Document 06ax4q406B4Rj6kyOEMBEX1en
UNION CARBIDE CORPORATION technical center
P.O. BOX B361. SOUTH CHARLESTON, WV 25303
Tc`Nam<l. E. Rucker 512/2009
Loc-e r.rf^n
B. H. Avashia - 512/23 J. W. Barna - 2009/6 W. L. Browning - 2009 J. E. Liana - 740/2320 C. P. Maxwell - 701/2 B. R. McMakin - 2009 F. R. Sunderland - 2009
^ May 4, 1987
0,,BnBt,nsDpr.EH&rs _
Ares Industrial Hygiene Asbestos Exposure Monitoring
Attached are the results of asbestos exposure monitoring for three days on insulators at the Institute Plan doing asbestos removal on lines in the #1 and #2 dock areas. A 3-inch steam line and two 3-inch product lines were stripped from the river to the top of the river bank and the risers across the road was stripped. Glove bags and enclosures were not used because it was not feasible according to the construction department and the 512 Plant Industrial Hygiene department. Employees used a powered man-basket to reach lines that were overhead.
All personal exposure samples were below the 2.0 fiber/cc level which permits the use of half-face HEPA cartridge respirators while employees are being monitored per 0SHA asbestos standard 29CFR 1926.58. One personal exposure sample exceeded the 0.2 fiber/cc permissible exposure level standard and four exceeded the 0.1 fiber/cc action level standard. Exposure monitoring may not be required in some instances where supplied air respirators in a positive pressure mode are being used while stripping and removing asbestos insulation. We encourage you to use supplied air respirators as much as possible in the asbestos abatement procedures.
Employees wore no street clothes, two pair of coveralls, headcovers, boots, gloves and A0 R57-A half-face HEPA cartridge respirators. They showered before lunch and at the end of the workday before leaving plant.
UCC 024799
Asbestos Exposure Monitoring
-2-
May 4, 1987
Please inform S. R. Erskine, B. J. Agosti, P. K. Snodgrass and C. 8. Clendenin of their exposure monitoring results as soon as possible. Have them sign and date this report and return to M. A. Patel at Building 701-330.
If you have any questions or if we can be of further assistance, please call us on extension 4779 or 3750.
WORK BY:
APPROVED BY:
Vance E. Stover &
Attachment
VES:HJK:MAP:rab 2289P
Manhar A. Patel
UCC 024800
Conp ref. W2187 W2188 W2189
ASBESTOS EXPOSURE MDNIT0RIN3
Date 4-21-87 4-21-87 4-21-87 4-22-87 4-22-87 4-22-87 4-23-87 4-23-87 4-23-87
Sanple Type/ Eiiployse Name
Sampling Time
Personal/ S. R. Erskine
6hr 3&nin
Personal/ B. J. Agosti
6hr 38nin
Personal/ P. K. Snodgrass
6hr 33rrin
Personal/ S. R. Erskine
7hr 4min
Personal/ P. K. Snodgrass
7hr 2nin
Personal/
7hr 3min
C. B. Clendenin
Personal/ P. K. Snodgrass
7hr 6mn
Personal/ C. B. Clendenin
7hr Sm'n
Personal/ S. R. Erskine
Thr 4min
Air Cone fibers/cc
0.209 0.142 0.003 0.239 0.002 0.052 0.157 0.016 0.129
fibers/cc 0.172 0.118 0.003 0.211 0.001 0.046 0.139 0.041 0.113
CCWENTS
Stripped, bagged and vacm/red approx. 90 feet of line at #1 dock.
Stripped, bagged and vacuuned approx. 90 feet of 1ine at #1 dock.
Stripped, bagged and vacuuned approx. 90 feet of line at #1 dock.
Stripped, bagged and vacuuned approx. 100 feet of line at #1 dock.
Stripped, bagged and vacuuned approx. 100 feet of line at #1 dock.
Stripped, bagged and vacuuned approx. 100 feet of line at #1 dock.
Stripped, bagged and vacuuned approx. 130 feet of line at #1 and #2 docks.
Stripped, bagged and vacuumed approx. 130 feet of line at #1 and #2 docks.
Stripped, bagged and vacuuned approx. 130 feet of line at #1 and #2 docks.