MEMORANDUM
date: February 24, 1972 SUBJECT: BRNW PROGRESS REPORT - LOUISIANA
to: Mr. C. R. Walbridge Mr. P. N. Shellenberger Mr. 0. J. Pa rr Mr. R. E- Mumford
Please replace page 2 of subject letter mailed to you February 23 with attached. Revised to include additional information under item 5 inadvei^ntly omitted.
Attach.
Elaine Weaver Secretary to Mr. Cornell
ASI-PR 0004200
2) Renovate and lmprov dust systems on lime kilns discharges and conveyors.
-2-
- Unit operational; major revision late 1971.
- Dust loss to be determined by fallout measurement.
- Continue to maintain the present dust system to reduce fallout to a minimum.
3) Plans call for purchase and Installation of three Improved
bag dust collector systems to replace the ones In Nos. 1, 3 and 4
elevator towers.
- Replace No. 1 tower dust collector - S.A. Section In 1972
- Scheduled to replace No. 3 in 1973 and No. 4 in 1974.
4) Four bag dust systems are to be replaced In the dense ash
operating systems.
- Replace rotary classifier dust collector in 1972.
- Replace Dense Ash house system dust collector In 1972.
- Scheduled to replace north system in 1973 and smith
system in 1974.
5) Design and install a scrubber for lead and organic fumes
from cell construction furnaces at chlorine/caustic north.
- Lead profile Initiated January 1972.
- Air sampling for organics scheduled March 1972.
- Data evaluation to detexmine extent of a scrubber system.
6) Chlorine gas cooling tower condensate now going to sew r
at chlorine/caustic north.
- Part of a proposed process sewer replacement plan which
includes degasser to put excess chlorine back Into system.
- Divisional and plant engineering studying proposed system
eliminating chlorine to sewer.