TENNECO ORGANICS & POUHERS DIVISION DAILY OVA MONITORING REPORT FLEMINGTON PVC PLANT DATE
Revise
22/74*
nperature:
F, Humid ity: &&%, Barometric Pressure:
Wind Velocity:
0 mph, Wind Direction (from): jz.
Scale Reading (1 Time, ppm
t 3 (Hours)
Comments '
Quality Control Laboratory I. Areas;
Laijuratory #1; near two-roll mill Laboratory #2; between sink & PlastiCorder . Laboratory #2 Desk Office
1. Special Operations: Laboratory ftl; Hood Area when testing VCM Laboratory +f2; GC Area when testing VCM
)ryer Building/Warehouse Areas: Foreman1s Office yaintenance Office
"'cfctaintenance Shop aSfarehouse
CO Cl
:orded By
Date:
5* .ST -----------------5T* ------
____ H___________
----
*,
%
i
7n
IS iC
........... ..... .__________a____________
*
J-JJWitnessed By:
Date:
**
Scale Reading @ Time, ppm
/$GC'
(Hours)
Dryer Building/Warehouse (cont'd)
A. Areas:
,
Warehouse Office
Bagging Room
Dryer Monitoring Desk
Dryer Panel Hoard
Tailing Collector Area
Sifter Deck "A" -
Sifter Deck "B"
Centrifuge "A"
Centrifuge "Li"
B. Special Operations: Slurry Transfer Hook-Up Wet Cake Sampling Bagging Mach ine-Operator's Station when bagging Bagging Machine-Operator's Station when filling Gaylords
^
s
H M H <4 H *f
4w
-- --
-
--
Underground VCM Storage Tank Farm A. Areas:
Tank Farm Area; center of tank farm ' Compressor Shack; inside
Walkway between tank farm & F-6 blend tank
sw
H
________ ________ V________
Chocking tank level Checking blend tank LEL &
blend tank
VCM Rail Car Unloading Area A. Areas:
Unloading Platform
O B. Special Operations: VCM Rail Car Hook-Up
top of
lleoa thing. AirBeqnlrod Breathing Air Required
i5
i
|Breathing Air Required|
i iUii CUX -Li
i\U
X L.
Page 2
Comments
- ----
VCM Rail Car Unloading Area (cont'd) B. Special Operations (coat'd)
VCM Kail Car Sampling 1 VCM Rail Car Disconnect
Draining of VCM Unloading Comp,
Reactor Building - 2nd Floor A, Ai-eas:
Stairway Stairwell Anteroom Lavatory Charge Meter Area; between meters and
weigh station Foreman's Desk 0perator's Desk Panel Board; aisle in front of stripper
platform Stripper PLatiorm Center Aisle Open Reactor; aisle around manway
3. Special Operations: Reactor Ooening Opening & Closing Hammer Blinds Opening & Closing Dump Valves Water Jet Reactor Reactor Cleaning; manual Reactor Closing; hatch cover closing and bolt down
Scale Reading 0 Time, ppm S3 o Q (Hours)
Breathing Air Required Breathing Air Required
--
S
3" S
s* S
S.
r
S'
5*
S
5-- H
i 4
4
4 H
H
Breathing Air Required -- --
Breathing Air Required Breathing Air Required
--
Areas: Center Aisle Slurry Basket; aisle in front of baskets C^iethocel Make-Up Platform Cjtecovery Comp. Room - between comp. CD .. CTJpecial Operations:
v-4>lurry Basket Cleaning
5H
&4
s4 ________ Jl_____ ____ y______
Breathing Air Required
fla't'o * ft/)(/
uany uvii Noniror.
I'agt; ~t Kepor t Page 3
Comments
....... ..
'
Scale , Effing @ Time, ppm %
<Q O J
(rlours)
Reactor Building - Ground Floor (cont'd) B, Special Operations' (cont'~d) | . , Slurry Sample'from Stripper
J --
| Recovery Tank Farm | A. Areas: 1 Recovery Yank Area; ad.-jacent to
center tank | Walkway Near Bunker | Catalyst Weigh house; inside
Settling Ponds; edge of pond near reactor | building
3-
r S
V
h
4 /_i
B. Special Operations: Recovery Yank; via ter drain eff
Pilot Plant A. Areas:
Reactor Area - 1st Floor Reactor Area - 2nd Floor
Finishing Area; center aisle
B. Special Operations: Opening Dump Valve CJusLug Hump Valve Reactor Damning Reactor Opening; remove bolts, open hatch Reactor Cleaning; manual Reactor ('losing; close hatch cover & bolt down Tower Bottom Removal
Breathing Air Required
S H ... H
4
-- -- Breathing Air Required Breathing Air Required -- Breathing Air Required"
A. Areas: ~C?~ Xorl.ii Lnd - inside
'--> South, lind - inside
- co--
ulk Loading & Transfer Areas: Tower; walkway between tower & bins
i s'
v-
______________ L______ S_____ _L_
JL
Si 0 A
f* /> / / * //
Witnessed By!
Comments
Page 4
________________________________
Date:
`Special Operations: Transfer Line Hook-Up Bulk Truck Sampling . Bulk Kail Car Hook-Up Bulk Rail Car Sampling
Rt&
Proti-*cVia*\
RAtirTtAt ofT\c<_
Scale Reading @ Time, ppm
/ 3<7q
(Hours)
-- --
--
iju i-Ly \j v i i i tw * 4
Comments
page 5
069600
n/? 0
-A- ,/T(S
Witnessed By:
Sate:
T69600
CUTTING - WELDING - HOT WORK PERMIT
no0Da tc_ f/W Tima Started__
Building Reactor - Pilot: Plane
Floor First - Second________________
Area
Tank Farm______________ __
Work Required_____ OVA Test____________
PRECAUTIONS CHECK:
S) 1. Work location has been examined by supervision*.
2. Flammable materials, dust gasses, removed.
3. Work will be restricted to area or equipment specified by permit.
4. Portable extinguishers or hose on hand.
5. Spark shields, fireproof curtains required.
Kt 6. Fire-watchers assigned.
7. Welding & cutting equipment in good repair & properly secured.
B 8. -Continuous explosimeter checks required.
9. Fire patrol after completion of job required
Permit expires
Time
. Work Status n Complete Time_.
a Incomplete Time
Mechanic's Sig.___________ Fire Watch Sig., ....... ^
Area Supv. Sig._ Return permit to MaintenanncceeFOremT
3/1/74 Prod. #20