Environmental Protection Agency Thuan Tran; Physical Scientist, Lead Inspector 732-321-4455 and tran.thuan@epa.gov Robert Morrell, Geologist Mangrove Lagoon Wastewater Treatment Facility DeShaun Estrill, Chief Plant Operator destrill@viwma.org Marcella Jennings, Laboratory Coordinator/Technician mjennings@viwma.org 3.0 FACILITY DESCRIPTION 3.1 General Information Mangrove Lagoon Wastewater Treatment Facility (WWTF) is located on #1A Estate Bovoni in St.
refid# nmJy8LnJMkdKwp4v6enNzvaw828 pages
Comment on the Annex XV Restriction Report from 22 March 2023 concerning the substance group of PFAS Executive Summary Rubber articles, for example seals, hoses, moulded parts, or linings, contain fluoropolymers if they need to withstand harsh conditions and / or are critical for the safety of humans and the environment.
refid# MDBVwaLK4a1kG6q07DkDOJKx23 pages
This was an EPA lead inspection. 8) Previous Inspection History ADEM has conducted three RCRA CEIs at Allworth between 2018 and 2020.
refid# MJXDObv8RqBka2XvpDnq2jNXa33 pages
Manager Status: FINAL Record Schedule: 1044(c) {unless landmark or precedent} Multi-media Checklist: ATTACHMENT #3 Referral: CWA EPA Lead Inspector Signature/Date X 2025/04/01 {phone/email} 787-977-5860 rhernandez@danacompanies.com dlacavera@danacompanies.com Supervisor Signature/Date DAVID CUEVAS- CUEVAS-MIRANDA Digitally signed by DAVID X MIRANDA Date: 2025.04.01 14:51:42 -04'00' David N.
refid# yk1JnymbyYYYYKrgDBVR6GOpV35 pages
Thelma generally alleged that (1) ARCO and the other defendants knew that Donald was being exposed to airborne asbestos fibers at ARCO's plant; (2) the defendants knew that asbestos caused respiratory illnesses, including asbestosis and mesothelioma; (3) the defendants failed to warn Donald about the risks of asbestos exposure or to protect him from it, and (4) Donald's exposure to asbestos at ARCO's plant caused him to develop mesothelioma, leading to his death.
refid# 82xwEY67J2NavwMjN3JGbnNnB8 pages
This was an EPA lead inspection. 8) Facility Description Corning is located at 1 Becton Circle, Durham, Durham County, North Carolina at Latitude 36.092723, and Longitude -78.851298.
refid# gaM4rGYqvxML8k20EQXaEaN6918 pages
This was an EPA lead inspection.
refid# 10wQDqQDwXgyJOja3wJ7oDzOZ17 pages
CWA COMPLIANCE EVALUATION INSPECTION REPORT U.S.
refid# xzDddYO4L0xqbLGGzRbDVXvJG39 pages
Greater Uniontown Joint Sanitary Authority (PA0027219) Pretreatment Compliance Inspection Report Title: Inspection Date(s): Regulatory Program(s): Type of Activity: Facility Name: Facility Address: Facility Latitude: Facility Longitude: County/Parish: Permit No: NAICS Code: SIC: Unique Project #: Clean Water Act Compliance Inspection Report July 30, 2024 National Pollutant Discharge Elimination System Pretreatment Compliance Inspection Greater Uniontown Joint Sanitary Authority 90 Romeo Lane, Uniontown, PA 15401 39.91483 -79.72322 Fayette County PA0027219 221320 4952 ECAD-459 (NPDES) Facility Representatives: Point of Contact Dave Depetris, General Manager Email: ddepetris@gujspa.com Marie Hartman, Senior Manager (LSSE) (Consultant for GUJSPA) Email: mhartman@lsse.com Ken Parks, Consultant (LSSE) (Consultant for CUJSPA) Email: kparts@lsee.com Inspectors: Chuck Durham, Eastern Research Group Email: chuck.durham@erg.com Yatasha Moore, Eastern Research Group Email: yatasha.moore@erg.com (Full list of additional attendees in Table 1) Yatasha Report Preparer Moore Signature/Date Yatasha Moore, Digitally signed by Yatasha Moore Date: 2024.10.10 16:12:49 -05'00' Eastern Research Group Supervisor Signature/Date JESSICA DUFFY Digitally signed by JESSICA DUFFY Date: 2024.10.10 07:35:44 -04'00' Jessica Duffy, NPDES 2 Section Chief Enforcement and Compliance Assurance Division Date Date Unique Project#: ECAD-459 Greater Uniontown Joint Sanitary Authority (PA0027219) Pretreatment Compliance Inspection Attachments Attachment A Industrial User Site Visit Data Sheets Attachment B Industrial User Site Visit Photograph Log Unique Project Identifier: ECAD-459 Page 2 of 25 Inspection Date: July 30, 2024 Greater Uniontown Joint Sanitary Authority (PA0027219) Pretreatment Compliance Inspection I.
