Refine
Estimated Years 2020-2029Clear
7,612 results foundRefine Search
This was an EPA lead inspection. 8) Facility Description Sheboygan Paint Company (known hereinafter as "Sheboygan" or "the facility") was founded in 1921 according to their website.
Document imageDocument imageDocument imageDocument image
refid# pe3R5nRrDRLavv1EzBRdZdG3D39 pages
PROJECT TEAM MEMBERS Organization NEIC NEIC NEIC NEIC NEIC NEIC NEIC NEIC REGIONAL AND OTHER CONTACTS Kentucky Department for Environmental Protection (KY-DEP) EPA-OCE-WED EPA Region 4 EPA Region 4 KY-DEP EPA-OCE-WCED Project Role Project manager (PM) Field team - CWA inspector Field team - RCRA team lead and inspector Field team - CWA inspector Field team - RCRA inspector Analytical project manager (APM) Laboratory analyst Laboratory analyst RCRA team member CWA team member RCRA team member CWA team member RCRA team member RCRA team member NEICVP1508E01 Page 4 of 46 Calgon Carbon - Big Sandy Plant Catlettsburg, Kentucky ENFORCEMENT CONFIDENTIAL Figure 1 FACILITY CONTACT INFORMATION Table 2 lists the primary facility contacts.
Document imageDocument imageDocument imageDocument image
refid# X7DdngNBxa0ZYdjeepwK9zXgg46 pages
This was an EPA lead inspection. 8) Facility Description Cymer Chemicals manufactures specialty chemicals for customers worldwide and operates two plants in Tennessee.
Document imageDocument imageDocument imageDocument image
refid# LRDbJDXL6DVBEQV1gvOZmY7w47 pages
Pretreatment Audit Report City of La Junta CO-0021261 La Junta, Colorado March 22, 2021 to March 24, 2021 Prepared by: Al Garcia, Pretreatment Coordinator U.S.
Document imageDocument imageDocument imageDocument image
refid# e57MjOMNKN0oJO0e5xqkg2Y0m61 pages
Pretreatment Compliance Audit Summary Report Discharger: Location: Contact: Audit Dates: Audited By: City of Beacon Wastewater Treatment Facility Dutchess County SPDES No.
Document imageDocument imageDocument imageDocument image
refid# Qg1zRGO8kLqgda27odNxvoxBE65 pages
Mancil Alliance TG Ben Rosenthal EPA R6 James Haynes EPA R6 Collen McCarthy EPA R6 Ben Donaldson EPA R6 Constantinos Loukeris EPA R5 Matthew Schneider EPA NEIC Brianna Leiker EPA NEIC Hans Buenning EPA NEIC Andrew Mills LDEQ Laura Bruchhaus LDEQ Environmental Advisor Operator Environmental Manager Senior Environmental Advisor WW OED OED POM Supervisor BWON Supervisor QAQC/HSE Technician Physical Scientist Physical Scientist Physical Scientist Environmental Engineer Environmental Engineer Chemical Engineer Environmental Engineer Environmental Engineer Environmental Scientist Environmental Scientist 6ENFORM-019-R8.2 (02/12/2020) 1 EPA Inspection Report - 2 of 57 EPA Lead Inspector Signature/Date Supervisor Signature/Date Citgo Petroleum Corp / Lake Charles Manufacturing Complex Inspection Date 12/04/2023-12/07/2023 Digitally signed by BENJAMIN BENJAMIN ROSENTHAL ROSENTHAL Date: 2024.03.18 12:43:28 -05'00' Benjamin Rosenthal Date JAMES LEATHERS Date: 2024.03.18 12:53:27 -05'00' Digitally signed by JAMES LEATHERS James Leathers Date 2 EPA Inspection Report - 3 of 57 Section I - INTRODUCTION Citgo Petroleum Corp / Lake Charles Manufacturing Complex Inspection Date 12/04/2023-12/07/2023 PURPOSE OF THE INSPECTION EPA Region 6 inspectors Ben Rosenthal, Colleen McCarthy, James Haynes, and Ben Donaldson, National Enforcement Investigations Center ("NEIC") inspectors Matthew Schneider, Brianna Leiker, and Hans Buenning, and Region 5 inspector Constantinos Loukeris arrived at the Citgo Corp ("Citgo") Lake Charles Manufacturing Complex ("Site", "Refinery", "Facility") at 8:05 am on December 4, 2023, for an announced Clean Air Act ("CAA") inspection.
Document imageDocument imageDocument imageDocument image
refid# O1mJb1952VVx4r4KmYe64Yebj57 pages
The C-F bonds in PFAS lead to very stable substances, a feature that also makes the terminal transformation products of PFAS very persistent in the environment.
Document imageDocument imageDocument imageDocument image
refid# 7Rbbvy3LZYqynZmYjO0rRak2629 pages
The C-F bonds in PFAS lead to very stable substances, a feature that also makes the terminal transformation products of PFAS very persistent in the environment.
