al waa *18.7.
r*0.999 y-int*rc*pta2.l8 alop*a102.0
7-13
MOKS QZQZlZ
Table 2
Induotlon of EBOD In tfBAS Targat Call* by Chlorinated Coapounde
Taat Chealoal
Znduolng Doaa (pg/al)
Equivalent
Belatlve
TCDD Dcaa {pg/al ) TCDD Effaotb
Dibanto-p-dioxip (DD)
*0,000
7-C1-DD
*0,000
2,7-dlOhloro-DD
90,000
1,9,3,9-tetraohloro-DD 20,000
1,2,3,9,7,6-haxaobloro-DD 9,000
0.20
0.32 0.20 2.00
1.00
2.0 X 105
1.3 x 105 2.0 X 1C5 1.0 X io"
4.0 X 103
Pantaehloropbanol 2,9,5 trlohloropbonol 2,9 dioblorophanol
90,000 20,000 20,000
0.25 0.063 0.063
1.6 X 105 3.2 x 10J
3-2 1 10s
i,a',i,i,'(,6' Poly-
oblorlnatad blphanyltPCB) 90,000
2,3.3',9,9'5 PC*
10,000
2,2*,9,5,6* PCB
90,000
2,2',9,5,5* PC*
90,000
2,3,7,6-tatraohlorodibanxofuraa
6
0,125 2.00 0.125 0.125
1,00
3.2 X 10 5.0 X 103 3-2 X 105 3.2 X 105
6
Doaa of TCDD required to give IBOD reaponae equivalent to that of the taat obaaloal
b Doaa of tha tost obaaloal divided by tba doaa of TCDD required to glva aa equivalent EBOD reaponae.
Kznxncu
1. Flndaill, B.D., D.L. Couob and B.S. Splera. J. *nv. Fatb. Tax. 9:901-925, I960.
2. Qlerthy, J.F. and D. Craaa. Fuad. Appl. Tox. 5: T59-759, 1965.
3. Safa, 5., at al. Chroaoapbara ibi675-663, 1995. 9. QLri, A.f. Mut. Baa. 169:211-2*6, 1966. 5. Zaek, J.A, aad B.B. Suakind. J. Oooup. Had. 221 11-22,
I960. 6. Cook, B.B. Laaoet Ii6i9-6l9, 1961. 7. Pitot, B.C., at al. Cano. Baa. *0:3616-3620, I960. 9. Oaboraa, B. and V.r. Oraanlaa. Tox. Appl. Pbara. 77:139.
*93, 1995. 9. Hudaon, L.O., at al. Bloob. Biopby. Baa. Coaa. 115: 611
617, 1963. 10. Safa, S. Ann. Bax. Fbara. Tox. 26: 371-399, 1986. 11. Sawyar, T. and S. Safa. Tox. Lot. 13: 87-99, 1982.
7-14
*ONS 02QZ73
BACKGROUND CONCENTRATIONS OF POLYCHLORINATED BIPHENYLS, POLYCHLORINATED DIBENZO-P-DIOXIVS. AND
POLYCHLORINATED DIBENZOrURANS IV OFFICE BUILDINGS IN SANTA FE, NEW MEXICO
John R. Komirvsky Nsttonol Instttuto for Occupational safety and Health
Cincinnati. Ohio
Warren T. Slade Environmental Improvement Division, state of New Mexico
Santa Fe, New Mexico
Robert Moorlnt Environmental tn|lneerln| Division, SOS International
South Ban Francisco, California
ABSTRACT
On June II, 1BBS, a SOD KVA transformer located In the lew Mexico State Highway Department General Office Building overheated and vented a vaporous-liquid aerosol containing polychlorinated biphenyls (PCBs), polychlorinated dlbento-p-dioxlne (PCDDs), and polychlorinated dlbensofurana (PCDFs). A study wea conducted to determine how the reoeeupancy criteria established for the building compared to normal concentrations of background contamination that exist in other similar buildings in Santa Fe. Three office buildings were tested for air end surface concentrations of PCBs, and PCDDs and PCDFs (tetre- through octa-chlorlneted homologa and the respective 2,3,7,8-tetra isomers). Measurable air and surface concentrations of these contaminants were present in the buildings with all sables showing concentrations below the reoeeupancy criteria, A statistically significant correlation between the concentrations of pcbs and PCDDs, PCDFs, or 2,3,7,B-tetrachlorodibenao-p-dloxln equivalents in air and on surfaces was not demonstrated Cp >0,10), The similarities of the PCDD and PCDF homolog profiles of the building air and ambient air suggest a cosmon source: atmospheric transport of combustion particulates. The data represent a baseline for these contaminants presant in office buildings in Santa Fe, but may be indicative of those concentrations present in eimllar buildings in other geographical areas.
INTRODUCTION
Cm June 17, 19*5, an electrical malfunction occurred in a 500 KVA power transformer located In the basement of the Mew Mexico stats Hlghwsy Department (WHSHD) General Office Building in Santa Fa, New Mexico (1). The transformer overheated and vented a vaporous-liquid ssrosol containing polychlorinated biphenyls (PCBs) and pyrolysis products ineluding polychlorinated dibensofurans (PCDFa) and, to a leaser extant polychlorinated dlbento-p-dloxlne (PCDDs) throughout the building. The building was decontaminated according to reoeeupancy criteria devaloped by the Governor's Expert Advisory Ponol.
7-15 MONS QZQZlh
I
The rooccupency criteria established by the Advlaory Panel on the VMSHD building were baaed on the maxlaum eoneentratlona of PCDDa, PCDra, and PCBi that would not reault In al|nlfleant human health risk If a person were exposed to these levels for a working lifetime of 30 year*. The potential toxicity of the PCDD and PCDr mixtures were saseaaad baaed upon the calculated concentration of 2,1,7.t-tetrechlorodlbenxo-p-dloxln equivalents (TCDD equivalents). The procedure, flret propoeed by the Hew York state Department of Health (21, remits oe leulet ion of the amount of 2,3,7,g-TCDD that would have to be preeont to exhibit the same toxicity ee the measured quantltlee of eaeh of tba various PCDDa and PCDFe that are present, and the sumatlon of these calculated amounts of 2,3,7,a~TCDD equivalents la an estimate of the total TCDD equivalent toxlelty of the mixture. The air and surface criteria for total concentrations of TCDD equivalents are 2 pg/m2 and 1 ng/m2, respectively (3). These criteria assume a 10** Increased eancer riek for a parson spending a working lifetime of 30 years In the building. The air and urfaee criteria for PCIe are 0.3 ug/m2 and 50 ug/m2, respectively (a). The criteria take Into account tha usual presence of background levels of Pegs In elr (3) end on surfaces (*), and were Intended to guide the cleanup of the building within a safe margin of this background level.
This paper presents the results of a study conducted to determine how those reecoupenoy criteria compare to normal concentrations of background contamination that exist in similar buildings In Santa Pe, IH.
STUDY DUIOV AMD MKHDOS
The buildings selected for testing were similar to the VMSHD building in both architectural design and age (constructed prior to 1S70); and had no history of experiencing an electrical transformer fire or failure. Three commercial office buildings ware tested for air end surface concentrations of FCie, ee well ee PCDDa and PCDfa (tetra- through octa-chlorlnated homologa end the 2,3,7,t-totre laomera). The buildings were tested with the KVAC ayatem operating under normal occupancy conditions. The freah-eir intake plenums were sampled to determine the concentration of theea centaminanto in the ambient elr entering the buildings.
The surfaces tested for both PCba, PCDDa, and PCDfa wart limited to high ekin centeet surfocas, High akin aontect surfseas art these which ere ropeotodly contorted, often far relatively long periods of time, by the building oceupanta. In thla atudy, these eurfecea wars llmittd to inoluda daaks, tablaa and countars. Tha interior eurfecoe of the froeh-alr intake plenums were tested for PCbst these surfaces were limited to the fleer end fees of the sir intake louvers.
Air temmlina Methods for PChs. PCODo. and PCDfa
Tha air aamp1st for PCie ware collected using a twe-ataga sampling devlea (4 7-mm, 0.3 is binderleaa glsae flbsr filter proceeded by a glaae tube containing two C00*mg sectlone of Florlall adsorbent). The eaaploe wars
7-16
HONS 020276
collected for approximately 50-hour period at flow rat* of l.o L/ain to achieve an air volume of approximately 3 m3. The aaaplaa vara extracted and analptad ualni capillary coluan |aa chromatography/electron capture datactIon (7).
Tha air aaaplaa for PCDDa and PCDPa vara col lactad using a two-stage aaaplim davlea developed by tha Sew York State Health Department (a). The flrat ateie la a 47-na diameter, 0.3 um pore alia blndarlaaa glass fiber filter. The aacond ata|e la a cartridge of ana of alllea sal adaorbent which la aplkad with 2.5 n| each of laballad 2,3.7.1-TCDD and l.S^.g-TCDP before aampllnf. Tha aaaplaa wara collected for approximately a 50-hour period at a flow rata of 20 L/mln to achieve an air voluaa of approximately (0 a3. Tha eagles wara extracted and analycad uelns coupled high reaolutlon |aa chromatography-high reaolutlon aaoe apoctroaatry (9>.
Surface S-yllng
*"r *= PCDDa. and PCDPa
Tha aurface wipe aaaplaa ware collected uelns 3" a 3" eoxhlet axtraetad cotton sauce pada watted with a-ml of paatlclda grade hexane. The sampling procedure
conslatad of marking off a aurface Into a 0.25 m2 area uelng a galvanised ' ataal template or a metal tape measure. Each 0.25 m2 area waa wiped, with a" gauxa pad held with a gloved-hand, In two directions; tha aacond direction waa performed at a 50* angle to the first direction. Tha gauss pad aaapla waa than plaaad in a glaaa aaapla container equipped with a Teflon-lined lid. Each PCDD and PCDP aaapla waa a composite of four 0.25 m2 aaaplaa for a total area of 1.0 a2, wheraea tha Pd aaaplaa consisted of a single aaapla from an area of 0.25 m2. The aaaplaa wara extracted and analysed according to tha proceduree prevlouely referenced.
SISULTS AMS DISCUSSION
AlrtMM cgatspiriUgm of fas, rcwi art ran
A total of 2d air aaaplaa ware collected for tha analyala of PCBa. Twenty-one of thoao aaaplaa wara collected In tha occupied apaaa of the buildings; and three aaaplaa ware collected In tha freah-elr Intake plenums. Pour of the 21 aaaplaa showed concentrations above tha detection limit (0.03 ug/m3); these four samples ranged from 0.10 to o.is ug/m3 (arithmetic mean o.ia ug/a3). The PCS was Identified as Aroclore 125* and 12(0. Tha ambient air samples did not show datactabls concentrations at the same detection limit.
A total of 13 air samples wara collected for totra- through octa-chlorlnated PCDD and PCDP homologa and tha respective 2,3,7,S-tatra Isomers, line aaaplaa ware collected In tha occupied workspace of the buildings (Tabla l)j and four samples wara collected In the freah-alr Intake plenums (Tabla 2). The concentrations of PCDD* In tha building air ranged froa 2.4 to 221 pg/m3 (arithmetic mean 9( pg/m3). The 2.3.7.S-TCDD Isomer waa not present above tha detection limit (0.09 to O.ef pg/a3) In any of tha aaaplaa. Tha corresponding concentrations of PCDPa ranged from non-dotocted (0.49 pg/a3)
7-17
HHOONNSS 020277
(
to 1(2 pg/a3 (arlthMtie Man 22 pg/a3). Tha 2.3.7,g-TCDP ItOMr wat prevent above tha dataetlon limit in two of tha nlna aaaplaa at a eoneantratlon of 1.0 pg/a3 In oaeh aaaple. Tha ea leu latad eoneantratlona of total TCDD aqulvalanta for tha building air aaaplaa ranged froa 0.15 to 1.5 pg/a3 (arlthaatlc Man 0.50 pg/a3), and that for tha aablant air aaaplaa rangad froa 0.01 to 0.21 pg/a3 (arlthMtlc Man 0.14 pg/a3).
Tha PCDD and PCDF homolog profllaa (tatra- through octa-CDOa and CDPa) for tha building air and aablant air aaaplaa ara praaantad In figure* 1 and 2, roapoetlvaly. Tha hapta- and oete-chlorlnatod hoaologa pradoalnatad In both of tha PCDD and PCDP profllaa. Tha alallarltlaa of tha hoaolog profllaa of tha building air and aablant air auggaat a conmon aourea: ataoapharle tranaport of eoabuatlon particulate* (10-11).
Tha nlna PCDD and PCDP aaaplaa war* collaetad at locatlona palrad to tha eollaetlon of PCI aaaplaa to dataralna tha axlatanee of a atatlatleal ralatlonahlp. Tha eoneantratlona of PCIa, PCDDa. PCDPa, and TCDD aqulvalanta wara log tranaforaad and uaad In linear ragraaalon anelyal*. Tha eorralatlon eoaffielenta (-0.54,-0.09, and 0.51, reapaetlvely) wara not atatlatlcally lgnlfleantly different froa caro (p >0.10) In any eaaa. Thua, a algnlfleant ralatlonahlp between airborne eoneantratlona of PCVa and eoneantratlona of PCga, PCDDa. PCDPa, or TCDD aqulvalanta waa not daaonatratad.
turfaea eoneantratlona of PCa. PCDDa. and PCDPa
A total of 45 aurfaea wipe aaaplaa wara eollaetad for the analyala of PCga. Thlrty-aaven of thaaa aaaplaa wara eollaetad on high akin contact aurfaeaa; and alx aaaplaa wara eollaetad froa aurfaeaa within tha fraeh-alr Intake plenum* of tha building*, Plftoan of tho 57 aaaplaa ahowad eoneantratlona abova tha dataetlon limit (1.0 ug/a2): thaaa 15 aaaplaa ranged froa 1.2 to 5.9 ug/a2 (arlthMtie Man > 2.5 ug/a2. Tho alx aaaplaa eollaetad within tha frtah-eir intake planuaa ranged froa non-deteeted (1.0 ug/a2) to 54 ug/a2 (arithmetic naan - 9.9 ug/a2); five of tha alx aaaplaa ahowad aonoentrotlon* above tha dataetlon limit. The PO waa identified a* Aroelor* 1242, 1254, and 1290.
A total of 12 aaaplaa war* eollaetad on high akin eontaet aurfaeaa and analysed for tatra- through oeta-ehlorlnatod PCDD and PCDP hoMloga and tha raapaetlva 2,5,7,1-tetra laoaar* (Table 5). Tha aurfaea eoneantratlona of PCDD* ranged froa 1.9 to 24 ng/a2 (arithmetic Man 9.5 ng/a2). Tha 2,l,7,g-TCDO iioaer waa not praaant abova tha dataetlon limit (0.02 ng/a3) In any of tha aaaplaa. The eoneantratlona of PCDPa ranged froa 0.55 to 4.5 ng/a2 (arlthaatlc Man - 1.4 ng/a2). Tha 2,5,7,8-laoMr waa praaant abova the dataetlon limit in all of tha eeaplee (rsnga O.02 to 0.74 ng/a2, arlthaotie aaan 0.29 ng/a2)) the field blank* did not ahow detectable eoneantratlona at a dataetlon limit of o.oi ng/a2. Tha calculated eoneantratlona of total TCDD aqulvalanta ranged froa 0.04 to 0.42 ng/a2 (arithmetic Man - 0.15 ng/a2).
Tha PCDD and PCDP hoaolog profile* (tatra- through oeta-chlorlnatad CDDa end CDPa) ara preaontad in Plgura 5. The PCDD profile ahows predominance of tha
7-18
HONS 020278
higher chlorinated homolog* with tha maximum concentration* rapraeantad by tha oet*-CDDa. Tha PCDD profile la almllar to that *hovn for both tha building and ambient plr aamplaa. It la alae almllar to that found in coamorelal grid* pantaehlorophanol (11-13); PCDDa ara manufacturlni contaminant* in ehlorinatad phanola (11). Tha PCDP homo lot proflla ihow* that tha tatra- throuth octa-CDF* ara mora avanly diatributad with tha maximum eoneantrationa rapraaantad by tha tatra-CDfa.
Tha 11 PCDD and PCDP aamplaa wara eollaetad at loeationa palrad to tha eollactlon of PCI aamplaa to dotarmln* tha axlatanea of a atatlatleal ralationahlp. Tha aurfaca eoneantrationa of PCBa, PCDDa, PCDPo, and TCDO equivalent* wara lot tranaformad and uaad In llnaar rograaaion analyaia. Tha correlation eoaffielanta (0.43. 0.31. and 0.41, raopactlvaly) wara not tatlatleally algnlfieantly different from sore (p >0.10) In any eaaa.
coiclusioiis
A atudy waa conducted to determine tha background eoneantrationa of PCBa, PCDDa, and PCDP* In air and on aurfaeea In three eomerelal office building* In Santa Pa, law Maxleo. Haaaurabla air and aurfaea eoneantrationa of thaaa eontamlnanta wara praaant in tha bulldlnie. Comparlaon of tha data to tha reoeeupaney eritarla davalopad by tha Oovamor'a Advloory Panel for the RH5HD Bulldlnt ahowa that tha eoneantrationa of PCBa. PCDD*, and PCDPa (converted to 1,3,1 ,t-TCDt> oquivalanta) praaant aa normal contamination In thaaa offlea bulldlnt* *ra below tha value* uaad ao tha reoeeupaney criteria.
Tha eoneantrationa of PCBa, PCDFa, and PCDDa maaaurad In thaaa bulldlnta may be Indicative of tha eoneantrationa praaant in almllar bulldlnt* In other teotrophleel arete.
The almlleritiee of tha PCDD and PCDP homolot profile* of the bulldlnt air and ambiant air auggaot a coanon aourea: atnoapherie tranaport of combustion pertleulatee.
ACKMOWLCDONUfTt
Tha author* wiah to thank Ha. Peehella Reynold* (law Maxleo Itata Highway Department) and Nr. William Iogar* (Aetna Caauallty and turaty Company) for coordinating tha adminlatrotlva offorte; Mr. Loul* Knaiptr (ITS of north America. Inc.), Mr. John Macur (formerly with Varaar, Inc.), and Mr. tarn Roger* (State of Maw Maxleo, Invlronmantal Improvement Division) for thalr field aooiatanea; and Mattella-Columbu* Laboratorlaa and Varaar, Xne. for completing tha ehemieel analyaaa of tha aamplaa.
RtPCRKNCU
1.Cantar* for Dlaaaaa Control. Polychlorinated Biphenyl Tranaformar Incident - Maw Mexico. MNUR 34 :557-SS, IMS
7-19
MONS 020279
I
2. 0. todon, K. Aldous. C. Frenkel et *1. Comparisons of__Chamie*l and Biological Data on Soot SwlH from the Binshamton iuu Office Building. Albany. BY: Center for Laboratories and Research. Haw York tata Department of Haalth. March 19*2.
3. Currant lntalll*anca Builatin Ho. 45 Polychlorinated Biphenyls (PCBt): potantial Haalth Hatarda from Ilaetrlcal Equipment Fire* or Failure*. Cincinnati: l).*. Department of Haalth and Human tarvlcaa. Public Health farvica, Cantart for Dlaaata Control, National Institute for Occupational Safaty and Haalth, 19Bt; DHH* (M10*H) publication no. **-111.
4. J.M. Maliua. Written coomunlcatlon to Tonay Anaya, Governor of tha Itata of Haw Haitico. rardln* cleanup lavala racommmndad by tha PCI Expert Advisory Panel. U.S. Department of Haalth and Human Bervlcet. Public Haalth Barvlca, Center* for Dlaaata Control, National Institute for Occupational Safety and Haalth, Division of Surveillance, Hatard Evaluations and Plaid Studies, Cincinnati, Ohio, October 2. 19*5,
5. X.E. MacLeod. Polychlorinated Blshenrl* in Indoor Air. Environ. Sci. Tech. 15(B): 92i-92S, 19*1.
t. J.B. Kaminsky, J.M. Nallus and J.P. Plasch. Asses*ini PCH Contamination asultlns from Electrical Eoulpmant Failures. Paper presented at tha American Industrial Hyslene Conference, Philadelphia, PA, May 22-2), 19*3.
7. Varsar, Inc. Analytical Report: Determination of PCBs in Surface Hip* and Air Samples, Santa Pa, Haw Mexico, Springfield, vlrtlnle. February 191*.
t. P.W. O'Kmafa, J.S. Ellkworth, J.P. Clarthy at ai. Chsmical and Blolotlcal Investigations of a Transformer Accident at Binghamton. HY. Environ. Haalth Perspect. *01201-209, 19*5.
9. P.L. DeBoos and S.C. wateon. Analytical Baport: Determination of Polyehlorinatad Dlbanso-p-Dloxlna end Polyehlorinatad Dlbontofurans in Surface Wipe and Air Samples, Sant* Pa, MM. Battalla-Columbus, Columbus. Ohio. January 19B*.
10. J.M. Csuecwm and B.A. Hites. Sources and fate of PCDF and PCDD. Chamoaphare Vol. 15 (9-12): 1417*1420, 19**,
11. H. Muehart and J. BalLschmitar. Polychlorinated Plbansofuran* (PCDP) and Dioxins (PCDD) aa Part of tha General Pollution In Environmental laralii of urban Sanaa. Chomospharo Yol. 15 (9*12) 1923-192*, 19S*.
12. Hatlonml Basaarch council of Canada, Polyehlorinatad Dibanso-p-Dioxina: Criteria for Their Effects on Man and His Environment, MRCC Ho. 1S574, 19B1.
13. Environmental Protection Service, Environment Canada, Polyehlorinatad Dibenso-p-Dloxins and Polyehlorinatad Dlbansofurans: Sources and Balaasas. Baport EPA 3/HA/2, July 19*5.
7-20
HONS 020280
Tabu 1
AIRIORNi CONCENTRATIONS OP PCDDa AND PCDFa IN TKREK OFFICE BUILDINGS IN SANTA FE, BH
2,3.7,1-TCDD TCOOa PeCDDa HxCODa HpCDD* OCDDa Total PCODa
2.S.7.S-TCDF TCDF PaCDF HxCPF HpCDF OCDF Total PCDPa
n/N* 0/* 0/S 0/S 2/S s/a a/s
2/S 2/S 4/S 4/S i/S 5/S
9Peantratlon - /a3
Mean**
______ Raft*a
0.13 D.14
(0.0S - 0.40) * (0.0S - 0.40)
0.24
(0.11 - 1.2)
0.44
(0.23) - 1.5
15 (0.13) ~ 24
SO 2.0 - 170
Si 2.4 - 221
0.37 1.1 0.42 1.7 i.S 11 22
(0.11) - 1.0 (0.11) - 5.0 (0.0S) - 4.1 (0.05) - 14 (0.15) - 53 (0.3S) - 02 (0.4S) - 142
* n/M danotaa tha nuaber of aaaplea abova tha dataetlon llmit/the total nuabar of aaaplea.
* Arithmetic aaan ealculatad with non-dataetad value* traatad aa ona-half tha dataetlon llatlt.
* Value In parentheaee la tha Halt of detection.
7-21
HONS 020281
Tabla 2 CONCENTRATIONS OF PCDDa AMD PCOFe
IN AMBlbNT AIR 1M SANTA PE. DM
2,3,7,9-TCDD TCDDa FaCDDa HxCDDa HpCDDa OCDOa Total PCDfia
2,3,7,1-TCDFa TCOFa PaGDFa HkCDFo HpCDFa ocor* Total FCDFa
____ n/b* 0/a o/a o/a l/a a/a a/a a/a
O/a O/a o/a l/a 3/a 3/a
Concentration - ca/a^
. Mean**
lanaa
O.Oi
(O.Oi - 0.1*)*
O.Oi
(O.Oi - 0.19)
0.11
(0.12 - 0.39)
0.30
(O.li - 0.72)
IS a - 22
lli la - 170
132 l* - 193
O.OI O.OI 0.11 0.10 1.1 1.1 3.2
t
o
(0.11 (0.11 - 0.11) (0.07 - 0.2B) (0.03 - 0.27) (0.22) - i.i (0.51) - 2.7 (O.iS) - a.s
* n/M denote* th* number of aaa?lea above the detection limit/th* totol number of cample*.
** Arithmetic Man calculated with non-datactad valuaa treated aa ona-half tha detection Halt.
* Value In parenthaeae la tha limit of datactlon.
7-22 MONS 020282
L
TabU 3
COSCENTRAT IONS OF PCDDi AND PCDFa ON MICH SKIN CONTACT' SURUCES IN THREE OF)ICS BUILDINGS IN SANTA FE, NM
2.3,7,0-TCDD TCDDo PoCDDo HxCDDo HpCDDo OCDDo Totol PCDDt
2,3,7,0-TCDF TCDFo PoCDFo HxCDTo HpCDFo OCDFo Totol FCDFo
jiiMi-----0/12 0/12 0/12 10/12 12/12 12/12
-------------- Concantration - nt/a* --mm**-- ____ Emm ,
0.02
(0.01 - 0.10)*
0.02
(0.01 - 0.10)
0.02
(0,01 - 0.11)
0.70
(0.04) - 4.3
1.7 0.23 - S.3
0.4 1.4 - 14
a.s 1.9 - 24
12/12 12/12
9/12 11/12 i:/12 11/12
0.29 0.S3 0.0* 0.17 0.27 0.34 1.4
0.02 - 0.74 0.13 - 1.4 (0.01) - 0.34 (0.01) - 0.54 (0,02) - 0.04 0.10 - 1.4 0.35 - 4.3
* n/N danotaa tha nuabar of auplaa abova th datactIon Umlt/tha total nuabar of aaaplaa.
** ArlttSMtlc atan colculotod with non-dotoctod valuoo traatad ono-hlf tho dotoctlon limit.
Volvo In poronthoooo lo tho limit of dotoctlon.
7-23
MQNS 020283
Flgur* li T*tr*- through oct*-chlorln*t*d dib*n*o-p-dioxln (FCDD) nd dlb*ncofur*n (PCDF) hoaolog profil** for *ir pi** in thr* offlc* building* la S*nt* F*, HK.
7-2*
MO NS 02028<t
Flgura 2i Tatra- through octa-chlorlnatad dlbtnto-p-dloxln
(PCM) and dlbantofuran (PCDF) hoaolog profllaa in anblant air plan obtainad in Santa Pa> NM.
7-25
MONS 020265
1 1
Flgura 3i Tatra- through octa-ehiorlnatad dlbtnto-p-dloxln (FCDD) and dlbantofuran (PCPF) homolog profllaa for vlpa
aamplaa obtalnad on high akin contact aurfacaa In thraa offlea bulldlnga In Santa Fa, NK,
7-26
HQNS 0202B6
HONS 020287
EVALUATION OF POTENTIAL HEALTH HAZARDS FROM FIRES INVOLVING LIQUID AND SOLID UTILITY MATERIALS
Philip H, Taylor, Sue L. Merer, Dabra A. Tlray, fi. Lawrence Fox, John G. Staltar, and H. Barrett Dalllngar Unlvaralty of Dayton Raaaarch Inacltuta Environmental Selancaa Croup 300 Collage Park Avanua Dayton, Ohio 45469-0001
ABSTRACT
Concern ovar tha toxicity of PCS flulda haa focuaad on both tha aajor and trace,,' pyrolyala and eombuatlon producta and haa lad to lncraaaad attantlon to tha flea toxicity of all aatariala uaad In utility application*. To build a databaa* on tha aaa* laval aa pravloua PCB degradation atudlaa. It la nacaaaary to perform thermal analyaaa on all potential eubatlcutee. In thla Initial atudy, a laboratory acraanlng approach hat bean applied to tha evaluation of toxic pyrolyala and combuatlon product* for a largo number of replacement utility fluid*. Following the evaluation of the acraanlng data, creoaota-traattd wood va* choaan for ln-d*pth thermal analyala duo to tha high number and yield* of toxic thermal reaction product* produced, Thl* paper diacuaaat the raaulta of thaa* atudlaa and the Im plication* with regard to ln-dapth thermal analyaaa of all potential *ub*tltut*a.
BACKGROUND
Bacaua* of potential health rlak* aaaoclatad with axpoaur* to polychlorinated bi phenyl (PCB) coabuatlon product*, fluid* containing thaaa aatariala have provided utllltla* with pravloualy unforaaaan and vary axpanalva problem* [1}. Thl* acanarlo haa prompted concern regarding other aatariala uaad In conatructlng and lnaullatlng utility aqulpmant. While axtanalv* field and laboratory documentation axlac* on coabuatlon byproduct* from PCB fluid* (Including tatrachlorodlbantodloxlna), ayataaatlc atudlaa of the byproduct* from fire* Involving other utility material* had not pravloualy been lnvaatlgatad (21. In light of thl* need, w* have lnvaatigatad tha nature and yield* of pyrolyala and coabuatlon product* from a number of utility aatariala, Thaa* material* include Kraft paper, Kraft-phanollc lamlnaca*. PCB replacement flulda, Nomex, varlou* apoxiaa, craoaota, and aavaral cable inulation*. Hapla wood waa uaad a* a benchmark material to ****** whether thaaa utility material* po** any unique hatard* whan Involved In fir* (eombuetlon) or arcing (pyrolyala) situation*.
EXPERIMENTAL APPROACH
Thermal degradation experiment* for replacement utility material* war* conducted ualng a highly controlled laboratory teat ayatam r*farrad to *a tha Syatam for Thermal Diagnoatlc Studlaa (STDS), The STDS 1* a thermal degradation unit houaed In a high temperature furnace Interfaced downatraam to a high resolution gaa chromatographlc/maa* apactroacoplc analytical ayatam. Thl* unique ayatam haa baen uaad to raaolva, detect, end quantify organic thermal reaction product* [3],
7-27 HONS 020288
For tha crooning studies, two experiments were performed for ch utility material Each materiel waa initially flaahad in an air or nltrogan ataoaphara uaing a CDS
pyroproha. Tha gaaaoua dagradatlon producta vara than awapt through tha tubular quartc raactor at a gaa-phaaa raaldanca tlna of 1.5 aac with either air (eombuatlon) or nltrogan (pyrolyala) aa tha reactor gaa, dapandlng on tha raaetlon con dition! simulated. Producta from tha oxidativa ataoaphara ara thoaa llkaly to fora from opan burning whlla thoaa froa tha pyrolytic ataoaphara ara thoaa moat llkaly to fora during arcing avanta.
For tha ln-dapth tharmal analyala, craoaota-traatad wood waa Initially dagradad in
an air or dry nltrogan ataoaphara uaing a CDS pyroproba. Tha gaaaoua dagradatlon producta wara than awapt through tha tubular quart! raactor at a gaa-phaaa raal
danca time of 1.5 aac with althar air (combustion) or nltrogan (pyrolyala) aa tha carrier gaa. depending on tha reaction condition! ainulatad. Data waa obtained over a temperature range of 300-930*0.
RESULTS AND DISCUSSION
Tha acraaning etudlea Indicated that a large majority of pyrolyala and coabuatlon
producta from replacement utility material! ara alao produced froa tha almllar
,,
dagradatlon of wood-baaad material!. Thaaa toxic producta included bantene, phenoli-
toluene, atyrana. naphthalene, and acenaphthylene. However, thaaa particular pro-*
ducta ara not unique to thla materiel. They ara alao produced In tha pyrolyala
and/or coabuatlon of a variety of man-made and natural material!. Thaaa Include
organic lnduetrlel waataa, aawage aludga, coal and coal-darlvad producta, pleetice,
wool, fabrlca, ate. Therefore, thair preaanca ehould not conatltute tha baala
for a dacialon on the eafaty and replacement of utility material!.
Tabla 1 praaante a aummary of unique pyrolyala and coabuatlon producta of replace
ment utility material! which appear to exhibit "significant" toxicity. In this context, "algniflcent" toxicity la defined aa a material which la a known or auapact carcinogen, mutagen, or material with a toxicity threehold level of leaa than 20 mg/kg. Major producta ara defined aa having ylelda of greater than O.H. Several obearvatlona ara deduced upon critical inapactlon of Tabla 1:
1. For all utility matarlala, ylelda of toxic producta ara considerably higher under pyrolytic condition!.
2. With tha exception of trace lavala of aniline, quinoline, and bencotrlaaola produced from Harkollta pyrolyala, calluloaa-baaad utility
matarlala produce relatively low toxicity producta. 3. Biphenyl and mathylenthrecene represent toxic producta from replacement
capacitor fluid! with relative ylelda dependant on fluid composition and oxygen concentration. Comparison of toxicity data for potential tharmal
dacompoaltlon producta from PCBe. l.a., TCDF. and chlorobanianaa, l.a., TCDD, with replacement alkylaromatlc capacitor flulda Indicate! a aubatantlal Improvement in terme of human health hatard. However, it should be noted that tha toxlcltlee of many of tha producta obaarvad In thla
etudy have not yet been quantified. A, For tha remaining matarlala studied, ethylene propylana rubber end RTEnp
fluid rapreaentad low toxicity utility matarlala; Nomax, varloua apoxlaa. end polyvinyl chloride produced moderate lavala of toxic products; and pyrolyala and combustion of creosote produced tha largaat number of toxic producta, all with vary high yields. 5. Tha reeulta of tha acraaning studies Indicated that creosote waa a prlna candidate for an ln-dapth thermal analyala due to tha high level of toxic tharmal reaction producta produced.
