TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Summary
January 1968
January Coat Improvement Savings totaled 825000 vs. $25,600 Target.
Organic Division
Aroclor Porocel Column resistivities Increased to 30 M level three days after successful recharging of column bed. Rough draft of the Aroclor MIP vas reviewed by plant groups. Target date for publication is March 1968.
Blohenvl Expansion Project (C.E.A. 1892) Scope reviewed with H. C. Carder and C.E.D. Representatives. TED will determine project justification and forward to H. C. Carder in early February.
Location of 150.000 gallon HC1 Storage Tank selected and approved by Safety Review Committee. Design revisions will be completed In March.
South Second St.
E. Glbba DeGarao
J. F. Quinn J. R. Savage - JFQ
Other Locations
D. B. Edwards - DR J. W. Craves - Lullng W. R. Kellogg - Nitro C. F. Knollmeyer -
Seattle J. 7. White - Everett R. 7. fflasanborn - CB }yM, J. Wilson WGK
PNP Debottlenecking Efforts continued in January. Reviewed problem areas with Maintenance and Production. TSD is monitor ing reactor operations to determine cause of long reactor let down cycles.
Coordinated Plant effort to reduce mercury vapor levels in
Cell House has resulted in a downward trend throughout
January. All levels were at or below maximum limit at end of month. Rough draft of Chlorine MIP will be reviewed with plant groups in February. Radioactive inventory results Indicate 122.000 lbs, of mercury in cells.
Waste Heat Recovery Program reviewed with H. C. Carder. Ver bal approval received for an additional $15,000 to modify test facilities to prevent Therminol contamination of boiler feed water, reduce Therminol entrainment losses, and Improve over-all heat recovery.
Ag Division
Plans to Pilot Plant Test Sulfur Recovery from Hiran still residue have been changed as a result of Bird Machinery Company's refusal to make teats in their facilities. New
03A6A73
: . . -
CONFIDENTIAL INFORMATION
:
OlHUlW Contains confldtnflel AatormAtlon which U His property of Monsanto Company. Only thoso portions of'the document relevant to a
'tfoly eutborltod Individual's wood to Anow -may be oxcerpted for him. The report must not be sent outside the Company without written approval and
dbo autbortied recipient Is accountable for Its safe beeping, excerpting or otherwise disclosing of Its contents and tor Its proper dispose!. The 'docu
ment remains tfce property of Memento Company and shall ba returned within two months to Its outhor, oxcapt upon special authorisation to bold
. lor a "longer period."
:
TOWOLDMONOQ44550
Summary - continued
plans call for erection of temporary facilities and field testing at Anniston. Cost of Installing temporary facilities estimated at $24,000. Safety Review of Sulfur Recovery Program will be held in St. Louis in mid-February with C.E.D. and Ag Division.
Preliminary design of Parathlon Formulation Facilities complete. A.F.E. ($18,000 NFC) will be submitted in early February. All long delivery items have been ordered per verbal approval. Target date for beginning operations is 4/1/68.
EVOP of Niran condensation reaction resulted in $11.000 yield savings in January. Further optimization is planned for February,
Plant Improvement
Aroclor Expansion - Project (C.E.A, 14^0) reviewed with C.E.D. Agreement reached all items except level indication for storage tanks.and metering of utilities.
Construction started on Expansion of Salaried Parking Lot. (Warehouse Project C.E.A, 1452). Warehouse Office and Building are out for bids.
2.
MEETINGS The next Engineering Planning Meeting will be held February 20.
DCM:kd
D. C. Malm Technical Services Dept.
0346474
TOWOLDMONOQ44551
N umbers n (9 1,000 ))-I
-1-100 -{- 80 -{- 60 + 4o!
-- 60 -- 100
TOWOLDMONOQ44553
DETAILS
3.
AROCLOR - J. HacPherson
A. Cost Improvement
Month
YTD
Comments
Target - - No Cost Improvement Savings targeted for first quarter. Second quarter
Actual - - Target ($15,950) will not be met because Aroclor C.I. Projects are
back-logged in construction scheduling.
