Chas. A. Gardner, Chief Electrician,
NiehoUon Terminal & Dock Ecor, Detroit, Michigan
PROBLEM
"We have many overhead cranes that operate on 24 hour schedules. The severe service to which these cranes are put when loading and unloading ships throws a tough load on the motors. This was causing us a lot of grief due to fuses blowing 4 or 5 times a day. Each blow caused a shutdown that stopped work and made men idle.
SOLUTION
"In testing Fusetron fuses to see if they would help us, we selected a certain crane and inserted Fusetron fuses in that circuit for one 6 hour shift. At the end of the shift we would replace the Fusetron fuses with the ordinary renewable fuses we had formerly used. Then we compared the down time of the crane due to fuse blows.
"To be sure the fuse blows weren't due. to the operator, we changed around and would run the Fusetron fuses on two shifts and the old fuses on one.
"The results, however, always came out the same. The Fusetron fuses would stand up under the hard service^--and the ordinary fuses would not.
"As a result of these tests we changed all fuses on our crane circuits to Fusetron fuses.
"That was last October, seven months ago, and to date we have had only 3 shutdowns of our cranes due to fuses blowing."
70
ClIANKR STACKS m .Mr
<>*'
du"-""",ln#
on
Public reaction to air pollution problems has become so inflamed that the solid progress of plonts and equipment manufacturers in bring
ing power boiler-stack headaches under control
has been overlooked or glossed over. For an
encouraging report, turn page . . . ftBS 0UT
CNOINSHINO AMD MANAGEMENT SECTION
73