C-8 PLUME IDENTIFICATION/GROUNDWATER ASSESSMENT WORK PLAN DUPONT WASHINGTON WORKS FACILITY AND LOCAL, LETART AND DRY RUN LANDFILLS
)
Date* May 2002
Project No.; D6WW7423
A
CORPORATE REMEDIATION GROUP An Alliance between
DuPont and URS Diamond
Barley Mill Plaza, Building 27 Wilmington, Delaware 19805
a
ASH018Z52 EID521412
C-8 Plume Identlfigation/Groundwaier Assessment Work Plan
Introduction
TABLE OF CONTENTS
1.0 Introduction..................................................... ............,,................................................2 1.1 Document Organization................................................ ................ ..................... 3
2.0 Washington Works Facility................ ........................................................................ 4 2.1 Key Findings................. ............................................... ................ ..................... 4 2.2 Data Gaps................................................................................ ............ ............. 5
2.3 Summary--Recommended Activities to Fill Data Gaps................................... 5 2.4 Detailed Justification..... ....................................... .............................................
3.0 Local Landfill.... .................................................................................... ....................... g
3.1 Key Findings.....................................................................................................
3.2 Summary-- Recommended Activities to Fill Local Landfill Data Gaps.......... 9 3.3 Detailed Justification........................... ................................................... ..........jq
4.0 Letart Landfill...............................................................................................................
4.1 Key Findings--Letart Landfill....................... .................... .................. ..........12 4.2 Data Gaps for the Letart Landfill...................................................................... 13 4.3 Summary--Recommended Activities to Fill Letart Landfill Data Gaps...... ..13 4.4 Detailed Justification ..................................................................................14
5.0 Dry Run Landfill............................................................................................. ........ 16 5.1 Key Findings--Dry Run Landfill......................................................... ........ 16 5.2 Summary--Data Gaps for the Dry Run Landfill............. ................. .........17 5.3 Summary-- Recommended Activities to Fill Dry Run Landfill Data
G aps.............................. .................................................................... ........17 5.4 Detailed Justification............................... ............................................. ........17
6.0 Path Forward............................... ......................................... ........................ ....... 20
7.0 References............. ........................................ ..
....... 21
Figure 1 Figure 2 Figure 3 Figure 4
FIGURES
Proposed Well Locations for the Washington Works Facility Proposed Well Locations for the Local T.anrfffn Proposed Well Locations for the Letart T^nrtfiit Proposed Well Locations for the Dry Run Tjwrifin
APPENDIX
Appendix A Sampling and Analysis Plan
O-B Plume W ork PlanZrioc May. 20,02 W ilmington. D
ASH018253
EID521413
I C-B Plume IcJentificalion/Groundwater Assessment Work Plan
Introduction
1,0 INTRODUCTION
A multi-media consent order (Order No. GWR-2001-019; Consent Order) was entered into between the West Virginia Department o f Environmental Protection (WVDEP), the West Virginia Department o f Health and Human Resources - Bureau for Public Health
(WVDHHR-BPH) and DuPont on November 15* 2001. The Consent Order identified a senes o f requirements and tasks to be performed by the parties (WVDEP, WVDHHR-
BPH, and DuPont) in order to determine whether there has been any impact on human health and the environment as a result of releases o f ammonium perfluorooctanoate (C8), CAS Number 3825-26-1, to the environment from DuPont operations at the Washington Works facility and the associated landfills (Local, Letart, and Dry Run).
The Consent Order established the C-8 Groundwater Investigation Steering Team (GIST)
to oversee investigations and activities that will be conducted to assess the presence and
extent o f C-8 in drinking water, groundwater, and surface water at and around the facility
and the associated landfills.
Pursuant to Attachment A of the Consent Order, three tasks will be performed by DuPont and evaluated by the GIST, Tasks A, B, and C. Task A: Groundwater Use and Well Survey/Groundwater Monitoring involves evaluating C-8 in groundwater initially within a one-mile radius from the Washington Works facility and the three landfills. Areas of investigation were expanded to a two-mile radius from the facility and the Local Landfill based on the results obtained. Expansion of the one-mile radius is not required for the Letart and Dry Run Landfills. The report presenting the results for the one-mile radius sampling was submitted to the GIST (DuPont, 2002a). Included with these sampling activities was sampling of public water supplies located one mile upstream and ten miles downstream o f the facility. Again, the area of investigation was expanded based on results obtained. Currently, 12 public water supplies located within the segment extending approximately 3.5 miles upstream and approximately 53 miles downstream have been sampled. Available results are included in the One-mile Radius Survev and C8 Sampling Report and Ohio River Public Water Supply Sampling (DuPont, 2002a).