Objective 1: Evaluation of Quaterphenvl Polyphenyl Effects on Solid Aroclor Yields By 4/1/68.
Target date re-set for 6/1/68. Rescheduling has become necessary because customer testing of Santowax OMP Based 5460, which is a prerequisite to the job, has not been completed. Customer Acceptance/Research approval is ex pected by 3/1/69. Preparation for Santowax OMP production will require 2-3 months, and will not commence until OMP Based 5460 is approved.
Job No. 456 - Fixed Bed Refining (Quality)
The fixed bed refining unit is again on stream. Time required to change the bauxite packing and regain 30 M resistivity treatment ability was 3 days.
Job No. 778 - Aroclor Manufacturing Improvement Plan (Long Range Planning
The rough draft was reviewed and is now in the process of being re-written. A second review is scheduled for March 8, 1968 - target date for distribution is March 29, 1968.
Job No. 455 - Chlorinator Study (Quality)
Timing of this study will depend upon inventory build-up of electrical grade Aroclor. The field test as planned would tie up production facilities for approximately two weeks and would produce 8-10 tank cars of non-electrical grade Aroclor. A meeting has been scheduled for February 9, to review this test with PR&D personnel.
Job No. 736 - Quaterphenvl Effects. Solid Aroclors ($457,700/vr. Savings)
Timing of this study will depend upon (1) completion of customer testing of Santowax OMP based Aroclor 5460, (2) installation of a LI and a FI on the No. 4 still system, and (3) scheduling of an OMP production run. Target date for completion of this study is now 8/1/68.
0346477
TOWOLDMONOQ44554
BIPHENYL-SANTOWAX - W. G. Niemeyer
Cost Improvement
Month
YTD
Target
$3800
$3800
Actual (Est.) $2680
$2680
Objective 3: Provide Assistance (Liaison) To CEP as Necessary on Project to Up-grade No. 1 Tube Furnace
CED representatives were here on 1/16 and 1/17 to firm UP project scope. Project scope was reviewed on 1/17 and 1/19 with H. C. Carder. TSD to forward project justification to H. C. Carder and continue to provide liaison.
Objective A: Demonstrate Yield Improvement on Santowax Still via Addition of Eight Tray Column
A design package to add a stripping section to the Santo* wax flash still was received from CED on 1/15/68. Approval for this project, estimate No. 2684, was received on 1/22/68. Plant comments on the design package will be forwarded to CED.
Others:
Job No. 763 * Install Sojourn Pot on B Pass on No. 1 Tubular Unit
The pot was installed during November 1967. Since its installation it has created a high noise level. A Liberty Mutual Insurance man came to measure the noise level at this new pot. However, the No. 1 furnace was not on stream on the day he arrived. He has been requested to return during February.
CHLORINE - D. W. Dudley, G. L. Moore, W. B. Dunlap
A. Cost Improvement
Month
YTD
Target
$6,075
$6,075
Actual
$7,830
$7,830
Objective 1: Monitor Mercury Usage Quarterly By Radio Active Inventories
Results of December 1967, Radio Active inventory indicate that 121,100 lbs. of mercury are in the cells.
0346478
TOWOLDMONOQ44555
CHLORINE - continued
Objective 2: Develop Program To Reduce Mercury Usage To 0.75 lbs. Per Ton Cl? By 2/1/68
5.
Program developed and published in Chlorine HIP. Plan is a coordinated TSD, Maintenance, and Production effort. Program is underway with EDC 3/69.
Objective 3: Assist In Demonstration Of Brine Dechlorination
Problem with unsteady vacuum has been located. Unsteady vacuum caused by:
Low steam motive force. New Jet nozzle on order that will operate at available steam pressure.
Lack of control of temperature in top of condensing tower. Maintenance will install a system designed to sense and control temperature in top of tower.
Job No. 1000 - MIP - (Potential Savings - $207,000)
Reviewed Chlorine MIP with Plant Groups In February.
Job No. 391 - Single Stage Decomposers - (Savings $18.100)
All graphite conversions have been made. One decomposer conversion left-to-do. Savings are being met.
