Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) 03/27/2025 Water CWA Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: Town of Red River Red River WWTP 2 Straight Creek Trail Red River, New Mexico 87558 Post Office Box 1020 Red River, New Mexico 87558 Taos 575-754-6671 Patrick Jaramillo awwtplant@gmail.com FRS Number: 110002042110 Identification/Permit Number: Media Identifier Number: NAICS: SIC: NM0024899 NA 221320 4952 Personnel participating in inspection: Isaac Cisneros Town of Red River Patrick Jaramillo Town of Red River Anthony Martinez Town of Red River Plant Manager Public Works Director Plant Manager Environmental Compliance Manager Miguel De La Mata Town of Red River Laboratory Analyst David Esparza EPA Lead Inspector Signature/Date Supervisor Signature/Date EPA-R6/ECDWM Environmental Engineer DAVID ESPARZA Date: 2025.05.20 08:50:55 -06'00' Digitally signed by DAVID ESPARZA David Esparza ROBERTO BERNIER Roberto Bernier Digitally signed by ROBERTO BERNIER Date: 2025.05.20 10:46:19 -05'00' 6ENFORM-020-R8.2 (02/12/2020) 1 Section I - INTRODUCTION Town of Red River/Red River WWTP Permit No.
refid# oeb7JB78QpnXymqKRmnN4Ojx320 pages
TABLE 1: Inspection Information Summary Inspection Team Lead Inspector: Jordan Noles, EPA Inspector-In-Training: Chetan Gala, EPA Date of Facility Visit: May 17, 2022 Facility Identification Name: Pilgrim's Pride - Guntersville Processing Plant Street Address: 3500 Lake Guntersville Park Dr.
refid# gEDxxa22Xd5Lwq693JJBv0Dqe6 pages
Photo log: Picture List: RIMG0175.JPG-map of site in trailer RIMG0176.JPG-cover of SWPPP RIMG0177.JPG-authorization signature on SWPPP RIMG0178.JPG-inspection report RIMG0179.JPG-swale upslope of stream, downslope of back of homes along Teaparty Ave RIMG0180.JPG-swale RIMG0181.JPG-downslope towards stream / silt fences RIMG0182.JPG-silt fences RIMG0183.JPG-swale RIMG0184.JPG-swale RIMG0185.JPG-silt fences by stream RIMG0186.JPG-silt fences by stream RIMG0187.JPG-silt fences along back of homes RIMG0188.JPG-swale RIMG0189.JPG-silt fences RIMG0190.JPG-slope with erosion blanket RIMG0191.JPG-swale, leading towards detention basin RIMG0192.JPG-settling basin RIMG0193.JPG-filter under rocks in basin RIMG0194.JPG-spillway into detention basin RIMG0195.JPG-basin 4 ED_019088A_00020096-00004 RIMG0196.JPG-inlet RIMG0197.JPG-in the basin RIMG0198.JPG-filter beneath sand at bottom of basin RIMG0199.JPG-filter beneath sand at bottom of basin RIMG0200.JPG-hundred - year storm outlet RIMG0201.JPG-other side of outlet RIMG0202.JPG - - outlet RIMG0203.JPG-down slope from basin RIMG0204.JPG-outlet pipe RIMG0205.JPG-outlet pipe RIMG0206.JPG-silt fence downslope RIMG0207.JPG-downslope from basin RIMG0208.JPG-stormceptor system RIMG0209.JPG-lawn erosion blanket cover RIMG0210.JPG-lawn erosion blanket cover RIMG0211.JPG-catch basin RIMG0212.JPG-gravel to mitigate track out RIMG0213.JPG-hydraulic oil containers RIMG0214.JPG-storage RIMG0215.JPG-catch basin with silt protection RIM
refid# 1Qw5Oj9vKzdzVw0Q2V3NexbEo5 pages
Over the last four years, the Biden Administration ruled by regulation, leading to higher energy costs across the board and less American-made energy.