Task B: Assessment of Existing Groundwater and Surface Water Monitoring Data includes the compilation o f historical C-8 data, monitoring all wells at the landfills, and the development o f a Groundwater Monitoring Plan (GMP) for the Washington Works.
facihty and the Local, Letart, and Dry Run Landfills, The first part o f the task has been completed. The historical C-8 data compilation report was submitted to the GIST for evaluation (DuPont, 2002b). The second part of Task B, monitoring C-8 in surface water and groundwater at the landfills, began in December 2001. Sampling will be performed
monthly for four months, then will be performed quarterly. The December 2001, January 2002 and February 2002 Surface Water and Groundwater Monitoring Reports for Washington Works Facility and Local, Letart, and Dry Run Landfills have been submitted to the GIST (DuPont, 2002c; 2Q02d; 20Q2e).
The Proposed GMP for the Washington Works facility has been completed (DuPont, 20021). It was submitted to the GIST for review' and was approved following minor modifications (DuPont, 2002g). Groundwater sampling at the Washington Works
C-8 Plume W o * Plan2.doc May. 20. 02
Wilmington, OS
ASH018254 EID521414
I I f jl w -
1
C-B Plume Identificatton/GrourKJwatsr AssessmentWork pian
Introduction
facility, based on the proposed GMP, began in late January 2002. Sampling will be conducted monthly for four months, then conducted quarterly. The results o f C-8 sampling for the wells and outfalls at the facility are submitted with the results for the three landfills.
Task C: Plume Identification/Groundwater Assessment at each site will commence following the completion of Tasks A and B, This activity will include delineating the vertical and horizontal extent of C-8 impacted groundwater and specifically includes an assessment of C-8 impacted groundwater at the Letart Landfill and its impact on the Ohio River and public water supplies along die river as required by the Consent Order. As part of this task, a separate river water sampling plan has been submitted to the GIST for approval (DuPont, 2002h). The GIST verbally approved the river water-sampling plan on March 5,2002.
The proposed work plan for Task C activities for the Washington Works facility and the associated landfills is presented in this document. The activities proposed were selected based primarily on the data obtained from Tasks A and B. Recommended activities were designed to identify groundwater plumes contributing to or with the potential to flow toward off-site receptors, with an emphasis on those areas where groundwater is used as a drinking water source.
1.1 Document Organization
This work plan is organized by section. Sections 2 ,3 ,4 , and 5 present the scope o f work proposed to investigate the Washington Works facility and the Local, Letart, and Dry Run Landfills, respectively.
Sections 2, 3, and 4, have the same format. In each o f these sections, a general overview o f each site is presented first. This is followed by summaries of the key findings and data gaps that were identified during development of the site conceptual model (SCM). The key findings were developed using information included in the historical data report, the monthly monitoring reports, and the available sampling results from the one-mile radius and public water supply sampling activities. The data gaps listed are those identified in the historical data report. Additional data gaps, identified after the submission of the historical data report or identified by the GIST, are also discussed. (For supporting information on the site background, key findings or the data gaps the reader is referred to the documents described in the introduction and listed in the references.) Following the' summary o f the data gaps is a summary of the activities proposed to fill the data gaps. A detailed justification for performing these activities is presented last.
Section 6 presents the prioritized path forward for implementing the recommended activities at each of the sites. Section 7 discusses reporting and Includes a preliminary schedule for the activities. Section 8 contains the references cited in the work plan.
C-8 PlumB Work Plan2.doe May. 20, 02
W ilmington, DE
I
3
ASH018255 EID521415
I C-8 Plume Idendflcioit/Gfoundwater Assessment W o * Pln
Washington Works Facility
2.0 WASHINGTON WORKS FACILITY
Significant historical hydrogeological and groundwater quality data for C-8 are available For the Washington Works facility from previous investigations that have been conducted. Most recently, these data were summarized in Section 2 of the historical data report. As part of the historical data report, the SCM for the Washington Works facility [originally developed during the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) (DuPont, 1999)] was refined based on additional data gathered since the RFI was completed. While refining the SCM, data gaps were identified.
In the following sections, the key findings for the Washington Works facility are summarized, and the data gaps identified for the Washington Works facility SCM are presented. A summary of proposed activities to fill these data gaps is then presented. Following the summary o f proposed activities are a more detailed discussion o f each data gap and the justification for implementing the proposed activities designed to fill these data gaps.