Job No. 411 - Steel Bottom Cells - (Savings Undetermined)
CED's evaluation of converting to steel bottom cells Indicate pretax returns on alternates range from 6-167, on total fixed and working capital based on present Chlorine and Caustic prices. Returns based on estimate of future prices are 3-6%. Conclusion of study is that capital investments in Anniston must be limited.
Job No. 802 - Brine Treatment - (Savings Undeterminedt
Study underway to determine effect of high calcium content in brine. Calcium is a major component of mercury "butter'1 along with iron and sodium or potassium. Rate of "butter" formation and per cent recovery are being studied at present. Sodium Carbonate was added to saturators (by Production) in solid form. Calcium level has fallen from 510 ppm to 160 ppm. Hypochlorites present in brine inhibit precipitation of calcium. Hypochlorites will be reduced by successful operation of brine dechlorination.
TOWOLDMONOQ44556
CHLORINE - continued B. Safety
6.
Objective 18: Develop A Program And Time Table To Reduce Mercury Level In Cell House To .05 mg He Per Cubic Meter Of Air
Program developed and is being published in Chlorine MIP, Work is underway with installation of collection header for pump tanks and end box cover water, and floor re surfacing project scheduled for February. Mercury levels have begun to drop as a result of program. Mercury vapor analysis on 1/31/68 indicated all levels were at or below maximum levels.
Objective 9: Design An Above-ground Unloading Salt (NaCl) Unloading
System By 7/l/l>8 ...........
-'
A completely above ground pneumatic system was designed and the AFE was submitted 12/67. AFE was returned 1/68 and TSD is evaluating two alternates for upgrading present system.
HCl K. J. Buturla
A. Cost Improvement
Month
YTD
Target
0
0
Actual
0
0
Objective 1: Demonstrate Reduction of Unaccounted HC1 Losses to 10% of Total HC1 Available
Reduction of unaccounted losses has been accomplished by the Installation of the Viton-coated butterfly valve. A Progress Report was issued December 27, 1967, Indicating the results of the HC1 absorption studies. Based on these results, a project has been submitted to provide means to keep the absorber fully loaded when unit is operating at a reduced rate. This will increase absorber efficiency and reduce gas load to the tails tower.
Objective 2: Assist In Demonstration of Filter Pump Project (Reduce D.T. by 10 Hrs./M).
Project package has been transmitted and pump is scheduled to be installed in February. Upon installation, D.T. will be recorded on this item.
0346480
TOWOLDMONOQ44557
HC1 - continued
7.
Objective 3: Submit AFE For Project To Produce Staley Grade Acid Bv ^/1/68
Evaluation la in progreas to determine necessary equipment and capital needed to routinely produce odor-free Muriatic Acid. Preliminary aolutlon la a coke acrubber which ahould reduce organic contaminants. Project AFE targeted for March 1. Work to continue.
Job No. 497 -Muriatic Acid Storage ($18,600/yr. Savings + $60,000/yr. New Earnings)
Project Safety Review was held on 1/16/68. Proposed new site for tank location twelve feet south of original location to provide sufficient clearance between tank and Chlorine tank cars. Proposed new site approved by Safety Review Committee. Design revisions will be completed by
4/1/68.
B. Safety
Job No, 815 - Submit AFE To Provide Automatic Cut-off System For Loading HC1 Tank Cars. Target - 4/1
Preliminary design complete. Work to continue in February.
PNP
K. J. Buturla
A. Cost Improvement
Month
Target
$6600
Actual
$2100
YTD $6600 $2100
CommentB
Inability to reach target was caused problems in demonstra ting 20 M/yr. rate.
Objective 1: Assist In Demonstration of 20 M Lb./Yr. Rate Bv 2/1/68 ($94,000/yr. Savings)
NIRAN
Savings not achieved in January because of problems with the reactor letdown time and the acldlfier cool down time. Both steps are being studied to determine what would be necessary to eliminate these problems. Work will continue in February.