7-28
HONS 020289
A craoaott-traatad utility pel* wt* chosan at tha utility aaterlal lor ln-dapth thermal n*ly*l*. Thie complex aampla we* chosen in *n attempt to slmuleta th* overall fuel composition which would b* pr***nt during creoaot* pyrolyal* or conbuotlon in an *ctu*l utility fir* or arcing *ltu*tlon, Th* wood *ub*tr*t* w 1*0 cho**n to provide th* po**lblllty of synergism with regard to th* number of po**lbl* toxic pyrolyal* and combustion byproduttg,
Ttbl* 2 peasant* euamary of th* thermal eteblllty of unique toxic combuatlon and pyrolyal* byproduct* fro* cr*o*ot*-tr**tad wood. Th* r**ult* indicated that th* conbuation of thl* materiel *t temperatures in axetaa of 600*C will likely r**ult in minimal (detection Halt " 40 pp*) yield* of toxic thamal reaction product*. Under oxygen-deficient condition*. tnlu* byproduct yield* were not obeerved over th* temperature rang* (300-930*0 of experiment*! Indicating that higher temperaturea will likely b* required to tharaally degrade thla utility material Into *lnl**l ylald* of toxic thermal reaction product*. Th* ln-depth thermal anelyei* of craoeota-traatad wood he* elao reeulted In th* following apatiflc conclusion*;
1. Numerous toxic combustion and pyrolyel* byproduct* are produced with * majority of thaa* compound* unique to thl* material; th* combuatlon product* included 2-propanal, 3-butan-2-on*, 2-but*nel, 2-furancarboxaldehyde, banaent and biphenyl; In addition to thaaa compound*, other pyrolyai* product* Included $-hydroxy-2-fur*ncarboxald*hyd*. 2-**chyl-l,3-bueadlan*. phenol, and laoqulnollno;
2. Analysis of combuatlon byproduct* Indicate* significant yield* at low temperature*; however, all of thaa* compound* are thermally labile with detection limit yield* at temperature* equal to or greater chan 600*C;
3. Analysis of pyrolyal* byproduct* Indicate* significant ylald* at low temperatures; in addition, several of th*g* compound* exhibit an Increase In concentration at high temperature# (100-900*0,
4. In-depth thermal analysis la th* beat methodology to completely elucidate the nature, yield, and atability of pyrolyal* and combuatlon byproduct* of utility notarial*.
Th* algniflcant ylald* of toxic pyrolyal* and combuatlon byproduct* obaarved from acraanlng atudlaa of Markolita, all flva replacement capacitor fluid* (Wemeol, Edison II. Edlaol HI. Solactrol, and Dlelaktrol), all thra* apoxlaa (th* anhydride cun, ch* amine cur*, and the dry-transfornsr epoxy). Nomax, ?VC, and craaot* uggsat that thaaa utlllry matariala represent prime candidate* for ln-dapth thermal degradation analyse*. As evidenced In th* craaott-traatad wood ln-dapth thermal analysis, thla methodology represents an excellent aciantific approach to th* de termination of tha nacura, ylald, and atablllry of potential toxic combuatlon and pyrolyal* byproduct* produced from utility materials.
ACKNOWLEDGEMENT!
Us wish to offer special gratitude to Dr. Gil Addle for his Invaluable guidance for Che duration of thl* research project. Thank* alao to EFR1 for sponsorship of thl* work and th* EPRI advisor* too numarou* to name for providing guidance, tuples, and support In thla program. Last, but noc laaae. thank* alao to Mr*. Diane Letch for typing tha extended abstract.
REFERENCES
1. B. Janaon and C. Sundatrom, "Formation of Polychlorinated Dlbantofuran* (FlDFs) During a Fir* Accident in Capacitor* Containing Polychlotlnaead Biphenyl* (pCBa)." ins Chlorinated Dloxlna end Related Compound*. Impact on the Environmsnt. 0. Huttlnger, at *1.. ad*., Pargaamon Prat*, Elmaford, K.Y., 1981. 15^207.
7-29
KONS Q2Q290
2. J.V. tboclnak, at al, "Stata-of-tha-Art Mvlawt Pyrolyala and Coabuatlon el PCB Subatltutaa," Elactric Powtr Rtaaarch Inatltutt Pinal Rapcrt EL-4303. March 1986.
3. W.A. Rubty and 8. Grant, "Daai|nof a Varaatlla Inatrunantatlon Syatam for Conducting Tharmal Dlagnoatle Studlaa," Submitted to "Rev. Scl. Inetrun,. Hay 1987,
TABLE 2
SUMfABY OF THE THERMAL STABILITIES Of UNIQUE
TOXIC COMBUSTION AND PYROLYSIS PRODUCTS FBflH CREOSOTE-TRIATED WOOD
COMPOUND
2-Propanel 3-Buten-2-one 2-Butenol 2-furencerboxaldehyde Bancana Phanol Blphanyl laopulnollna 2-Mathy1-1,3-butadiana S-Hydroxy-2-furancarboxaldehyde
TEMPERATURE^<*C> <
(air)
(nitrogen)
500 S50
500 550
700 700 550 m (3)
HD
NO
700 600 700 800 --( 900
930 900
800 500
<1) Temperature. rafara to tha temperature at which tha compound la < tha
dataction lEilt of 0.0041 ylald,
~
(2) Althou|h bancana la aaan In tha nltro|an runa of tha creoeote-traeted wood
atudyi Ita preeence In thla etmoephere had baan aaan bafora In tha napla wood acraanlni atudiaa.
(3) HD lndlcataa that thla compound waa navar datactad In air at any taaparatura.
7-30
HONS 020291
TABLE 1
TOXIC PRODUCTS UNIQUE TO REPLACEMENT UTILITY MATERIALS
UTILITY MATERIAL
Craoeote Craoeote Craoeote
Craoeote Craoeote Dlelektrol
Edieol III Edlaon 11 Edlaon 11 Epoxy(enlne curt) Epoxy(aalne euro) Epoxy(anhydride euro)
Epoxy(anhydride cure) Epoxy(dry treneforaer) Epoxy(dry treneforaer) Epoxy(dry tranaforaat)
Herkollta Herkollta Herkollta Noomx Noaax
Noaax PVC-KRI PVC-MRI PVC-VP PVC-VP PVC-VP Salectrol Salaetrol Weacol
TOXIC PRODUCT
TOXICITY
Blphanyi
Hutagan
Chryaana
Carcinogen
Kethylenthracene Mutagen
Acanaphthana
Mutagen
Quinoline
Hutagan
Mathylanthracana Mutagen
Blphanyi
Mutagen
Mathylanthracana Mutagen
Blphanyi
Hutagan
Aerylonltrlla
Carcinogen
Pyrldlnaalna
LDjq{}90 ug/kg
Acanaphthana
Hutagan
Hathylphthelate LCj0*.S.5ng/kg
Acanaphthana
Hutagan
Blphanyi
Hutagan
Propanol
Carcinogen
Banxotrlaxola
Hutagan
Aniline
Carcinogen
Quinoline
Hutagan
Acrylonitrile
Carcinogen
Aniline
Hutagan
Banaanediealne Hutagan
Blphanyi
Hutagan
Banxylchlorlda Carcinogen
Acanaphthana
Hutagan
Banxylchlorlda Carcinogen
Blphanyi
Hutagan
Blphanyi
Hutagan
Mathylanthracana Hutagan
Blphanyi
Hutagan
YIELD(AIR)
Major
Major Hajor Major Hajor HD*
Major ND
Major HD
Major ND Major ND ND Major
Minor ND
ND ND ND ND
Minor Hlnor ND Minor Minor KD Major Major
* flot detected
YIELD(N2)
Major Major Major Major Major Major Hajor Major Major Major Major Major Minor
Minor Minor , ND ND ' Minor Minor Major Major Minor Minor ND Major ND Major Major Major Major
HONS 020292
HONS 020293
FIRES INVOLVING LIQUID AND SOLID UTILITY MATERIALS: A POTENTIAL UTILITY CONCERN. II. PVC.
THomi M. Sack Midwest Raatareh Institute
425 Volksr loulevard Kama* City, MO 64110
ABSTRACT
Tha pyrolysis and combustion product* of po1y(v1ny1 chloride) (PVC) wer* itudlad' by tha u*a of on-line pyrolyals-GC/MS systems In ordor to Investigate tha potant1*1 rolo of PVC In tht fonaatlon of toxic or otherwise harmful apacla* during utility flrta. PVC was thanaally dagradad alon* and In tn* praianca of ethyl*n*-propy1*nt rubber, ruit, and ataal and found to produce banian*, *tyr*n#, and other aroaatlc ipaclaa In abundance under both air and Inert atmospheres. The preaanc* of oxygan 1* shown to facilitate tha fonaatlon of chlorinated benzene* along with trace aaount* of polychloronaphthalenea a* a reault of PVC degradation. Factor* Influ encing the relative aaount* of product* Included *aapl* reel dance tie* In tha heated zone, pretence or absence of air, and pretence or abttnct of Mtel apacla*.
INTRODUCTION
Since the restriction of Manufacture and coeaerclal u*e of polychlorinated biphen yl* (PCI*) In 1976, there ha* been considerable Interest within the electrical utility Industry regarding the toxicity of the alternative dielectric fluid* end their theneal degradation product*. In addition, the PCI Issue ha* also sparked Interest regarding tha other type* of aaterlal* (such as plastics, binders, paint*, support notarial*, and electrical Insulators) presently used In utility devices and tha potential of these aiatarlals to produce toxic or otherwise undesirable spacles in the event of a fire. Of particular interest ara chlorine-containing notarials, which have bean Implicated as on* of the sources of polychlorinated dlbenzo-g-dloxlns and furans (PCODs and PCDFs) In fires and Incineration. Mate rials In this category Include PCIs, some of the alternate dielectric fluids such as tatrachloroathana or trlchlorobenzene elxturea, and po1y(v1ny1 chlorlda) (PVC). which Is used widely es * wire Insulation.
In this study, tha pyrolysis and combustion of PVC was Investigated In detail using an on-line pyrolysis-gas chromatography/mss* spectrometer system. Furthermore, as PVC Is rarely used alona as a utility material, tha affects of added organic mate rial or catalytic surfaces that might be found with PVC In a utility device, on the
7-32
HONS 020294
tnarmal degradation of PVC. ware Investigated. For theta prtllmlntry experiment!, the materials ethylene-propylene rubber (EPR), Iron(IH) oxide (run), and steal were chotan to be copyrolytad with PVC tinea they may be expected to be found neer or with PVC In utility davlcet. The objective of thlt work It to obtain additional Information regarding the potential of PVC to form harmful or undesirable pyrolytatea In a utility fire.
EXPERIMENTAL SECTION
The PVC and EPR were obtained at ttanderd grade Inauletlon from electrical cablet
and were not treated In any way prior to enalytlt. Saaplat were taken by cutting
email placet of approximately 100 pg from the cable Inauletlon by the uae of a
razor blade. The ruat (fatOa) and tteal wool were obtained at reagent chemlcalt
and were uted at received.
,
Thermal degradation experlmenta were performed with two different pyrolyzert, A furnace-type pyrolyzer In which the temple la forced to patt through the hot zone wat uted to characterize tecondary reectlona of the material and Itt primary py* rolyala products. A fllament-type pyroprobe which can heat a temple rapidly end reproduclbly to a aped fled set temperature waa uted to characterize the primary pyrolytic procettet of the utility material a. Experlmenta were carried out either under an atmosphere of helium (pyrolytlt) or elr (combustion) over the temperature range of $00 to 900aC.
Pyrolysis products were characterized by gat chromatography/mass spectrometry (SC/MS) using electron Impact (El) Ionization end negative chemical Ionization (NCI). Full scan, low rtsolutlon mats spectra wart acquired to enable tentative Identification of the pyrolyala/combuatlon products by library searching and manual Interpretation. Confirmation of tract components waa accomplished by the use of selected Ion current profiles (SICPs) of major Iona In the mate tptetra of th* components of Intarast.
RESULTS
The major products rssuiting from the pyrolysis and combustion of naat PVC along with tha PVC/EPR and PVC/rust mixtures using tht filament pyrolyzar are shown is n example In Table 1. PVC character!stlcally products abundant nonhaloganattd aromatic degradation products, such at banzana, ityrant, and naphthalan*, undar both hallum and air at 900*C, which it In good agreement with th* literature (1-4) Thermal degradation In air result* In a surprising Inertsat In tht Itvtli of poly* chlorobtnztnti (CBs) and th* axptcttd Incrtait In tha Itvtli of oxyganatad sptc'ts but no avldanct (0.001X yield) of chlorlnattd aromatics which contain oxygen (1 e
7-33
MONS 02095
PCOO* or PCOFs). The addition of ruit or EP*t dooi not seem to offset tho produc tion of halogenated ipocloi to any major oxtont.
Whon tho furnaeo pyrolyzer It mod, similar roiulti oro obtained, except that the nonhalogenated aromatic special account for a larger proportion of the total prod uct yield and the CBs are vary minor products. This reduction In C8 production and Increase In aromatic production Is a result of the secondary reactions of PVC and Its thermal degradation producta In the furnace pyrolyzer to form highly stable aromatic species such as benzena and naphthalene. Examination by NCI-MS of the products generated by the furnace pyrolyzer, however, revealed that higher CBs (penta- and hextchlorobanzent) along with polychloronephthelones ere produced by PVC under combustion conditions. Although these polychlorinated aromatics repre sent one of the smaller fractions of the overall yield of degradation products, they remain as evidence that some of the chlorine liberated by PVC as HC1 (1) can become Incorporated Into the aromatic nuclei.
CONCLUSION
It may be concluded from this work that PVC alone and admixed with other common utility materials thermally degrades In the absence of oxygen to predominantly form nonhalogenated aromatic species such aa benzene and naphthalene. In the presence of oxygen, however, PVC displays a tendency to form low, but real levels of chlorinated aromatics which could be of concern In a fire since they are fre quently Implicated ea precursors of PCDOt and PCOFs. No evidence of PCOO or PCDF formation above the 0.001X yield level wea observed In this work; however, modifi cations to the on-line pyrolytic Instrumentation used here may allow future studies to examine yields well below O.OOIX.
ACKNOWLEDGMENTS
This work was performed under the support of the Electric Power Research Institute, Contract No. RP2028-1S, Or. Gilbert Addis, Project Manager. The author withes to thank Audrey Sanford and Leslie Moody for their efforts In this work.
7-34
MONS 020296
references
1. T. Hjartbarg and E. M. Sorvlk. "Tharmal Dagradatlon of PVC." Dagradatlon and StablHutton of PVC. E. 0. Owan, Ed, , Naw York: Elsavlar Applied Sclanca Publishers, 1984, Ch. 2.
2. R. A. Hawlay-Feddar, H. L. Parsons, and F, W. Karasak. "Products Obtained Ourlng Combustion of Polymers Undar Simulatad IncInarator Condition*. III. Polyvinyl Chloride." J. Chroma too r, . Vol. 315. 1984, pp. 211*221.
3. R, P. Lattlmar and W. J, Kroenke- ''The Formation of Volatile Pyrolyxates from Poly(vlnylchlorlde)." J. Appl. Polymer Scl.. Vol. 2*. 1980. pp. 101-110.
4. 8. Ahllng, A. Bjorsath, and G. Lunde. "Formation of Chtorlnatad Hydrocarbons Ourlng Combustion of Poly(vlnylchlorlde)," Chemosohere. Vol. 10, 1978, pp. 799-808.
Tibia 1
breakdown of major pyrolysis ano combustion prooucts of PVC (Fllamant Pyrolytar)
Notarial PVC PVC PVC EPR PVC * EPR PVC Rust PVC Rust
Experiment Typt*
PY900 C0900 PY900 C0900 PY900 C0900
Parcant Ralatlva Abundanca by Product Type** AaC
73.5 N/0 N/0 10
16.5
28.1
11.4
9.4 26,2 24.9
48.1
22-1
1.3
0.6 29,9
27.7
19.7
5.3 27.6 19.7
44.4
8.8
1.5
19.1
25.2
2B.1
13.2
5.5 52.5
0.7
*PY900 900*C pyrolysis; C0900 900* C combustion.
"*A nonhaloganatad aromatic products (benzene, styrana, naphtha!ana. ate.); 8 aliphatic products (alkanas, alkanas, cycloalkanes); C chlorobenzenes; 0 oxygenated products (phthalates, banialdahyda, ate.); E unldantlflad, low abundanca products. N/0 not obtarvad.
7-35
HONS 0ZQ2.91
interlaboratory comparison of pcoo ano pcof analysis
E.O. Pelllxxarl, K. Perrltt end T. Hartwell Reteerch Triangle Institute Pott Office Box 12194
Reteerch Triangle Park, NC 27709
ABSTRACT
A ttatittical analysis of Intorlaboratory data fro* flva laboratorlat was parforto assass the accuracy and precision of analysis for taiactad PCOO and PCOFs In three basallna and savan In-sarvica utility samples. CoaparIsons art aada by coRpound. staple type and laboratory,
INTRODUCTION
Tha Electric Potter Research Inatltute <EPRI) Initiated a retaarch program with tha following aajor alaoents:
Round-robin oathod evaluation using tha bast available In-housa extraction and analytical techniques, and
Analysis of In-service dielectric fluids for tha pretence of poly chlorinated dlbenzofurans (PCDFs) and polychlorinated dlbenzodioxm (PCODs) of Interest.
The round-robin method evaluation mss designed to validate analytical oethodology and to deterolne the accuracy with which specific congeners could be quantified. It Included the synthesis of native and itotoplcally-labeleo standards, and the analysis of spiked taaple Retrices (baseline staples) Standards and the spiked aatrlx *ancles were prepered by a contract laboratory and distributed to the participating round-robin laboratories. The staples were analyzed "blind* by five independent contract laboratorlat (2-5).
The In-service dielectric study consisted of (1) developing appropriate tempi* selection criteria, (2) obtaining representative taaplet, and (3) analyzing the selected samples. General Electric Company prepared the selection criteria docuaent (1), the samples were collected by one of the laboratories (2), and tha analysts were performed by tha five laboratories.
The study was conducted In two phases Phase I Involved the analysis for PCOFs and PCODs In five spiked ''baseline'* samples (Aroclor 1016. Aroclor 1242. Aroelor 1260. a trl- and tatrachlorobenzene mixture and aged elnerel oil) and four in service dielectric fluids, with eech participating laboratory using thalr bast available In-house extraction and analysis techniques. Since validated analytical methods did not exist before this program was Initiated this pnase
7-36
HONS 020296
wt necessary In this phase response factors for the c0*00rants of interest
wara generated at a single concentration using a Standard calibration solution After avaluating these rasults. and implementing several improvements to tne
mmtnodology, Phase 11 has initiated.
Phase It mas designed to provide quantitative data on PCDFs and PCOOs which allowed a statistical interleboratory comparison to bo aaoa. Tha specific aims
were to:
determine tha accuracy of analysis by each participating laboratory for a selected list of PCDFs/PCDOs in spiked samples.
. determine the precision of analysis by each laboratory for PCDFsyPCDOs In spitted and in-service samples.
perform an inter laboratory comparison, and thus a comparison of methods employed, for precision and accuracy, and
measure the levels ot PCOFs and PCOOs in in-service samples.
;
tt
Phase 11 sables Included tnree spiked baseline samples (Aroelor 1016, Arocttr 1260. end aged mineral oil) and saven in-service dielectric fluids. The In service semolms were selected to attempt to be representative of e Hide range of conditions to challenge tne analytical methodology
The results of the Inter laboratory study for samples analyzed in Phase It are presented.
SAMPLE SELECTION, SAMPLE PREPARATION. AND CHEMICAL ANALYSIS
Three spiked baseline samples (Aroelor 1016, Aroelor 1260. and aged mineral 0>l> were prepared as previously reported (S). Selected PCDD end PCOF congeners Here added to each sample at known levels to assess accuracy of the methoos employed for sample extraction, purification and analysis.
Seven In-service dielectric fluids Here chosen according to specified criteria U) and usad to determine the precision of tne methods for PCDO and PCOF determination.
Five Independent laboratories participated in the Inter laboratory study. Eacn laboratory was provided with aliquots of tne three baseline and seven in-service samples. Also native and isotopically labeled PC00 and PCOF standards Here synthesized (5) and provided to each participating laboratory. Subsequently. eeeh laboratory employtc their best available in-house extraction and analysis techniques (2-5). Calloration curves Here generated ever the linear response range of the gas chromatograpn/rnass spectrometer system (GC/MS) at five concentrations using the seme initial stock calibration solutions containing eight native and five isotopically laDeled PC00 and PCOFs (5). All analyses employed capillary GC/HS analysis, one of tne five systems Included high resolution MS. and one negative ion chemical ionization, nhlle tne rememirq four systems used electron Impact
RESULTS AND DISCUSSION
Table 1 gives a listing of tne PCDO and PCDFs tnat were cnemlca",ly nc statistically analyzed. From eacn laooratory the concentrations Here repo-tac
7-37 MONS 020299
TARLf. ! rciii Ann tdf compounds hfasured in basfunf and in sfhvkf samples
Compound
Compound
Total TCDF Total pncof Total IIXCOF Total HPCOF OCRF Total TCOO
OCDO 2,3,7 ,8-TCDO
2,3,7.8- 2 3,4,8-TCOF 1.2.3,7,#- * 1.2.3.4,B-PNCOF 2,3,4,7 . Il-PNCDF 1.2,3.4,7,$- + 1,2,3 4.7.9-HXCDF 1.2.3,7.8.9-MXCOF 1,2.3,6.7,8-HXCOF
2.3,4,6,7.8-HXCOF 1,2.3.4 ,fi,7,9-HPCOP
as ng/g (ppb). and the means and standard deviations of the dttinintt ions werecomputed by laboratory, sampla and PCDO/PCOF compound. On* laboratory <|.A8 Si raportad only on* determination for aaeh sampla and PCOD/PCOF compound, while LAB 4 raportad thraa axtracts with three Determinations for each attract. The remeinlng laboratories raportad ona axtract par sampla and tnraa determinations par axtract. Tha databasa contained large variations in concentrations among tha PCOO/PCOf compounds mi thin a sampla. and among samplas for a givan compound Thus, thara mas a substantial dynamic ranga in Itvtls which allowad for assassing accuracy and pracision at low and high Itvals and in diffarant samde
types (matricas).
Tha standard deviations varied and equal variances could not ba assumad. Since tha standard daviations tended to ineraasa as tha concentration levels
increased. basic oata transformations of taxing logarithms and souara roots wara appliad to this dataoasa. Unfortunately. this did not minimise rna prop la* and therefore. liaitad tha typas of statistical lasts that could be oarformas s.nce many oapand on tha aquality of variancas
The coeff Icianeias ot variation (CVs.) for the i ASS (excluding LAB 0) were
calculated using only tnose concentrations raportad as maasu*ed amounts Tne
CVs era summarized in Tabla 2 showing tne minimum, medlar, ano maximum CVs vw-
compounds by lab and samola
(Note; thara appaarao to ba llttla relatior
bttwoan lavel and tha CV. i.a.. tha CV did not tana to inertase or oecraase as
tha individual PCOD/PCOF compound lavtl increased)
Overall. I AS 3 depicted the largest median and maximum valuas for CVs. out variation among tha othar LABs also occurred
A comperison of spiked versus found amounts in samples 1 and 2 art compared m Tabla 3. Tha parctnt accuracy was calculated as1
X Accuracy Maan "stue-- *
Tha minimum, median and eaxieum parctnt found by laboratory art listad LAB 3
again had by far the largest ranges
Among the other LABS. LAB 2 had me
highest maximum values, while LAB l had the lowest minimums
Analysis of variance want calculated to determine the sources of variation Centrally, tha TCDF. ?NCDe. and OCOO r.omoounds showed smaller variances, while
7-3B
MONS 020300
OCDF showed the largest variances
There was so** variability among ,_*BS in
amount of total variant'# with I.AB 5 having a tonotnry to 0# nigntr The
greatest oarcant of variation was oua to sample oif fr-ences as r*flecteo in
comparing portent sample varianto with percent error variance
For LAB 4, tha variance component for extract could be included because three extractions were performed par sample (Table 4) Here as before, at least 90S of tha variance was in samole extraction and determination (error) contributing
little
Table 5 provides approximate 95 percent prediction Intervals for future analysis
of tha samp las
Tha LABS were treated as a random samp la from a large
population of LAes. end a variance component. Ovnoud as Vi . of the log
concentrations due to LABS was estimated
A measurement error variance
component. VM. was also estimated
This component is the wUMn-extractlon
variance of the log concentrations The two components were used to calculate
the intervals via the following formula;
exp ( X + 2 V) where X mean of the log concentration (across LABS and extracts)
V yf VL VM
, '/
With about 95 parcent confidence of being correct, each of the reported intervals 1$ expected to cover a future laboratory's analytical results for the given compound end sample This assumes that tne concentrations are lognormatly distributed.
ACKNOWLEDGMENTS
Authors wish to then* the technical staff of the five laboratories who gave expert assistance in providing date and consultation. We are especially appreciative of the advice end encouragement proviOtO by the personnel at the Utilities and Mr G. Ado is and Dr J Guertm of EPRI during the course of this wortc
REFERENCES
t. Polychlorinated Dlbenzofurans _ (PCDF) and .Pybcttllyinutfl. Pi&ftHIPrP-pipxinj (PCOOl in Utility Transformers and Capacitors. Vol. t, Palo Alto, CA Electric Power Research Institute. EPR1 EL/EA-485B, October, 1968
2. W.M. Cooke end F.L, OeRoos. Formation of PCDO and PCDF in Asxarel and Contaminated Mineral Oil Eouipment, Columbus, OH. Battalia Columbus laps , Project 2028-6, (December. 1906.
3. OR. Hilker. at el.
Analysis of Chlorinated Dibenzo-p-dioxins ana
Dlbenzofurans in Utility EQuipment, Aloany, NY' New York Oeoertment of
Health. EPRI Project Number 2028-7. July, 1987,
l. Polychlorinated Dlbenzofurans LPCOr) ano Polychlorinated D-btizo-pQiox^i IPCDOI In utility Transformers and Capacitors. Vol. 2. Palo Alto, CA Electric Power Research Institute, EpRi EL/EA-4858, December. 1986
5. Polychlorinated Qibanzc*urans (PCQF) ano Polychlorinated Dibtozo-D-Qioxms
IPCODl in Ut 1 * i*.v Transformers jnq___Cajaacaors Vol 3, Palo alto CA
Electric Power Research Institute. P!ll EL/EA-a#58, February, 1907
7-39
HONS 02 030i
TABLE 2 MINIMUM, MEOIAN, AND MAXIMUM CVS BY LAB AND SAMPLE OVER COMPOUND
U) 1 LAB 2 LAB 3 UB 4-1 UB 4-2 LAB 4-3
FOIAN LAB 1 UB 2 LAB 3 UB 4-1 UB 4-2 UB 4-3
6lPl
"
_ll jjL liii. zn:
4.01 0.00 11. 34
1.25 0.96 0.71
3.45 0.67 2.55 0,40 0.41 0.96
0.83 1.02 8.33 0,74 2.04 1.31
0.99 5.83 9.36 6.97
0.00 0.17
1.90 3.71 5.13 6.84 0.58 1.55
3.25 4.41 10.20
6.25 1.75 0.00
0.57 1.24 4.66 4.46 1.26 0.96
1-71
1.96 2.16 4.64 0.63 0.34
11.78 4.25
41.52 4.85
4.00 2.40
11.15 2.25
13.87
2.44 2.70 3.08
3.26 4.56 29.82 2.68 5.39
2.21
8.63 14.10 58.92 13.60
2.08 2.53
19.21 6.62
23.94 12.22
4.54 4.92
15.54 17,63
31.23 11.06
7.53 6.24
2.86 12.62 30.49 12.39 14.65
1.93
4.34 19.22 ' 22.16* 11.94
4.90 2.07
UB 1 UB 2 UB 3 UB 4-1 UB 4-2 UB 4-3
18.08
16.89 159.06
26.52 6.53
20.86
40.29 45.81 86.90
5.30 4.29
7.64
5.42 30.59 144.88 11.82 30.30
7.11
46.96 45.73 121.26
32.44 20.80
6.21
56.89 20.24 56.95 22.05
7.66 27.56
33.16
39.41 62.39 39.04
24.12 26.91
56.57 46.63 125.10 26.47 26.69 16.64
20,47
28.4! 33,35 22.04 22.31
8.84
EE5EEEE
TABLE 3 MINIMUM, MEOIAN, AKO MAXIMUM PERCENT FOUND FOR SPIKED SAMPLES 1 AND 2
1 &SS&SQ mxlflum
64BTP1* 2
Kinirum
Maxium
1
49.0
97.9
105.3
74.7
106.6
135.4
2
66.0
96.0
124.0
55.3
112.0
149.2
5
36.0
103.2
116.0
42.4
113.9
120.2
3
9.2
94.2
3371.4
12.4
120.3
3939.4
4-1
60.7
96.7
114.5
90.5
100.8
120.1
4-2
66.0
100.6
113.6
9.4
104.9
119.4
4-3
66.7
94.5
107.2
90.6
96.7
120.8
7-flO
HONS 020302
Illlilil
TABLE 4 VARIANCE COMPONENTS BY COMPOUND FOR RADIAN
variance Corsonentt
A* Percent oi Total
nda Total Sanplt attract Error SarTit iPetra-- Error
TCXT
1.40 1.31 0.01 0.01 91.9 0.6 0.5
mar
1.62 1.61 0.00 0.01 99.2 0.0 O.t
uxor
3.66 3.59 0.05 0.01 91.3 1.3 0.4
KPCSP
5.13 5.00 0.09 0.03 97.S 1.9 O.S
Tax?
7.73 2.23 0.00
7.41 2.25 0.00
0.30 0.00 0.00
0.02 0.00 0.00
93.9 99.9* 99.9+
3.9 0.0 0.0
0.2
0.0 f o.o"'
2.3.4.9- TCD
2.25 2.25 0.00 0.00 99,9+ 0.0
0.0
2.3.7.9 + 2.3.4.9- TCDF
1.41 1.47 0.00 0.00 99.5 0.2 0.3
1.2.3.7.9 + 1.2.3.4.9- PNCEF
1.14 1.92 0.01 0.01 99.2 0.4 0.4
2.3.4.7.9- WCEF
1.31 1.30 .0.00 0.01 99.9 0.0 1.1
1,2,3,4,7,9 + 1,2,3,4,7,9-WOT
5.90 5.90 0,00 0.00 99.9 0.0 0.1
1,2,3,7,9,9-KXOr
4.73 4.71 0.01 0.01 99.5 0.2 0.3
1,2,3,6,7,9-WCCBT
2.73 2.69 0.02 0.01 93.6 0.9 0.5
2,3,4,6,7,9-neCDr
2.25 2.16 o.oa 0.01 96.1 3.4 0.5
1,2,3,4,6,7,9-WCDP 3.92 3.B7 0.02 0.03 99.7 0.3 0.7
HONS 020303
7-41
table s
APPROXIMATE 95 PERCENT PREDICTION INTERVALS BY COMPOUND AND SAMPLE
Ccncound Total rar Total Pnar Total nor
--1-- --i-- --1-- UET 12 _JlL ii-
n
144 37 1044 37 37 349 532 249 222 47 2321 342 321 1247 1349 729
204 220 1004 1125 143 179 5444 3(2 431 317 1442 3079 590 442 13471 1999
US 40 794 3041 724 1142 2114 10434 21535 1320
11 3497 (10 194 21437 13977
Itotftl HpGDP
103 137 419 1341 1447 nos 1332 4341 41114 3090
2 1391 242 52 3443 11043
OCEF
2 47 2240 9441 3422 204 4434 44743 10453
7 94 442? 73 457 24445
Total TCEO
4 40 43 <1 <1 <1 <1 <1 40 40 132 21 14 15 20 10
COD
1 1 2 7 5 <1 1 3 39 40 32 19 30 70 43 32
2,3,7,4-TCDO
IS 40 43 <1 <1 <1 <1 <1 30 40 132 25 20 13 32 11
2,3,7,1 2,3,4,4-lCOr
144 37 977 24 15 90 251 119 221 47 1355 41 81 459 459 241
1,2,3,7,1 1,2,3,4,4-P9CSF
123 134 224 41 27 144 193 425 7913 244
4 742 30 1577
74 74(
2,3,4,7,1-PHCCF
99 90 144 44 24 44 1324 10* 244 321 414 143 59 80 2389 403
1,2,3,4,7,I i,2,3,4,7,-nor
142 347
1 425 2134 15 1434 12379
447 409
13 3144 486 34 54(0 5023
1,2,3,7, 4,9-KQT
<1 <1 2 1 4 <1 (4 <1 34 23 943 4449 1(7 (1 7400 613*
1,2,3,6,7,1-WCOr
31 72
2,3,4,4,7,4-WffiCr
40 1041
1,2,3,4,4,7,1-KPOr 103 1104
43 72
24 1912
137 1530
234 214 412 403
33 3973
24 879
94 580 3234 14403
20 97
9 48
418 974
2 5(1 10 1385
43 134
1 19(
10
51 2882 2237
1 482
79
17 1130 3632
7-R2
HONS 02030*
PRODUCTION OF PCDFt AND RELATED PRODUCTS FROM PCB* - AN OVERVIEW* by
Kitcholl D. Erlckton Analytical Chaalatry Laboratory
Chaalcal Tachnolojy Dlvialon Arconna National laboratory 9700 South Caai Avanua Artonna. It 60439-AB3?