2.1 Key Findings
Based on the historical data report, the monthly monitoring reports, and the results available for the one-mile radius mid public water supply C-8 sampling in the vicinity of the facility, several key findings were identified
O The highest concentrations of C-8 measured in groundwater (up to 47,500 ug/L) were detected in wells clustered in one area of the facility. These wells are
located in and around the western end of the Riverbaak Landfill and the former Anaerobic Digestion Ponds solid waste management units (SWMUs) that are positioned adjacent the Ohio River.
u Concentrations of C-8 that were measured in 46 other monitoring aid temporary wells located across the site are relatively lower, ranging from <0,1 to 67 ug/L, C-8 concentrations in 18 o f these 46 wells were less than 10 ug/L. In 11 wells, C8 concentrations were less than lug/L,
Groundwater elevation contour maps indicate that continued pumping of on-site ' well fields near and parallel to the river (i.e,, Ranney Well, the DuPont-Lubeck Well Field, and the East Well Field) lowers the groundwater level in the alluvial aquifer to below river stage. This likely induces surface water from the river to flow into the alluvium toward the production wells, replacing water pumped from storage in the aquifer.
C-8 was detected in eight public water supply well fields located along the Ohio River near the facility. The furthest well fields were located as far upstream as Belpre (approximately 3.5 miles upstream o f the facility) and as far downstream as Tappers Plains (approximately 19 miles downstream of the facility). Sampling was also performed at the City of Parkersburg well field (located one half mile upstream of Belpre) where C-8 was not detected in four of the five water supply
C-8 Plume Work PtanZ,doe May. 20, 02
WUmlnston, D i
I
ASH018256 ED521416
C-8 Plume Idenffirafion/G roundwater Assessment Work Plan
Washington Works Facility
wells sampled. Although C-8 was detected in the fifth water supply well at Parkersburg (the well closest to the facility), it was measured at a concentration o f 0.069 ug/1, just above the practical quantitation limit (PQL; 0.05 ug/L). C-8 was not detected in groundwater from the five water supply wells at the Ravenswood
well field, located 30 miles downstream of the facility.
2.2 Data Gaps
In the historical data report, the following data gaps were identified during the development of the Washington Works facility SCM:
.
Q Additional monitoring wells are needed to further delineate C-8 concentrations in groundwater and to evaluate groundwater flow direction, particularly in the bedrock aquifer.
Continued refinement of the groundwater model for the Washington Works facility is required to re-evaluate that groundwater captured by the pumping wells is preventing off-site migration of C-8 impacted groundwater.
Q Surface water quality in the Ohio River needs to be evaluated. A separate work plan, the Ohio River Water Sampling Proposal for the Washington Works Facility and the Letart Landfill was submitted to the GIST to address this issue (DuPont,
2002f).
An additional question/data gap includes identifying the C-8 migration pathway or pathways from the Washington Works facility to the Little Hocking Water Association Wells, located immediately across the river in Ohio.
2.3 Summary-- Recommended Activities to Fill Data Gaps
Activities proposed to fill the above-described data gaps in the Washington Works facility SCM are summarized below and are discussed in detail in Section 2.4.
Install three new bedrock wells at locations near existing wells that are screened in the alluvial aquifer. Use new geologic data to characterize the bedrock under the site. Figure 1 shows the locations of the three proposed new bedrock wells.
Conduct hydrogeologic testing, using the three new bedrock wells to evaluate aquifer characteristics of the underlying bedrock aquifer.
Expand and refine the groundwater model for the unconfined alluvial aquifer to include tire Ohio River and nearby production wells pumping groundwater from the alluvium. The refined model will be used to evaluate groundwater flow under and around the Washington Works facility and to evaluate the potential for flow from the plant towards the Little Hocking well field.
O Conduct field reconnaissance to identify additional surface water features located on-site. Sample surface water from new locations identified during this effort.
Continue to monitor C-8 in groundwater in both the unconfined alluvial aquifer and underlying bedrock aquifer (utilizing the newly installed bedrock wells).
C-8 Plumo W ork Plan2.doc May. 20, 02 W ilmington, DE
5
ASH018257 E D 521417
I C-B Plume Mentitication/Groundwater Assessment Work Plan
Washington Works Facility
Continue to monitor C-8 in surface water at existing locations identified in the Consent Order.
Q Refine the Washington Works facility SCM based on the additional data gathered during the above listed activities.