D C. Malm, 0. J. Norris, K. G. Hale
A. Cost Improvement
Month
YTD
Target
$8,220
$8,220
Actual
$11,950
$11,950
03Hb'* 81
TOWOLDMONOQ44558
NIRAN - continued
8.
Objective 1:
Demonstrate Parathlon Recovery From Waste Water Bv 5/1/68 ($70.000/vr. Savings + A 10-15% Reduction In C.O.D. Loading)
Design complete. Installation scheduled for March 1968.
Objective 2: Complete Condensation Yield EVOP Bv 5/1/68 ($39,000/yr'. Savings + J7. Reduction in C.O.D. Loading)
EVOP of Nlran condensation reaction resulted in $11,300 yield savings in January. Mole ratio of PNP/Intermediate was lowered from 1.085/1 (December, 1967) to 1.070/1 in January. January savings were $0.406/cwt. in December. Tentative plans are to further reduce mole ratio to 1.060/1 in February to determine if optimum mole ratio has been reached.
Objective 3: Demonstrate Solvent Addition To Residue (Interim) Process Bv 6/1/68 ($59.000/yr. Yield Savings)
Separate tests were made in one chlorlnator-stlll system on the effect of high Nitrogen Sparging and increased chlorination level during January. Preliminary results indicate that a 25 lb. increase in Chlorine charge at normal sparging will Improve yield by 85 lb./batch or $3,000/Mo. savings. High Nitrogen Sparging improves yield by 150 lb./batch, but the value of this increase is off-set by the cost of extra Nitrogen and Xylene.
Increased chlorination level tests will continue in February. High Nitrogen Sparge Testing will be stopped.
Objective 4: Evaluate Sulfur Recovery From Residue Process Bv 7/1/68 ($400.000/vr. Savings 4 A 517. Reduction In S0o Load To Air)
Plans to Pilot Plant Test Sulfur Recovery from Niran Still Residue have been changed as a result of Bird Machinery Company's refusal to make tests in their facilities. New plans call for erection of temporary facilities and field testing at Anniston. Cost of installing temporary facilities is estimated at $24,000. A Safety Review of the Sulfur Recovery Program will be held in St. Louis in mid-February with C.E.D. and Ag Division Representatives.
Objective 5:
Demonstrate Reliability of Submerged Pump For R.I. Control of Chlorination Six Months After Project Installation ($5.000/vr. Savings + Improved Safety)
Project Installation scheduled for early February. Testing will start as soon as Installation is complete.
New Developments
1. Evaluate Formulation of Parathion Blends At Anniston
Preliminary design complete. A.F.E. ($18,000 NFC) will be sub mitted in early February. All long delivery items have been ordered per verbal approval. Target date for beginning operations is 4/1/68.
0346482
TOWOLDMONOQ44559
NIRAN - continued
9.
Formulation of 1968 requirements (170,000 gallons) at Anniston will result in $17,700 New Earnings (B.T.) in 1968.
B. Safety
Objective 12: Provide Design On High Priority Safety Jobs Resulting From S & P P Parathlon Safety Audit By 9/1/68
Participated with Production and Maintenance in pre paring a work plan for correcting problem areas noted in W. B. Howard's Report on 1967 Parathion Safety Survey. Action will be completed on eight (8) of the fourteen (14) TSD responsible items by 9/1/68. The first Status Report will be Issued by 3/15/68.
C. Quality
Objective 8: Determine Correlation Between Assay of Ethyl PCT And Nlran Condensation Yields by 2/1/68
Completed in December. Lab tests indicate a 107. con densation reaction yield gain potential, plus Improved Niran quality via use of high assay (997. by GLC) Ethyl PCT. Future work plans call for evaluation of techniques to upgrade PCT Assay.
D. Pollution
Objective 10: Assist In Demonstration Of Fume Collection System In Parathlon Department One Month After Complete Installation
Design Package on Fume Removal System transmitted to Planning and Scheduling on 1/8/68. The Design Package for dismantling of the old incinerator equipment is scheduled to be transmitted on 2/7/68.