To ba praaantad at> EPRI 1917 PCS Saalnar
Oclobar 6-9, 1987 Kanaaa City, MO
**. i WV t ! H >"
ly.tM V i mm* #
*Vork. tupportad by tha U.S, Dtpaitaant of Enargy undar Contract U-31-109-Eng-3fl.
MONS 020306
7.43
PRODUCTION OF PCDFf AND RELATED PRODUCTS FROM PCI* - AN OVERVIEW
Hitch*11 D. Erick*on
Analytical Chemistry Laboratory Argonn* National Laboratory 9700 South Caaa Av*nu* Argonne, IL 60439
ABSTRACT
In th* aid* to late-1970s, a*v*ral worker* d*aonttrat*d th* formation of PCDFa fro* FCBa at *l*vat*d temperatures in th* laboratory, Thia vork v*nt largely unnoticad ' by thoa* conc*rn*d vith th* aeicntific, toxicity, regulatory, and product liability iaauta *urrounding PCI* until February 19S1 vhan a fir* in a PCS-containing transformer in tb* Binghaaton, N*v Tork State Offic* Building brought *PCB fir**" to international attention. Sine* that event* nuaerou* other PCB fire* and related event* hev* underacored the need to "do something." That eoaething ha* Included nev regulation* froa the U.S. EPA and other legal reatrlctlona in varloua countriea. lncreaaed reaoval of FCB-contalning electrical equipment froa aerviea, financial preccure froa inaurance coapani**, auch better and faater cleanup and verification of the cleanup, and aore reaearch.
The reaearch into th* theraal production of PCDFa and related coapoundc froa PCB* haa addreaaed the follovlng areaft
* identification of product* foraed (e.g., PCDFa, FCDDa, FCBPa, etc,) and their aaountc
e reaearch on reaction aechaniaaa * deterainatlon of aatrlx effect* (e-g-, Mineral oil, ailicona oil) a atudlea of effect* of condition* (e.g., teaperature, realdenc*
tiae, oxygen) end type of event (e.g., fire, arcing) a atudy of formation of PCDFa and related coapound* froa other
dielectric fluid* (e.g,, trlchlorobenrenec)
Reaearch has been conducted under both laboratory and real-world conditions. Laboratory experlaent* have ranged froa snail, uncontrolled heating in aapulea to arcing experlaent* with actual eleetric equipaent. To exaaine product* foraed under real-vorld conditions, saaples froa event* such e* Binghaaton have been exhaustively analysed,
In the PCB fire of 19B1 in Binghaaton, Nev York, leakage fro* a PCB transformer vas dispersed throughout the 18-story State Office Building (1,2). The average PCB
concentration on exposed horizontal surfaces vas 162 ug Aroclor 1254/e1. Saaplet
of the soot were found to contain PCDDs (20 ug/g) PCDFa (700-2,200 ug/g), and polychlorinated blphenylenes (54 ug/g). Hllker et al, (3) analysed saaples from the saae fir* and found 200 ppa of 2.3.7.B-TCDD. Similar results at several other
PCB fire sites were reported by Williams et al. (4*6). Th* contaminants from Binghaaton and other "aeeident" site* were recently reviewed (1). Table 1 presents a summary of the compounds found at these sites.
7-44
HONS 020307
$0b resosrch ha* town conducts to Identify the product*, especially the PCDFs, of incomplete PCI combustion. PCDP* voro observed to fora on heeting in (oolod ampules contoininf PCX (Aroclor* or lndlvlduol congener*) and oxygen (7), Evan at temperstures a* lov a* 30C*C, incraa*ad laval* of PCDP* vara observed aftar 1 week (B). PCDP* ara foraad froa PCS* by at laaat four reaction aachaniaa* (7). In addition, aecondary reaction* can degrade the initial product* by dechlorination and other reaction* (9). The net refult i* that the PCDP mixture* foraad in PC> fire* (and experiments) are coaplex. The optiaua axpariaontal condition* for the PCB-to-PCDr reaction appear to X in the S00-700*C range, with reaction tine* in the lov-aecond range and exce** oxygen present in the atmosphere (10-14).
Vhlle aoat of the attention ha* focuaed on the formation of PCDP* and PCDDs froa PCB*, other precuraor* preaent in utility equipment can alao fora the** product*. Chlorobentenes are 30-40K component* of transformer aakarele along with the PCI*. Tetrachloroethylene 1* used as a retrofill fluid and alao a* e PCI substitute dielectric. The reaction path for these two precursors is more coaplex than with PCI* (13). The chlorobensone* must not only acquire an oxygon atom like PCI*, but two "chlorobensenes" (molecules, free radicals, or derivatives) aust collide with sufficient energy to reset. In the case of tetrachloroethylene, the reaction pathway is even more tortuous, A series of free-radical condensations aust fora the bensenold nuclei, in addition to the three ring PCDP or PCDD structure. In general, the longer the pathway, the lover the anticipated yield would X. Both PCDFs and PCDDs have been observed in laboratory experimental combustion of chlorobenzene* and tetrachloroethylene (16,17). These levels are much lover than the PCDFs observed from PCB combustion under similar conditions.
This presentation will review the work done in the above areas,
unuiKSi
1. J, Vucete, J. R. Marsh, S, Kennedy, L. Hlldemann, and S. Wiley, *Stete-of-theArt Reviewt PCDD* and PCDFs in Utility PCB Fluid," CS-330B, Research Project 1263-11. Final Report, Electric Power Research Institute, Palo Alto, CA (November 1913).
2. Environmental Protection Agency, *40 CFX Part 761, Polychlorinated Biphenyls (PCBs)i Manufacture, Processing, Distribution in Commerce and Use Prohibitions) Use In Electrical Transformers, Advanced Notice of Proposed Rulsmaklng," Fed, Res. 49i 11070-11013 (March 23, 1984).
3. D. R. Bilker. R. H. Aldoue, R. H. Smith, P. V, 0'Reefs, and J. Juruslk, Comparison of Methods for the Determination of PCDDs and PCDFs in Transformer Oil and Transformer oil Soot," Presented at the American Society for Mass Spectrometry, Thirty-First Annuel Conference on Hass Spectrometry end Allied Topics, Boston, MX, Hay 8-13, 1983.
4. C. H. William*. C. L. Prescott, P. >. Stewart, and C. Choudhary, 'Formation of Polychlorinated Dlbensofuren* end Other Potentially Toxic Chlorinated Pyrolyti* Products in PCB Plrea," Extendsd Abstract, Division of Environmental ChamXtry. American Chemical Society, Washington, DC, pp. 265-266 (September 1983).
5. C. H. Williams Jr., C> L. Prescott, and L. D. Carre toon, 'Detection of Polychlorinated Dlbencofurans and Other Chlorinated Pyrolysis Products in the Soot Formed in PCB Fires," Proceeding*! 1983 PCS Seminar. C. Addis and A. T Komml, Ed*., Report No. EPRI-EL-35B1 (Pal Alto, CAt Electric Power Research Institute, 1964).
7-45
HONS 0^0308
6. C. H. Villieae, Jr., C. L. Prescott, P. 8. Stewart, and C. Choudhary, "Formation of Polychlorinated Dibantofurana and Other Potentially Toxic Chlorinated Pyrolyala Producta In PCI Flrea," In Chlorinated Dloxlnt and Dibantofurana in the Total Environment 11. L. H, Keith,, C. Rappe, and c. Choudhary, Ed*., pp. 457-46$ (lottorn Euttervorth Publlahara, 1965).
7. H. 6. tuaer and C. Kappa, "Formation of Polychlorinated Dibantofurana (PCDPa) froa the Pyrolyala of Individual PCI leoaera." Cheaoaohere 6(31i137-17* (1979).
6. N. Horlta, J. Nakagave, and C. Kappa, "Polychlorinated Dibenaofuran (PCDF)
Foraatlon Proa PCI Mixture by Heat and Oxygen," lull. Environ. Contaa. Toxicol
19t665-670 (1978).
------ ------------ `
9. S. Suanaon, M. Erickson, L. Moody, and D. Heggea, "Themal Coabuation of Octachlorodlbeneofurane to Fora Lover PCDPa," pp. 109-119 in Chlorinated Dloxlna and Dibantofurana In Feraoectlvi. C. Kappa, C. Choudhary, end L. H. Keith, Eda., Levi* Publiahing Coapany, Ann Arbor, Ml (1986).
10. M. D, Erlckaon, C. J. Cole, J. D. Flora, Jr., P. C. Coraan, C. L. Halle, C. D, ; Hlnahav, P. C. Hopkins, and S. S. Svanaon, "Theraal Degradation Producta froa *
Dielectric Flulda," U.S. Environmental Protection Agency, Ueahlngton, DC, EFA^ 560/5-8A-009I NTH No. PI 85/38535 (1964).
11. K. D. Erlckaon, C. J. Cole, J. D. Flora, Jr., P. C, Coraan, C. L. Haile, C. D. Hlnahav, F. C. Hopkina, S. E. Svanaon, and D. T. Heggea, "Foraatlon of FCDFa Under 'Optlalted' Coabuation Conditlona froa Lov-Level PCI Dielectric Flulda," pp. 3-13 - 3-16 in Proceedlngat 196* EPNI PCDF Workahop, C. Addla and R. Koaal, Eda., Electric Pover Research Inatitute, Docuaent No. EPRI CS/EL-410(July 1985).
12. M. D. Erlckaon, C. J. Cole, J. D. Flora, Jr., P, C. Coraan, C. L. Halle, C. D. Hlnahav, F. C. Hopkina, S. E. Svanaon, and D. T. Heggea, "PCDF Foraatlon froa PCHa Under Fire Conditlona," Cheaoaphere 14(6/7)t 855-658 (1985),
13. S, E. Svanaon, K. D. Erlckaon, and L. Moody, "Producta of Theraal Degradation of Dielectric Flulda (Revised)," EPA Contract No, 68-02-3938, Tack 23; EFA Publication No. 560/5-85-022 (Septeaber 1986),
14. G, Addle, "Pyrolyala and Coabuation of Aroclor 1254 Contaminated Dielectric Flulda," Cheaocphere 15(9-12)i 1265-1271 (1986),
15. G, G. Cboudhry and 0. Butsinger, Eda. Mechanistic Aspects of the Theraal
Formation of Haloaenated Organic Compounda Including Polychlorinated felbenzo-pflloxlm (Nov Torki Gordon and Breach Science Publlahera, 1983), 194 pp.
16. B. K. luaer, "Foraatlon of Folychlorinated Dlbanaofurana (FCDFa) and Dlbanzo-p-
dioxlna (PCDDc) froa the Pyrolyala of Chlorobenzanaa," Chaaoaphare 6t 415-424 (1979),
17. G. A. Eadon, unpublished date from EPRI Contract No. RF202B-4, prasanted at Ravlev Meeting February 19, 1986, Palo Alto, CA.
HHOONNSS 02030' 6
T*l* l. Ivmiy *t cilniMK* tiiMtit lyOiciitm tiKetil tvdni tillitiil (Cl Icclloli
wiKMt
icmi
iciri
ic (C (cn iei icin iccii
**(*t*lj*. **
( ItMklili dill) ******, ****** I**h*. J*f* r**o*. ti*
9.*!*.* M>
* PM *l-l*l **/
IHO.HI !( 41-114 f/|
771 *$/n*
*1* ** ftp*
kill ft ft ft ft
* ft ft
ii* P ft
*eg t*ir*hi*ii**i** ***t*iM**rt*
mi
t*[*h**Tl*
-eT -
ii,,.............
*****tiCit*ti* in (nliinUM hi iMilili * i* 1**1 ( *********.
*1 1*rc*t **
* .. Hi*.
***** *** llltlltl*.
**4**>*** Kith **r*lt*l
tlircifit till. tlHlilc
7-47 HONS 020310
HONS 020311
DETICTION Of 1,3,7,g-TtTtACHLORODI1EN20PURAN ACTIVITY IN DIELECTRIC FLUIDS BT AN EPITHELIAL CELL CULWEE 1IOASSAY
John F, Diarchy and David V. Line*In Wadsworth Canear f or Laboratories and Research
Wav York 8taco Daparcnant of laalth Albany, NT 12201
ABSTRACT
,
cndloo vara parfarnad co dacaralaa cha faatibilicjr of ualns an In yltra bioaabay to dacact tbt converalon of polychlorinated biphenyl* (PCBa) to polychlorinated dlbanaofurano (PCDF*) In Aroelor baaad dlalactrlc fluid* which warn aubjaccad co pyrolyala or coabuatlon. Tha bloaaaay la baaad on polyhaloganacad hydrocarbon Induced alteration* la srovth and cellular norphology of aplthallal coll culcura* which la coealdarad ralatad to KSf Induced ehloracna la bunan* Thla endpoint la vary owaaltlv* and relatively apaelflc for the aora potaat PCDF*. Pyrolyala of Aroelor 125* at 550*C for 15 ala raonlto la a 100-fold laeraae* In tha bloaaaay activity, ahem by ga* ehronatographle/aaaa apactroaatrlc aaalyel* co ha correlated to aahancad PCDF lav*la. Beoulta of tatting of ala chaaltally characterised, lnaorvlce tranafomar flulda danonatrated that the bloaaaay la pocenclally uaaful for ncowinlcal acraanlae of uaad dlalactrlc fluid* and other aubetaneaa for Pcor-llk* aggragata activity.
INTRODUCTION
Polyehlorlaatad biphenyl alxturaa (PCBa), auch aa Aroelor 125*, uaad a* dielectric fluid In electrical tranaforaara and capacitor*, can b* converted to polychlorinated dlbanaofuraaa (PCDfa) aa a raault of pyrolyala, conbatcion or electrical breakdown.
PCBa and PCSPa exist la different foraa, whleh vary baaad on tha nuabar and poaltlon af cklorlaatlan and which dacaralaa chair biological pocaocy. For exanple, the congener 2,4,5,2',*',5'-hexaehloroblpheayl coaetlcucaa 6.31 of Aroelor 115* aod la converted t* 2,3,7,ft-tatraeblorodibantofuran (TCDF), on* of ch* saac acclve PCDF congener*, by allaiaatloa of Clj, Hoat ocher PCBa la Aroelor 125* are converted to PCDF* *f lower biological activity.
A coMkom ellalcal nanlfaacaclon of PCDF axpoaur* la bunan* 1* ch* devalopnant of ehloracna, coneldarad to b* the eona*Yu*ne* of Induced aplthallal cell differentiation ratulclng in hypnrkoraclnltaclon and aubaaquanc blockage of hair folllclaa. Ue have developed an eeeay baaed on tho PCDF lnducod altoratlon* of cultured woua* aplthallal call growth and narpholegy. That* change* era eoneldared to ha tha heel* of the davalopnanc of PCDF Induced ehloracna In vivo. Tha atudlaa daacrlhad In chit ra pore danonacrata cha faaalhlllcy of ualog chi* bloaaaay, referred co at ch* flac-eell eaaey, to dacacc cha eonvaralon af PCI* to PCDFa In diolaecrlc flulda and to dacarnln* ch* aggragata biological acelvlty of tha aeeumulatad PCDP* in a aanpla co eupplenenc analyclcal dec*.
7.48
HQNS 020312
methods
Chemical* Source* of compound* taatad *r* deecribed elaewhere (1), Purity vie determined to be 991 or greeter.
C*11 Culturo. Th* XBF cello were derived from the cloned XB mouo* epithelial cell line which wea gift from Dr. H. Green, Herverd Univeroicy (2,3). Th* derlvetion end propagation of th* XBP line he* been deecribed eloevhere (4).
Alley Procedure, XBP cello were sue pended by trypelnieetloe end ocoded Into 24-well piece* (lb-mm diameter well*, 5 x 10* cell*/ml) with irradieted 3T3 cell* (5 x 10*/ml per well) in Dulbeeco'o modified Eegle medium eupplemented with 20X fetal bovine eerum (Ft*). After overnight incubation, the culture* were refed with * eerie* of 10-fold dilution* of e etock eolueiom of teet chemical in dimethyl ulfoxld* (DMSO) or DMSO clone la DMEM, 20X PB*. The maximum DMSO concentration we* 0.1X, Th* culture medium containing teet chemlcelo wee replaced every 3-4 deye. After 14 deye of incubation, the culture* were evaluated for th* elteration of growth end morphology indicative of PCDP expoeure* ee deecribed eleewher* (1) end characterised by e confluent monolayer of flat cell* ee compared to th* higher denelty, control cultural comprised of multlleyered eplndle eh*pad cell*.
ItXBULTt AMD DISCUSSION
Baeelln* determination of TCDF equivalent flat-cell Inducing activity w*c determined for 2,3,7,B-tetreehlorodlbeii*o-p-dioxl* (TCDD), varloue polychlorinated dlbensofureno (PCDF*), polychlorinated blphenylo (PCto), and dielectric flulde. Tha reeulte are aummarlcad in Table 1 and refer to th* loweat concentration of a 10-fold dilution eerie* which lc capable of inducing th* deecribed change* In cell morphol ogy and growth (th* flat-cell effect),
TCDD we* the moat ectlve compound teeted end wac about 10 timee more potent then 2,3,7,t-TCDFj 1,2,3,7,g-PencaCDP| and 1,2,3,4,7,g-H*xaCDF. The activity aaeoclated with 2,3,4,6,7,5-BexaCDF; 1,2,3,4,6,7,B-H*ptaCDP wea about 100-fold leaa than TCDD or one-tanth that of TCDF, while OctaCDF end 2,6-DiCDF war* at leant 1000-fold lea* active than TCDD.
Th* moat active PCD tooted waa 3,4,3',4'-TetreCB? with activity about 10"s that of TCDD, followed by 2,4,3,2',4*,3'-B*xaCBP with a potancy of about 10~* that of TCDD. Tha other PCI# Mated (2,3,2*, J'-Tatra, 2,3,4,2' ,4' ,3'-#x*-, and 2,3,4,2' ,3' ,4'Haxa-) had me detectable activity at a concentration of 10"7 chat of TCDD.
Verloua Areclor* war* taatad and tha raault* indicated that 1234 had an activity of obout 3 x 10"' that of TCDD. Arocloro 1016, 1242, and 1260 had poaalbly ona-tanth th* activity them 1234 elthough thl* eetlmet* mey be high elnca at th* concantratlon* taatad, eytotoxielty waa becoming a factor.
Th* detection limit for TCDD In varlou* dielectric fluid* we* than examined. Tha reeulte indicated that it waa poaalbla to detect TCDD at approxlnataly 0.3 ppm in
7.49
HONS 020313
Aroclora 1254, 1260, and 1242. The maxima concentration of Aroclor tolerated by tha essay via approxinetely 10 ug/ml. Mineral oil and ailicon oil ware alao atudlad and vara shown to ba lneMpatlbla with tha aeeoy dua to thalr Insolubility in althar tha squaoua culture medium or tha routinely ueed dimethyl eulfoxlde aolvant. Attampta ware mada to uaa an amulalflar to ganarata a atable amulalon of thaaa oils. In tha eouraa of thaaa axparlmanta It wee discovered that ultraaonleation of the * ailicon oil without tha praeenea of tha amulalflar resulted in an amulalon which waa atable and eompetlbla with tha bloeeeey. Subsequent prallalnary axparlmanta ualna a111coo oil apiked with TCDD Indicated that thla procedure waa comparable to ualng TCDD in DMSO (tha poaltlve control). Thaaa atudiaa will continue for ellleon oil and mineral oil to varlfy thla raault and to optlmlaa the aonlcatiom procedureThle procedure could raault In a vary elmple method for preparation of unfractiona ted olle end other inaolubla, lipophilic eemplee for bloaaaey taatlng.
The next etudy Involved taatlng dlaleetrle tlulda which had bean subjected to pyrolyala end eonbuatlon to determine If the flat-cell aaaay could detect tha conversion of PCBe to PCDFe aa dhewn by ehemieel analysis. It waa found that pyrolyala of Aroclor 1254 at S50*C for IS min resulted is a 100-fold lneraeee In activity In tha flet-eall aaaay. Thla raflaeta tha aggragata activity In tha sample and la tha first demonstration of the PCI to PCDF conversion aa shown by a biologi cal ay stem under laboratory conditions. Thaaa rasults Indicate that tha flet-cqll aaaay can be used to detect the presence of PCDra In tha laboratory simulated `'used* Aroclor.
Tasting of chemically chareeterlsad ln-eervlee transformer fluids (Aroelore) by the aaaay to deaMnetrete lta use as a screen for tha accumulation of polychlorinated dlbentofurane was undertaken. The six tested oil samples in hexane wars obtained from Isttella (41155-11-12 through 41155-11-17), where they ware apiked with various ^^C-laballed internal etanderda at 100 ppb for each component. TCDD equivalents wars calculated for each sample beead on the analytical results for PCDFa and PCDDe and the biological potency of each isomer and congener in terms of their potency ualng various biological endpoints (5). Thla activity, including the contribution of the internal atandard, rangaa from 130 ppb to 1030 ppb. The raaulte of tha bloaaaey, in a blind taat, gave consistent low values of 100-300 ppb for all aanplas with tha exception of sample 41155-11-14 which exhibited relatively high activity of approxlmataly 1000-3000 ppb TCDD equivalents. These results indicate that tha flatcall aaaay wee capable of detecting dioxinlike activity In aseh of tha samples, and waa able to distinguish the single sample with relatively high activity. Tha currant raeulta suggest that this biological aaaay can ba used as a screen to test used PCI beead dielectric oil for PCDF contamination.
ACnOHLESCKMDnt Thla work waa funded by tha CPU contract RP2026-4.
Kftincu 1. J.F. Worthy and D. Crone. Fund. Appl. Toxicol, 5:754-759, 1985. 2. J.G. Kholnwald end 1. Green. Coll 6:317-330, 1975. 3. J. Knutson and A. Poland. Call 22:27-36, 1980. 4. J.F. Worthy and D. Crane. Toxicol. Appl. Pharmacol. 74:91-98, 1984. 5. G. tadon, at el. environmental Health Perspective* 70:221-227, 1986.
7-50
HONS 020314
Tabla 1 INDUCTION or THE TLAT-CELL EfFICT POLYCHLOUNATED DIOXINS
01 lENZOfUKAN $, glMENTLS, AND AAOCHL0M
2,3,7,8-Tat rachlorodlbanto-p-dioxin 2,3,7,6-Tetrechlorodlbentofuren 1,2,3,7,5-Pentchlorodiban*ofuran 1i2,3,*,7,l-Rax*ehlorodibantofuran 2,3,4,6,7,6-Hexachlorodlbentofuran 1,2,3,4,6,7, 6-Hptechlorodlbaniofuraa Oetachlorodlbancofuran 2,6-Dlchlorodlbancofuren
Minlaun Oataetabla Concantration fppb)
0.0032 0.032 0.025 0.023 0.37S 0.250 4.41 >2.35
3,4,3*,4'-Tatreehloroblphenyl 2,4,3,2*,4',3'-Haxaehloroblphanpl 2,3,2',3'-Tatrachlorobiphanyl 2,3,4,2*,4*,5*-Haxaehloroblphenyl 2,3,4,2*,3',4'-Haxachlorobiphanyl
100 1,000 >10,000 >10,000 10,000
Aroclor 1234 Aroclor 1016 Aroclor 1242 Aroclor 1260
10,000 >10,000* >10,000* >10,000*
* Poaalbla plight flat-call induction at thla concentration. A concantration of 100,000 ppb vai toxic.
7-51
0203^5
kqks
PART e: RISK MANAGEMENT
HONS 020316
PRELIMINARY ANALYSIS Of RISE* ASSOCIATED WITH USE OF FERCHLOROtTHYLENt IN TRANSFORMERS
<7. V, Mirxy V. s. Environmental Protection Aganey
401 M Street. S. H. Veahington, 0, C. 10460
ASSTRACT
There art acute tad chronic toxicity eonearaa with tha uaa of perchloroetbyltnt (FCE) in trensforntre, Should a aajor laaA or cttaatrophic fiilura ot a FCE-fillsd unit occur, tha relatively high vapor praaaura ot PCS could raault m air concentre tiona high anough to praaant an acuta riak ot eantral nervoua ayatem (CKi), pul monary, heart, liver and kidnay at tact*. CNt at tact* could baeoua aavara enough to aka aata aacapa difficult or lmposelbla and ia thus the ehiat acuta haxard/riak conearn.
Lo*larsl lasts and exposure to workers conducting routine nalntanane* operations could prasast chronic risks of cancar as wall as li**r and kidnay at tacts.
Risks associated with coohustion/pyrolysis products an hard to estmate, sines only very United Intonation has bean available on rata* and level* ot production of these aatarials. Heuchlorobenxene is of particular concern in this regard.
INTRODUCTION
Polychlorinated biphenyls hevs baas used as dielectric fluids m electrical power trenaforaers aad eapaeitora for daeadaa because of their combination of good alaetrical properties and lira raaisttnea. Tha toxicity of thasa char real* and of their eombustlon/pyrolysis products, however, ha* required that substitutes be found tor this spplicstion.
Along tha liquid# that have baas found to poaaaaa alaetrical and phyaical propertie* uaaful tor dlelactrical fluid applicatlona la FCt. Howawar, pcE. Ilia polychlorobiphenyls, possesses properties which result In sost level of risk whan the compound ia used in alaetrical equipment. Thla paper is s preliminary look at thoaa naka.
TINDINOS
Riak aatiratac presented here era bated on hatlth affaeti laformatlon contained in Health Aiaaismant Document for Tatrachloroathylana (Fsrchloroethylens) tl) end it* Addendum: Updated Carcinogenicity Assessment for Tatrachloroathylana (2) . Laval* of PCE in *ir anticipated to cauaa toxic allecta, particularly CNS affaeti, were taken troa the Health Asaeatnent tl) end combined with aaaumptiona about office building dtiign (1) to aatimata link rataa from FCE-lllltd traniforaer* that could retult in
8-1 mons 02031-7
toxic effects. lo addition to CNS effects. plausible, upper-bound ctoetr dak levels ot 10**, 10*', 10-* and 10*' wart assessed using this nethod. Sisks as sociated with PCX conbuetlon/pyrolyeit product* could not bo aatiaatod. lo to office building of 21,400 voluna which haa ona air exchange par hour, a leak rata of 2S grana/br would pot* an extra cancer riak (plausible upper-bound) of 10*4 to an oftica worker, uting tha uaual aaiuaptiona about tba worker. A tranatornar containing POO kg. ot PCX and leaking at 20 grant/hr would Iona 10% ot ita fluid in about 4 aontha. For tha tana building paraaatara. a laak ot It,COO gtaaa/hr would bo required to produea PCI lavala of 200 ppa (aatualng inatanteneoua vaporisation aad aguilibra* tioa), lavala high aaough to aaka aafa eacape fron tha building difficult for tone paoplo. Depoadlag on contalnnaat failure cotditioaa, inatantnneoua vaporisation and eguilibratloa nay or nay not occur. Thut, tone parts ot such a building would contain nuch higher level* ot PCX while other parts would contain lovtr lavala. In othtr words, under condltloaa of tuck a aajor laak, tone parts of a building could bacoaa loaded with dnagarou* levels of PCX rather gulckly. Since haxaeholorobeaient (NCI) is a broad tpactrua. potent toxicant, ita pottlbla by-production in PCX-filled transtoraers could have serious lapllcationa for disposal of used fluid and used transforaara. Thara are axparmental data support ing this concern (4).
CONCLUSIONS In sunaary, use of PCE-fillad trsaaforaars in buildings that have no provision for sacursly iaolatlag than froa general air circulation could poeo a danger to people trying to escape it a najor breach of fluid eontainaeat occurs. Further, 80 nay be by-produead ia PCX-tilled transforaara, and units that have bean in use for sons years could be tested lor its presence.
DISCLAIM!* This report has aot beaa peer or adalnlstratlvely reviewed and should not be construed as finsl policy of the U. t. Snvlroaaentel Protection Agency.
HONS 0203 IS
8-2
REfEAtMCE* 1. Baalth Antpnnant Dormant tor_T*tt*i:blotPaADYltM (Parchlototthvlint).
EPA/400/l-t2/00SF. Oltie* ol Haaltta and Lnvironaantal Aaaaaaatnt. U5EPA. Ktitarcb
Trianpl* Park, KC 27111. 19*5. 2. Addtadua to tha Haiti Aarmaant Docuntnt for Tatracbloroathvlana (Parchlototibvlint). Undated CArciaea<i..tnjf liiuwnt tor Tctraebloroetbvlafla {Perchloroathvlana . PtkC. PCE1. External kevitv Dralt EPA/40O/t-t2/OOSrA. 01 ilea el Baaltb and Cnvironnantal Aeaeaaaant. USEPA, Waabinpton, DC 204(0. 1944. 2. Hethoda ftt Aaaaailna txnoaura te Chemical lubatancaa. Vel. T. IPA/MO/i-IS001. EPA Contract No. 41-02*2044. Expoaura Evaluation 01viaion. ottic* ol Toxic Subatancaa. USEPA, VaaAlaeton, DC 20440. February 1914. 4. 0. Orant. Pvrolvala ol Chlorocarbona 2. Appl. Cbaa. Dioteehnol. 21. 49 41914).
HONS 0203 IS 3-3
MANAGING PCB RISKS IN POWER PLANTS
MIchaal S. Johnson Donald S. Wilton David Cohan
Daeltlon Focut Ineorporatad 49M El Camtno Raal Lot Altot, CA 94MJ
ABSTRACT
*
Should PCB transformer* In power plants be replaced? Even If health risks ara minimal, PCBt can present economic risks to utilities. An Incident involving PCB* can result in miiftons of dollars in cleanup, replacement power, and legal coats. On the other hend. Incidents are vary' unlikely, and replacing or retrofitting transformer* can be vary expensive. PCB equipment management decisions are difficult because Incident occurrence, severity, and cost are til highly uncertain. The PCB Economic Risk Management Model (ASK), developed for EPRI by Decision Focus, helps utility personnel balance the certain costs of replacement or retrofitting against the uncertain eottt of keeping PCB equipment In service. ASK has been used successfully by more then t dozen utilities throughout the United States to help manage PCS transformers.
THE ASK MODEL
The PCB Economic Risk Management Model (ASK) la a decision support too! designed to help utility personnel manage equipment containing PCBt. Based on the methodology of decision analysis, the model allows utility personnel to compare alternative strategies on the basis of overall costs. Including both equipment cotta and the cotta of potential Incidents such as fires or tpllle. ASK allows model users to explicitly represent uncertainty regarding the occurrence, severity, and cost of Incidents, and to explore the sensitivity of management
options to change* In assumptions. These features are combined In an Interactive software package that It designed for easy use on microcomputers.
Management decision and uncertain events ara modeled In ASK using decision tree to organise a set of scenarios. For etch management strategy the probability of a given scenario Is simply the product of the Individual outcome probabilities for each uncertain event In the tree.