refid# K60anDK5K5Qx16KLmge02KkJ66 pages
Cibolo, TX 78108 Same Bexar & Guadalupe Counties 210-619-0069 Chris Hubbard chubbard@cibolotx.gov Utilities Supervisor FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: 110071951747 TXU009131 NA 221320 4952 Personnel participating in inspection: Jeremy Trimm City of Cibolo Nicholas Guel City of Cibolo Chris Hubbard City of Cibolo Julio Gomez City of Cibolo Shannan Hall City of Cibolo Rachel Matthews Environmental Protection Agency Utilities Foreman Utilities Crew Leader Utilities Supervisor Public Works Director Executive Assistant Life Scientist EPA Lead Inspector Signature/Date Supervisor Signature/Date RACHEL MATTHEWS Rachel Matthews Digitally signed by RACHEL MATTHEWS Date: 2025.06.25 09:56:44 -05'00' Date ROBERTO BERNIER Date: 2025.06.25 14:13:03 -05'00' Digitally signed by ROBERTO BERNIER Roberto Bernier Date 6ENFORM-019-R9 (02/27/2025) 1 Section I - INTRODUCTION City of Cibolo, Texas Sanitary Sewer Overflow Initiative - 6-4-2025 PURPOSE OF THE INSPECTION EPA Region 6 inspector Rachel Matthews arrived at the City of Cibolo Public Works office, at 8:56 am on June 4, 2025, for an announced inspection.
refid# G8zyadRn35NJXZ5gNObaoY1x4 pages
Refrigeration, air conditioning and heat pump systems are technically tight systems, which is of utmost importance in practice - on the one hand for environmental reasons and on the other hand because unwanted F-gas emissions lead to a reduction in performance and especially also in efficiency.
refid# Xo2GY5weq9nxb7X4LZx5b4Lx4 pages
Jennifer and Jacqueline lead Brendan, Elly, and I on a facility walkthrough.
refid# qm2KVLv300YO75Kovj8EBYkeK7 pages
The scrubbers all Facility Name: Big River Resources Boyceville LLC Facility Location: N10185 370th St, Boyceville, WI 54725 Date of Inspection: April 19, 2023 lead to the RTO.
refid# v1Vm3EMN2QoabgB0yz2Z7Yrm84 pages
ENVIRONMENTAL PROTECTION AGENCY REGION 5 Purpose: Pretreatment Industrial User (IU) Inspection Facility: Honda Development and Manufacturing of America, LLC--Indiana Auto Plant 2755 North Michigan Avenue Greensburg, Indiana 47240 Date of Inspection: September 12, 2023 EPA Representatives: Newton Ellens, Pretreatment Program Manager, 312-353-5562 E-Mail Address: ellens.newton@epa.gov Joseph Forth, Environmental Engineer, 312-886-7275 E-Mail Address: forth.joseph@epa.gov IDEM Representatives: Mary Armacost, Pretreatment Coordinator, 317-234-4816 Christina Sandlin, Wastewater Inspector, 812-216-5646 Facility Representatives: Belinda Heath, Environmental Team Jonathan Nelson, Green Facility Lead, 812-651-6051 Alanie Hooton, Environmental Engineer, 812-560-9652 Arnie Bauawa, Environmental Engineer Report Prepared by: Newton Ellens, Pretreatment Program Manager, 312-353-5562 E-Mail Address: ellens.newton@epa.gov NEWTON Digitally signed by NEWTON ELLENS Date: 2023.11.22 Inspector Signature: E__L_L_E_N__S______15_:2_9:_36_-0_6_'00_' ______________ Report Date: ________________________________________ Approver Name and Title: Molly Smith, Section Chief, Water Enforcement and Compliance Assurance Branch MOLLY Digitally signed by MOLLY SMITH Date: 2023.11.22 Approver Signature: _S_M__IT_H________1_5:_47_:0_8 -_06_'0_0'___________________ Approval Date: __________________________________________ Purpose of Inspection The purpose of the inspection was to evaluate, and document compliance with the Clean Water Act (CWA) and associated pretreatment regulations with respect to Honda Development and Manufacturing of America, LLC--Indiana Auto Plant (Honda), located at 2755 North Michigan Avenue, Greensburg, Indiana.