PgS3
D. C. Malm, K. G. Hale
Cost Improvement
Target Actual
Month 0 0
YTD 0 0
B. Safety Objective 15: Provide Design To Reduce Fumes In PgSs Working Areas Bv 4/1/68 At Surge Tank Vent
Preliminary design complete. Evaluating the need for forced ventilation of the Pent House. A.F.E. will be submitted by 3/1/68.
0346483
TOWOLDMONOQ44560
LIAISON AND PUNT IMPROVEMENT
10. M. R. MeItwain, J. W. McGee (W. F. Taffee)
CEA 1450 - Aroclor Expansion
Finished model of tank farm reviewed in St. Louie by V. R. Haupt and E. E. Smith. Agreement reached on all items except level indicators for storage tanks (tape vs. bubbler with local or remote readout) and metering of utilities.
Field work delayed by leaks in 24 inch acid aewer. Leaks discovered when Gunniting 56 inch storm sewer. Uncovering 24 inch sewer indicates it to be leaking at nearly every joint probably for it's entire length. Review and examination by Gene Stepp and Mike Heishaar (CED) resulted in recommendation to relocate away from tank farm/Warehouse area, since this approach would be
little, if any, more expensive than repairing the existing 24 inch sewer. Cost estimates are expected in early February covering replacement of entire length of sewer. Flans now being formulated to by-paas section which is stalling work on 36 inch storm sewer. Action in this area expected by 2/1/68.
Gunniting operation on 56 inch sewer revealed major void at northeast corner of Building 27. Void has been successfully filled with sand. More voids are expected as work progresses under Building 27 and toward salt pad.
In a very commendable demonstration of local contractor/CED cooperation, new electric power poles were set and all electrical feeders (2300 and 440 volt) in the Warehouse area and along Duncan Street were transferred to new poles without Interruption.
HB-40 and Santowax are now served from Aroclor motor control center freeing the "old" transformer east of Aroclor Office. This change accomplished without additional production loss by coordinating with mechanical downtime, Sub station feeding Administrative area transferred to new feeder on Saturday without significant interruption of office services.
Installation of sewer lift station, manholes, gravity and force mains under way.
First sketch of preliminary drumming/flaking/packaging area layout received 1/24/68, This area is a critical one and will require careful study and close cooperation between Plant and CED groups to achieve the most desirable balance between capital and operating requirements. Present scope provides for little change in present manually oriented technology.
CEA 1452 - Warehouse
Construction started on expansion of salaried parking lot to east of existing lot.
Warehouse office and Warehouse building out for bids. Alternate of brick facing for east wall (3OO feet long) facing public highway results in about $15,000 net increase in cost. Problem reviewed with project sponsor and Director of Manufacturing. W. A. Lang of Office of Corporate Identity will work with CED to establish an acceptable but less costly approach to improved appearance. CED Architectural Section to prepare architectural renderings of proposals for Division review.
0346484
TOWOLDMONOQ44561
LIAISON AMD PLANT IMPROVEMENT - continued
11.
Rail spur tie In and routing finalised with L&N. Monsanto, L&N or Calhoun County own all property to be crossed. Southern RR notified to take neces sary steps to reach agreement with L&N on use of portion of L&N track to allow Southern to switch on our new spur. Remission granted by Calhoun County Commissioner to cross Tenth Street right of way with track. L&N will negotiate with Alabama Power Company to move 44 KV poles as necessary.
Latest agreed layout of Warehouse and tank farm leaves room for second rail spur at future time and second Warehouse area north of Sixth Street.
Hourly parking lot relocation under study with recommendation targeted for mid-February. CEA 1430/1452 will provide replacement for spaces destroyed by new rail spur. In addition, a Division Project will be submitted covering sddltional spaces required because of plant growth - our present lot is in adequate today.
Building 28
Dispensary, two Production Superintendents and Safety Engineer offices occupied in early January. Heating/cooling system installation remains. Expected to be installed in February.
Study started of revisions to Maintenance Office area for more efficient utilization and working condition Improvement.