For each scenario defined by the tree, Incident and equipment costa arc calculated using
the models shown In Figure 1. The equipment model calculates all costs associated with existing and replacement equipment. The Incident occurrence model calculates the likelihood, expected timing, and probable severity of an incident. The incident cost model calculates *u costs of an Incident, given that one occurs. Cost elements can include equipment replacement costs, cleanup and repair costs, costs of legal liabilities, and replacement power costs if the plant Is shut down during the claanup and repair effort. The financial model adds up all the cost
elements and computet the discounted expected value of the scenario.
Weighting the cost of each scenario by Its likelihood, ASK can detarmin* the expeetd cost of each equipment management alternative. In addition to the most likely cost, ask provides information regarding tht cost rtngtt possible under aach managamant strategy.
020320
HONS 8>4
data requirements
Tht data rtquirements of ASK ara modeit. in order to evaluate an equipment management alternative, the uaer need* to auppjy basic Inform*-Ion about tne existing equipment Including its remaining useful life and disposal cost. The cost of new equipment Is also required* along with cost of any risk reduction measures that arc part of the strategy.
Estimates of Incident frequency can be obtained from industry average data. Incident severity is usually characterised sufficiently by three possibilities: spills, arcing and smoke with no fire, and major firea or explosions. Associating appropriate cost estimates with each severity level mutt be done on cast-by-csse basis, although the breakdown of costs into cleanup, replacement power, and legal liability components helps make the estimetes manageable. Again, Industry experience can provide valuable benchmarks, especially when estimating the cost of severe incidents.
ASK will provide formatted data tables, allowing convenient review and providing clear documentation of the assumptions underlying the analysis.
RESULTS
,
ASK produces four basic results tables, including summary results, detailed results that break down overall expected coat Into the equipment and Incident components, expected Incident costs for each severity level, and cost ranges. Table 1 Illustrates the detailed results
table from a typical analysis. Tne results can be used to identify and communicate the leastcost option, as shown in Figure 1.
Using ASK Interactively, extensive sensitivity analyses can be easily performed. Often, this information Is most effectively communicated on a graph. Figure 3 Illustrates a typical format. The horltontal axis represents the overall Incident frequency; the vertical axis the duration of the shutdown resulting from a major fire in a PCB transformer. In the lower region of the graph, retention of the existing equipment has the lowest expected cost, in the upper region, retrofitting is the preferred option. The solid Ifne through the center of the plot represents the combinations of incident frequency and fire shutdown duration that result In equal expected costs for the retention and retrofitting alternatives. The base case data combination Is Identified in he lower left-hand corner of the graph. The distance of the base case data point from the equal cost line is a measure of the robustness of the analysis results.
SUMMARY
ASK provides a powerful toot for utility personnel charged with evaluating PCB equipment management alternatives. Development of a base case date set can often be completed within days. Experience by utilities using the model indicates that, in most esses, well-documented and defensible analyses can be planned, performed, and provided to
management within several weeks of the initiation of the analysis.
Figure 1, The Set of Models Used to Cslculate Costs in ASK and Coil 8-5 MQNS 020321
Eiprrtcd NTV M a n
vi,no Hymn ItMKKt
n Flfur* 2. Summary of Trantformar Manacamant Options
Fljura 3. Sansittvfty Analyses Can Bo Presented Graphically HONS 020322
6-6
PCD Fwt S M o m Umnuam (Dart)
Table 1 ASK DETAILED RESULTS TABLE
ALTERNATIVE
DETAILS Of EXPECTED COSTS (* INDICATES SEST ALTERNATIVE)
equipment
COSTS
: EXPECTED INCIDENT COSTS
t TOTAL
* CLEANUP SHUTDOWN
LIABILITY 1 COST
Retain RATEPAYERS SHAREHOLDERS
TOTAL
.'Replace lamed
RATEPAYERS SHAREHOLDERS
TOTAL
Retrofit!. RATEPAYERS SHAREHOLDERS
TOTAL
315. 0.
285.
PROIASILITY OF INCIDENT >.01U11
t 160St. :
lip. :
5*1.
t 0. : 0. :
0.
t 1*0*9. :
7*17. i
5*1.
:
PRORASIL1TY Of INCIDENT .019412
11)45. ;
108. i
0. t
0.
0.
0. ;
0. :
0.
:w*s.
.08. :
0. :
0. . :
PROSASILITY Of INCIDENT
win. t
3*08. :
751 . .*
o,
0. :
0. :
win.
2408. :
751. t
019612 55 . 0.
55. ;
2*333. 11*53. 15528.
MONS 020323 8-7
PCS RISK ASSESSMENT USING THE ASK MODEL
Wesley A. Sprout*, Jr. Virginia Power
Parfomanc* Services Department P.0. Box 26666
Richmond, VA 23261
PCS Incidents Ctplllt, fires, etc.) are rare, but the potential costs from iv Incident cm be quite Urge. The likelihood, severity, and cost of afT Incident are highly uncertain. Consequently, the equipment management decisions feeing electric utilities are challenging,
A study of the risks posed by PCS equipment at Virginia Power's generating plants was performed using the PCS Economic Risk Management Model (ASK). Probability Inputs to the model were obtained from the us* of a risk ranking worksheet. The results presented management with a life-cycle cost for each alternative course of action and allowed management to compare Its own risk standards to a 'break-even1 probability.
INTRODUCTION
Virginia Power, In January 19B4, began a PCS removal program designed to eliminate all PCB and PCB contaminated equipment from the transmission and distribution system. However, the Power Operations Department had no program in place at the power stations that mandated equipment removal or other risk reduction measures. In late 198$ a Power Operations staff group initiated a study to assess the economic risks posed by PCB equipment at the generating facilities. Performance Services, a technical service group within Power Operations, was chartered to use the PCB Economic Risk Management Model (ASK) to evaluate the risks and to present the findings to management In a concise format.
ASK Is an Integrated decision support tool Incorporating equipment cost and performance calculations, a financial model, and explicit representation of uncertainties In the occurrence, severity, and cost of Incidents. The model runs on a personal computer and the software has been designed to facilitate Input and analysis. The output of the model presents the expected value of the life cycle cost for each alternative.
The model requires the user to specify the management alternatives under consideration and th* branches for each of five areas of uncertainty. These five areas ere: (1) Incident frequency, (2) Incident severity, (3) cleanup costs, (4) plant shutdown costs, and (5) liability costs.
HONS 020324
3-8
Equipment date to be Input to the model for existing equipment Include the original capital cost, KVA rating, power factor, capacity factor, OtM cost, disposal cost, useful life, tax life, book life, and remaining life. The information for the replacement equipment includes the capital cost, 0*H cost, power factor, and risk reduction cost (retroflll, curbing, etc.) in expensed or capitalized form.
ESTIMATING PROBABILITIES
Perhaps the most difficult Input to develop is the probability of an uncertainty branch. Sensitivity analysis Indicated that the annual Incident occurrence rate had a significant effect on the model output. Ourlng Initial model runs, the Incident frequency uncertainty was represented by three branches with different values for the Incident rate and varying probabilities based on the condition of the equipment. Industry data Indicate that the current physical condition of the equipment (age, casing condition, etc.) may not correlate with the potential for failure. Therefore, the Incident occurrence rate section was changed to one branch. The value of this branch Is .001 incidents per year. This figure represents the Industry average bastd on a number of studies by different groups and Implies that out of one thousand transformers, there will be one Incident. This does not speak to the magnitude of the incident; it could be a spill, large or small, an arcing Incident prooucing soot, or a catastrophic Incident such as fire or explosion.
Three branches were chosen to represent the uncertainty involved with the severity of an Incident. These were: (1) RGB spill, (2) PCB arcing/smoke, and (3) PCB fire/explosion. The probabilities assigned to each branch were .95, .04, and .01 respectively. The probabilities were chosen as a result of an analysis of industry data. These branches were applied to the 'retain alternative". The study did not assign severity branches to the retroflll and replace options because It was assumed that no PCB incidents will occur under those alternatives.
Representing the uncertainties of cleanup costs, shutdown costs, and liability costs Is more of a challenge. Three branches (minimum, moderate, and maximum) were chosen for each uncertainty. The value assigned to each branch is discussed later.
The probabilities were chosen In a manner based on a relative ranking of each piece of equipment. This ranking, the Incident Severity Ranking, was a result of field Inspection of each Item using an Incident Risk Ranking Worksheet (adapted from EPRI Document CS-4094: Design Manual for Reducing Airborne PCS Contamination). The study assumes that the magnitude of the costs of ar Incident, providing an Incident occurs, Is related to the Incident Severity Ranking of the piece of equipment In question.
The probabilities for the branches representing cleanup costs were chosen by using the graph In Figure 1. This graph was constructed by reccgnlilng that If the Incident Severity Ranking was low, and an Incident occurrec, there is a greater probability that the associated cost will be on the low side. Ftexample, If the equipment had a ranking of IS the probability of a mlnimucost would be 561, the probability of moderate cost would be 321, and probability of maximum cost would be 121. By using this graph with Incident Severity Ranking, the process achieves a relative risk compans:" between PCB Items.
HQNS 020325
8-9
The probabilities for th branches representing the shutdown costs and liability costs were selected In the seme manner with one modification. A Shutdown Factor and an Exposure Factor were added, separately, to the Incident Severity Ranking, and those sums were used to select probabilities from the graph. These factors were used to account for Individual characteristics of the different PCB Items that Indicated one may be more prone than another to cause a shutdown or to expose personnel to contamination.
V/U.UE5 FOR BRANCHES
The study assigned values for the minimum, moderate, and maximum branches of the cleanup cost, shutdown cost, and liability cost uncertainties'. The variance from item to Item will occur In the associated probability, not 1nthe value of the branch. The cleanup cost values were based on Industry experience for various Incidents. The liability cost values were based on lewsult figures from actual incidents, but were modified to show only the awarded portion of the suits. The shutdown costs are computed by the aod#l based on the expected value of the shutdown duretlon, the MW rating of *he unit, and the capacity factor of the unit.
RESULTS
The results were presented In tabular form giving the life-cycle cost for each alternative and a "break-even* probability for each situation. This break-even probability Is the point at which the life-cycle cost of the retain option Is equal to the life-cycle cost of the next best option: retroflll or replacement. This Is a numerical representation of the Intersection of the lines on the graph In Figure 2. The graph is shown to Illustrate how management may compare the results to their own risk standards. One should note that the probability that an incident will oeeur is given by
PROS 1 - (l-p)1
where: t Remaining life of equipment p Annual Incident occurrence rate
The study was effective In focusing management's attention to PC8 risks. Several power stations are now In the process of replacing or reclassifying their PCB equipment. Vie have since used the ASK program on several occasions for "what-lf* analysis and have also re-run certain scenarios using updated Information on cost and life expectancy.
8-10
MONS 020326
00
oH
MOOOft MJWY IWMNO
figure 1. Probability Selection Graph
Figure 2. Incident Probability vj Total Cost
8-n
MONS 02032?
RISK ANALYSIS Or USING PCS PILLED TRANSFORMERS IN INDUSTRIAL AND RESIDENTIAL APPLICATIONS.
R.Belnens, K.Hesel, A.Peytier, w.Geysen Laboratory for general system aafaty and foranaie aecidant
investigation K.U.Leuven
Xerd.Mercierlaan 94 B-3030 LEUVEH-NEVERLEE
BELGIUM (EUROPE)
ABSTRACT
This papar dascribas tha application of tha Management Oversight and Risk Traa (MORT) method for the anelyaia of the haserds which may oc cur due to the use of PCB filled transformers exposed to fire, as thia may yield in specific circumstances the production of dioxins (PCDD) and furanes (PCDF). The method reveals a number of measures which have to be taken in order to avoid the production of these extremely toxic products.
INTRODUCTION
Although the Belgian law (Royal Decision datsd July 9, 1996) forbids the selling of new systems containing PCB's, it allows the use of existing equipment as long as its normal lifetime. As static electric equipment as e.g. transformers and capacitors has a typical lifetime of 30 years and more, the problems and hasards coming from the use of these products will still be present for a long time, especially when the equipment is exposed to fire, yielding the creation of extremely toxic products liks dioxins (PCDD) and furans (PCDF).
As shewn by various examples in the past (1,3,3), this might lead to dangerous situations and to major economic damages. Therefore the authors used a systematic approach, called MORT (Management Oversight and Risk Tree) method to analyse the risks due to the use of PCB filled transformers.
The major features of the MORT analysis are discussed briefly.
MANAGEMENT OVERSIGHT AND RISK TREE (MORT)
MORT is a systemic approach to the management of risks in an organisa tion. It was developped by the U.S. Department of Energy (DOE) and incorporates ways to increase reliability, to assess risks, to control losses, and to allocate resources effictively.
MONS 02032a
8-12
It is conceived for decreasing the safety-related losses of *n organi sation with *n tlrssdy sxcsllsnt ssfsty rseord. Its philosophy esn bs summarized by ths following points []:
1. Management takes risks of many kinds.
2. Risks in ons area sffset opsrstions in othsr srsss.
3. Risks should bs atds explicit vhsrs prsetiesbls.
4. Risks management tools should bs flexible enough to suit s vsristy of divsrss situations.
Ths various intsrsetions in ths system which nay yisld ths undisarsd dangerous phenomenon, ars rsprsssntsd using logical analytical dia
grams (trass).
Ths full MORT approach is a "univaraal trss" dsvsloppsd for an antirs
safsty systsa disciplins. As ths systsa discusssd here, is rslativaly
siapls whan s.g. coaparad to a chemical plant, a lot of ths faaturss
ars not ussd hsrs.
/
rigure 1 rsprsssnts all ths graphic systsas nssdad for ths analysis.
we will now discuss ths application of ths HORT analysis for ths cre ation of PCDD and PCDT from PCS ussd as an insulator in a transformer.
USE or THE HORT ANALYSIS TOR A PCB TILLED TRANSFORMER
With rsspset to ths problsas which aay occur vhsn using PCS fillad transformers in industrial and residential areas, two aajor risks have two bs analysed)
- the leaking of PCS out of ths transformer and the direct pollution eaussd by it;
- ths generation of dioxines and furanes whan PCS is burned during a firs.
Both situations vers analysed and will bs discussed during the seminar. However only ths second ons, which is by far ths most dangsrous, will bs explained hsrs briefly.
Figure 2 shows ths risk trss. As wa can see, a number of conditions have to bs satisfied in order to generate to toxic products. A lot of electrical as wall firs protection measures have to ba less than ade quate (LTA).
The datailled discussion of ths various elements of the tree will be presented at the seminar.
Therefore we may conclude that a lot of protective measures must be taken cars of and must be checked regurlarly in order to avoid major disasters when using pcb filled transformers.
8-13
MONS 020329
ACKNOWLEDGMENT
Tha author* ar* mostly grataful to tha Council of tha Joint Bailc
Ramaareh Fund (F.K.P.O.) of tha Balgian Scianca Foundation {N.P.w.o i for granting a projact that finanead this raaaarch.
REFERENCES
1. X. Blackman. Aftar a PCS flra - claan-up In*Ida building* cont-.^natad vlth dioxin** and furanaa. Procaading* 19*9 EPRI PCS Sami: nar, Saattla Washington, octobar 22-29, 1919, cs/EA/EL-4490, p.>i to s-4.
2. A.Schachtsr, T.Tiaman. "Occupational axposur* to polychlorinatad
dioxin*, polychlorinatad furan*, polychlorinatad biphanyls, and
biphanylana* aftar an alactrical panal and transformer accidant in
an offica building in Binghamton, NY.", Environmental Health Per-
BDactlva*. Vol.90, p.309-312.
,
3. D.W.Boyd, D.Cohan, D.S.Wilson. Analysis of tha coat* and benefit. at iltimitlva eakerel treneformer raoulatorv potions. Dacia ion
roeus ineorporatad, DPI Projact No.1433.01, July 1994, Los Altos,
California, U.S.A.
4. X.J.Elsem, D.S.Conger. "Management Oversight and Risk Tree.", Tha Risk Report. Vol.S, No.2, October 1993.
Output
Inputs Output
AND-gata: Coexistent of til inputs required to produce output
OR-gate: Output will exist If at least one Input Is present
Inputs
Out TRIANGLE:A connecting or transfer symbol. All tree construction below the "out" triangle Is transferred In at "In" triangle location!s).
RECTANGLE: An event resulting from the combination of more basic events acting through logic gates
Figure 1. Basic symbols of the MORT analysis 8-H
MQNS 020330
Figure 2. MOST analysis of generation of PCOD and PCDF from PCB'S
6-15
MONS 020331
PART 9: decontamination OF OIL
HONS 020332
"GE'S Non-Sodium Process For Chemically Decontaminating Mineral Oil Otelectrtc Fluid
C. w. Horneek. P.E. GE Industry Sales A Services 1 River Road. Bldg. 2.525 Schenectady, New York 12345
1-BOO-626-2001 Ext. 722
Or. C.l. Coceto
Mgr.-PCB Business Op*ration BE Industry Sales l Services 1 River Rotd, Bldg, 2-525 Schenectady, Mew York 72345.
ABSTRACT
As *rly is 1979, scientists at GE's Corporate Research *nd Development C*ntcr, Schenectady, NY. recognized that PCB contaminated transformer dielectric fluid could b* chemically tr*t*d to rcduc* PCB content to non-deteetabl* levels, This led GE to d*v*lop end patent chemical decontamination process In <961 using metallic sodlun. Because of the potent!*! difficulties in handling sodium (sodium nd water produce hydrogen which can be explosive), GE embarked on a research program aimed at Identifying a safe, economic means of reacting PCBs In transformer oil that would reduce PCB levels to below the U,$. Environmental Protection Agency (EPA) 2 part per million (ppm) upper limit for chemical destruction. To be successful, this process would be safe, efficient and economical and would not require the use of sodium.
This paper describes the successful development by GE of a patented non-sodium process meeting these objectives and the design of a trailer mounted PCB decontamination unit for commercial us* utilizing the new advanced GE chemistry.
THE PCB REGULATORY ENVIRONMENT
Polychlorinated biphenyls (PCBs) are a class of hydrocarbon compounds that have long been used at dielectric (insulating) fluid In electrical equipment. The majority of liquid filled transformers in service today us* either mineral oil or PCBs as their insulating fluid. While both fluids were used separately in their intended application, many mineral oil-filled transformers were contaminated with PCBs during manufacturing or servicing. While the estimated number of contaminated units in service varies, there are at least 2.5 million transformers contaminated with more than 50 ppm PCBs.
In 1976. Congress enacted the Toxic Substances Control Act (TSCA) as a response to public concern over hazardous waste. On May 31, 1979, EPA published the PCB "Ban Rule* regulating fluids containing over 50 ppm PCBs. Since promulgation of the 'Ban Rule*. EPA hat Issued many additional regulations, addressing PCB related issues and defining various uses and restrictions of PCB fluid and equipment containing PCBs.
HQNS 020333 9-1
chemical DESTRUCTION OF PCtS IN mineral oil
EPA dispose regulations require destruction of PCt dielectric fluids, by thermal or 'alternative* destruction methods. Thermo! methods Include high temperature incineration and destruction In 'high efficiency boilers*.
Although a number of 'alternative destruction methods* have been tested, this category principally Includes PCt chemical destruction systems.
Most of the currently permitted sodium chemical destruction systems can decontaminate fluid containing PCts up to S.000-10,000 ppm. However, because chemical costs Increase with the PCt level treated, sodium based chemical systems are usually economic up to about 3,000-$,000 ppm. beyond that level, incineration becomes more economical when transportation costs are equal. Besides being economical for the low contamination levels, chemical decontamination systems can be trailer mounted. Additionally, these systems produce a non-PCt fuel oil with a high BTU content.
because of the above advantages, many owners are now selecting chemical destruction as the preferred method of destroying PCts In mineral oil.
THE 6 PROCESS
GE found that PCts In transformer oil react with polyethylene glycol (PEG) and potassium hydroxide (KOH) under relatively mild operating conditions, Destruction of PCBs occurs by mixing heated transformer oil with small amounts of PEG and KOH in a stirred vessel. Both PEG and KOH are non-proprietary chemical substances conmonly used in Industry and do not pose any unusual risks, Complete reaction of PCBs occurs quickly producing decontaminated transformer oil and a non-PCt byproduct. The small quantity of byproducts produced are Insoluble In transformer oil and are easily removed from the decontaminated oil by decanting. Figure 1 schematically depicts the 6 process in simplified form,
While sodium based processes destroy PCBs by sequentially stripping away chlorine atoms from the biphenyl molecule over time, GE's process destroys PCBs as a result of a simple chemical substitution of a glycol atom (from the PEG) for a chlorine atom in the biphenyl system (Figure 2], while multiple substitutions of chlorine atoms may occur, with the GE process only a slnole substitution is needed to render the PCB product molecule insolueble In the transformer oil, This non PCB product can be easily removed from the oil by simple decanting. The non PCB byproducts can be Incinerated and the decontaminated oil used as fuel.
Because of the simplicity of the process, PCB destruction Is fast, efficient and highly predictable. Because the oil and chemicals are easy to handle, a trailer-mounted PCt decontamination unit can be built using conventional and proven process equipment. Beceuse metallic sodium Is not used, there Is no possibility of explosive hydrogen production.
Unlike the sodium based processes, the GE process is not particularly sensitive water. Additionally, it Is not necessary to precisely measure the amount of pes end KOH added to the oil.
Therefore the GE process offers significant advantages over sodium based process (Table 1).
HONS 020334
9-2
LAB EXPERIMENTS AND EVALUATION
Commercial development of the GE process begin In 1981 with i series of laboratory bench scile experiments using variety of process conditions and reagents.
following the extensive experiments which proved the effectiveness of the decontamination chemistry (PCBs were destroyed to less than 2 ppm per EPA's requirements), an engineering analysis was conducted to establish the feasibility
of commercializing the process: to evaluate the effects of using different process parameters: and to obtain scaleup and design data.
As a result of this laboratory evaluation, GE concluded that a safe, economic, simple and efficient method of destroying PCBs in mineral oil had been achieved without using sodium. PCBs were destroyed In a simple reaction under mild operating conditions. The non-PCB reaction products were easily separated from
oil.
DEVELOPMENT OF A TRAILERMOUNTEO PCB DECONTAMINATION UNIT
Based on the success of the laboratory experiments, GE commenced process design" and engineering of a PCB decontamination system using the advanced GE chemistry.
Prior to beginning design of a full scale commercial unit, GE established strict design criteria that would ensure proper operation and safety of the unit consisting of:
Maximized Safety Features
Failsafe Design Computer Controls Maximized Dally Throughput Meeting EPA Performance Objectives
Onboard PCB Laboratory Online Data Acquisition System Proper Materials of Construction Use of Conventional Equipment Ease of Operation
Using the basic process configuration proven In the lab, GE has designed a tretler-mounted PCB decontamination unit {Figure 3] with three (3) vessels operating in a batch type process. Batch processing was selected over continuous because of Its operating simplicity, higher reliability and failsafe features. The simplicity of the chemistry enabled GE to select commercially available components and to provide for automated operation using GE's 'Series six"* programmable controller. The Series Six" automatically controls the chemical process from the control room and provides the operator with continuous on-line process Information and periodic status reports for critical process parameters.
Figure 4 provides a simplified process flow schematic of the system. PCB contaminated oil from storage is pumped through a filter to the effluent heat exchanger where the Incoming oil it partially heated by exchanging heat from the previous batch of decontaminated oil. In the electric heater the oil reaches the
reaction temperature before entering one of the three (3) reactors.
KOH added to the feed hopper is fed in the required amount to the reactor via the KOH feeder. PEG from the feed tank is metered and pumped to the raactor where the oil, PEG and KOH are mixed for the required reaction period. The reactor is blanketed with nitrogen during the reaction. Any excess nitrogen and vapors are passed through an activated carbon bed. In this way. any hydrocarbons are
absorbed In the carbon bed.
HONS 0*0335 9-3
Tht reactor contents re pumped through the heat exchanger, thereby heating the next incoming bttch of oil. From the heat exchanger, the decontaminated oil end reaction products are pumped to decanting tanker where the oil and reaction products are easily separated,
The entire seouence of filling, reacting and drelnlng of the three (3) reactor loops Is accomplished automatically with the onboard microprocessor which also provides the operator with status reports and alarm.
All equipment and components are mounted In a specially designed 48 foot long air ride trailer which includes separate process and operational lab areas.
design of the equipment and trailer includes many safety features such as an integral spill pan, air ride suspension, halon fire protection system, trouble alarm system, automatic system shutdowns, emergency exits, safety shower, eye wash and air emissions control system.
SITING ANO OPERATING CONSIDERATIONS
The GE decontamination unit Is designed to be operated in multiple shifts either . at a fixed location or in e mobile environment.
Operation of the decontamination unit requires two operators, one of whom is skilled in PCB product analysis. Prior to and following decontamination, the oil and products are tested for PCS content. These tests are performed using the onboard electron capture gas chromatograph.
GE will operate the decontamination unit with the highest degree of safety and in accordance with a strict risk control program.
SUMMARY
GE hat developed and proven, through extensive laboratory experiments that the GE decontamination process is a safe, economic and reliable method of chemically decontaminating mineral oil containing pest. PCS levels are reduced to less than i ppm thereby meeting EPA's destruction requirements. The GE process offers a number of significant advantages over sodium-based processes Including:
No Chance of Hydrogen Production Insensitivity to water In the Oil Precise Amount of Reagents Not Critical Fast Turnaround
Laboratory and scaleup tests have shown that the process can effectively decontaminate oil containing up to 10,000 ppm PCSs.
The simplicity of the GE process supports the use of conventional chemical processing equipment in a trailer-mounted unit with large volume of PC8 destruction capacity.
HONS *336
9.4
Mgurt 1. G Proe*** (Slmpllfltd IHtgrtn)
Mgurt 2. Otitructlon by GE Proctst MONS 020337
9-5
Ftgurt 3. PC# D*cotM)tt)on Unit Mod*)
Flgur* 4. SlmplWltd Proem SchiMtU 6E PCS O*cont*m)nt1on System
HONS 020338
9-6
Tibi* 1 Advintigis of th* GE Process Slnpl* Chonlstry F*it----- H-tfflclont Highly Prodlctoblo Outcoow <No Intirnodliti PC&s Fonood) Non Proprietory ftoogonts Cost Effective No Sodltu Used (No Hydrogen) Mild Operetlng Conditions Not Sonsltlvo to tutor Convontlonil Process Coulpnont Usod
020339 HONS 9-7
THE VALUE OF DEHYDPATtON PHIOP TO PFTPOFIU OF (MMF, PCB-CONTAtNlNC THANSFOPMEFS
Felix F. Vttissquus Power Engineering. Inc. San Juan. Puerto ft leu OOB,Iff
ABSTRACT
Field retrvftll activities ara highly dealrabjt tu reduce PCS voinaaitiaUtw and tn eneure prolonged transformer life. Particularly in larger transformers. an operat ing conetreinx (mater build-up) which can Halt ur own curtail the success ut ratroffll meat ha eliminated prior to ratroflll in order to anaure prolonged safety ot tranafnrmar performance and life. A pertii uiarly wei l-astabiJshed provadute involving the uaa ot keroaene In conjunction with a well-daatgnad vacuum dehydration apparatua all owe virtually complete and totally aafa rnsmvnl of water build up. Thia paper mill detail thie method.
nmooucTiON
Aa might ha expected, the PCS aituatittn in Puerto Pico in much the name In thv OS. tn thia raapaet, Puerto Pico may be conaldarad a microcoam ut the larger PCS world in the OS (aa a Commonwealth, Puerto HI no la covered by US tnwx end rrguln tlona). Although the number* ot trinr/orMn containing PCS* <s teal ter- roughly 1SOO PCS containing tranafnrmara- the throat poaad by the prraiwo ot PCtie In m< leee viaibia. reel or apparent to the populace. Conaidar the situation which would ariaa if a PCM aptll or incident (aimllar to and own amajirr than that of fc'.iukegnu Harbor or tAe Pudaon Pivar) ahoold occur on an inland which railaa aoiely on ground or aurfaca water tor water. The reaulta would bv catastrophic, whether politically, economically or environmentally. The aituatlon would ha compounded hy the tact that the water table on an inland la, ecologically, mo fragile.
Patently, tha Inland narrowly mlaaod a PCS trant former tire Incident which would have rivhimd the incident at the Stato Office Building in upatete Hew York. On New Yearn hay, iSBt, a fire in a luxury hotel in San Juan guttnd nont of the ground end the tiret floer ot tho atrueturo, leaving the reaeinder struct urnlly auund Fortu nately. hard the parallel with the Haw York aituatlon caaaad. The fire vary nar rowly misood iarfa PCM tronofornaro located un the lower Hour, wheat involvement would hovo coaproeieed the entire hotel.
APPPOACHES TO THE PPOBt.EH
Ao in the US. there ere Iw epproechoe for removal ut the PCBe. One involve* removal ot the PCB and the tranaformer. In thia approach commonly called retrofitting, the PCB* ora removed from the tranaformer by a simple drain and shIppcd to e SPA permitted facility for deatruction. As Puerto Pico has no EPA authorized PCB
Printed with permission of Power Enoineerlno. Inc.
9-8
MOWS 02034*0
drstrnrt tup fart t it trs. the FCH', most hr shipped st.itrsirte for drstroct ton. no ti.iiif. fi`i mn ran a tv, trhlih xiil) nwt.ilns typically liKwc/i to and 100 pound* of Pfn.t nm hr rl telu.i/oJ m xuOfi manner, goat-rally by landft 11. fortunately for the I'-l.tlitl. three an re fCtl piti m > I ti-il l.mdf ills, lintI thf IM11 liter*/!-* Uf t b* Mhlpped itati-shtr for hurt,11 h>rtnii>rly hn tota of the; prnviouaty mentinned dependence on u fratfUr wetrr t/tl/)r tike nm Ilf neighbor*, r err subjected to the reetrietlone of the CF.RCEA Regulut hunt, end thr PCAs once burled cannot bn forgotten Any prnbhms tit thr luneif111 hintimr mtr pi obire* rven though only one of our treneformere may have made tht-tr way to the landfill,
Thr n Kernel Jvr In retrofit Involve* t rvhnnl ogy known ee retroflil. whereby the PCBs are- roeuvmt Uy it ter let of fluid exchangee, culminating In tbe reclassification of e PCS t rente former to unnl'Cb etmtoe per HS-EPA rule*. The benefit of thie epproech te that only ihr PClte arr dretroyed, leaving the valuable and etlll fonetlonel trtneft-rmrr In place. That In illicit j* a tremendous fineneiel advantage. Retrofit] of mineral till traneformrre contaminated with PClte he* been tocceeefully conducted on thr Is hind fur thr pent *-6 year*. Itnwrvrr. retrofit J of PCS treneformere hee only remit ly t-mn introduced la the Island end ot it tree a temporary dielectric fluid to n-muve PCbe. it 1* the autlinr'* underetending that tbe eerviee hee been available /tt the Slates fur nvrr two yearn. In our opinion, thi* retroflil eerviee, which dues not rrtioire the opeietton of unattended peripheral equipment. ik superior to ; the replacement option In a number of areaa end offera the guarantee of attaining iton-ITH attrina.
TEAREFORMERS tR PUERTO RICO
Tran*former design In Puerto Rlrn in almilnr to the dmeigne found in the State* end, in ir f<* except lan*. Europe, lne 1 ruling coneervator treneformere which generally are I let led to mineral nil unite. Thr occurrence of conservator unite In Puerto Rico te rnrii hot .itne three fnm breathing unite have e tendency to pick up water more then common m-ah-d or gae hlenketrri unite . The rnlntlvn humidity in Puerto Rico le approximately TM year round ft subtropical island setting). The safe use of free Uri-athlng transformers woiiltl be difficult at brat. Exceedingly rare in Puerto Rico arc unite which ere hermetically seeled wtth no air epee*. In the author's experi ence. moat of the tranaformers in Puertu Rico ere ermitid or gee blanketed unite.
Ti ensformer KVAs In Puerto Rico span e wide range, from 25-7500 KVA for PCB unite nod op to noo MVA for einerel oil unite. Three huge oil unite ere reeliy etep-up Irene formera ee the secondary voltage le, usually. 230 KVA. 6*I Ion to KVA ratioe arc no dlffrrmt from their US counterpart*. This le contrary to first expecta tion*. as one would expect that in the hotter environment the treneformere would be physic*Uy larger in order to enhance the cooling effJnicncy. This le not ti>e c*ee to general, e 10/M KVA transformer coniuins on average 200 gallon* up to e rare 300 gallons. The larger PCB trnnePoreore on the Telend can contain up to elaoet 2,000 gallon* of pure PCB prior to retroflil On this email island, the presence of such large PER quantities on one epot duel ly putt* e heserd tbst euet 0* considered.