refid# 93kXgzabGGKkY53r1bNKRnnpR7 pages
PROJECT TEAM MEMBERS Organization EPA, Region 7, ECAD, Air Branch MDNR Southeast Regional Office Project Role Lead Inspector Inspector FACILITY CONTACT INFORMATION Table 2 lists the primary facility contacts.
refid# Lg5eVKZOGn8R5LQnvobve2Rpb6 pages
TABLE 1: Inspection Information Summary Inspection Team Lead Inspector: Jordan Noles, EPA Inspector-In-Training: Bethany Terpin, EPA Date of Facility Visit: December 15, 2021 Facility Identification Name: General Mills Yoplait Street Address: 2695 General Mills Way City: Murfreesboro County: Rutherford EPA Facility ID No: 1000 0019 1062 Dun & Bradstreet (D&B) No: 1326438 Latitude: 35.798333 Longitude: -086.391667 State: Tennessee Zip: 37127 Name, address and phone of corporate parent company: Owner/Operator: General Mills Operations, LLC Mailing Address: 1 General Mills Blvd, MN City: Golden Valley State: Minnesota Phone: (260) 490-3000 Zip: 55426 Name, title, and email of person responsible for 40 C.F.R.
refid# NGeNX3DEGwnmGvBRLqKbZ66GR5 pages
EPA Inspection Report - Page 1 of 6 Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) 02/14/2024 Air Title V, NESHAP Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: Lion Elastomers Orange, LLC Lion Elastomers Orange 5713 FM 1006 Orange, TX 77630 5712 FM 1006 Orange, TX 77630 Orange County 409-924-4723 Kimika Lowe Environmental Manager kimika.lowe@lionelastomers.com FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: 110064446531 CN605689207, RN100224468; Permit FOP O-1271 AFS # 48-361-00004 325212 (Synthetic Rubber Manufacturing) 2822 (Synthetic Rubber Vulcanizable Elastomers) Personnel participating in inspection: Sarah Frey EPA Region 6 ECDAT Colleen McCarthy EPA Region 6 ECDAT Kimika Lowe Lion Elastomers Orange Physical Scientist Life Scientist Environmental Manager EPA Lead Inspector Signature/Date SARAH FREY Date: 2024.04.15 11:01:35 -05'00' Digitally signed by SARAH FREY Sarah Frey Date Supervisor Signature/Date Digitally signed by JAMES JAMES LEATHERS LEATHERS Date: 2024.04.15 11:08:28 -05'00' James Leathers Date 6ENFORM-019-R8.2 (02/12/2020) 1 EPA Inspection Report - Page 2 of 6 Section I - INTRODUCTION Lion Elastomers Orange, LLC Inspection Date 02/14/2024 PURPOSE OF THE INSPECTION EPA Region 6 inspectors Dr.
refid# 5Dpv2p3andk1k7o9OQp2Mp9356 pages
RECHARGE - The leading voice of the advanced rechargeable and lithium batteries industry in Europe - is calling for an urgent decision by the Commission to exclude batteries from the ECHA PFAS restriction scope.
refid# wDwE2G1EMEeaV7Dyn2e7aBEpB6 pages
Having only one HFC option for inhaled medical use; would theoretically lead to higher raw material dependence, supply chain fragility and therefore, more vulnerability to shortages and underserved patients.
refid# Neq0Ejbn0795ybEb8GprG51V83 pages
Team Member Lead Inspector, Sean Bergin Ryan Jack, Environmental Compliance Regulation Specialist Table 1.
refid# NE9Nyv48njeVpq3eM551GJyyR7 pages