Fire Break
Construction underway.
Property Survey
Bench marks at 5th and 6th Street intersection with Parkwin and Duncan Streets will be installed as part of CEA 1430. Other major bench marks in plant will be Installed on approved Plant Project. Design package forwarded. To be done on contract.
Dikes
Design work on Benzene storage tank dikes being held pending decision on future of existing 50 M gallon storage tank and site of proposed 3OO M gallon storage tank on CEA 1892.
Alcohol and Xylene tank estimates completed, project rough draft prepared and forwarded to Ag Division Production Superintendent.
Steam Meters
Jim Benson has started survey to determine size, number, location and proposed approach to steam metering on departmental basis.
Loading/Unloading Docks
Study underway (C. R. Mcllwain) to set up schedule for completing estimates, projects, and design packages necessary to comply with recommendations of Loading Dock Task Force. Schedule to be presented at February Safety Board.
0346485
TOWOLDMONOQ44562
WASTE HEAT RECOVERY
J. F. Benson, C. E. Woodward, (W. F. Taffee)
12.
Waste Heat Recovery Program Status and Flans reviewed with H. C. Carder. Verbal approval received for an additional $15,000 to modify test facilities to prevent Therminol contamination of Boiler Feed Water, reduce Therminol entrainment losses, and Improve over-all heat recovery. Revised plan calls for an eight step Program over the next six months to test the modified facilities.
Improved Gas Phase sampling equipment and techniques were re-tested during January and proved satisfactory in estimating Therminol stack losses. Test data re-confirmed new 6" knock-out pad has greatly reduced stack losses. Installation of second Demister, relocation of Gas fan Motor, and correction of fan vibration problems scheduled for early February.
GENERAL ITEMS
A. Cost Improvement
Objective 2: Complete TSD Work As Scheduled To Obtain $492.600 Cost Improvement in 1968
January Target = $25,600 Organic Division $17,400 Target
Actual = $25,000
= $13,050 Actual
Objective 3: Determine Technical Manpower Needs To Implement Programs in Manufacturing Improvement Plans by 4/1/68
Phase one of this program has been completed. A study TSD Manpower needs over the three year period 1968-1970 was made by each Engineer for his area of responsibility. Phase two will consist of developing a coordinated Long Range Manpower Utilization Plan based on job justifica tion and available manpower. Phase Three will consist of Determining Short and Long Range Technical Manpower Needs To Implement MIP Programs. Results of this study will be used to; one, plan effective use of manpower, and two, justify additional manpower at Anniston.
Objective 4: Achieve YTD Level of 507. of TSD Time On Process Improve ment by 7/1/68, And Maintain For Remainder of Tear
January Level = 35.5%
B. Safety Objectives 1, 2, &
Achieve Disabling Frequency Of 0,0; Serious Inlurv Frequency of 0,0; All Injury Frequency of 1.0
1 Minor injury in January . No disabling or serious injuries. (1.6 AH Injury Frequency).
0346486
TOWOLDMONOQ44563
GENERAL ITEMS - continued
13.
B. Safety
Objective 4: Conduct Monthly Safety Meeting Following Accident Prevention Plan
January meeting was conducted by G. C. Goodwin. The subject was "Use Of Scott Air Paks."
Objective 5: Submit A.F.E, For Prolect To Winterize Safety Showers By 4/1/68 (Price)
Three project A.F.E's submitted on 1/29/68 to install 25 induction heated showers In plant. (Total costa = $25,500 Plant Improvement Capital, $4,800 Dismantling Expense).
Objective 8: Submit Final Report Of Mechanical Guarding Task Force By 4/1/68 (Price)
Work continued in January. Final Report will be submitted by 4/1/68.
Others
AFE 2468 - Install Safety Devices on HC1 Elevator (Price) (Plant Improvement Capital $6,300 - Expense $2,200)
Tubular conveyor ordered 1/29/68. Delivery expected by mid May, 1968.
AFE 2761 - Install Handrail On Niran Control Room Roof (Price)
A.F.E. submitted for approval on 1/23/68.