The locution of treneformere in the subtropical environment pose* spec It 1 concerns as well. Such rnneeme center around the always preeent Mgl> humidity of 7OX, If transformers are improperly gasketed end ere allowed to breath, the transformer tllclei trie content t.sn rapidly ha contaminated wtth water to level which would compromise the transformer Integrity If the effect ie severe enough, this could result In breakdown of the- insulation. a short developing, severe arcing end in the extreme eh explnstoo of thn transformer Care ehouid be taken to oneure that the trensforaere am properly gasketed end that gsektte ere routinely checked for Ireks
Ft nvantIvn maintenance programs are inre jn Puerto Rico except for the power indus try and thr more *no*lrdjreni>/r Jndusti isl (wnrj* Thie habit le not wjut end uofor
9-9 HONS 0^0341
tunstoJy. ia not changing rapidly. PCM unite arc at riak In thla anvlronaant On* concludaa that it a tranaformar ia exposed to *atar (unavoidable here), than iwiiaatrebla IncJdanta are likely to occur. If thta happana. it would bo for batter if the tranaforaor la non-PCM. If tha tranaformar at ill function* wall, there ia no real raaaon to replace the entire unit Kather. the uaa or retrofit! tachniquaa and ultlaata reelaaatfleet Ion to non-PCM atetua would be recommended.
DEKYDkATION TECHNIQUE
Prior to. or ea pert of atendard aarvielng techo1 quae including ratroflll. it it recoaaended that treneforeera In Puerto Pico be dehydrated to remove ee ouch water aa poaalbla. Thla la particularly racommendad for the larger tranaformara (higher KVA) found on the telend. A number of techniguea have been utillaed to dry tre/ieformere. for example, atmple vacuum dehydration ia affective for the emaller untie However, in the larger unite, insufficient energy ia available to remove the water present in anything approaching o raeeonabla timeframe. During the procedure, the core of til* trana former remelna cool and the water aimpla dome not vaporize rapidly
Not fluid exchangee may bn acceptable for mineral oil contaminated unite. However, for PCM unite, tit* uaa of thla technique would create a large heaardoua waate prob lem. The aevaral volumee of fluid required to remove the water would require die-, poaal aa if la ware pure PCM. Conelderetion of thla would lead to the conclualotr that an alternative method tor dehydration would have to be utilized ahort of taking over the national traaaury.
fortunately, a method can be utilized which allowe for the aafe, rapid and economi cal dehydration of thaea unite. Thta procaae, utllltlng inexpenelve karoaana coupled with a vacuum dehydration la dancribed lu thla paper. The firet stop* pre pare tike tranaformar tor the dehydration iteelf. Initially, the PCM ia drained and diapoamd of par MPA ragulationa. The unit ia rlnaed to remove ee much PCM e* poelbla and te lisit fusee for tbe regaaketlng atep by circuiatinp about tot by volume of keroeena for e period of tine depending on the tranaformar alee and geometry.
The tranaformar la then regaekated, a step required because: 1. aoma of the gaekete may have bean damaged or worn during the yeera end may not eupport the vacuum dehy dration eequeneea: >. the purpose of the entire procedure la to raaova water and leaking geaket if not repaired would only allow the problem of water conteeination to occur again; 3. depending on the final fluid fparticuioriy eiiiconei regaaketlng may be required in order to prevent leeke from developing. In many inetencee, a large number of geakate era Involved (we have changed over too gaakata in on* trene former). Such a large number ia unusuai, however.
Once the regaaketlng be* been completed, the unit la checked for leeke. a vacuum pump and a manifold with a freon detector are attached to tbo unit. Vacuus is drawn on tbe unit, and freon is eprayed aaquantlelly around each geaket, if e leak it preaent, the freon ia immediately drawn into the trsnsforssr and to the freon detec tor, My aaqueatially tooting every gaakat. the operator cso identify any leaking gaekete. If leaka are detected, the vacuua ia removed, end the geaket lx repaired or replaced. A reoheok (eame method) ia carried out to assure no leaka.
Once the tranaformar te leak free, approximately 10k by volume of keroeena ia added to tbe traneforoor. A heated, karoaana recirculating loop la attached to the trans former such that the heated karoaana enters tbe top of the tranaforaor. la aprnyed over the core, than exits from tbe bottoa of the tranaforaor. At top another open ing ia attached a vacuum pump with two dry lea/ acetone cold traps between puep end tranaformar. A temperature gauge ia ineteiiad in tbe core if not already present
The kerosene is booted and circulated within the transformer until the temperature
9-10
MONS 0203^2
nf the fH'e reaches .i/wMiaetely 90"C. The time required it dependent on the transformer use end geometry, but m be expected to teke et Jettt 12-fi bourt. nOrion tile time, the vaive# on the tooilng fine muet be r.lottd last the fine cool the kerosene, requiring e longer /mat-up end down time. After the core het ettelned the fh'kireti itnc tin- kerom-nn it drained from the trenuformer end dlepoted of properly The drained, nettled t rent former it now ready for dehydration.
,1 1'nruum of si least 100 tnrr is drawn on the treneformer. Any water preernt will be vapor iron and condensed et the dry ice/ acetone t rapt. Be ceute there It no effi cient mrniik for r.ootlng (thr cooling fin velvet have been doted end the treneformer is under veruum). the core of the treneformer remelne hot for prolonged perl ode of time. If the tumpnrnturr fella below 7S-90C, the vacuum ebould be broken with dry ntttngnii. end the heeling procedure with the keroeene repeated. Periodically during the drhyrlrat trig. t hr we I or from the traps should be reeved end quantified. The liming of the dehydrating prncee* le fully dependent on tbo transformer else, geom etry find total water inntant. However, a minimum of thrme (SI deye can be expected to ciaplot* the proreaa. The proeeee can be coneldered complete when no additional wMlt:r Is collect nil in the rotd trepe. Throughout the dehydration sequence < tempera ture and pressure readings should he taken every hour. A check of the completentee of water removal from the transformer can be obtained by the use of Piper Curves, a dier.ueeion of which ia beyond the scope of thie paper.
At thr conclusion of the drying. the vacuum is broken with dry nitrogen end the trensfurmrr Is rinsed one iime with the operetlng dielectric fluid (eltlcono oil, a tun nl ull. nr other). After draining the rinse, t ha traneformsr Is again placed under vacuum, removing moat of the remaining keroeane (voletila under theme vacuum iont/1 tltmej, The vacuum ia held for at iMit one hour up to Z4 hours, and tha unit la filled with the operating dlaloctrlc fluid while under vacuum In order to elimi nate air voids.
Other fluids may he utilized to heat the treneformer prior to the dehydration step However, kerosene prnvlJrs some hsneflte not realised with elternetlvee. for example, kerosene and water have ah swot rope which effectively removee more water then Is possible with other fluids, tn addition, at tha finish, residual kerotene it. removed by the vacuum dehydration step, flashing over to tha cold trop. finally, the kerosene ia ralatlvely inexpenaiva. particularly Important sines tha notarial ia be considered fCB material and must he appropriately destroyed.
One may question whether the draining uf the keroeene prior to tha vacuum dahydraI ion lx required. Thla probably ia not essential, however, the pumping,' recircula tion "iteration under full vacuum of iaaa than 100 torr la not assy to accomplish, in nrder tn successfully recirculate the liquid, the pump (necessarily a poaitioa diapiaraaont puapf must be below the trensformer tank where It le fed by gravity. it would then feed tha liquid up tn tho top uf the treneformer. ke hove had little sncceee with this approach, because too little kerosene Is recirculated end the transformer cannot be pruperly heeled to 90C. Accordingly, w# have abandoned this practice In favor of draining the keroeene prior to the dehydration at op,
COHCLVStOlf
Hut every transformer requires or can be dehydrated with this technique. Only the larger transformers (ganarally fraatar than 700 gallons) naad ba dehydrated this extensively. The smaller KVA transformers do not raqulra this procadure. In addi tion, tha transformer muet ba capable of withstanding and holding tha vacuum required to complete the dehydration step fth/ti transformer tank must ba daaifnacJ to hold at lesat BO torr or lose), tn total, this ia an axcaliant. tofo and economical meihod fur dehydrating large PCS containing transformers prior to retroflJJlng end rsutsxsiticot Inn of these units
9-n
HONS 020343
COMMERCIAL NON-SODIUM TREATMENT OF PCD CONTAMINATED MINERAL OIL
JOHN P. HOODYARD, P.E. JURGEN EXNER, Ph.D.
INTERNATIONAL TECHNOLOGY CORPORATION KNOXVILLE, TENNESSEE
ABSTRACT
This paper describes th* current state of development of the first coammrclal KPEG technology for treating PCB's end other halogenated organic compounds. The process hat already been permitted for full-scale use In USEPA Region 2 end New York State, and Is currently scheduled for a national TSCA mobile treatment permit demonstration In October. The process has also been used commercially to treat PCS and dioxin contamination In waste oils as part of several major Superfund projects. Illustrating Its versatility In handling waste contaminated with water, solids and other contaminants not conducive to treatment by other available processes. The paper includes several case studies In which different waste materials have been treated successfully, and Identifies plans for second and third generation technology designs for commercial deployment. The concept of joint IT/utlllty ownership of semipermanent facilities Is described, Including the status of several such projects In the U.$.
BACKGROUND
In 1982, researchers under contract to the Niagara Mohawk Power Corporation (NMPW) developed a series of non-themal processes for removal of PCB from transformer oil. These processes use low toxicity, low hazard reagents to react the PCB to a dechlorlnated material which is not soluble in the ortglnal oil. The process docs not use metallic sodium, thereby providing a safe and economical method for removal of PCBs, either In a mobile or stationary fashion.
In 1985, NMPC was granted a mobile PCB treatment permit by USEPA Region 2 and the NYDEC, using a full-scale demonstration treatment rig. To date, the fullscale unit hat treated over 6,000 gallons of transformer ofl and 20,000 gallons of dioxin-contaminated waste oil under a variety of contracts.
CHEMISTRY
The basic chemistry of the NMPC process was described in an earlier paper presented at the 1985 EPRI PCB Seminar (Ref. 1). To suemarlze, tests conducted for NMPC confirmed that PCBs mixed directly with a hydroxide/glycol reagent were rapidly dechlorlnated to less than 2 ppm. Kowevar, hydroxide/glycol reagents used to dechlorlnate 500 ppm PCB In transformer oil reacted very slowly (6-7 hours).
In an effort to Improve the rate of extraction of contaminant from the oil phase Into the reagent phase, a variety of co-solvents were tested, Including sulfoxides, amines, alcohols and, ketones. The most promising results were obtained with sulfoxides such as dimethyl sulfoxide or sulfolane and amines such as ethylene diamine. The addition of sulfoxide to the hydroxlde/alcor:
9-12
MOSS 02034^
mixture in laboratory testing caused a substantial increase In the overall rite of reaction.
The reagent for the oil treatment process consists of two components: a solid component {KOH) and a mixture of liquid reagent materials. The proportions of these reagent components are varied to meet the needs of a particular decontamination problem, primarily due to considerations of viscosity and reactivity.
The KOH is first loaded into the reactor in a flake or prill form. The PEG,
OMSO, and TMH are then added, followed by the contaminated oil. The reagent is then drawn into the recirculation line and crushed by the mixer Into a powdered form which flows easily. Nitrogen is drawn from the vapor space at the top of the reactor for the conveying process.
The mixture Is slowly heated using a on-board boller/heat transfer system.
The oll/reagent mixture continues to heat until a pre-datemined temperature
Is reached. The mixture is then allowed to recirculate through the heat
exchanger until analysis of tha oil Indicates that the PCB content Is less
than 2 ppm PCB. The oil Is then cooled by circulating the oil through coolers -
until the oll/reagent mixture reaches the desired temperature.
,
The reagent then settles over period of severe! hours, providing a well defined phase septritlon from the oil. The oil phase Is then withd-iwn and
stored for any additional filtration or pre-treatment for subsequent use.
Several tests of tha treated mineral oil product have shown the oil to be suitable for reuse is transformer oil, although certain other tests have shown that oil quality prior to treatment can Impact Its reusability.
The solvent phase can be recycled for up to nine batches of oil, depending on the degree of contamination end general condition of the Incoming oil. The reaction time for each batch tends to lengthen as tha number of recycles Increases, until the cycle time for the last batch becomes Inconveniently
long.
The waste reagent Is a mlxtura of potassium chloride, unreacted reagent, and small quantities of dechlorlnatad byphenol. The mixture Is currently being Incinerated, as It reprtsents only around 1 to 5* of the treated product.
Current testing Is being conducted to determine the feasibility of solidification for landfill disposal or delisting as a hazardous waste.
TEST RESULTS
The KPE6 technology has been used on several commercial projects involving PCB or dioxin decontamination In hydrocarbon fluids such as mineral oil and waste
oil, all with success.
The most noteworthy early project using the technology was conducted for (JSEPA in Butte, Montana at the Montana Pole Superfund site. Approximately 9,000 gallons of dioxin-contaminated waste oil were processed over a period of approximately two weeks. Table 1 lllustrites the results of the project and shows that the dioxin was removed to below normal detection limits.
9-13
MQNS Q20345
Subsequent treatability studies have been conducted for seven! other materials to determine the potential for the technology. Some examples of treatability results are shown in Table ?. Attempts to decontaminate oil at one Superfund site were moderately successful, reducing the level of PCB to below 10 ppm In waste oil. Because the phase separation was not as clean as in mineral oil and much of the reagent was lost to the oil phase, the speed and associated cost of treatment were relatively high compared to mineral oil. Similar tests conducted on gas line condensate have shown the process to be effective at reducing PCB concentration from 150 ppm to below 2 ppm with the first reagent pass. Again, reagent reutlllzatlon was not always feasible based on these test results.
Field demonstrations using the gas line condensate and selected waste oil products are planned for later In 1987 and early 1988, The laboratory test results have shown promise for treatment of virtually any hydrocarbon fluid contaminated with PCB of any aerochlor type, although the cost of processing will vary significantly depending on the effectiveness of reigent recovery.
PERMITS
NMPC successfully demonstrated the KPEG technology on PCB for USEPA Region 2 and NYDEC in 1965, resulting in the granting of a permit to operate the system at several NMPC owned sites in New York State. Upon licensing the technology, IT was subsequently granted operator status in New York State and is currently treating PCB-contamlnated mineral oil under that permit.
IT has applied for permission to demonstrate the technology to USEPA and hopes to obtain a permit to operate on a mobile basis throughout all fifty states. The USEPA demonstration is scheduled to take place in October, attempting PCB decontamination for levels up to 5,000 ppm In mineral oil.
PLANS FOR DEVELOPMENT
Upon receipt of the Initial USEPA mobile treatment permit for PCB, IT plans to construct several additional units specifically designed for different fluid treatment problems, including mineral oil and waste oil. Pending the results of the demonstration, IT hopes to offer this service comerclally later this year.
In addition, several utilities end other private organizations have expressed Interest in developing fixed facilities using the treatment technology, primarily for mineral oil. These projects are currently under study, particularly in locations that are remote from alternative means of disposal. The results of one or two studies should be ennounced shortly.
HONS 020346 9-14
The unit At currently designed It capable of processing between 500,000 and 1,000,000 gallons per year of oil. depending on operating schedule. Modifications to the next generation of design will allow for faster processing, perhaps Increasing the unit capacity by at much as 100X.
REFERENCES
1. Petersen, R.L. and G.P. Adams. Non-Sodium Process for Removal of PCBs from Contaminated Transformer Oil. Presented at the 1985 EPRI PCB Seminar, Seattle Washington.
9-15
MQNS 020347
TABLE i XPEfi DIOXIN TREATMENT IN HASTE OIL
SAMPLE Hrst Hatch
TETRA 1KST. CDO
C
PBfTA CDO
HEX A CDO
HEPTA CDO
OCTA CW)
TETRA CDF
ND (10)
PENTA CDF
HEXA CDF
HEPTA CDF
OCTA CDF
Second Batch A B
0.52
NI (1.13 NO (2.1) NO (1.0) ND (2.9) ND (0.60) ND (2.3) ND (0.52) ND (0.67) ND (0.35)
Nl) (2) ND <2) NO (2) ND (A) ND (A)
third Batch
A B
2.1 A
1 .A NO (*)
NU (1.1) NO (1.2) ND (3.2) ND (2.6) ND (1.5) ND (0.60) ND (1.A) ND (1.1) NO (A) ND (5) ND (6)
El fill Batch C
70
A - UC/KS B . CO/MS/MS C - U7EC
MQNS 0 2 0 3 4 6
TABLE 2
KPEG PCB TREATABILITY RESULTS FOR SELECTED CONTAMINATED HYOROCARBONS
(Concentration* In ppm)
PARAMETER
AROCLOR 1242 124B 1254 1260 TOTAL
ASPHALTIC HASTE OH
GAS LINE CONDENSATE
INITIAL BATCH BATCH REAGENT INITIAL BATCH BATCH REAGENT
CONC.
1
2
12
138 9 40 4B <4 <5
16 <4
178 9 40
16
ISO <4 110 46
<30 <4 <10 <4 <30 <4 <10 <4 150 <4 110 46
HONS 020349 9-17
GEORGIA POWER'S SOLVENT EXTRACTION PLANT TO REMOVE PCBs FROM MINERAL OIL
P. F. Way Vtrldyne, Inc. 462 Boston Rod Topsfleld, MA 01983
ABSTRACT
An EPRI project to evaluate PCB removal processes end oil reusability led to con. centrtted effort Being directed towtrd developing a solvent extraction process. This was seen as low-cost separation method for traatlng contaminated mineral oil as an alternative to the currently available destruction methods. Selecting diethylene glycol monomethyl ether as an Ideal solvent, the theoretical predic tions of high extraction efficiency were verified by pilot plant testing. A full scale commercial plant was then designed and constructed as a joint venture be tween EPRI and Georgia Power Company. Located at Georgia Power's Forest Park facility, this plant has demonstrated the ability to reduce the PCB concentration from as high as 330 ppm to less than 1 ppm, Operating costs are given for several applications of the solvent extraction process.
DEVELOPMENT
In 1961, EPRI Initiated a development program with General Electric to evaluate PCB removal processes for contaminated mineral oil. The processes considered were 1) sodium, 2) electron beam Irradiation, 3) critical fluid extraction, and 4) sol vent extraction. The treated oils from these processes, as well as other treated oils, were evaluated by GE In a number of ways to determine their suitability for reuse In transformer service. This Included analysis of changes In the hydrocar bon composition of the oils, measurement of the standard physical, electrical, and chemical properties by ASTM methods, comparative oxidation resistance, and acce lerated aging studies to evaluate the effect of these treated oils on paper degra dation. The results of this work have been the subject of various EPRI reports. It was concluded that the various treatment processes for removal of PCBs all pro duced oil suitable for reuse In electrical equipment, and In several aspects, the oils were Improved.
At the same time, VeHdyne, as a subcontractor to GE, prepared engineering designs for the various processes, with comparative plant and operating cost estimates.
9-16
MOWS 02035Q
Based on the remits of this combined effort, * decision was mide by EPRI to con centrate further work on the solvent extraction process. The goal was a process for PCB removal based on separation as an alternative to the in situ destruction processes currently available.
The critical factor of a solvent extraction process is of course the solvent. Tnt solvent selected ultimately determines the extraction efficiency, ana me pro cessing cost, The Ideal solvent would extract only PC8s and no other components of the oil, and would not Itself be soluble In the oil. 8ut real solvents have a mutual solubility nature, so that the selection process Is a compromise and trade off of the good and bad characteristics. Solvent selection was based on an eva luation of the following factors:
* Good selectivity for PCBs relative to oil components. * low solubility of oil In the solvent, and of the solvent In the oil. * Ease of removing and recovering the solvent from the product oil. * Ease of separating the solvent from the PCB residue. * Low toxicity * Moderate cost.
On this basis, GE screened a number of different solvents, and concluded that the best *11 around solvent was a glycol ether, diethylene glycol monomethyl ether.
FROM PILOT PLANT TO COMMERCIAL FACILITY
The next step was the construction of a pilot plant to prove out the theoretical predictions of the solvent extraction process. A 10 GPH unit was designed by Vtrldyne, for installation at G*s Pittsfield plant. Both new oil doped with PCBs, and aged contaminated oils were processed under a variety of conditions, Ourlng this work. It became evident that the more highly chlorinated PCB specfes were more resistant to removal. Yet even Aroclor 12S0, the most chlorinated one in common use, could be extracted with efficiencies in the high 90*s by proper adjustment of the operating variables. And a special design feature, that of recycling the PCB residue back to the extractor, proved effective in limiting the residue rate to e few percent of the feed.
The success of the pilot plant led to negotiations between EPRI and Georgia Power for the construction of a full scale commercial facility at Forest Park, Georgia. A plant capacity of 120 GPH was selected as the design basis, so is to give an annual production capacity of approximately 500,000 gallons, with two shift opera tion. At that time the EPA had not established required levels of PCB removal for separation processes, thus the State of Georgia's cleanup requirements were used to fix the product purity at 10 ppm. With a feed concentration of 500 ppm, this meant an extraction efficiency of 98 percent, which was within the range of per formance achieved by the pilot plant. However, late in the project, after equip ment orders had been placed, the EPA rendered an opinion that removal of PCBs by solvent extraction would require the same product level as had been established for the destruction processes, which was less than 2 ppm. To meet this require ment, an extraction efficiency of 99.4 percent would be needed to process 500 opr oil.
9-19
MOMS 020351
Construction of this facility it Forest Perk was completed in the fell of 1986. It consisted of two skid-mounted units which were shop fabricated and assembled as a packaged plant. These were enclosed, together with the five 30,000 gallon feed and product tanks, and tanker unloading area, in a common building.
PROCESS DESCRIPTION
The flow diagram Illustrates the main components of the solvent extraction process It consists of two pairs of similar extraction systems, each with an extraction column and a distillation column. The first is the solvent extraction system, which contacts the oil with the solvent, and then separates the solvent from the extracted oil fraction and PCBs by distillation. The pure solvent is collected in a surge tank, and is then returned to the extractor to complete the solvent loop. A portion of the PCB residue from the distillation is recycled back to the extrac tor, and the remaining portion Is drummed for disposal.
The second is the water wash system, which contacts the oil from the solvent extractor with wash water to remove the small amount of solvent dissolved In the oil, and wnlch then distills the water from the extracted solvent to proouce solvent-free water, and water-free solvent to return to main solvent loop. The distilled water ts pumped back to the water wash column.
The two extraction columns, which are Identical In construction, were supplied by the Otto H. York Company, They contain multiple stages for the countercurrent contacting of the oil and solvent, and the oil and water.
The agitation for each mixing stage Is provided by rotating turbine blades attached to a central shaft. Surrounding each mixing stage Is a coalescing zone and baffles, consisting of a ring of wire mesh which separates the two phases, with the light phase (oil) flowing up to the next higher stage, and the heavy phase (solvent or water) flowing down to the next lower stage. The upflowing oil, in the case of the solvent system, progressively contacts solvent that contains less and less of the PCBs, Thus at each mixing stage PCBs pass from the oil phase Into the solvent phase, to establish a new equilibrium condition. The upflowlng oil becomes gradually depleted of PCBs, while the downflowing solvent becomes progressively richer In the contaminant. At the top stage, from which the oil exits, the oil contacts the fresh Incoming solvent, which Is completely free of PCBs. At the bottom stage, as the solvent exits the extraction section, the solvent contacts the oil with the highest PCB concentration, which is the incoming feed. An extra section has been added to the solvent extractor below the feed point to enable processing the residue recycle as a secondary oil feed. The solvent phase from the extraction section continues down through this section to remove the PCBs from the recycle stream.
The distillation columns that are coupled to each of the extractors operate under a moderate vacuum, so as to limit the bottoms temperatures to a maximum of 155 C. The heat supply to the distillation columns if 175 pslg steam. Cooling for the overhead condensers is provided by a dosed-loop cooling tower.
9-20
HGNS 020352
PLANT OPERATIONS AND MODIFICATIONS
Shakedown and calibration run* were carried out for the first two months of ooerations using non.PCS o>1 s feed. Then during November, 1986, PCB-contmtn*ted oil was processed under * 30-day EPA fttO permit. At the end of this period, it ws evident thet minor process modifications were needed to correct i problem In the residue handling system. The solubility of the oil In the extract leaving the extractor was appreciably greater than what had been experienced with the pilot plant. This resulted In an increased oil residue rate, an Increase that the residue recycle could not handle. Since this problem did not surface during the pilot plant runs. It appeared that the oil for those runs was not as severely aged as the oil that was typical of Georgia Power's operations.
In any event, this difficulty brought to light an added feature of solvent extrac tion not at first recognised. The solvent used not only did a good job of removing PCBs, but also of removing the products of thermal decomposition and oxi dation. Removal of these highly polar compounds further upgrades the quality of the product oil, and will undoubtedly extend the service life In reuse applies- , tlons. The only penalty Is that a larger percentage of the oil ends up as PCB residue for disposal. In the original design, the residue rate was controlled at about 2 percent of th* feed by recycling the excess residue back to the extractor. However, wtth the higher content of aging products In the oil, the larger soluble oil fraction coutd not be recycled to the same extent. Equipment changes were made to permit a more flexible residue handtlng system.
Another Important change was made In the process. Ouring the laboratory work that was undertaken at this time. It was discovered that a slight change In the com position of the solvent lessened this increase in oil sotubllity in the solvent, and thus the quantity of net residue produced. But at extreme limits, this reduc tion In solubility by changing the composition was accompanied by a reduction In the extraction efficiency. In practice, then, this finding suggests that a compro mise could be sought between residue rate and efficiency, In processing oils of different levels of PCBs,
Plant modifications In these two areas were completed early this year. Finally, after extended delays in obtaining a renewal of the EPA RID permit, a second test run was conducted during Duly.
Various types of contaminated oils were processed during these runs, varying in PCB content fro* 73 to 330 ppm. At the higher concentration, product oil of lest than 1 ppm was obtained, with a residue rate of about 12 percent. This Is an extraction efficiency far better than the design value of 98 percent. For tht* condition, the solvent composition could have been adjusted to lower the residue rate to around 10 percent, allowing the PCB content in the product to increase to the 2 ppm level. This was done for oil feeds with lower PCB concentrations, and residue rates in the range of 6 to 9 percent were obtained. It should be noted that the solvent com position can be adjusted either way while the plant is in operation.
The operating permit expired before full process optimisation was completed. This work had been hampered by uncertain and conflicting results from the different laboratories doing the PCB determinations. But the test run did demonstrate that
9-21 MONS 020353
high extraction efficiency is tchievtble, with retsontble residue rtte* to nr
ells with high levels of PCBs,
' p ee**
Economics.
A cost tntlysls of the solvent extraction process Is shown in Ttble 1. Two ctses re presented, one In which the oil Is produced for reuse In electrlctl equip ment, nd the other in which the oil is simply decontm1nted for sle s fuel. For etch of these ctses, there tre two options for residue dlspostl. The first dlspostl by outside metns, ts Is the cm tt Georg It Power. The scond Is ln.pi(nt processing of the residue by one of the non-sodium methods, then disposing of the refined residue ts fuel product. In both ctses, the cost of repltcement oil u Included In the tottl cost . the 10 percent residue loss In the reuse ctse, tnd the 100 percent repltcement in the fuel ctse.
The lowest cost option Is processing oil for reuse, employing the In-pltnt residue option, tt S1.32/gtl. But the corresponding fuel ctse Is also tttrtctlve, depending on the cost of new oil. At t projected cost of Sl.SO/gel., the pro cessing cost tfter deducting the fuel credit tdds only SO.41 to give t tottl cost of XI.91/gt1 -
HONS 020354 9-22
EXTRACTOR
DISTILLATION
COLUMN
HATER HASH
COLUMN
MATER STILL
* O z
V
c js e o z o
Table 1 SOLVENT EXTRACTION COST ANALYSIS
Annual production - 500,000 Gal
Solvent Extraction Utilities l Solvent Operating A Maintenance Costs Total Operating Cost Fixed Charges (capital replacement, int.)
Processing Cost Fuel Credit Total Operating Cost
Oil for Reuse ------ ffTl?--------
0.27 105 0.32 or
ohr
1/Gat
Oil For Fuel
--o?-- 0.27
109 0.32 0T7T
-0.36 05
Reclamation Degassing t Clay Treating
Residue 6 Replacement
o
i
itesTdueDisposal or Treatment
IM Fuel Credit
Oil Replacement
Net Processing Cost
0..40
Outside D7S0-
0.15
In-Plant
nnr -0.04 0.15
1.86
1.32
-
Outside "DM
1.50
In-Plant
-mu -0.04 1.50
2.45
1.91
M0N5 020356
HONS 020357
PART 10: PCB ANALYSIS
HONS 020358
PCBA-102 UPDATE
Eugene A. Burnt S-CUBED Division of Maxeell Laboratories
P.0. Bor 1520 La JoI It, CA 9203B
ABSTRACT
Tho furthor development of tK* PCBA-102 for characterising Aroelort in dielectric fluids and temples taken frem spill sites is described. As s result of findings obtained on inter-utiltty studios managed by tho Brown k Caldwell (RP-1263-23), sovorsl spocific changes hsvo boon incorporstod Into tho operation of snd training* for ths PCBA-102. Tho major chsngos ineorporstod were modifications of tho soft-" wars snd implementation of sovorsl hardware upgrsdos. Tho instructions for uso of tho PCBA-102 hsvo boon rewritten to provide additional elsrity. An oporstionsl vidootopo is slso ovsilsblo to fseilitoto tho brotk-in poriod for sn uninitistod oporstor. Vs boliovo those modifications hsvo furthor sioplifiod tho uso of tho Instrument snd provido sssursnco thst repeatable, sccursto dsto sro obtoinod.
PCBA-102 Instruments wort subjected to s sort os of onvironmenteI tosto to sssurs thoy could oportto in fiold thermel snd huoidity environments snd withstond vibrstions which may occur In off-rosd trsnsport of tho instrument. Also prosontod sro ths rosutts of s dots Hod throo-concontrstion level, four-Aroclor typo, snd fiveinstrument factorial study (in quintupiot) which ohowod oscollont ropostobiIity, Tho rosutts of inter laboratory tooting among throo utllltios snd s sorvico labora tory sro prosontod. Finally, in-house studios of tooting snd characterisstion of ssoptos contsining mixed Aroelor mixtures sro prosontod.
BACKGROUND
Tho PCBA-102 portoblo gss chromatograph for polyehlorinstod biphony I snslysos oss dovotopod by S-CUBED undor partial support from tho Eloctrlc Powor Rosaorch Inotituto undor Projoct 1253-9 (Rof. 1,2). Tho PCBA-102 utilltos s simple sample propsrstlon kit wherein o portion of s liquid sample is added to a nlsturo of hexano snd sulfuric seid, ths mixture is shskon, resulting in tho extraction of Aroeiora into tho hexane phsao; othwr ioipuritios sro ratal nod in tho sulfuric acid layor. Aftor tho Instrument has boon calibratod snd roady for ssoplo analysis, a 2-pL portion of tho hoxsno Isyor is than transforrod by moans of a B-pL ayrings Into tho instrument. For soils, thoy aro troatod with methanol to extract Aroclors snd then s portion sf tho methanol mixture is subjoctod to tho oii preparation kit procedure to partition Aroctors Into tho hoxsno isyor. Tho resulting gas chromato gram is stored in tho on-board minicomputer and is compared with Aroelor standards In memory. At tho conclusion of tho chromatogram (about 15 minutes), pattern recognition snd quantitation subroutines are pwrformod and tho instrument prints out Information on (1) tho Aroelor typo found, (2) ita concentration in ppm, and (3) a measure of tho closeness of tho sample chromatogram shape to that of Aroelor standards stored in memory. This mosauro ia called MATCH, whieh is calculated using a multidimension statistical procedure (MATCH values ranee from 0 to 1000, with values above 500 being an acceptable comparison). In EPRI Contract 1253-23,
10-1 HONS 020359
Brown A Caldvatl conducted field inter-utility atudy to determine the applica bility of the PCBA-102 (Ref. 3). One of the primary difficultiea experienced aa the fact that tho fiold oparatora, ho aoro unfamiliar ith tho uaa of 90a chrometographa had o tondoncy to tlghtan dean on tho aeptum nut to tho point that tha aaptu* aould bo extruded into the gaa chromatographic column, tharaby aeverely raatricting gaa floa. Tha extruaion of tha aaptum attariaI *aa by far tha blggvat cauaa for faituraa in tha fiald. Othar problama aroaa from inexperienced oparatora in injecting a mierolitar chromatographic ayringa into tha inatrumant.