2,4 Detailed Justification
The first data gap identified in the historical data report recommends the installation of additional monitoring wells to further delineate C-8 concentrations in groundwater and to evaluate groundwater flow direction, particularly for groundwater flow in the bedrock.
The Consent Order and the West Virginia/National Pollutant Discharge Elimination System (WVNPDES) permit for the Washington Works facility require surface water and groundwater sampling of the alluvial aquifer. This sampling was to be performed monthly for four consecutive months, beginning in December 2001; then it will be performed quarterly. This additional sampling will provide the data needed to evaluate the extent and migration of C-8 in the alluvial aquifer and will also provide additional data on surface water quality.
The installation of three additional bedrock wells is recommended to fill the first data gap. The locations of the three proposed bedrock wells are shown in Figure 1 and monitoring well installation details are presented in Appendix A. The installation of these bedrock wells will be clustered near existing wells screened in the unconfined alluvial aquifer. Data measured at well clusters will evaluate the vertical gradients between the two aquifers and the direction o f groundwater flow in the bedrock aquifer under the facility. Groundwater sampling of the three new bedrock wells will provide data needed to determine if the bedrock aquifer has been impacted by C-8 from the facility. Well installation and sampling methods are detailed in the Sampling and Analysis Plan (SAP) in Appendix A.
The second data gap identified for foe facility in foe historical data report is related to the continued refinement o f the groundwater model for the Washington Works facility. Refinement of foe model is required in order to reevaluate the extent of groundwater captured by the pumping wells at the site and determine the likelihood that off-site migration of C-8 impacted groundwater is occurring. This is particularly important given that C-8 has been recently detected in foe Little Hocking Water Association well field, . located directly north of the facility on foe other side of the Ohio River. Once the groundwater model has been refined, it can be used to evaluate foe likelihood that a groundwater migration pathway exists from the facility to the Little Hocking Well Field across the Ohio River.
The third data gap identified in the Washington Works facility SCM is that surface water quality in foe Ohio River should be evaluated. A separate work plan was developed and submitted to the GIST addressing this issue (DuPont, 2D02f),
The final recommended activity for foe Washington Works facility is the integration of all the new data gathered during implementation o f the work plan activities and foe results of the refined groundwater model into a revised SCM. The revised SCM should
C-8 Plume Work Plan2.dc May. 20, 02 W ilmington. DE
ASH018258 EIDS21418
0 8 Plume IdentHtcallon/Groundwater Assessment W ork Plan
Washington Works Facility
accurately represents the geological, hydrogeological, and human health and ecological exposure pathways for the current conditions at the site.
C-8 Plume Work P la n i.doc May. 20. 02 Wilmington, DE
7
ASB018259 EID521419
0 8 Plume Identificaton/Groundwatr Assessment W oik Plan
Local Landfill
3.0 LOCAL LANDFILL
The Local Landfill is located immediately south of the Washington Works facility and consists of three separate closed cells, which operated from 1964 to the mid-1980s under West Virginia/National Pollutant Discharge Elimination System (WVNPDES) Permit No, 0076538. Materials landfilled included scrap product, scrap metal, wood pallets and bins, and Powerhouse ash. The specific source of C-8 in groundwater and surface water samples collected from on-site locations has not yet been determined. When the cells were closed, the cells were covered with approximately 2 feet o f low permeability soil.
Historical hydrogeological and groundwater quality data for C-8 are available for the Local Landfill from previous investigations that have been conducted. Most recently, these data were summarized in Section 3 of the historical data report (DuPont, 2002b). As part of the historical data report, a SCM for the Local Landfill was developed, and data gaps were identified.
In the following sections, the key findings for the Local Landfill are summarized and the data gaps identified during die development of the Local Landfill SCM are presented. A summary o f proposed activities to fill these data gaps is then presented, Following the summary o f proposed activities are sections providing a more detailed discussion o f each data gap and the justification for implementing the proposed activities to fill the data gaps.
3.1 Key Findings
Based on the historical data report, the monthly monitoring reports, and the results available from the one-mile radius monitoring for C-8 in the vicinity of the Local Landfill, DuPont has identified several key findings:
Groundwater migration in the significant underlying bedrock aquifer flows towards the Washington Works facility to the north.
The elevation of the significant underlying aquifer [~710-730 feet above mean sea level (MSL)] is higher than the elevations at die Washington Works facility (-600-650 feet MSL).
