Refine
Estimated Years 1940-1949Clear
19,188 results foundRefine Search
HEATINC VENTILATING AIR CONDITIONING GUIDE 1941 GAGES, Compound American Radiator & Standard Sanitary Corp., 992-993 Crane Company, 998-999 .
Document image
refid# 3JpynG3EkZBBwpZB02JLKpRoa1 page
HEATING VENTILATINC AIR CONDITIONING CUIDE 1942 germs died out within a few hours9.
Document image
refid# MMQX589E7V8K4GKoGNpmre3NL1 page
HEATING VENTILATINC AIR CONDITIONING GUIDE 1942 flows laminarly with practically no cross flow (i.e., in the direction of heat transfer).
Document image
refid# 15Rex6BzVd4Ngv59DKGpb4ODE1 page
HEATING VENTILATING AIR CONDITIONING CUIDE 1942 Velocities through registers may be reduced by the use of registers larger than the connecting pipes.
Document image
refid# DvDp07kk6L3VQd3zOwX9R0dRO1 page
HEATINC VENTILATING AIR CONDITIONING GUIDE 1942 temperature for a period of time prior to the advent of the peak load, when the heat gain begins to increase to peak' conditions, some of the increase is used in raising the temperature of the furniture, fixtures, etc., to the design conditions and the cooling load can be reduced accordingly.
Document image
refid# DGL1jnvM7oV0ZJ9EbvmkEjBkM1 page
HEATING VENTILATING AIR CONDITIONING GUIDE 1942 reverberant or both, the intensity at the 5-ft station may be almost doubled and the noise level increased nearly 3 db thereby.
Document image
refid# 15Yy3OZ3DzGQbQLrJqX8XeJj1 page
HEATING VENTILATING AIR CONDITIONING CUIDE 1942 tion weighing 2 to 3 times the weight of the motor and compressor, in order to maintain the machine movement below 0.03 in.
Document image
refid# 7MEa0Qx5ZVJnnXg6mVzq77LpB1 page
HEATING VENTILATING AIR CONDITIONING GUIDE 1942 per cent of the heating equipment is necessary to handle only the outside air load.
Document image
refid# oDydqX63yN3eX53jXzZYR04vD1 page
HEATINC VENTILATINC AIR CONDITIONING GUIDE 1942 soldered to the core or by both pressure and soldering.
Document image
refid# 8RbVrJxrZmn9rpDrvME0287jy1 page
HEATING VENTILATINC AIR CONDITIONING GUIDE 1943 mid-height of a building, and that the temperature., difference is 70 F, Equations 1 and 2 may be used to determine an equivalent wind velocity . to be used in connection with Tables 1 and 2 that will allow for both wind velocity and temperature difference: Me = VJf - 1.75 a (X) where = Vtf + 1,75 b , (2) Mt = equivalent wind velocity to be used in conjunction with Tables 1 and 2.
Document image
refid# xzYrw0GEvqERkQvBXDg9r5Rrm1 page
HEATINC VENTILATING AIR CONDITIONING CUIDE 1943 the fuel bed and thus automatically causes a larger draft above the fuel bed, which draws in more secondary air through the same slot openings.
Document image
refid# BbpbkB59g9RXDZqKeX7YBeVw1 page
HEATING VENTILATING AIR CONDITIONING GUIDE 1943 Table 9.
Document image
refid# pvzyr84q33aQ59wkdQwkvzdk1 page
HEATING VENTILATING AIR CONDITIONING GUIDE 1943 Such, units are usually designated as filters or unit filters.
Document image
refid# zbxkX7v4dGbZBG7QKXrQZOBbz1 page
HEATING VENTILATING AIR CONDITIONING GUIDE 1943 the return air may be brought through door grilles or door undercuts into the corridors and then to a common return or exhaust.; The pressure drop through door returns should not be excessive (50 per cent of: supply grille pressure); otherwise.the air distribution to the room may be:seriously unbalanced with the opening or closing of the doors.
Document image
refid# V3rONn88YBR4Jj7EEYb6wmpJq1 page
HEATINC VENTILATINC AIR CONDITIONING GUIDE 1944 Table 6.
Document image
refid# MGwbEb1nbLNXMNrNdq1OG4gqa1 page