Aa a raault of tha oparational probloma oncountarad during tha Broan A Caldvatl project, aeveral apaclfle changaa hove boon incorporated into tha aparation and training for tha PCBA-102. In addition, aeveral upgradaa vara incorporated ta alImlnata othar potential probloma a aav, and to faeilltata tho manufacture of PCBA-102. Thaaa ehangaa a dlaeuaaed batov in aactiona on:
Softvara modification,
Hardware upgrade,
Oparatora manual modificationa, and
A videotape damonatratlon on tha uaa and eara af tha PCBA-102.
SOFTWARE MODIFICATIONS
Tha pattern recognition coda vae rewritten from tha original combination of aoeombly and PASCAL longuegee into C language. The peak detection eehome vaa atao modified te incorporate the peak detection by the inereaaing tangent aeareh, baaed on a aecond dorivotive teat with decraaaad aenaitivity far notae, aa deaerlbed by Voariae and Mol (Ref. 4). Byuaa of a C-omulator etation, a computer program vaa prepared to aadiat in preparation of individual inatrumant etandard tablea, tharaby reducing tha time to prepare a new PCBA unit for uaa.
Software vaa alee modified to provide additional information during the anaiyaia, otatlng whan tha data vara being acqulrad, whan tha program vaa going through tha MATCH and Aroclor calculation atepa, and, finally, providing tha reaulto.
HARDWARE UPGRADES
Savaral modificationa ta the hardware ware incorporated to facilitate tha operation of tha PCBA-102 and permit tha inatrumant to meat apecifie mechanical teat requiramenta. The column inlet tuba vaa tapered to facilitate inaartlon of the ayringaa Into the inatrumant. Savaral meehanieal connectIona waro atrangthened, tha column cot la ware reatfalned mechanically, and tha oven'a thermal Inaulation vaa made aecura mechanically.
The PCBA-102 hee paawed the following apaciftc environmental teata in accordance with teat protocol MIL SPEC-STD-B10C:
High Temperature - Teat Method 501.1; 24-hour expoaure to 40*C.
Low Temperature - Teat Method 502.1; 24-hour expoaure to -10*C.
Humidity - Teat Method 507.1; 24-hour expoaure to BOX relative humidity maintained at 40*C. Temperature cycling la not a part of thla teat.
HONS 020360 10-2
Vibration - Teat Method 514.2, Procedure X; toat *aa porformod at throo different level*, including the high-level vibration teit, the
magnitude of maximum diaplaeeetent in a vibration table waa one inch with a forca of 1.5g. The vibration waa done in three axi* from 5 to 200 to 5 hi in aeven eye lea of 12-minutea eaeh.
After the teata, the inatrument waa then powered up and Aroclor 1260 waa found with MATCHa from 975 to 969 at eoncentrationa within *10X. It ia believed thia vibra tion teat clearly exceeds that that would be expected to be found in an off-road truek environment.
OPERATORS MANUAL MODIFICATIONS
,
Conaiderable more information waa provided to the operator in the inatruction man ual regarding proper proeedurea for filling and uaing S-pL ayringea with the PCB extraeta. The operator ia encouraged to praetiee thia atop for the firat aeverel runa until he hea built up confidence that he cen inject a repeatable emount of PCB extract into the PCBA-102. The entire operation of cleaning the ayringe, tranafarrlng a repreaentatlve aliquot to the deaired level in the ayringe, and, finally, , Injection into the gaa chromatograph ia relatively straightforward; however, aa waa obaerved by Brown R Caldwell, thia proceaa doea take aome ftneeae, particularly : with people who tend to be *ell thumbs.1 Other aide deaeribed are: (1) teehniquea to aaagre that only the hexane layer ta removed for enalyaia and not the aulfuric acid layer, (2) the uae of a Chaney adaptor to present the amount of fluid in the
ayringe, (3) a special section on hew te analyze both low and high PCB contractions in dielectric fluids and soils, (4) use of standard Aroclor aotutions prepared in isoectane to assure their long-term integrity, end (5) a special troubleshooting section, including normal and problem computer messages.
Because the Instrument is optimized to run samples having concentrations in the range of 10- to 1000-ppm Aroclor, it la important that samples having high Aroclor coneantratlona are diluted prior to injection Into the Inatrument. Using tha nor mal procedure, samples above 2,000 or 3,000 ppm tend to saturate the detector and the inatrument will be inoperable for aa long as eight hours to a day. To this end, S-CUBED recommends using a screening procedure, such as CLOR-N-OIL , to aatimsts the aetuaf concentration range and then dilute the sample, if appropriate. An operational videotape has been prepared to isaiat operators in observing how on* is suppose to uee the deviee. Aa a result of the revised instructions and the videotape, the sample preparation and insertion into the inatrument has been improved. Ve believe these amdifieations have simplified the uae of the instrument and have provided eeeuranee that repestabio, accurate data are obtained.
REPEATABILITY OF DIFFERENT INSTRUMENTS
The preclsiem end eceuraey of the PCBA-102 wai studied by using five different instruments end quintriplIcate ana Iytit of 100-, 260-, and 500-ppm standards of Aroclora 1016, 1242, 1254, and 1260. The remits of this three-concentration
level, fowr-Aroclor type, five-instrument and five-replicate (300 analyses) study are shown are Table 1. It is seen that excellent accuracy (comparison of the veragoa found and that taken) and MATCH of the standards were obtained. The repeat ability of the concentration measurements (e.g., pooled itandard deviation) waa generally leas than ten percent relative, which was higher than the average error. Mean MATCH values were all greater than 950. The MATCH pooled standard deviation
waa generally greater for the early eluting Aroelora 1016 and 1242 than for Aro clora 1254 and 1260. T.he latter two Aroclor* take considerably more time to elute and have broader peake; henee, the error eesocieted with meeeurmmenta associated
10-3
MQNS Q20361
with retention tin* ! considerably laia. Nevertheless, thaaa data show the precision and accuracy capable of achieving with tha PCBA-102 whan analyzing known i tends rda.
Aroclor 101# 1242 12S4 1260
TabI a 1. ANALYSIS OF STANDARDS
Measurement Concentration Hatch Concentration Match Concentration Match Concentration Match
Concaniratton Takan (ppm)
100 Valga Poolad Found SD
96 6.6
260 . Valga PooI ad
Found SD
247 11.3
600 Valua Poo Iad Found SD
464 12.7
976 24.6 97 6.6
969 51.2 97 7.0
963 9.6
970 24.6 245 26.4 966 23.4 256 12.6 963 6.6
964 21.7 469 23.3 967 32.3 515 26.2 963 5.5
100 3.5 990 2.6
250 16.4 991 4.6
462 23.1 969 9.1
An Intarlaboratory study of tha uaa of an applicability of tha PCBA-102 waa undertakan through analyaaa by Pacific Caa A Eleetrie, San Diego Gas A Eleetrie, Loa Angolas Powar A Light, and Myriad. In ganarol, thaaa uaara found tha instrument to maet thatr needs; however, aoaa eoncarna wara raiaad bacauaa tha inatrwaent, aa it ia currantly designed cannot rwport tha rwaulta of Aroclor mixtures. To that and, S-GJBED Ia conducting studios to dataraina tha aagnituda of arrora that sight ariaa through tha anaiyaia of binary Aroeior mixtures. Tha raaulta of studios of tha 15 binary mixtures obtained at eoncantration levels of 10, 60 and 100 ppa for tha thraa Aroclor types 1242, 1264, and 1260, will be proaantad.
REFERENCES
1. Picker, J.E. and B.N, Colby, *Fiwld Determination of Aroelora Ualng an Autosated Electron Capture Detector Cas Chromatograph,1 Proceedinga of tha 1965 EPRI PCB Seminar held in Atlanta, Ceorgia, December 6-6, 1965, pp 219-234,
2, Picker, J.E., B.N, Colby, S.M, Trujillo, and E.A, Burna, *A Portable Cas Chro matograph for PolyehlorInatad Biphenyl (PCB) Analysis', EPRI Report CS-4175, Final Report for Research Project 1263-9, July 1966.
3. Hina, Jim, 'Field Testing of tha S-CUBED Caa Chromatograph, PCBA-102', Pre sented at tha EPRI PCBA Seminar held October 22-25, 1965, Seattle, Washington.
4, Woerlee, E.F.C., and J.C. Mol, *A Raal Tima Cat Chromatographic Data System for Laboratory Appl ieationa,' J. Chront. Sci., 16,, 256 (1960)
10-4
HONS 020362
CHROMATOGRAPHIC ANALYSIS OF PCBt IN TRANSFORMER OILS; A MINI-ROUND ROBIN
G. Addis EPRI
and '
T. Rouse General Electric Company
An article appeared In Electric Light and Power magazine In Qecember 198&reporting that Capillary Column Chromatography/Mass Spectroscopy (CC/MS) for analysis of PCBs in transformer oils was more accurate than Packed Column Gat Chromatography/Electron Capture Detector (PC/ECD) and Capillary Column/Electron Capture Oetector (CC/ECO). It was said that these commonly relied upon ECO techniques had a tandency to give false high readings. It Is shown in this paper that when properly done, all three techniques give comparable results.
This work was initiated because e number of people end organizations expressed concern over the published claim of systematically Incorrect PCB analyses. Included among these were electric utility PCB managers, the United States Environmental Protaction Agency, members of ASTM Committee DZ7, who contributed to the development of ASTM Standard Method 0*059 (Analysis of Polychlorinated Biphenyls in Insulating Liquids by Gas Chromatography), and Doble Engineering Company. It was suggested that EPRI Investigate the matter. EPRI then contracted with General Electric In Pittsfield, HA to Investigate the relationship between the three methods.
General Electric arranged with three nationally-known laboratories to run a series of tests. The participants were:
Midwest Research Institute - Rob Scuderl Radian Corporation - Maureen Kilpatrick and Alan Nichols Twin City Testing - Fred OeRoos
Four samples were obtained, and aliquots sent to each laboratory. Each one was requested to analyze the samples by three methods:
PC/ECD Packed Column/Electron Capture Oetector CC/ECO - Capillary Column/Electron Capture Oetector CC/KS - Capillary Column/Mass Spectrometer
10-5
MONS 020363
The samples were;
A - 430 wg/g Aroclor 1254* In aged oil 6 - 1110 wg/g Aroclor 1242* In new oil C - 2350 wg/g Aroclor 1254* In tged oil 0 4170 wg/g Aroclor 1242* in tged oil
* average of all results from three labs and three methods
For comparison of laboratories and methods, the results were normal lied so that
1.00 represented the average (for all laboratories and all methods) on each
sample. The average values. RivtP, and standard deviation. o,,. are shown in the
following tables:
'n
NORMALI2E0 RESULTS - PCB ANALYSIS AVERAGEO BY METHOD
Method
All Wes aver-----------
PC/ECD CC/ECD CC/MS All Methods
D tver n
B"aver n
B aver n
0.B7 0.09
1.08 0.07
0.95 0.19
*aver n
1.00 0.13
NORMALIZED RESULTS - PCB ANALYSIS AVERAGEO BY LABORATORY
Laboratory
R - 'x/V All Samples
w
D "aver
n
Y B aver n
Z
D aver
n
All labs
Raver n
Finally, the following observations were made:
0.96 0.14
1.11 0.16
0.93 0.11
1.00 0.13
o Results from Lab Y are somewhat higher, o Results from Method CC/ECD are somewhat higher,
o Results from Method CC/HS are somewhat more variable, o Differences between Methods and Labs are less than 20X.
10-6
HONS 020364
Wa concluded whit the ECO technique* *how no slgnlflcent jyitemetlc difference from MS when proper procedure* ire used for eich, ind therefore, the ECD method* do not result In filttly high value*.
10-7
MONS 020365
INCREASING THE ACCURACY OF THE GC/ECO AND GC/HECO QUANTITATION OF PCBs USING A NEW PCB ANALYTICAL STANOAR0
St> T. Turner and Robert Scudarl
INTRODUCTION
Polychlorinated biphenyls (PCBt) peasant a difficult challenge to tha analytical chaialit. Thar# art 209 for** of tha PCB molecule and aach for* (1so*#r) 1* dlffarant In It* affact on tha connon analytical datactlon systems pratantly avallabla. Thli dlffaranca In affact by aach Isomar on tha analytical datactlon systems, combined with tha wlda varlaty of 1so**rt oftan ancountarad In PCB contaminated samples, can make tha accurate mas* turanant of PCB* a difficult talk. To addraii thli problem, tha posslbllIty of a naw analytical itandard nlxtura 1* Investigated.
BACKGROUND
Tha Toxic Subitanca* Control Act of 197S require* tha pha*1ng*out of all material or aqu1p*ant contaminated with PCBt obova a cartaln laval. Thl* regulation ha* resulted In tha need for tha analysis of a larga numbar of samples fro* PCB dastructlon/removal processes. Midwest Research Institute (HRI) hat baan providing technical assistance to tha U.S. Environmental Protection Agency's Office of Toxic Substances In support of their affort to monftJ?' that* destruction/removal processes since 1980. Part of HRI's responsibilities have Included tha analysis of pre- and post-procass sam ples and by-products from mobile PCB Incinerators and alternative PCB dastruct1on/r*oval procassat to datermlna If tha regulatory limit for PCB content has baan achieved.
Tha analytical method most frequently used to maasura tha PCB content In dastructlon/ranoval procast samples Is gas chromatography (GC) equipped with a chlorine sensitive detection system. Chlorine datactlon systems
10*8
MONS 020366
Include the electron capture detector (ECO) end the Hill electrolytic conductivity detector (HECD). Mott PCB dastruction/removal procettet require the inelytit ut templet containing a variety of PCBt. The feed templet from thete procettet ere typically contaminated with PCBt at Aroclort. The procettad templet may be contaminated with PCBt at Indi* vidual Homers.
If tht identity of the temple's PCB "character" can be adequately identi fied, at it the cate when a tingle, nondegreded Aroclor is the primary analyte, then tht sample's PCB content It most accurately measured using an external Aroclor analytical standard. This measurement can be made by com paring the sample's chromatographic pattern versus the chromatographic pattern and concentration of a known Aroclor (l.e.. fIngerprlntlng). How ever, when the sample't PCB "character" cannot be easily identified, the PCB measurement process becomes more complicated. Examples of thlt are: samples containing mixtures of Aroclors, partially degraded Aroclort (oc cur Ing either singly or In combination with other degraded Aroclort or nondagraded Aroclors) and samples which contain individual PCB Isomers which do not present an Aroclor chromatographic pattern.
The accurate measurement of the PCB content of these complex templet pre sents a unique challenge to the analytical chemist. One method seeking to provide at least a partial solution to this problem hat been the use of a multi-Homer PCB analytical standard referred to as the Dya Color Manu facturers Association (DCMA) standard. The DCMA standard Is a 10*PCB Homer external standard containing a series of tingle isomers representing each of the 10 possible homo log series of PCBt. The DCMA standard Isomers era used to establish retention time windows which are compared to the sample chromatograms. The establishment of the windows is arbitrary, how ever, one cosmn method is by setting the windows at a midpoint retention time between the DCMA isomers as they appear In the OCMA standard chromato gram. PCB concentration in the sample Is then calculated by compering the sample's peek response (integrated area) to the response observed for the DCMA standard isomer In the window where the sample peak occurs. The OCMA external standard method measures PCB sample concentrations by allocating sample chromatographic responses to 10 "homolog" windows.
Past-process samples frequently have chromatographic peaks in the mono- and
dl-PCB retention time region. Evaluations of the DCMA analytical standard |L
10-9
HONS 020367
have bean conducted by GC/ECO analyst to quantitate a solution of tha 15
mono- and dl-PCB Isomart. ThU evaluation raiulted In accuracies ranging
from 10X to 150UX for tne Individual Isomers. Tha raaion for such a larga
accuracy ranga 1> primarily Out to the variability of tha PCB Isomers ra*
apontai to tha ECO datactor. This ranga of accuracy can ba predicted by
pravlouily putollihad lltaratura valuaa(l) for tha 209 PCB lioiaar'a ralatlve
rosponta factor* (RRFt) for ECO datactor*. Tha publlihad valua* alio In*
dlcata tha variation of tha RRF 1* algnlflcant within aach of tha 10 PCB
homolog larla*.
>
OBJECTIVE
Tha objactlva wa* to datanalna If an altarnata PCB Isomer external itandard could ha pradfctad fro* tha lltaratura valua* to Rtora accurataly naatura tha PCB contant of samples. Gufdallnt* wara aitabllihad prior to tha 1nvattlgatlon which balanct tha naad for Incraattd accuracy with tha naad to optlwlxa tha utility of tha ratultlng standard. That* guldallnes wara:
* Tha naw standard will prinarlly ba tallorad for ECO analysis but alto ba appllcabla to HECD analysis.
Tha naw standard should also ba aaty to uta and contain * minimum numbar of 1 sonars.
* Tha standard 1 sonar* should ba cosmarclally aval labia and not raoulra t1me~consu*1ng and costly tynthasls.
Tha naw standard should ba ananabla to changat In GC tanparature progranalng paranatars In ordar to raduca tha overall analysis tin* for aach sampla.
Tha statistical analysis of tha RRFt (lltaratura valuas for ECO, astlnatad valuas for HECO) and RRTs will ba parformad on an unwalghtad distribution for *11 209 PCB Isomers.
Tha purpota of this last guldallna Is thrae*fold: (1) to maintain a pra* dlctabla parformanca for tha standard and precluda tailoring tha standard to a certain subset of samples which would then decrease tha standards accuracy for a different sample sat. (2) to recognize the Improbability of
10-10
HONS 020368
accurately predicting PCS Isomer abundance for a vary large tat of sample typai or dastructlon/ramoval processes, and (3) to apply the standard to a significant variety of environmental samples where tha PCS Isomer abun dances vary greatly. Relative response factors for tha HECD analysis wars estimated by using tha homolog number for each PC6 Isomer. Tha HECD pyroly sis chamber was assumad to ba 100% efficient In Its ability to claava tha chlorine-carbon bond. Any decrease In the pyrolytic efficiency of the HECO pyrolysis chamber to claava the bond would tend to result In e decraasa In tna RRF/KECD variation between homologous series.
RESULTS
Published RRF values for ECO analysis, RRT valuas(l) for a specified GC liquid phase and estimated RRF values for HECO analysis ware evaluated. It,' was concluded that a PC6 standard containing savan Isomers could achlava ' the goals that had been established. The Isomers used In the new standard are 1UPAC (International union of Pure end Applied Chemists) Nos. l, 10, 24, 69, 107, 198, and 209.
Tha 7 Isomers In tha projected standard were chosen so that their Individual retention times would succaslvely begin and and calibration windows, thereby helping to facilitate its usa as well as allow temperature programming to occur without Invalidating tha statistical study.
The estimated relative standard deviation for accuracy (calculated by using the weighted mean of each calibration window based on tha total number of Isomers present) for ECO analysis Is / -33X and for HECD analysis Is / - 16%. This accuracy cannot ba greatly Improved without tha Inclusion of an excessive number of additional Isomers.
Comparison of the literature valuas(2.3) for tha PCS Isomer abundances In tha 7-1somar standard windows for Aroclors 1016, 1242, 1248, 1254, and 1260 Indicate a possible-accuracy for tha quantitation of these Aroclors by althar ECO analysis or HECO analysis of from 90% to 110%. This may Indi cate tha 7-Isomer standard can provide good accuracy for complex Aroclor mixtures.
10-11
HONS 020369
SUMHARY
Th OCMA standard Is shown to ba Inaccurata for tha quantitation of fraquantly ancountarad PCS byproducts froai PCS dastructlon/raiaoval procassas. Lltaratura ravlaw and subsaquant statistical analysis Indlcatad a naw 7-PCB standard nlxtura to ba thaoratlcally *ora accurata for non-Aroclor PC# quantitation by GC/ECD and GC/HECO analysis. Additional analysis of tha 7-1 iotr standard alxtura for usa as an Aroclor standard for cooplax Arodcr Ixturas Is promising. GC/ECD and GC/HECO analysis of tha potantlaT stan* dard Is currently balng performed. Full experimental results will ba datallad.
10-12
HONS 0203TM
REFERENCES
1. Mullln, Mlchaal 0. and Cynthia m. Pochlva. "high ftatolutlon FOB Analytic Synthatit and Chromatographic Propartlat of All 209 PCS Conganars," Environ Scl. Tachnol. 18:466-476 (1964).
2. Albro, Phillip W. and Carola E. Parkar. "Companion of tha Competi
tion* of Aroclor* 1242 and 1016," Journal of Chromatography 169:161*
166 (1979).
,
3. Albro, Phillip W., Jain T. Corbatt, and Joanna L, Schroadar. "Quantitatlva Charactarlzatlon of Polychlorlnatad Biphenyl Htxturai (Aroclort 1248, 12S4, and 1260} by Oat Chromatography Utlng Capillary Column*," Journal of Chromatooraohy 205:103*111 (1981).
10-13
HONS O203?l
PCB System Inventory: Io.-PruUct PCB Contamination In Electrical Eauinment
C. Collen Karquist Snohomish County Public Utility District
General Engineering Division PO Bo* HOT
Evtrttt, HA 98204
ABSTRACT
Electric utilities often identify t system inventory as the preferred method to orgtnlza an oil sampling prograia to tast for PCB concentration. A full-teal a Inventory It Implemented ovar a thraa to four month ptriod (dtptndlng on the size of tha tarvica area, number of transformers, ate,) by a project manager, temporary tupervltor, and data antry and field team. Tha data provide currant Information to update utility maps and records (cards and eoaiputtr Information), billings for pola contacts and aaintananca requirements. Most importantly, the data provide a snapshot of geographic conditions which describe environmental and human health and safety exposure risks. The number of equipment In specific categories of exposure risk can ba prioritized for a systematic program of sampling, testing and remova 1. IT warranted. The author discusses planning, Implementation, costs, and benefits of data to other areas of system operation.
INTRODUCTION
The decision to Implement a PCB system Inventory to identify potential PCB (polychlorinated biphenyl) exposure risk recognizes that the burden of PCB regulations is not diminishing and action Is necessary to identify thosa electrical units which pose tha gravest threat to the environment, human health and the financial status of a utility. The ultimate result is the ability to rank equipment for either sampling and then removal or removal prior to sampling, A PCB system inventory should represent approximately .05 of one percent of a utility's annual budget, and is likely to lead to a yearly budget commitment over several years representing one percent annually.
The Intent of a PCB system Inventory is to clarify best PCB management practices for a utility to sarva the needs of tha customer base, to respond to government regulation of PCBs, to raduca liability exposure and to support cost-effactlve planning and Implementation of a PCB control program. Tha inventory is designed to systematically collect information to build a data basa which Identifies and environmentally characterizes all fluid-filled equipment In an electrical service area pertaining to PCB exposure risk. Naads for further information gathering activities, such as sampling, or tha cost-effectiveness of removal can be assessed using this data. Data analysis produces categories of equipment which can be targeted as "suspect PCB," because the serial numbers closely match other equipment with lab tast results in specific ranges of PCB contamination. In this way, a PC8 Inventory
10-14
HONS 020372
provide! the data to accurately quantify probable PCS contamination In a
service area. Targeted equipment can be removed first which reduces liability by orders of magnitude at the onset of a PCS removal program.
IMPLEMENTATION
Evaluating the potential exposure risks of unknown PCS levels In all types of electrical equipment found In a distribution network Is a cumbersome task, at best. This task Is streamlined by utilizing a baseline which captures the data necessary to make Informed and economically sound decisions about sampling effort, equipment management, removal and disposal. The baseline Is composed of data from the following sources; the history of PCB lab test results; the Identification of lanlnent hazards; the characterization of pathways to food or feed, water and commercial ventilation systems; anc the record of the distance of Imminent hazards from electrical equipment. These data elements are likely to be new areas of Information development within a utility and constitute the backbone of the field inventory. This baseline responds to the Environmental Protection Agency regulation of PCBs,
From the entire data base, a utility can determine the most operationally efficient and cost-effective strategy to decrease exposure risks and liability from Inadvertent release of PCBs to the environment. Several strategies for equipment management are available to utilities such as removal of equipment based on unit-specific test results, removal of equipment based on serial number Inference from the test results history, and ratrofllllng units.
A system Inventory can bo completed either through full-scale Implementation of the field survey or in a phased approach through surveying equipment around specific Imminent hazards such as schools, restaurants, and largo buildings. Both methods have merits to qualify them.
For utilities with maps and records severely out-of-date, a full-scale system Inventory allows a groat quantity of Information to bo collected which. If recorded promptly, can bring records to a high level of accuracy In as short a time period as a few months. This mathod can require field crews to record Information about equipment not directly pertaining to PCB control, such as telephone and TV cable unauthorized contacts verification, which helps to support the comaltment to budget for end Implement the Inventory. Revenue generated from this verification can be substantial. Also, for utilities performing In-house maintenance on electrical aqulpment. the full-scale Inventory allows the environmental considerations of the data base to carry more weight. This Is Important especially If oil was reused among transformers making the serial number Inference less dependable.
The phased method of Inventorying Is useful to utilities with fairly accurate maps and records, because a substantial portion of work can be performed In the office prior to going out In the field. The mass of data generated during phased inventories can be turned over fairly quickly to facilitate the equipment management decision process, and then the data can be filed. Either approach Is aided by a history of lab test results, but the phased approach especially Is enhanced by using the test results history to justify removal of equipment based on Inferences about specific serial number categories of equipment manufacturers. This method is applicable to systems which do not have excessive oil cross-contamination of units.
In either case, but particularly with a full-scale Inventory, the mass of data collected will be enormous. This necessitates planning for computer access. Several computer applications can be used, but a PC with adequate storage
10-15
HONS 0203?3
cipiclty 1 lHly the most versatile and powerful medium. Sorting capability It more Important than statistical (valuation, so a software program such as DBASE Is adequate and easily learned by data entry personnel.
31 Is essential to coordinate the field Inventory with the maps and records division, because Incorporating the data with existing records Is crucial. Also, the maps and records system Is a necessary element In setting up the Inventory work schedule and strategy. It Is Important to note that soma utilities may have made the decision not to maintain current maps end written Information about equipment locations and types to save operating costs. A credible and successful PCS management program Influences all areas of operations and maintenance In a utility. Without a data base, the program Is crippled administratively and every spill Is 4 crisis. As PCB regulations are enforced more stringently every year, current records are Increasingly essential to utility operations.
Despite the analytical conclusion that cleaning up spills as they occur Is cheaper In the longrun than a concerted removal program, liability exposure risk considerations have prompted several utilities to characterize the equipment on their respective systems Immediately. Small utilities with less than 5,000 transformers have opted to simply test everything on the system. Large utilities with 20,000 to 1,000,000 transformers have begun to reduce liability substantially by making Inferences about manufacturer serial numbers based on the history of PCB lab test results, and are removing equipment from Imminent hazard areas prior to sampling based on those Inferences.
Results of a full-scale Inventory at Grant County PUO, a phased Inventory at Snohomish County PUO, both of Washington, and complete equipment sampling and testing at Salem Electric In Oregon show that General Electric and Hestlnghouse transformers are the likely manufacturers to test out greater than 500 parts per million PCB. One plant for each manufacturer (Sharon, PA Hestlnghouse: Pittsfield, HA General Electric) produced the units which can be targeted by serial number Inference as contaminated, for both plants, this contamination problem appears to drop off beginning In 1972 or 1973. Standard transformers of all types from the serial number beginning with "PF" (approximately 1974) often test out greater than 100 parts per million PCB.
As an example, Implementation of a full-scale PCB Inventory for a system with 100,000 transformers will cost $300,000, and requires 40 workers to complete the project In four months. The number of workers can be reduced by lengthening the project time, but the cost will remain roughly the same. This type of Inventory Involves a project manager, two crew supervisors, five data entry and forms controllers, and 16 two-man crews. College students can ba used for the field survey, data control and crew supervision. The skills required of the survey crews include training In natural resources and/or environmental managemant and/or environmental anglneerlng, the ability to read Township and Range maps, First Aid qualifications, the ability to record Information accurately and the desire to work outdoors In changing conditions. Crew rotation allows the observational skills of individuals to be kept at a high level and transmitted throughout the crews, thereby Increasing the accuracy of Information.
Tha data collected (See: Figure 1, Geographic Description of Equipment Location form) Is scored (given points) according to specific parameters, to be discussed, which result In the ability to rank transformers for sampling or removal. The crews collect the data elements, as shown In Table 1, for the purposes of uniquely Identifying each unit of electrical equipment, each geographic location, and the exposure risks of etch site. The site Is given points according to a set scale, and the point total, called the Transformer
10-16
HONS 020374
Exposure Risk Score (TERS). allows units to be prioritized for templing or removal over a predictable time period.
In the high density category, three points are allocated for access, high traffic, shopping, and/or parking lots near a transformer. For distance, If an Imminent hazard such at water or a restaurant Is within 100 feet of a unit. It receives 3 points.
Imminent hazards art defined as raw food/fead processing, wholtsale/retall food/feed, water, commercial ventilation systems, open storage of food/fetd. human health and safety, and hospltal/hcalth cart facilities. All the hazards receive five points except for the last two categories which receive four points. ERA dots not specifically regulate water exposure as It does food and feed facilities and commercial ventilation systems except for the containment of water In the case of extinguishing fire. However, In light of spill cleanup problems associated with water contamination and the difficulty of disposing of contaminated water, the water imminent hazard carries equal . weight with food and feed or commercial ventilation exposures.
Pathways are defined as the ability of transformer oil to be transferred to an Imminent hazard. This point criteria Is the most subjective In the field survey and scoring process, but continual communication about what Is being seen In the field allows the supervisors and project manager to maintain control over this evaluation. The prime methods of transfer are contamination by actual contact with an Inatnent hazard and trantfer by the food chain or machinery.
Other data elements which can be added to the TERS Include a point allocation for equipment age (sliding scale), a stained unit (no current leak visible, current leakers reported Immediately), burn barrels, fire wood, garbage cans and mall boxes. Burn barrels and fire wood receive three points because of the potential for dioxin development through burning PCB-contamlnated wood or refuse.
Educational areas receive three points. Residential and agricultural areas receive two points. Recreation, airport. Industrial and undeveloped areas all receive one point. The reason these areas receive a general point allocation
Is that no Imminent hazard may be present within loo feet or near a pathway,
but the point allocation reflects human or animal use of the area. Commercial areas are not given a general point allocation, because Imminent hazards and pathways are typically present.
Equipment used in the field Includes high-powered spotting scopes at a cost of approximately $500 for the scope and carrying case, tripods, distribution maps, tape measures, notebooks, field report forms and name tags for Identification, Each crew Is assigned to a designated Section, Township and Range. One crew member sets up the spotting scope and tripod to read the equipment nameplate, and the other crew member records Information on the transformer location form noting the following*, map location and road name, whether the transformer Is on the map correctly, area and ground condition of the site, water type, distance of the transformer from buildings or Imminent hazards and any other additional observations. Hissing unit numbers and TV cable and telephone contacts are also noted.
This lavtl of activity Is more Important to a utility which has Inaccurate written records of actual equipment In the field. The spotting scopes used with a tripod are highly effective In reading nameplates. If written records are accurate, the total cost of Implementing the Inventory wilt be much less If the spotting scopes are not used.
10-17
HONS 020375
CONCLUSION
Deciding the level of Inventory effort to commit to may be a difficult task for utilities. but several considerations may streamline the decision process. The Inventory will product valuable Information and results for all artat of utility optratlont from customer requests mad* to survey crews to Identification of equipment hazards. The physical status of the electrical system Is tvaluatid. The maps and records are updated. Leakers are Identified. The PCI program manager becomes familiar with potential environmental hazards which can be addressed Immediately or In subsequent budget and labor planning.
All the data collected, of course, will be useless unless the utility Is committed to act. When this commitment has been made, a system Inventory of som scale will be necessary and valuable. For a PCS program manager, a can-do* attitude Is Impossible to maintain without a description of what and how much Is In the system needing attention. A PCS system Inventory provides greater predictability to the mammoth struggle to control PCS eiposure risk and allows utilities to drive their PCS programs rather than be driven by outside entitles. Those utilities opting to remove equipment Identified by a PCS Inventory may be unable to quantify the payback In reducing liability risk, but one catastrophic failure by equipment which was not removed but could have been Identified for removal Is proof enough that system Inventories for the cost are an excellent Investment.