AFE 2756 - Alter Electrical System And Gate On Vertical Niran Drum Elevator B (Veazev and Price) (Plant Improvement Expense $800)
Project is a result of near-miss Accident 1-68. AFE submitted 1/19/68, and approval received on 1/22/68. Project design transmitted to Planning and Scheduling on 1/23/68.
C. Quality Control and Process Surveillance (W. B. Dunlap)
The Right First Time Index for January was 97.6 with 16 lots rejected out of 665; 13 out of 566 from the Organic Division. The January Quality Score was 95.5, up 6.5 from December. The new Quality Divergence Report was begun weekly, with a monthly Divergence Summary incorporated into the Quality Control Summary.
0346487
TOWOLDMONOQ44564
QUALITY CONTROL - continued
14.
Departmental and in-process chart surveillance of F^Sc showed excellent correlation with deficient cooling in the Holoflite chiller. This will be used for Improved process control.
Job No. 794 - Aroclor 5460
Initial attempts to duplicate United Resins "Adhesive ness Test" have revealed inability to obtain complete solution of all resins by the customer's specified teat procedure. The lab has gone back to the customer through Sales for clarification.
D. Function
Objective 3: Submit Project A.F.E. To Install Equipment To Permit In-Plant Photodrafting By 2/1/68 (Goodwin)
A.F.E. forwarded for approval in January.
Objective 9: Conduct A Monthly Engineering Planning Meeting
January meeting was held on 1/16. February meeting scheduled for 2/20.
E. Personnel Recruiting And Development
Objective 5: Continue Development Of Technical Personnel Through Short Courses Both In And Out Of Plant
Six Engineers attended a one day I.E.I, Seminar on Technical Writing on 1/12 in Birmingham, Alabama. (J. C. Price, C. R. Mcllwain, 0. J. Norris, D. W. Dudley, E. G. Wright, K. J. Buturla).
F. Pollution And Community Relations
Objective 3: Establish A Monitoring System For The Air Effluents From The Plant Bv 5/1/68 (Wright)
Visited WGK Plant on 1/24 and 1/25. Reviewed their Air Sampling Program and equipment. Received correla tion data on S0e levels. Discussed Air Monitoring Systems with P. B. Hodges, Organic Division Manager of Environmental Engineering.
Objective 4:
Develop A Plan For Reporting Spllla And Any Other Non-Routine Operating Conditions In The Plant Bv 4/1/68 (Wright)
Developed two new procedures for reporting plant spills and Air Emissions. Procedures will be Included in Anniston Plant Operation Manual as soon as Plant Review has been completed.
03A6488
TOWOLDMONOQ44565
F. Pollution And Community Relations - continued
15.
Others
Job No. 707 - Install Trebler Sampler At Parshall Flume (Wright)
Equipment has been ordered.
Job No. 808 - Install Solids Removal Equipment At Waste Treatment Plant (Wright)
Inspected Surplus Eimco Filter Unit at Monsanto Pensacola Plant for possible use at Anniston. Will complete evaluation of this equipment by 5/1/68. Target date for installation of a Solids Removal System is 6/1/68,
General
0 Water Pollution complaints. 2 Air Emissions complaints received in January. One Plant Spill reported involving smallamount of NaPNP from the Niran Department entering Snow Creek. No complaints were received on the spill.
MECHANICAL & ELECTRICAL INSTRUMENT DESIGN
J. C. Price, J. A. Veazey
AFE 2685 ~ Replace Steam Line From Building 28 To 28-A
Design Package was transmitted to Maintenance l-23~68.
AFE 2^94 - Install Concrete Pad For Storage Of Freon And Glycol Containers (Estimated Capital $2000)
Revised AFE to include Glycol Storage. AFE approved 1/19/68. Transmitted Design Package to Maintenance on 1-22*68.
AFE 2595 - Install Drainage Pad At KOH Loading Dock (Plant Improvement Capital $5600)
Revised AFE to allow overtime installation of pad and forwarded for approval on 1-18-68.