Document imageDocument imageDocument imageDocument image
refid# 35k69NpG5Gpeg6dX9VVJ5LZE29 pages
Aktdetaljer Akttitel: Re: APPLiA contribution to the Call-forEvidence on PFAS Aktnummer: 190 Sagsnummer: 2020 - 15422 Akt-ID: 3898602 Dato: 18-10-2021 12:51:55 Type: Indgende Dokumenter: [1] Re APPLiA contribution to the Call-for-Evidence on PFAS.eml [2] APPLiA comment paper_ss airconditioners_28-01-2021.pdf [3] fpren50625-1-general-treatment-standard.pdf (MEDTAGES IKKE) [4] GEN - 1273.01 - Excerpt Price monitoring Q1-2021.pdf (MEDTAGES IKKE) [5] APPLiA comment paper_PFAS_F-Gases Summary Report_15-102021.pdf Den 12. juli 2024 Til: P1 El ), restrictiePFAS E7 ), P2 E2 ), P3 E3 ), DE ( El El ), P4 E4 ), Toke Winther (M@mst.dk), E5 E5 Fra: P5 E6 Titel: Re: APPLiA contribution to the Call-for-Evidence on PFAS Sendt: 18-10-2021 12:51 Bilag: APPLiA comment paper_ss airconditioners_28-01-2021.pdf; fpren50625-1-general-treatment-standard.pdf; GEN - 1273.01 - Excerpt Price monitoring Q1-2021.pdf; APPLiA comment paper_PFAS_F-Gases Summary Report_15-10-2021.pdf; Dear, As complementary information to my previous email sent to you on Friday 15 October, please find attached accompanying documents that provide further and detailed information to take into consideration while reading our comment paper.
Document imageDocument imageDocument imageDocument image
refid# Mb8GJD7DNRjkRq2XOyg14jML61 pages
April 27, 2026 TRANSMITTED VIA EMAIL The Honorable Ernest E.
Document imageDocument imageDocument imageDocument image
refid# wgebmRQK9DmNLwGNZNo48Br1B46 pages
VIA ELECTRONIC MAIL Pat Boyle City of Baltimore, Maryland 8201 Eastern Avenue Baltimore, MD 21224 pat.boyle@baltimorecity.gov Re: City of Baltimore, Maryland Pretreatment Compliance Audit Dear Pat Boyle: Thank you for your cooperation and participation during the Pretreatment Compliance Audit (PCA) conducted on May 8 and 9, 2024.
Document imageDocument imageDocument imageDocument image
refid# v19OGnyZYvd7O39grZjJMvpBR83 pages
Pretreatment Compliance Audit Summary Report Discharger: Location: Contact: Audit Dates: Audited By: City of Beacon Wastewater Treatment Facility Dutchess County SPDES No.
Document imageDocument imageDocument imageDocument image
refid# 5bYaJEV2Qg1Qr6G0kYL2o83d865 pages
This was an EPA lead inspection. 8) Previous Inspection History NCSU - Main Campus was inspected by the EPA and NCDEQ on June 20, 2019 and January 13, 2020.
Document imageDocument imageDocument imageDocument image
refid# ymE2L8eB8kVky3nnwLeMKB1pD44 pages
Environmental Protection Agency Office of Compliance and Enforcement 1200 Pennsylvania Avenue, NW Washington, DC 20460 CHEMOURS FIRST CHEMICAL CORPORATION CLEAN WATER ACT (CWA) INSPECTION AND SAMPLING Pascagoula, Mississippi Report Date: January 9, 2020 (Revised 1/5/2023) Inspection and Sampling Activities: November 19 - 21, 2019 Chemours First Chemical Corporation CWA Inspection and Sampling Inspection and Sampling Dates: November 19 - 21, 2019 Signature Page Michelle Spiezio Date: 2023.02.02 13:52:49 -05'00' Digitally signed by Michelle Spiezio Michelle Spiezio, ERG (EPA Contractor), Lead Inspector Date BENJAMIN BAHK Date: 2023.02.03 10:15:12 -05'00' Digitally signed by BENJAMIN BAHK Benjamin Bahk, U.S.
Document imageDocument imageDocument imageDocument image
refid# 33v6wK2YRgVdmo8oV04XpKpy70 pages
For EPA - ERG Lead Inspector Signature/Date EPA Section Supervisor Signature/Date [REDACTED]/Reliability Manager [REDACTED]/Staff Reliability Engineer [REDACTED]/Instrumentation, Analyzer, Electrical, and Control (IAED) Reliability Manger [REDACTED]/Maintenance Director [REDACTED]/Human Resources (HR) Administrator [REDACTED]/Technical Trainer [REDACTED]/Senior Safety Engineer [REDACTED]/Emergency Response Superintendent [REDACTED]/Safety [REDACTED]/Vice President (VP) and General Manager Brook McKeown Digitally signed by Brook McKeown Date: 2026.03.05 10:27:38 -05'00' Brook McKeown, ERG Date KAYLA Digitally signed by KAYLA BUCHANAN BUCHANAN 09:31:24 -06'00' Date: 2026.03.05 Kayla Buchanan Date 2 FACILITY/PROCESS DESCRIPTION The Valero Ardmore Refinery (the Facility, or the refinery) is located in Ardmore, Carter County, Oklahoma.
Document imageDocument imageDocument imageDocument image
refid# 0MBxMdoJmLz70y8kNX3QOa7M38 pages