10-1B
HONS 020376
ACKNOWLEDGMENTS
Think* to Diniin Dorsty, now tmployid by Gtmrtl Elictrlc In Sicrimtnto. CiHfornti, for htr Invtlutblt tttlstinc*, p*r*#v#nnci ind ldtts during th Implemintitlon of tht Grint County PlID *y*t*m Inventory In 1965.
REFERENCE
.
1. PCB Equipment. Oointlon* *nd Hinioimtnt Rtftrtnci Minuil. Withlngton, D.C.t Nitloml Kuril EUctrlc Coopintlv# Astoclitlon, NRECA Riturch ProJlet 92-7, Mirch 19BJ.
10-19
MONS 020377
Geogfephfe Description of Equipment location
ll*AH NUOAL ip Ipcia np Or* ____
Qvw p u
OBTMCT HUUN
TVFt VAULT 1
acbiamlonunit
non. oc law. oh unit OL LlAKHQ NAMi AtATS OATA
rt no NAMftPLMt
*
Aau uaun Su*mt>a*a Via*
Una Nava
OYa. O No Yoa QNo.
DYm On,
lanalNa
*
Asia Uaun
PtfUauM
Una Hama Otn
O Y a vaa
tanUNa.
MTm UantMtt
tuanawau
Oia N. a N.
*aUMr 1
Una Hama
Om . O *a tan* Na. OAToaa UMdV
Vrnm
p No O
TANK CONOmON
I Omim
; olpum NEWUM Q lp***rv
a OLOUAa .Marina linaiA
OLOUM NfWUaa______
OatWrM. P etrltmm
O m
MWHfHT HAZMOMJtmuM
. AoMm AtacaIa*
' 3 w>Hmli*wl fmt/tn*
HW
Human Hum 1 MMjr
TEST?----- -- aOM*a*AT*neu oo
3
Oaaft Starata
*m*oowanoN
anatom coNomaw
aCpMMtfWUL 0 MtaiOuati
MCntATtQNMI MH1ATI0 teutTWAl MSMNTULAOOOaAmCN
0 Daty
KM
MVWt
AAftMCNOAS
UHOIVtLOniO a fASTUnt
AaaS Onto OlHtft
OftAVtL
AAVfufNT
0 WMIMM
ftaaiavran
OJUISAAWft
o tweaftT
OQBiwUMwNBTWw.r
lmmtumid LANOtCAACD
OMNCULTUnU.
IMUOX
SOAHaaOi
WATMTYOt
Q WITUWM
WHO
9 UKt
entt* a twin
ommaocottcm
itobm itwan
WttHVOM a salt
MWAHON DITCH
Sir
eoaauaNTt
a dale Haaeira MNaan an tyaaman Caulant laaaw aaynani an tHiramn uaa O laaemoaiaaaaUAaaailafanOtauaNumaai a Saa DUabMJan lAaa U> Oauaaa Camnama
Caav Mamaar ionium
Oaia
D*m ****** mu * m#m i*+*r IHmi. Mia) pr MMlNtMT HAZAAO'
OEVlCt an Arwaaa Anaany
AMOTOTAKIN Aai
Afama
CabmTaitanana Canuau AOLl: P Ya p Na
mwiii lr
Qa*
Figure 1. Geographic Description of Equipment Location field report form. Shaded areas Indicate Inmlnent hazards.
10-20 p 0n
020378 *QNS
Tibi* 1 DATA ELEMENTS FOR PCS SYSTEM INVENTORY
Electrical equipment Identification: Utility number Type of equipment Type of Installation kVA size Manufacturer Serial number Year of manufacture
leaks
Presence of PCB labels Equipment condition Height
Nameplate fluid type Fluid capacity
Geographic location Identification:
Section. Township. Range
Road address Business or plat name Hap or driving number
" raphlc grid number t number
Pole location
Exposure risk categories: Density of use - 3 points iMilnent hazards - 4 or 5 points
Pathways - S points Distance - 3 points
10-21
HONS 020379
FIELD DETERMINATION OF PCB IN GROUNOCOVER
Luciano A. Gonzalez and James S. Ferrte Chemical Research Department
Ontario Hydro Research Division 900 Kipling Avonut Toronto, Ontario Canada H82 5S4
ABSTRACT
A reliable and quick method to determine if groundcover contains chlorides equivalent to that in SO or more mg/Kg of PCB contaminated solid has been developed. The method Is based on a solvent extraction technique and a subsequent testing of the solvent extract with the commercially available "C1or-N-011 50* PCB kit. The test procedure was adjusted to give a positive response to soils contaminated with SO mg/kg of Aroclor 1242, The method has been successfully applied to soils of different types. It requires however, minimum reagent and sample temperatures of 15 C, and pre-drying of the solids If water content Is greater than 30 g/kg. The use of this test method after a PCB spill occurrence will reduce the growth rate of PCB contaminated solids stored In Ontario Hydro locations.
Introduction
Polychlorinated biphenyls have been used In North America In the manufacture of a wide variety of products such as paints, plastics and lubricants. Their most important use however has been in the electrical industry where they have been used as major components of dielectric fluids In power transformers and power factor correction capacitors, Because of concerns relating to environmental pollution and possible health hazards, the production of PCBs and their use in manufacturing Industries was stopped , while their use by electrical utilities has been drastically restricted. In Canada, the use of PCBs is restricted to PCBs In service in closed systems purchased prior to 19B0, In Ontario, PCBs and PCB contaminated equipment no longer In service must be stored In approved waste storage facilities.
Ontario Hydro, with a large PCB Inventory, has undertaken several programs to find solutions to the problems associated with the management of PCBs, Specifically, research programs have been carried out to evaluate the feasibility of retrofllllng askarel filled power transformers, to design and build a mobile unit to decontaminate PCB contaminated Insulating oil, to develop methods to decontaminate PCB contaminated soil and other materials, and to develop a quick and reliable method to determine the degree of contamination Df groundcover following a PCB spill.
10-22
WINS 020380
The absence of an approved PCB destruction facility for treating solid westes In
the Provine* of Ontario *nd the lack of n efficient method to accurately determine on-site the degree of eontemlnetlon of groundcover efter t PCB spill
htve produced Urge volume of PCB solid westes at Ontario Hydro facilities. To reduce such inventory growth, Ontario Hydro developed a quick and reliable method to determine If groundcover contains chlorides equivalent to that in 50 or more mg/kg of polychlorinated biphenyls contaminated so!ld/l/.
Test Method Description
The test method consists of extracting the PCB from the soil sample with an appropriate solvent and analyzing th solvent extract with the commercial "Clor-N-011 50* test kit. Representative samples of groundcover from a spill location are weighed to the nearest 0.1 g. Stoddard solvent meeting specification CAN-2-3.8 H and equivalent to 70 percent by weight of the sc 11d is added to the soil and the mixture is vigorously shaken for one minute. After allowing the mixture to settle for two minutes a 5 ml aliquot of the supernatant solvent extract is added to Tube 1 (with black cap) of the "Clor-N-011* test kit. Steps two to five in the "Clor-N-011" instruction sheet are then followed/2/.
The colours developed with solvent extracts from soils contaminated with PCBs vary In some degree from those shown on the "Clor-N-011" bulletin. Solvent extract from soil containing 50 mg/Kg or more of the common transformer Aroclor 1280 will produce a deep yellow to colourless solution. Any tinge of pink, mauve or blue developed Indicates 50 mg/Kg or lest of Aroclor 12(0 In the soil. If however the suspected PCS soil contaminant is capacitor Aroclors 1242 or 1016. or If the type of PCBs Is not known, then yellow to colourless or yellow with a tinge of pink Indicates 50 or more mg/Kg of PC8s; while a blue, mauve or pink without a dominant yellow Indicates less than 50 mg/Kg of PC8s.
Test Results and Qitcustlon
The test method has been applied to PCB contaminated soil of different types with different PCBs and moisture contents. Some of the results obtained with the PC) screening test using Aroclor 1260 are summarized In Table 1. Although,
as observed in the table, the solvent/soil ratio gives positive results when testing soil contaminated with Aroclor 1260 at 40 mg/Kg, this ratio was maintained to get a safe range In case the contaminating PCB was one containing
less chlorine, such as Aroclor 1242.
Sampling Is a critical step in analyzing PCB soil contamination since the solid
Is not homogeneous and the contaminant Is not uniformly distributed In the soil.
To minimize the error in obtaining a good representation of the contaminated
soil, it Is desired to have the largest sample size within the practical limits
of the analytical technique, Our experiments show that soil samples between 250
and 350 g give reliable and consistent results, while significantly smaller
sample sizes tend to give inconsistent and erroneous results; and larger soil
samples are Impractical. Therefore sample sizes between 250 and 350 g soil are
recommended for this test method.
-
The results show that consistent responses were obtained with different types of
soils, pasture, clay, gravel, sand or a combination of them. This Is In good agreement with the results obtained in a previous study/3/ which showed that from 95 to 99t of the original content of PCB In clay, sand or gravel can be
10-23
HONS 020381
extracted by this solvent at ambient temperature {~20C). This difference In the PCS extraction efficiency of the solvent Is not significant enough to ehtnge the kit's response.
As expected however, and as observed In the table, excessive moisture in the soil will affect the colour Indication, The presence of significantly greater than 30 g/Kg of water may give "false negative" results because of t reduction of the PCS extraction efficiency of the solvent, water In excess of 30 g/ltg In the soil should be removed from the sample by careful drying at a moderate temperature to obtain a more accurate result.
The presence of Inorganic chloride compounds such as sodium chloride and calcium chloride In the soil will not give "false positive" PCS results. The low solubility of these salts in the PCS extracting solvent prevents their removal from the soil In significant amounts to Interfere In the PCS determination.
Storage of the kits t low temperatures {-1SC) and allowing them to return to ambient conditions (25 C) prior to their use does not affect the kit's performance. However the use of PCS kit at low temperatures {10C or lower) gave Inconsistent results and is not reconmended. Moreover, the PCS extraction efficiency of the solvent Is reduced at lower temperatures and may produce Incorrect negative results.
Conclusions
A reliable field test method to determine If groundcover contains 50 or more mg/Kg of PCS has been developed. The method is based on the extraction of PCS from any type of soil with a Stoddard solvent meeting the specification CAN-2-3.8M end analysis of the solvent extract by means of the "Clor-N-011 50" PCS coenerclal kit. Water content In the soil lower than 30 g/Kg and a minimum test and reagent temperature of about 1SC are required to ensure accurate results. The test method Is designed to give a positive response to any soil containing chlorine In organic compounds equivalent to a minimum of 50 mg/Kg of Aroclor 1242. With more highly chlorinated PCBs such as Aroclor 1254 or Aroclor 1250 a safe "false positive" Indication will be obtained with tolls containing between approxlmtely 35 and 50 mg/Kg PCS. When determining PCS levels In contaminated soils, false "positive results" will represent only e smell fraction of all tests carried out.
References
1. Ferrle, J.S., "Field Determined on of PCS In Groundcover." Onterlo Hydro Research Report 83-286-H (1985).
2. Dexsll Chemical Corporation, "Instructions for CLOR-N-OIL 50 PCS Screening Kit*.
3. Oanls, W.J., "Removal of PCS from Contaminated Soils and Associated Materials - Pert I," Ontario Hydrc Research Report B3*429-K (1963).
10-24
HONS 020382
Ttbit 1
Scretnlng Ttlt Rtlultl For PC8 Conttnintttd Solli *t Olfftront Condition!
Dry Soil PCB Content
Sinplt
Weight
A-12(0
bumper Soil Type (9>
(*>*/* 1 .
1 Ptlturt 115.5
40
2 ftHurt 115.5
40
Utter in son
11 13
501 vtnt/50l 1
Rltlo (9/9)
Colour Devtloptd
0.7 Ttllow
O.S Tallow with pink ting*
PCS level Inolcited -("9^9)
> 50
> 50 (bordtrllnt)
) Ptltur* 115.5
40
11 0.9 Ttllow with Ottptr < 50
pink thtn ft
(bordtr-
Mnt)
4 Ptltur* 115.5
40
11 1.0 Tallow with rft*p*r . 50 pink thtn fl
5 Ptltur* 321.7
40
10
0.7
Tallow with pink
50
ting*
(bordtr-
1 Ine)
6 Ptltur* 323.7
40
50
0.7
Otp*r pink thtn
< SO
In 15
7 Ptltur* 123.7
40
100
0.7 Purpt*
< 50
a Ptltur* 321.7
40
100
0.7 Purple
< 50
9 Ptltur* 251.1
50
10 0.7 Tallow
> 50
10 Ptltur* 258.1
50
50 0.7 Plnk-Purpl* < 50
11 Ptltur* 218.7
50
100
0.7
tallow with pink
50
ting*
(bordtr-
1 Int)
12 Ptltur* 181.1
70
100
0.7 Plnk-Purpl*
50 (bordtr-
1 Ine)
13 city 14 City 15 City
258.1 ZH.l 123.7
50 50 SO
25 0.7 Ttllow
> SO
2$ 0.7 Tallow
> SO
25
0.7
Ttllow with pink
so
tlngt
(border-
lint)
15 Grtvtl 17 Srtv*l ia Crtv*l
134.1 258.1 123.7
35 SO 40
14 0.7 Ttllow
> 50
14 0.7 Ttllow
> SO
14
0.7
Ttllow with pink
50
tlngt
(border
line)
10-25
MONS 0203&3
APPENDIX HONS 020384
PCI Seminar
10/06/17*10/09/17 Hyatt Regency
Kansas City, HO
Lilt of Attindtti
Albert Abel Vice President A. L. Sandpiper Corporation 2917 M, Star Road Columbus, OH 4)221 614/416*0405
Cll Addl* Pro)act Manager Electric Powar Raaaarch Initltuta )412 Hlllview Avenue Palo Alto, CA 94)04 415/155*2216
To* Allan Distribution Superintendent Mequokets Municipal Elec. Utility 2) 1 6, Main Itraat Haquokets, IA 52060 319/652*6691
Toni K. Allan M/A Plpar 6 Marbury 666 16th Straat, N.V, Vaahin|ton, DC 20006 202/761*61)0
Michaal Altitar Senior Muclaar Engineer Georgia Powar Company 3) 4) piedmont Avenue Atlanta, CA 30302 404/526*6526
Rogar V, Andaraon Development Staff Member Martin Mariatta Enargy System* Oak Rldga Caaaoua Olffuilon Plant P.0. Ion P, Mall Stop 272 Oak Rldga, TN )76)1 615/574-9936
John A. Anachutg Environmental Tralnar KPt Gaa Earvlea 111 Kanaaa Avanua ' Topaka, KS 66601 913/296-1905
Richard H. Armstrong Sanior Project Engineer Potomac Elactrlc Powar Company 3300 lannlng Road, H.E. Washington, DC 20019 202/386*2)04
Charlaa Arrington Procaaa Englnaar Elactrlc Equipment Sarvlca Corp, 4731 Huatang Circle St. Paul, MN 55112 612/764*4040
A. P. Asbury Suparviaor of Technical Services Sulphur Springs Valley Elac. Coop. P.0, ton 820 Villcoat, AZ 6564) 602/314*2221
Karl C. Ashley Manager, Corporate Planning Quedrex HPS, Inc. 1940 M.V. 67th Plsca Gainesville, Tl 32606 904/373-6066
David N. Atwood Supervising Division Engineer Public Service Co. of New Mexico Alvarado Square Albuquerque, NH 67156 505/761*3444
MONS 020385 A-l
Dick R. Atwood Research Associate Union Carbide Corporation Siliconai Building Saw Hill River Road. Rt. 100C Terrytovn. NY 10591 914/789-2147
Ann Bailay President Eco Chain. Inc. 155 Northaaat 100th, Suita 405 Saattla. VA BS115 106/527*4146
Scott H. Jakar Utility Administrator Vaatinghoues Hanford Company P.0. Bon 1970 Richland, VA 99352 509/373-3606
Richard Sail Engineering Aaalatant Memphis Light, Gas A Veter Co. 705 Saala Straat Memphis, 17) 36105 901/577-2070
Robart Bartholomew Environmental Manager SCA Chemical Sarvicaa 11700 S. Stony la land Chicago, IL 60617 512/646-5700
Frank Batehaldar Environmental Consultant A. L. Sandpiper Corporation F.O. Son 16423 Columbus, ON 43216 614/466-0405
V. S. Sates Staff Engineer Georgia Power Company P.0. Sox 634J 17th Floor, 270 Sldg. Atlanta, GA 30302 404/526-2435
Richard J. Beagle Vice Praaidant, Operations Power Engineering Services 44 Nobile Drive Toronto. Ontario CANADA N4A 2P2 416/266*0962
Jamas Beard Scientist Arkansas Power 6 Light Company 9th 6 Louisiana Little Rock, AK 72203 501/370*6666
Robart C. Back Environmental Affairs Supervisor Missouri Public Service Company 10700 E. 350 Highway Kansas City, M0 64136 616/737-9340
John Bednerceyk Project Engineer Black A Veeteh P.O. Sox 6405 Kansas City, MO 64114 913/661-6466
Joseph Bellevie Senior Chemist Rochester Gas A Electric Corp. 69 East Avenue Rochester, NY 14649 716/546-2700 K4170
Oscar M. Bello Substation Equipment Specialist Florida Power A Light Company P.O. Box 029100 Miami, FL 33102 305/552-3732
Julia K, Berkhsimer Jr- Environmentalist Cantarlor Energy Corporation P.O, Box 64661, Room 1-312 Cleveland, OH 44101-4661 216/447-3203
HONS 020386 A-2
Adolph lie lack! Project Managtr U 9. Naval Civil Engrng. lab
Cod* L-71 Pore Kuan***, CA 95043
H05/962-4116
Dan 1*1 Biro Gal** Manager Electric Equipment Service Corp. 4751 Huatang Clrcl* Bt, Paul, HN SSI12 612/794**040
John M. Black Sanior Engineering Technician Virginia Power Company P.0. Box 29666 Richmond, VA 23261 604/2S7-4933
Kirk Blackmon Praaidant BMS Tachnologiea, Inc. On* Summit Avenue, Suit* 202
Port Worth, TX 76102 917/332-9201
Lawrence E. Blalock
Environmental Spaclellat Slarra Pacific Power Company P,0. Box 10100 Bano, NV 69520-0026 702/699-4666
C, 0. Bland Lab Suparviaor Union Electric Company 1901 Gratiot Stra*t St. Louie, M0 63166 314/554-3349
Ralph Boehm
Superintendent, EFT Program!
Kana a* City Power 6 Eight Company
P.0. Box 679
Kanaae City, HO 64141
916/556-2600
'
Rick Bogar* Environmental Technician Western Faroari Electric Coop. P,0, Box 429 Anederko, OK 73005 405/247*3351 X34g
Stephan W Booth rraiidant Tranaformer Service, Inc. P.0, Box 1077 Concord, NH 03301 603/224-4006
Can* Bott* Operation* Manager ETI, Inc, 994 Freeport Sperke, NV 69431 702/331-9400
Ed Bowmen Sanior Engineer EGfcO Florida Kennedy Space Center Florida 305/867-0627
Robert J. Brandt Supervising Engineer Union Electric Company 12121 Doreett Road Maryland Kalghta, HO 314/S54-3066
David Brey Heintenence Engineer Ontario Hydro 700 Univaraity Avanu* Toronto, Ontario CANADA M5C 1X6 416/592-3906
Richard D. Brewar Environmental Specialist Cincinnati Gee 4 Electric Company 139 Eeat Fourth Straet Cincinnati, OH 45202 513/632-3604
MOWS OZQ36? A-3
Larry Brlnton Eon1or Plant Engineer Georgia Power Company P.0, Box 442 lax lay, GA 51513 912/167-7851
Mark S. lroakar (anlor Regional Plaid Englnaar American Nueleer lnaurara P.0. Box 11717 Kanaaa City, NO 641)8 I16/S6)-B966
Jackie Brown Suparvlaor, Electrical Engineering Bonnavilla Powar Adminiatration P.0. Box 491-EM Vancouver, WA 98666 206/690-2753
John P. Brown, Jr. Hanatar, Haalth Reeearch Oanaral Elactrlc Company
,RAO Cantar
P.0. Box 8 Bldg. K1-3B33 Schanactady, NT 12301 318/387-7987
Stuart Brown Dapartoant Manager CH2M Hill P.0. Box 91500 Bellevue, Vi 98009-2030 206/435-5000
Jamea 0. Bryant Dlractor of Taehnology Standard Cblorina of Dalawara, Inc. Governor Lea Road Dalawara City, W 19706 302/834-4536
John Bncno Electrical Englnaar Boaton Edlaon Coopany 800 Boylaton Straat Boaton, HA 01288 617/424-3259
Scott Burnatt Vlca Prooidant rPH, Inc. 10 Central Avanua kanaaa City, NO 66118 913/621-4206
Eugene A. Burna Division V.P., Ngr. Chealatry Group S-Cubed P.0. Box 1620 La Jolla, CA 9203B 619/453-0060
Bruca Calar Environaiental Facility Englnaar XPL Gaa Barvlca 818 Kanaaa Avanua Topaka, XS 66601 913/296-1979
Richard T. Cartwright Project Manager Chemical Vaata Management 150 Vaat 137th Straat Rivardala, XL 60627 312/841-8360
Jacquaa Caatonguay Senior Raaaarch Chaaiiat 1REQ (Hydro-Quebec) 1800 Hontee ita. Julio Varennea, Quebec CANADA J0L 2P0 514/652-8393
David J. Cooaroo Env. Pacilitlaa Progroa Manager AT&T Boll Labe 25 Lindalay Drive Mornetoim, NJ 07960 201/898-1373
H. E. Chubb Environmental Administrator Xanaaa City Power 6 Light Company P.0. Box 418679 Kanaaa City, NO 64141 616/536-2362
HONS Q203S8 A-4
Craig Chynowsth Her., Elec. 6 Electronic Systems Vestinghouee Electric Corporation P.0. Box 206B Idaho Falla, IP 83403 20B/S28-S046
C. C. Claiborne Senior Materials Engineer Veetinghouee Electric Corporation 469 Sherpeville Avenue Sheron, PA 16146 412/883-427?
William T. Clark PCI Program Manager Chamlcal Waste Menegeaent 3003 Butterfield Road Oek Brook, 1L 60521 312/218-1500
Harry Clarke Director Groevenor Traneforcer Servicee, Ltd 20 tverehao Grove, Hlghfield Park Idle, Bradford VF129DU Watt Yorkehire, ENGLAND 0144/274-618309
Hike Clemente Electrical foremen Sen Diego Gea 6 Electric Company 890 Bey Boulevard Chula Vleta, CA 92011 619/420-9700
Harry A. Coatee Manager, Waste Prograaa Con Edison Co. of New York 4 Irving Place New York, NT 10003 212/460-2362
Christopher Coeeio Mgr,, PCS Buaiseaa Operationa General Electric Coopany 1 River Road Schenectady, NY 12345 518/385-7044
Edward H. Cohen
FCB Dlapoaal Coordinator U.S. EPA Region 3 841 Chaatnut Building Philadelphia, PA 19107 215/597-7668
Ray Colburn Lab Coordinator
Texes Electric Cooperatlvaa, Inc. P.0. Box 9589
Auatln, TX 78766 512/454-0311 X42S
Vinca V. Conant
,
Environmental 6 Special Projecte
Ohio Edlaon Conpany
76 South Main Street
Akron, OK 44308
216/384-5765
Douglaa C. Conrath Senior Fecilitiee Engineer Allied-Signal, Inc. Bandlx Kaneea City Dlvieion P.0. Sox 419159 Kansas City, M0 64141-6159
816/997-5451
Glenn F. Cook Dietrlbution Engineer Alabama Electric Cooperative P.0. Box 550 Andelueie, AL 36420 205/222-7092
Hercue Cooke Program Manager
Battalia Memorial Institute 505 King Avenue Columbue, OH 43201 614/424-3024
Jack E. Cooper Operationa Manager IT Corporation 1570 Bear Creek Road Oak Ridge, TN 37830 615/462-7075
HONS 020309 A-5
V. C. Coward) Jr. Mgr., Transmission 6 Dlatrlbutlon Savannah Electric 6 Power Company p.o. box tie Savannah, CA 31401 912/944*3541
John X. Craddock Dir., Product 6 Env. Safety Monaanto 500 N. Lindberg St. Louie, MO S3167 314/694*4754
Richard R. D'Auteull Dir., Environmental Affaire Buckeye Power 6677 Buecb Boulevard P.O. Box 26036 Coluabua, OH 43226*0036 614/846*3737
Suean M. Damon Environmental Ensineer Loa Anselas Dept, of Water k Power P.O. Box 111, Room 1116 Loa Anselee, CA 90051 213/461-4696
Cecil Daugherty Senior Ensineer Tampa Electric Company 6S20 Temalmi Trail Ruakln, FL 33570 813/671*3361
Richard Davla General Electric Supt. Northwestern Public Service Company 3rd 6 Dakota Bo. Huron, SD 37350 605/352-6411 X234
Kim De Issues Business Development Specialist 501 International 501 Forbes Boulevard, Suite 11B S. San Francisco, CA 940B0 415/672*0673
Rite Dement Product Line Specialist Chemical Waste Henesement 2600 Dalk Road, Suite 100 Marietta, GA 30067 404/952*0444
Bob A. Derka Rational Busineee Manager Unison Transformer Services 111 Deerwood Piece, Suite 200 San Ramon, CA 94583 415/B31-4B33
Hiroshi A. Dodohara Chemical Engineer U.S. EPA 401 H Street Washington, DC 20460 202/362*3959
Deneen F. Dorsey PCS Facility Supervisor General Electric Company 12055 White Rock Road Rancho Cordova, CA 95670 916/965*100$
Bill R. Duffett Manager, PCS Sueinset Dev. Westinghouae Electric Corporation 675 Greentree Road Bldg. B, Fourth Fir. HS4 166 Pittsburgh, PA 15220 412/937*7140
George W. Duffield Environmental Engineer Weatlnghouae Hanford Company P.O. Box 1970 Richland, WA 99352 509/373*4932
Larry L. Dunn Environmental Control Specialist Oklahoma Gat 6 Electric Company P.O. Box 321 Oklahoma City, OK 73101 405/272*3522
MOMS 020390 A-6
Stephen rinch Laboratory Manager Dexdll Corporation ] Handan Park Drlva Hainan, CT 06517 203/266050*
David J, Flahar Sanior Conaultant
Dexail Corporation Ona Hamden Park Drlva
Handan, CT 06517 203/2660509
'
Chuck J. Flippone Regional luainaaa Manager Onlaon Traneformer Sarvicat
32 Graenaat Ridge Road Vllton, CT 066*7
203/79*0621
Hobart S. Forbaa, Jr.