refid# 2qozZp0r28M7erOz8yLMpke4R25 pages
Part 68 Chemical Accident Prevention Provisions - Risk Management Program (RMP) Hartree Refinery Channelview Splitter 16518 De Zavalla Road Channelview, Texas 77530 16518 De Zavalla Road Channelview, Texas 77530 Harris County (832) 737-4261 Jorge Aguilera jaguilera@hartreerefining.com Operations Manager FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: 110070225682 N/A RMP ID: 1000 0023 8316 32411 (Petroleum Refineries) N/A Personnel participating in inspection: Justin McDowell US EPA Region 6 Jarrod Gregg Hartree Kevin Holmes Hartree Charles Alderman Hartree Clay Riassetto Hartree Inspector/Enforcement Officer Director HSE Technical Manager Maintenance Manager Terminal Manager EPA Lead Inspector Signature/Date Supervisor Signature/Date JUSTIN MCDOWELL Digitally signed by JUSTIN MCDOWELL DN: c=US, o=U.S.
refid# gDGdjx8oZG7bEyondnEdvReLG13 pages
Environmental Protection Agency (EPA): Tiffany DeLong, Life Scientist, ECAD Kenneth Herstowski, Environmental Engineer, ECAD/CB/RCRA Timothy Evans, Life Scientist, ECAD (Lead Inspector) 3.0 INSPECTION PROCEDURES On May 23, 2022, Tiffany DeLong, Ken Herstowski, and I arrived at the facility at approximately 9:30 a.m.
refid# a1V5O1Za8NDoZmpVbe9OgZyQM15 pages
Urban, Environmental Scientist (Lead Inspector) Amy Thompson, Life Scientist 3.0 INSPECTION PROCEDURES Ms.
refid# gbDRkLe46gkZg5xnjEyQw0Koq13 pages
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY *REGION 1 ENVIRONMENTAL AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12 100 PROTECTION Drafted Date:July 8, 2022 Finalized Date:Dated as shown on electronic signature Subj:Inspection Report Clean Water Act - National Pollutant Discharge Elimination System (" NPDES ") City of Bridgeport From:Rachel Olugbemi, Physical Scientist Digitally signed by RACHEL OLUGBEMI RachelOlugbemid Date: 2022.07.20 14:55:29 -04'00 ' Thru:Jack Melcher, Environmental Engineer To:File I.
refid# vVzjVZXJ637YbnMbKqQY7VO1814 pages
Sanderson Schwan's Jason Daniell APSM Natalie Reed Schwan's Waker Chavez Schwan's Kevin Mapps Schwan's Dan Connelly Schwan's Physical Scientist Senior Manager: PSM VP, Operations Senior EHS Manager Senior EHS Specialist Plant Manager Refrigeration Manager EPA Lead Inspector Signature/Date Supervisor Signature/Date AIMEE BOSS Digitally signed by AIMEE BOSS Date: 2024.10.29 10:04:34 -05'00' Aimee Boss Date SAMUEL TATES Date: 2024.10.29 10:36:11 -05'00' Digitally signed by SAMUEL TATES Samuel Tates Date 6ENFORM-019-R8.2 (02/12/2020) 1 Section I - INTRODUCTION SFC Global Supply Chain, Inc.
refid# XVMq5jqegnxd87Z91Bed0E2G14 pages
Comments on the Annex XV report proposing a restriction of PFAS - September 2023 Comments regarding the time unlimited derogation for active substances in plant protection products Summary In this document, Generations Futures provides data on the use of PFAS being active substances in phytopharmaceutical products (PPP) in France.
refid# oeJdwqR8K3xMXLnRVX1n1LkZr16 pages