Design, Review, Liaison, Estimating, and Procurement Assistance was provided in the following areas:
Aroclor
In Line Electrical Measurements, Bagging & Flaking Chlorine Unloading Docks.
HC1
150,000 Gallon Storage Tank.
0346A89
TOWOLDMONOQ44566
Mechanical & Electrical Instrument Design - contInued
Niran
Fume Collection, Parathlon Recovery, Refractometer, Niran Formulation, Sulfur Recovery, Safety Audit.
16.
Isfi
Safety Audit, Fume Removal System.
Chiorlne
Rectifiers, NaCl Unloading.
Miscellaneous
Plant Disaster Control Plan, Blue Track Flag Procedure, Plant Safety Shelters, Warehouse Liaison, Mechanical Guarding Task Force.
DRAFTING
G. C. Goodwin, R. L Brewer
Jobs completed in January.
i. Permanent Bench Mark In Plant.
2. Niran
Dismantling Old Incinerator.
5. Niran 4. Niran
Drum Storage Facility. Safety Gate On Drum Elevator.
5. Cl2
KOH Loading Dock Drain.
6. Aroclor Revised Drawing on Clg Docks.
7. Biphenyl Revised Santowax Line.
8. Plant
Liaison with CED Personnel on 1
Scheduled for February
1. Niran
Formulation.
2. Niran
Revise Fume System.
3. P*5 4. Niran
Fume Removal System. Sulfur Recovery.
5. Plant
Rework Hourly Parking Lot.
6. Niran
Dismantling of Old Incinerator
7. Waste Heat Recovery
Revisions To System.
03A6A90
TOWOLDMONOQ44567
PERSONNEL
17.
1. Mr. H. C. Carder visited the plant 1/17 - 1/19 for discussions on C.E.A. 1892 (Biphenyl Expansion Project), Waste Heat Recovery status and plans, Aroclor Quality Program, and review of the C.E.D. Report on Anniston Chlorine Facilities.
2. D. W. Dudley visited the WGK Plant on 1/24 and 1/25 to inspect WGK Chlorine facilities and review operation of the Brine Dechlorination System.
3. E. G. Wright visited WGK and General Offices on 1/24 and 1/25 to discuss pollution control and reporting techniques. He met with P. B. Hodges and J. Garrett at the General Offices.
4. E. G. Wright inspected an Eimco Solids Filter Unit at Pensacola, Florida,
1/31 (Monsanto Plant) to determine if the unit would be suitable for
Installation at Anniston to remove solids from the Waste Treatment Plant
Discharge.
'
5. Dr. R. P. Stevens and Mr. E. F. Anthony (C.E.D.) visited the plant on 1/16 and 1/17 to review the Proposed Scope of C.E.A. 1892 (Biphenyl Expansion project.
6. Mr. H. J. Hileman, Organic Development, visited the plant on January 10-12 to review Waste Heat Recovery.
ADDITION
Mr. J. C. Landwehr (C.E.D.) was appointed Superintendent of Technical Services at Anniston on 1/4/68. Mr, Landwehr assumed his duties on 2/5/68.
OJAbAOV
TOWOLDMONOQ44568
IN MAINTENANCE
FOR CONSTRUCTION
IN MAINTENANCE COMPLETED
NOT CLOSED
TSD PROJECT SUMMARY
PROJECT? SUBMITTED
FOR APPROVAL
APPROVED PROJECTS IN TSD
:i 1
600
500 400
300
200
100
0
Dec. Jan. Feb. Mar. Apr. May
June
03*6*92 -
July Aug. Sept.Oct. Nov. Dec.
* Jan.
TOWOLDMONOQ44569
PROCESS IMPROVEMENT
NEW PRODUCTS
PLANT IMPROVEMENT
' distribution of time by technical service Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec.
70 60 50
40
50
20
~jA~ 3=
-- 1--_ L_
ASSIST OPERATIONS
SPECIAL ENGINEERING SERVICES
TECHNICAL MANPOWER
MISCELLANEOUS ACTIVITIES
' AND ABSENCES
TOWOLDMONOQ44570