Praaidant Trinity Chemical Company Clovarlaaf 3, Suita 313
6403 Mate*If Shawnee Miaaion, XS 66202 *13/631*2290
Thomaa L. Forraatar
Director Pacific Gao A Electric Coopany 77 Baala Street, Roe* FI625 San Franciaco, CA *6106 4lS/72*703
Doug A. footer Environment Spacialitt Ontario Hydro 700 Univaraity Avenue, U4 C6
Toronto, Ontario CANADA MSG 1X6 416/5*2**177
Hobart D. Fox Technical Director IT Corporation 312 Director* Drlva
Knoxville, TN 37923 615/6*0*3211
Emery L. Franc la Sanior Engineer Arkana aa Power 6 Light Company 5001 Thlbault Road Little Rock, AX 72206 501/377-563*
Paul J. Fray Engineer Baltimore Gaa 6 Electric Coaipany Rutherford lualnaaa Cantor P.0. Em 1475 Baltimore, HD 21203 301/261*3777
R. N. Fugatt Manager, General Sorvlcoa Dlvlaien Electric Power loord 537 Cherry Street Chattanooga, TN 37402 615/629*320*
Chriatina Galuga Aaiociota Environaontal Engineer Southern California Gaa Coopany P.0. Sox 3249 Tanainal Annex Lot Angela*, CA *0051 213/66**37*3
Violet* Gareia-Ue Aaat. Technical Suparvlaor Ontario Hydro 700 Univaraity Avenue, A2*C7 Toronto, Ontario M2N 1J5 CANADA 416/592*4373
Gary Gauger Suparvlaor, Analytical Sarvlcaa MeGraw-Ediaon Coaipany 11131 Adana Road Frankavllle, VI 53126 414/635*2921
Ray Calmer Sanior Engineer EGfcC Idaho P.0. Box 1625 Idaho Falla, ID 63415 206/326*1090
MONS 020391 A-7
David L. Durlar Environmental Specialist Central Power 6 Light Company P 0. Box 2121 Corpus Chrlstl, TX 78403 512/881*5300
Rsmaah Dwlvady San lor Engineer Dalmarva Powar Company P.O. Box 9239 Newark, DE 1)7U 302/454-4915
Jamas A. Dykhula Tachnlcal Salaa Representative Chamleal Vasts Management 3003 Buttarfiald Road Oak Brook, XL 80521 312/218-1300
George Eadon Director, Dlv. of Env. 5elancaa Wadsworth Canter for Labs 8 Rea. NYSDOH.Rm. E280, Empire (tats Plass Albany, NY 12201 518/874*4170
David X. Edwards Project Manager Ontario Miniatry of Environment Waste Management Branch 133 St. Clair Avenue, Vest Toronto, Ontario M4V IPS CANADA 418/323-5181
David M. Eggera Environmental Protection Specialist Allied-Signal, Inc. Bandlx Kansas City Division D/144 0B29, P.O. Box 41)159 Kansas City, HO 64141*815) 818/9)7-4045
Charles E. Eigati Vies President Trinity Chemical Company Cloverlaaf 3, Suita 313 8405 Metcalf Shawnee Mission, KS 66202 913/831*2290
Mitchell D. Erickson Group Leader, Organic Analysis Grp Argonna National Laboratory 9700 S. Casa Avenue Argonna, 1L 60439-4837 312/972-7772
Martin Eroh N/A Arisons Public 5ervlce Company P.O. Sox 21666 Phoenix, AZ 85036 602/250*6471
Larry Eachbech PCB Program Manager Chemical Waste Management 10 Alma Drive V. 5anece, NY 14224 716/675-3839
Robert J. Faulkner Northeast Regional Manager Sun Environmental, Inc. 10 Ferry Street P.O. Drawer A Concord, NH 03301 603/228-9131
Paul V. Feeney Coordinator, Industrial Wastes Central Hudson Gas 6 Electric Corp. 284 South Avenue Poughkeepele, NY 12601 914/486-5343
Edward V. Fauaretein Mgr., Marketing 6 Product Support General Electric Company 1 River Road, Building #6/233 Schenectady, NY 12345 518/385-3134
Rick Finch Environmental Coordinator Georgia Power Company 271 Maple Street Atlanta, GA 30314 404/527*4430
HONS 020392 A-8
Jacob George Manager, Laboratory Servieee Standard Chlorine of Delaware, Inc. P.0. Box 31* Governor Lee Road Delaware City, DE 19706 302/834-4536
Richard George Manager, Special Projecte Tranalormer Service, Inc. T.O. Sox 1077 Concord, NH 03301 603/224*4006
John F. Glerthy Reaeereh Sclentlat Hew York State Department of Haalth Wadaworth Laboratorlea Empire State Plata Albany, NY 12201 516/473-7333
Floyd Gilmore Facllitlae Staff Engineer Allled-6ignel, Inc. Bendlx Kanaaa City P.0. Sox 619139 Kanaaa City, HO 64141-6139 816/997*2433
Don Glrvln Senior Reeearch Sclentlat Battalia Pacific Northweat Laba P.0. Box 999 Battalia Boulevard Richland, VA *9352 509/376-3246
Edward G. Gledbech Senior Power Engineer Lot Angelee Dept, of Water 6 Power 111 N. Hope Street, Room 1220 Loa Angela*, CA 90012 213/481*6319
. A. Geleblowahl V.P., Plant Manager Warrenton Refining Company P.0. Box 250 Warrenton, MO 63383 3I4/436-36B6
Luciano A. Gonsales Chainlet Ontario Hydro BOO Kipling Avenue Toronto, Ontario CANADA M82 554 416/231-4111 X 6416
William B. Goode Principal Engineer Baltimore Gaa 6 Elactrlc Company F.O. Box 1475 301 Front Street Baltimore, HD 21203 301/291-3212
F. J. Graham Vice Pretident, Marketing Unlaon Tran*former Servleea 1338 Hundred Oak* Drive Charlotte, NC 28217 704/529-4469
Lloyd Gray Mgr., Plant Maintenance A Const. GE Canada 142C Dupont Street Toronto, Ontario CANADA M6H 2B2 M6/530-53B3
Richard Green Mgr., Elac. Prod. A Env. Affair* Northvaatern Public Service Company 3rd Street A Dakota So. Huron, SD 57350 605/352-8411 X22B
Jacquea Guartin Project Manager Elactrlc Power Reaeereh Inatltuta 3412 Hillview Avanue Palo Alto, CA 94304 415/855-2018
HONS 020393 A-9
Harry E. Hatkeen Engineer Philadelphia Electric Coaipany 2300 Market Straat, Third Fleer Philadelphia, PA 19101 215/661-5706
Varran G. Htnaan Englnaar HDR Infreatructura 1100 Eeatleke Avanua, Eaat Saattla, VA 96109*6606 206/682*9000
Tiaiothy S. Hardy Partner Kirkland 6 Ellia 655 15th Straat Veehlngton, DC 20005 202/679*5062
Nark Harrla Electlcel Englnaar Sierra Pacific Fewer Company P.0. Sex 10100 6100 Nall Hoad Sane, NV 69520 702/6S9*i551
Dabble Hart Corp. Aden. 6 Dir. Marketing SOS International 501 Forbea Boulevard, Suita 116 S. San frencleco, CA 96060 615/672*0673
Martin L. Hartley Manager, Power Syatea Oparatlona Knoxville UtilIt lea Heard 6517 Mlddlebrook Pika Knoxville, TO 37921 615/550-2566
Villlan 0. Hawk Acting Dlatribwtion Supv. Knoxville Utilitlea loerd 6517 Mlddlebrook Pika Knoxville, TO 37921 615/5S6-3610
Donald Jt. Haddan Manager, Marketing (ECUS) UOP, Inc. 25 Eaat Algonquin Road Dae Flalnae, IL 60016 312/391-2626
Kant D. Hedrick Envlronattntal Englnaar Kentucky Utilitlaa Coopany One Quality Straat Lexington, KT 60507 606/255-1661
Tod Haitwon, Jr. Product Lina Special let Chaelcal Vaate Henegeawnt 2600 Dalk Road, Suita 100 Marietta, GA 30067 606/952-0666
Tlawthy I. Hanning Induatrlol Cheailet Lee Angalaa Dept, of Voter 6 Power 1630 N. Main Straat, lldg. 7 Lob Angalaa, CA 90012 213/661*6691
J. V. Hlrsy Senior Sciontlat U.S. EPA Rlak Analyala Ireneh 601 M Straat, S.V. Veehlngton, DC 20002 202/362-6615
Tarry Hogan Spvar., Environmental Engineering Indianapolla Power 6 Light Coatpany P.0. Sox 1595 I Indianapolla, IK 66206 317/261-6635
Herynell Hollenbeck Adoiniotrotiva Aaat. to Sen. Mgr. loerd of Public Utilitlaa 700 Minneaota Kaneee City, HO 66101 913/573*9161
A-10
HONS 020396
Craig V. Hornack Project Managar Ganaral Elactrlc Conpany 1 River Road, lldg. 2-525 Schenectady, HY 12515 518/3BS-I86*
John Hughaa Vlca Praaldant Salaa U.S. Pollution Control, Inc. 2000 Claaaan Caatar
Oklahoma City. OR 73108 105/528-8371
Paul P. Hypnarowakl PCI Program Manager State of California 1500 5th Straat Sacraaento, CA 53811 516/115-2155
Jarry J. laaaca Account Executive Uniaon Tranaformer Sarvlcaa 821 Corporate Drive, Suita 200 Lexington, Kt 10503 606/223-7851
'
Barbara N. Jecobe Oparatlona Analyat Southweetent Elactrlc Power Company
P.O. Box 21106 Shreveport, LA 71156 318/222-2111
Bruce Jacobean Director, Engineering
SOS International 501 Forbee Boulevard, Suita 118 S. San Fraacleco, CA 51080 115/872-0673
Jama* J, Jakoba
Ganaral Spvar., Plant Maintenance Alllad-llgnal, Inc. Bandlx Ranaaa City Dlvlalon P.O. Box 615155 Ranaaa City, HO 61111-6155 816/557*1211
Marvin L. Jeffera Environmental Speclellet Bonneville Power Adalnlatretion P.O. Box 3621-SJ Portland, OR 57208 503230-5136
A. D. Jennlnge Praaldant Ranaaa City Power 6 Light Company 1330 Baltlnora Avenue P.O. Box 118675 Ranaaa City, HO 61111-5675 816/215-3801
Gard Jeroehln Managar, Trananlaalon 6 Dlatr. Seattle City Light 1015 3rd Avenue Seattle, VA 56104-1198 201/625-3129
Michael Johnaon Aaaoclata DaciaIon Focua, Inc. 1561 El Canlno Real, Suita 200 Loe Altoa, CA 91022 115/960-3150
Jeff Jung N/A TAR Service Company P.O. Box 197 Colnen, SC 57017 605/531-3107
Robert E. Rana Staff Engineer Union Elactrlc Conpany Mall Coda 612 P.O. Box 115 St. Loula, K0 63166 311/551-1005
Bruca Raatal Sanlor Syatama Analyat Arkansaa Powar A Light Conpany P.O. Box 551 Littla Rock, AR 72203 301/377-5153
A-n
HONS 020395
David V. Kay Environoental Spaciallat Southern California Edlaon Coopany 2244 Walnut Grove Avanua Roaeaead, CA 91770 816/302-2149
Tin Xant Sanlor Projact Engineer IT Corporation 304 Dlractora Drlva Knoxvilla, TN 37923 615/690-3211
Alan F. Kattla Mgr., Pollution Control and Rea. KPL Gea Service P.0, lox 169 616 Xanaaa Avanua Topeka. KS 66601 913/296-6376
Jaoee L. King Manager, PCI lervicaa IT Corporation 312 Dlractora Drlva Xnojtvllla, TN 37923 615/690-3211
Jaoee P. Kinnay, Jr, Senior Davalopoant Chaaltt General Electric Coopany 1935 Redoond Clrcla Rom, 8A 30161 404/291-3163
David Kautaon Cantral Laboratory Suparvlaor Florida Power 6 Light Coopany 9250 V. Glagler Itraat Miami, FL 33174 305/552*4250
Calvin A. Xodraa Mechanical Engineer Naval Civil Engineering Lab. Coda L-71 Port Ruanaoe, CA 93403 605/962-5065
Richard L. Koanlga Spvar., Plant Tachnical Waehlngton Pub. Powar Supply Syataa 3000 George Vaahlngton Way HO-9I6U Richland, VA 99352 509/377-2279
Ralph T. Kooei Envlronoantal Affalra Adolnlatrator Southarn California Gaa Coopany 810 So, Flower Straat, HL-110K Loa Angalaa, CA 90017 213/669-3560
Duana P. Xoatalka Dir., Raaaareh 6 Davalopoant Trinity Chaaleal Coopany Clovarlaaf 3, Suita 313 6405 Metcalf Shavnaa Mlaalon, KS 66202 .913/131-2290
Eugana Iran* Suparvlalng Chaailat Northern Stataa Powar Coopany 1516 Chaatnut Avanua, North Mlnnaapolia, HN 55403 612/347-9440
Richard Kuahn Waata Dlapoaal Coordinator Martin Marietta Energy Syataoa P.0, lox 1410 Paducah, KY 42001 502/444-6311 X319
Roland K. Ku^ Manager, luainaaa Davalopoant Ganaral Electric Coopany 1 River Road, Rooo 2-525 Schenectady, NY 12345 518/365-9763
Hlchaal A. Laacara Daalgn Enginaar Duka Powar Coopany P.0, lox 33119 Charlotte, NC 21242 704/373-5201
A-12
HONS 020396
Frank H. Lerchen Engineer General Sarvlcaa Adailnietration 7th A D Streeta, S V. Waehlngton, DC 20407 202/472*6570
Jay LaCenpta Cuetower Sarvlcaa Repreaentatlva U.S. Ecology, Inc, 9200 Shelbyville Road, Suita 300 Loulavilla, KT 40222 502/426*7160
Vllllaa J. Llbro Regulatory Analyit Wortham Stataa Power Coapany 414 Wlcollat Mall Minneepolii, KN 55401 612/330-7630
Stan Llndgren Project Manager Electric Fewer Raaaarch Institute 3412 Millvlew Avenue P.0, ox 10412 Palo Alto, CA 94303 415/155*2306
Janea V, tingle M/A Vlacencin Electric Power Conpany 333 V, Evaratt Milwaukee, VI 53203 414/221-2136
Richard Love Director, Technical Service* Hartford Steen loilar One State Street Hartford, CT 06102 203/722*5672
Thome* J. Luby Sanera1 Manager Sun Environmental, Inc. 1700 Gateway Soulcvard, S.E. Canton, OH 44707 216/455*4677
Dale G. Luca Environment*! Aatletant Nabraaka Public Power Diatrlct P.0. Sox *99 Coluabua, KE 66601 402/563-5379
Ted Lynn President Detail Corporation 1 Handan Park Drive Heerien, CT 06517 203/261*3509
lyronHebry Electric Power Specieliet Unlaon Trane fomer Sarvlcea P.0. Soa 471 Taxaa City, TX 77510 409/946*3327
A1 0. Halfatt Regional lualnaaa Manager Unlaon Traneforaar Sarvlcaa 2727 Tuller Parkway, Suita 200 Dublin, OH 43017 614/195-2600
Collan Marqulct Environmental Coordinator Snohoelah County Pub. Utility Diet. P.0. Box 1107 Everett, VA 91206 206/347-4369
Willlew H. Martin Director of Technology Uniton Tranefornar Sarvlcaa 1336 Hundred Oaka Drive Charlotte, NC 26217 704/529-4450
Michael J. Maaeey Vice Freeldent REI Technologies, Inc. 696 Virginia Road Concord, HA 01742 617/369-6910
A-13
HONS 020397
Mike Mattee Vic* Praaident, Operatlone tun Environmental, Inc. 1700 Gateway Boulevard, S.E. Canton, OH 44707 216/452-0837
Jack Mauldin Environmental Protaction Bpeciellet San Antonio Real Property Malnt. P.0. Ion 62*5 Vainvrlght Station San Antonio, TX 78208-0295 512/221*2100
Harlbeth HcCoroick Environmental Analyat 0ran|a 6 Rockland Utllitiaa, Inc. One Blue Hill Plata Pearl River, NY 10965 914/577-2580
Robert C. McCormick Project Manager u.g, Any Corpa of Engiaeera 601 E. 12th Street Kaaaee City, M0 64118 816/376*2782
Jaoea V. HcCullay Maintenance Superviaor Cental Electric Kanaaa 2300 Iroadway P.0. Ron 170 Great lend, K5 67530 316/793-7841
John I. McDermott Staff Cbeaical Engineer General Electric Company E-l, CEI-408 Sebeaectady, NY 12301 51g/387*7892
Jerry McDonald Senior Staadarda Engineer St. Joaeph Light 6 Power Company 520 Prancle Street St. Joaeph, HO 64501 816/233*8888 X196
Patrick L. McRaa Environmental Project Sclentlat Public Service Co. of Indiana 1000 Eaat Main Street Flalnllald, IN 46168 317/838-1194
Mary McLeern Project Manager Electric Power Reaearch Inatltute 3612 Hlllviaw Avenue Palo Alto, CA 94304 415/855-2487
Murray 0. McMahon N/A Veetlnghouae Electric Corporation Engrng. 6 Inetruaientation Service 875 Graentree Road, lldg. 8 Pltteborgh, PA 15220 412/937-0811
J. P. HcPartland Environmental Coordinator Iowa Electric Light A Power Company P.0. Box 351 Cedar Rapide, IA 52406 319/398*4567
C. P. McShane FluIda Product Manager RTE Corporation 1319 E. Lincoln Avenue Waukeaha, 1 53186 414/549*5000 X302
Paul R. Michael Manager, Product A Env. Safety Monaanto BOO N. Rlndbargh Boulevard St. Louie, M0 63167 314/694-4838
Jeff Killer N/A TAR Service Company P.0. Boa 197 Colnan, SO 57017 605/534-3107
A-14
HONS 020396
Deborah Minuecl Cham at Dexsil Corporation 1 Handan park Drlva Htmden, CT 06517 203/280*3509
C. C. Mitchell fir. Environmental Speciallat Georgia Power Company P.0, Box 4545 Atlanta, CA 30302 404/326*7013
Jorge A. Horendo President Plaemefuiion, Inc. 8510 Gron Road P.0. Sox 288 Groaaa 11a, HI 48138 313/675*8533
Stephanie Moulton Senior Environmental Coordinator Pacific Gaa 6 Electric Company 123 Hleeion Street, Room 1163 Sen Francisco, CA 84106 415/873*5682
Warren Hueller Environmental Sarvicae Union Electric Company 2815 Scott Avenue St. Louie, HO 63103 314/554*3063
Dana S- Hyere General Manager of Operation* S, D. Myara, Inc. 180 South Avenue Tallmadg*. OR 44278 216/633*2666
Don Kalla QA/QC SOS International SOI Forbet Soulaterd, Suita 118 South San Frandaco, CA 84080 415/872*0673
Jim Nealy Project Manager Ecology and Environment, Inc. 160 Spear Street San Franclaco, CA 84105 415/777-2811
Victor Niemeyer Senior Project Manager Electric Power Reaeerch Inatltute 3412 HUlvlew Avenue Palo Alto, CA 84304 415/855*2744
\ Edward Nowak Environemntel Hgmnt- Speciellat ATfcT Sell Labe 25 Lind*lay Drive Norrlatown, NJ 07860 201/888*1458
Larry E. Oehlaon Selea Manager IT Corporation 1370 Seer Creak Road Oak Ridge, TO 37630 615/482-7073
Doug Oliver Environmental Supervlaor Eeat Xentucky Power Cooperative P.0. Sox 707 Winchester, XT 40381 606/744*4812
Glnny Pallo Spvir., Herket Date Service* l',S. Ecology, Inc. 8200 Shelbyvlll* Rood, Suit* 300 Louisville, XT 40222 502/426-7160
Jo**ph Palmer Senior Steff Engineer Massachusetts Vster Res. Authority 100 First Avtnu* Chsr1sttown Ksvy Tard Boston, HA 02128 617/242*7110 X2008
A-15
HONS 020399
Craig Parker Senior Environmental Engineer Iowa Electric Light It Power Company P.0. Im 351 Cedar Raplda, IA 52406 31P/3P8*467S
Steve Pattlaon Engineer laltlmore Gee A Elaetrlc Company P.0, lox 1475 Fort Stallwood Conplex laltlaora, HD 21203 301/787-5124
Edo D. Pallitter1 V.P., Analytical 6 Chaolcal Science Raaaarch Triangle Inatltut* P.0, lox 12194 3040 Conwalllt Road Raaaarch Trlangla Park, NC 2770* 919/541-637*
John Pannall ConanItant Regulatory Cooplianca Service* P.0. Ion 4642 Springfield, HO 6580S 417/133-2108
Hark Pannall Praaldant Regulatory Cooplianca Servlcea P.0, lox 4642 Springfield, HO 65808 417/833-2101
Charlaa H. Panel 1 Environmental Aaalatent Haw York State Electric 6 Oaa Corp. 4500 Vaatal Parkway Eaat llrolnghan, NT 13777 607/729-2551
Rickard D. Paten Mgr., PCI Klak Control General Elactria Cwapany 4900 Xing*ton Street Denver, CO 80239 303/329-2374
J. 6. Pfrimer Manager, PCI Servlcea General Electric Coopany 1777 lotalho Drlva, Suita 320 Walnut Craak, CA 94596 415/947-2210
Jody Plun Sanior Regulatory Coordinator Public Service Co, of Haw Mexico Alvarado Square, MS-0246 Albuquerque, NM 87158 505/648-2216
Joe Popwell Staff Englnaar Georgia Power Company 270 Peachtree Street Atlanta, OA 30302 404/526-2798
John Poxao Environmental Servlcea Union Electric Company 2913 Scott Avanoa St. Louie, HO 63103 314/534-3063
Patrick Price Manager, Enviornmantal Affiara IASP Corporation Flbera D1viaion Enka, NC 2S72S 704/667-7701
luaen Price Director of Marketing IWln City Teatlng Corporation 662 Cromwell Avenue St. Paul, HN 55114 612/649-5501
Doneld Pylea Safety Director Ohio Tran*former Corporation 1776 Conatltution Avenue Loulevllle, OH 44641 216/875-3333
A-16
HONS 020400
true* V. Rasher Senior Aquatic llologlst Consumere Power Company 1945 V. Parnell Road Jackson, HI 49203 517/788-0331
Dwight Fatliff luyer Wisconsin Pawar 4 Light Coapsny 221 V. Washington Avanua Madlaor, VI 53701 808/252*3147
Char11a T. Raymond Hgr., Transformer Sarvicaa General Electric Company 1 River Road, luildlng #6/293 Schenectady, NY 12345 518/385-0060
William K. Raad RagIona1 Salaa hanagar Weetlnghouee Blactrle Corporation P.0. lex 286 Hadiaon, PA 15663 412/722-5303
James L. Raldy Plra Prevention Technician leltlmore Gaa 6 Elactrlc Company 1 Cantar Plasa P.0. Ion 1475 Baltimore, MB 21203 301/234-6301
Ronald D> Raita Account Executive Unison Transformer Sarvicaa P.0. Rox 38373 Carmantown, TN 31113 901/757-8530
Robert D. lane Environmanta1 Affairs Manager Sum Environmental, Inc, 1700 Gateway Boulevard. S.E. Canton, ON 44707 216/452-0837
Klrt V. Rhoada Environmental Analyst Utah Power 4 Light Coamany 1407 V. North Temple Salt Lake City, VT 84116 801/535-2252
Roger Rlcheraon Technical Sarvicaa Forman Sulphur Springa Vallay Elae. Coop. P.0, lex 820 Vlllcox, A2 85644 602/384-2221
David L. Robereon Suparvlaor, Land and Vatar Alabama Power Company 2641 600 N. 18th Street Birmingham, AL 35291-0830 205/250-4190
Jerry Roberta Sclentlet Arkanaaa Power 4 Light Company 9th 4 Lou la 1ana Little Rock, AK 72203 501/370-8888
R. I. Robartaon Senior Consulting Engineer Tampa Elactrlc Company P.0. Rox 111 Tampa, FL 33601 813/228-4661
Phillip V. Rosenbaum PCI Salas Repreentetlvs Rollina Environmental Services P.0, lex 609 Dear Park, TY 77536 713/479-6001
Thomas 0. Rouse Manager, Dielectric Projects General Elactrlc Company 100 Voodlava Avanua Pittsfield, HA 01201 413/494-3947
A-17
HONS 020401
nil Rutledge PCI Specialist Gsnsral Electric Company S323 Gardner Avenue Kansas City, HO 6*120 116/231*077
Thomas H. Sack Banter Hssa Spectrometrlat Midwest Reeeareh Institute 623 Volkar Boulevard Kanaaa City, HO 66110 616/753*7600
Lyla K. Salaala Regulatory Compliance Conaultant Northern Staten Power Company 1511 Cbeltnut Avenue N. Minneapolis, HK 55603 612/367*1525
Valtar Snndera Technical Barvlcaa Manager Taxaa Elaetrlc Cooperatives, Ine. P.O. Boa tSSt Anatin, TX 71766 311/636-0311 X611
Clyde Sehaefer Sanlor lagisear Union Claetrlo Company 1101 Oratlot Street P.O. Boa 169 It. Loala, HO 63166 316/556-3530
Antboay tch--a 1 President Oanaral Transformer let anat tonal 2100 Vyaodotte Street Kanaaa City, MO 66106 616/221-3736
Adolf Schneider Chief Chart >* Dairylaad Power Cooperative 2615 last Avenue, Sooth La Crease, VI 56601 606/767-1267
Dougina Schulta Technical Hanagar Dupont Company 1*721 rierrldy Street Chataworth, CA *1311 116/663*6276
Xlchard P. Schuoan Director, Call Biology Veatlnghouee lle*Analytlcal gyatama 20*6 Calthar Road, lulta 200 Rockville, HD 20650 301/670**367
Mary Scribner PCI Program Coordinator Chemical Vaata Management 3*6*9 lalantina Drive, Suita 320 Newark, CA 96560 613/651*2966
Robert Seeder1 Chemist Hldwett Research Institute 625 Volkar Boulevard Kanaaa City, HO 66110 616/753-7600
Thomas J. laalmaa Gen. Supervisor line. Barvlcaa Consumers Power Company 212 V. Michigan Avenue Jackeen, Ml 6*201 517/716-1026
Dava K. Serlenga Senior Engineer San Diego Saa 6 Electric Company P.O. Ion 1631 San Dlsgo, CA *2112 619/6*6-1976
Dennis Bewlll President Electric Equipment Service Corp. 6751 Mustang Circle St. Paul, m 55112 612/766-6060
A-IS
HONS 020402
Lewi* R. Sharp* Electrical Enilnaar Tannaaaa* Vallay Authority 1101 Market Straat, LP 2N 75A Chattanooga, IN 37402-2B01 615/751-5972
Rick J, Shearer Rational Suainata Manager, v.p. Unlaon Tran*former Sarvlca* 3A06 Oakcliff Road Building D, lultaa S 6 Doravilla, GA 30340 4 04/451-009*
Joaaph E. Shefchak Etivlroiuaantal Enalnaar Wiaconaln Power 6 Light Company P.0. Box 192 222 V, Vaahlngton Avanua MedIron. VI 33701 608/252*3132
Bruca Shook Fla Id Harkat Development Manager Dow Corning Corporation 1120 Lak* Cook Road, Suita 120C Buffalo Grova, 1L (0089 312/541-3430
J. J. Slmcak Envlronoantal Program Coordinator Tax** Utllltlaa Elactrlc 600 North Oliva Straat, LB-SI Dallas, TX 75201 214/B12-S603
Sheldon 6. Sloon PCS Coordinator * - Ration 5 U.S. SPA 230 S. Dearborn Straat Chicago, It 60604 312/886-6087
Jim Simpson Director, Engineering F7W, Inc. 10 Central Avanua Ranaaa City, HO 661IS 913/621-4106
Carlo* Singer Gantr*1 Manager Segutided Elactrica Mexican* S.A. Sor Juana Inee da la Crux, No. 23 Mexico. D F. 06400 347/3 000 341 X0666
Dan Slaton Environmental Speciallet Vaatarn Farmers Elactrlc Coop. P.0. Box 429 Anadarko, OK 73005 405/247-3331
Mareua Slttanflald Director Mareua Slttanflald 6 Aaaoclata* 1013 Chaatnut (treat, Suite 1510 Philadelphia, PA 19107 215/923-2288
David Skipton Power Supply Engineer Lincoln Elactrlc System 11th 6 0 Straat* P.0. Box 80869 Lincoln, NF. 61501 402/475-5512
Warren Slada Progrw Manager New Mexico Env. Improvement Dlv. P.0. Box 968 Sant* Fa, NH B7504 505/827-2173
Gary R. SIOman Manager, Operation* Service* Public Sarvlca Co. of Now Mexico Alvarado Square Albuquerque, NM B7138 303/761-3402
Terry Smith Coordinator, Solid Waat* Central Power 6 Light Company P.0. Box 2121 Corpua Chrlatl, IX 7B403 312/8B1-S390
A-19
WQNS 0^0403
Reginald Sobeeynakl Senior Cheaiet
SH c*r*c
30001 Van Dyke, Room 251*23 Warren, HI 18090 313/317*5612
Jama Spigeretll Vice President Mldveat Reeearch Inetltutt 125 Volker Boulevard Xaneae City, HO 61110 116/753*7600
Wee ley A. Sprouee, Jr. Engineer Virginia Rover Company P.0. Box 26666, 0JRP-11 Richmond, VA 23261 101/771*1113
Que Steete Environmental Speelellet Oeorgla Rover Company R.0. Bex 1513 Atlanta, 6A 30302 101/326*7103
Rueeell A. ftenael Project Engineer Becktel Environmental 50 Beale Street San Frenelaco, CA 91105 115/761*3315
Carl Stoltx Environmental Speelallet Dayton Rover A Light Company P.0. Box 1217 Dayton, OR 15101 513/227*2565
Helen L. Stone Writer/Editor U.S. ERA 101 H Street, S.V. Weahlmgton, DC 20160 202/312*3991
Hark R. Strang
Hanager, PCS Servlcea Senerel Electric Company 2311 V. 22nd gtreet, gulte 300 Oak Brook, 1L 60522 312/573*3711
Michael D. Stringer Rrejeet Hanager U.S. Ecology, Inc. 9200 Shelbyvllle Road Louievilla, XT 40222 502/126*7160
Peter H. Tedln Induatrlal Ryglenlat Tenee Department ef Health 1100 W. 19th Street Auatln, TX 78756 512/151*7251
'
Ron Tam Environmental Sclentlet Puget Sound Rover 1 Light Company 1101 Lake Waahlngton Boulevard, N Renton, WA 91056 206/235-7621
R. X. Tendon
Electric Rover Speelallat Public Work* Canada 110 Promenade du Portage rhaee 1, Level 12
Mull, Quebec, CANADA 119/997-5053
Jerry Teppa
Director, Engineering North America Environmental 2261 Reeeareh Drive Livermore, CA 91SS0 115/119*5591
Philip H. Taylor Aeeoclate Reeeareh Selentlat Unlv. of Dayton Reeeareh Inatltute 300 College Park Avenue
Dayton, OH 15169*0001 513/229-2816
A-20
HONS 020404
V. V. Taylor Senior Design Engineer Georgia Power Company P.O. lex 4343 Atlanta, GA 30302 404/326-1132
Jana H, Thomea Slta Environmental Engineer Washington Pub. Power Supply Spate* P.O. Sox 968 1chland, VA 99332 309/372-2339
Chart** Thompson Regional lualnaa* Manager Uniton Transformer Service* 8600 Farley Street, Suita 100 Overland Park, KS 66212 913/381-9480
Donald V. Thompson Senior Staff Engineer Public Service Electric 6 Gas Co. 80 Park Plaaa Newark, NJ 07101 201/430-7638
Jim Thompson N/A Til Service Company P.O. lex 197 Colatan, SD 37017 603/334-3107
Michael D. Tirpak Manager, Operation* 6 Engineering fiorthveatern Rural Electric Coop. Road 91, Rout* 86 Cambridge Spring*, PA 16403 814/398-4651
Richard V. Tock Profeaaor, Chemical Engineering Text* Tech Onlveralty Department of Chemical Engineering P.O. lox 4075 Lubbock, TY 79409 106/742-1766
Doneld C. Tomcaek Senior Engineering Technician Virginia Power Company 2400 Grey lend Avenue Richmond, VA 23220 804/237-4893
Hoeep Toroeeian Project Scientiat Domtar, lne. P.O. lex 300 Sennavllle, Ouebec CANADA K9X 3L7 314/437-6810
V. C. Trench Preaident PreCor 3653 Lindero Canyon Road Building 100, Suit* 49 Veatlak* Village, CA 91361 05/494-0524
Dennla F. Tulloh Technical Manager, Electronic* Unieon Trana former Service* 1938 Hundred Oaka Drive Charlotte, NC 28217 704/529-4465
Joan D. Turnbull Aaaletant Environmental Scientiat Puget Sound Power 4 Light Company P.O. lox 97034 Bellevue, VA 9B009-9734 206/454-6363 XS161
Jack R. Turner Spver., Standard* 6 Record* Dlv. Salt River Project P.O. Box 32025 Phoenix, A2 83072-2025 602/236-5054
Stephan Turner Associate Chemiet Midwest Research Institute 425 Volker Boulevard Kansas City, M0 64110 816/733-7600
A-21
HOMS 020*05
Ellaabeth 1. Ufalnger (tatletlclen IT Corporation 27*0 Moot Ido Boulevard Monroeville, PA 15146*27*2 412/372-7701
Andro Vendenput Frofeaaor Catholic Unlverelty of Leuven E.E. Dopt., Dlv. V1T Kard. Herder lean *4 t-3030 Louvan, BELGIUM 32/16 22*0**31
Fall* F. Valasquaa Prealdent/Oeneral Hanager Power Engineering, Inc. S.F.O. Ion 1*05 Ban Juan, PR 00*36 60*/784-6052
Jin Vick Envlronaantal Licencing Engineer Gulf Paver Company P.0. Box 1151 Panaacola, FL 32520 *04/444*6311
Itaran C. Vick Technology Manager Union Carbldo Corporation Old law Kill Rlvar Road Tarrytovn, NT 105*1 *14/7I**3422
Rudy Vlngria Marketing Hanajar Chanleal Vaata Hanasanant 3003 Butterfield Road Oak Brook, IL 60521 312/211*1616
Richard H. Warner uptrrlaor, Induatrlal Hygeniet Burthen California Edlaon Coapany 244 Walnut Qrova Avanua, Roon 171 Roaanaad, CA *1770 213/633*036*
Peter Way Praaldant Verldyne, Inc. P.O. Box 415 Topoflald, HA 01*63 617/667-5600
L. J. Vaat
Elactrlc OparatIona Enslneer Illlnola Power Cenpany 500 So. 27th (treat P.0. Boa 511 Decatur, 11* 62525 217/424*6536
David T. Veaton
Principal Standerda Engineer Kanaaa City Power 6 Light Coapany 4400 Front Street Kanaaa City, HO 64120 S16/245-3617
Ralph H. White Senior Daalgn Engineer Georgia Power Coapany P.O. Boa 4545 1S/333 Atlanta, GA 30302
404/526*7153
Rick A. White Engineer Northeaat Utllltlea 324 Savage Hill Road Berlin, CT 06037 203/665*510*
Wllllau R. White
Chief, Hetarlela Lab. Branch Bonneville Power Adnlnlatratlon P.O. Boa 41*ER0
Vancouver, WA 91666 206/690*2644
Ceorglnne Whltaon
'
Environmental Engineer
Charleaton Naval Shipyard
Coodr., Charleaton Naval Shipyard
Code 160, Naval Baee
Charleaton, SC 2*406-6100
603/743-6116
A-22
HONS 020406
Catharine Williams Environmental Chenlet MM DUlon, Ltd. 47 Shepard Avanua Eaat Wlllowdale, Ontario H2N 5X3 CANADA 416/229-4646
V. B. Willingham Eupt., Service* Can. Papalr thop Georgia Power Company 62 Lake Mirror Bead, Bldg. V Foraat Park, 6A >0050 404/362*5607
Donald B. Wilson lanior Aaaoelata Dacia Ion Focus, Ine. 4964 El Caialno Baal, Suita 200 Lea Altoa, CA 94022 415/960*5450
Lynn A. Wlpf Environmental Technician Kansas Gaa 6 Elactrle Company P.O. Box 201 Wltehita, KB 67201*0201 >16/261*6669
Bradley A. Wlaa Senior Engineer Penney 1vanla Electric Company 2 North 9th Street Allentown, PA 16101 215/770*6501
Maury Wlehaoff Maintenance Consultant Calanaaa Fibers, Inc. P.O. Box 32414 Charlotte, NC 2S232 704/554-3S31
J. K. Wittle Engineer Arc Technologic! Company 996 014 Eagle lahaol Bond Suite 111* Wayne, PA 190S7 215/667*9070
Michael Wolfe Product Line Specialist Cheolcsl Wsete Management 521 North Belt East, Suite 600 Houston, TX 77060 713/647-4320
John Woodyard General Manager, PCB Services IT Corporation 23456 Hawthorne Boulevard Torrance, CA 90505 213/378-9933
Gary Worrell Corp- Environmental Engineer Motor Wheel Corporation 4000 Col Una Bead Lansing, MI 46910*5694 517/337-5670
Bruce H. Wright, Jr. Environmental Specialist Southwestern Electric Power Company P.O. Box 21106 Shreveport, LA 71136 316/221*2604
Sidney E. Wueliner Water Quality Scientist Northern Indiana Public Service Co. 5265 Hohmsn Avanua Haamond, IN 46320 219/153*5361
Dannie p. Yannone Engineering Aealatent Fremont Department of Utilities 725 North Park P.O. Box 146B Fremont, NE 61025 402/721*2490
Sschlo Yssufuku Heavy Apparatus Engineering Lab Toshiba Corporation 2*1, Uklshlns*aho, Kawasaki-ku Kawasaki City, JAPAN 210 044/277*2111
A*23
HONS 020*0?
Jan* A. Zavaly
EnvlroiMMiital ERflnaar Navy Public Verba Canter San Plate, CA *2136*3113 41*^6*6*6013
A-24
HONS 020408
FtK(E|tlCt 1W mi PCI ICRIMI
clcciTiTmuci uuuh lltimu
m it
,
HONS 020409