The measured concentrations o f C-8 in groundwater in LLMW-4 and LLMW-6, ` two monitoring wells located downgradient of the landfill cells, have displayed a decreasing bend over time, 39 to 1,4 ug/L and 15 to 3 ug/L respectively. Data from the most recent sampling events are higher, possibly indicating that the C-8 concentrations are increasing at these wells. However, an analytical method change was also implemented around this same time (November 2001). Additional data is required to more accurately evaluate possible trends.
The measured concentrations of C-8 in the upgradient monitoring well, LLMW-9, and in LLMW-10, located in one of the cells, have ranged from non-detectable to 0.22 ug/L.
C-8 Plume W ork P1an2.doc May. 20, 02 WSfrtlngtOn, D i
8
ASH018260 EID521420
I C-8Rum Idenlitjcadon/GroundwatefAssessmentWorkPlan
Local Landfill
Q Measured concentrations of C-8 in surface water from the six outfalls, two stream samples, and a leachate sample have ranged from non-deteetable to 82.4 ug/L. Many o f these sampling points are associated with seeps, the leachate collection ponds, and discharge pipes coming from the collection ponds.
C-8 has been detected in water samples from wells, springs and cisterns at properties located within a one-mile radius o f tide Local Landfill. Results from the one-mile radius sampling event shows that 43 wells, four springs, and six cisterns were sampled. All o f the samples collected had quantifiable levels o f C-8 with the concentrations ranging from 0.252 to 10.9 ug/L. Six o f the wells are used for drinking water and the C-8 concentration in these wells ranged from 0.328 to 2.8 ug/L, However, no distinct groundwater flow path from Local Landfill is apparent based on current monitoring well measurements.
In the historical data report, the following data gaps were identified during the development o f the Local Landfill SCM:
Q Identify the locations of seeps in the valley walls and measure C-8 concentrations in the surface water sampled from these seeps.
0 Measure the C-8 concentrations in streams and other surface water features.
Q Acquire additional geological data to refine the SCM.
Install additional monitoring wells to provide additional groundwater flow data and groundwater quality data,
Gather additional C-8 concentration data from monitoring wells for plume delineation.
3.2 Summary-- Recommended Activities to Fill Local Landfill Data Gaps
The following activities arc proposed to fill the above-described data gaps in the Local Landfill SCM:
0 Conduct additional sampling to better characterize the C-8 concentrations of known surface water features located on-site.
Combine topographic map analysis and field reconnaissance to identify additional
surface water features, particularly searching for seeps along the southern sides of the three landfill cells. Integrate any new surface water features into the field sampling program to determine if C-8 impacts have occurred.
Install four clusters of shallow and deep bedrock monitoring wells located along
the boundaries o f the landfill property (see Figure 2). Conduct slug tests in the
newly installed wells to determine aquifer characteristics. Conduct
hydrogeological investigations to determine aquifer relationships, such as the
vertical gradient between the overburden and bedrock zones. Continue to
evaluate groundwater quality in the underlying significant aquifer, including data
from the newly installed wells.
C-8 Plume W ork Plan2.dos May. 20, 02 Wilmington, DE
'iSlS*
9
ASH018261 EID521421
/
C-B Plume Identificaten/Groundvmter Assessment Work Plan
L ocal Landfill
Refine the Local Landfill SCM based on the additional data generated during the
above listed activities,
3.3 Detailed Justification
The first and second data gaps listed for the Local landfill show the need foT additional data on the location of surface water features, particularly seeps in the valley walls around the three landfill cells. In addition, further characterization of water quality (with respect to C-8) is needed. The first two recommended activities address these data gaps. The first recommended activity is to continue sampling o f known surface water features at the site to further characterize C-8 concentrations in these surface waters. The Consent Order requires monthly sampling of specific outfalls for four consecutive months beginning in December 2001, followed by quarterly sampling thereafter.
The second activity will include a topographic map study and conducting field reconnaissance to identify additional surface water features, particularly seeps located along the southern sides o f the three landfill cells. If unidentified surface water features are found, these surface water features will be integrated into the field-sampling program to determine if C-8 impacts have occurred. In addition, the former Local Landfill dewatering pit
Investigating the southern side of the landfill is needed because C-8 has been detected in residential wells, springs, and cisterns located south of the landfill (DuPont, 2002a). The migration pathway for C-8 to these residential wells has not yet been determined, therefore, the Local Landfill is considered to be a possible C-8 source. In evaluating this possibility, additional surface water features need to be identified and sampled and additional groundwater flow data needs to be obtained.
The third and fourth data gaps identify the need for additional geological and hydrogeological data to more accurately represent the geology and hydrogeology of the bedrock in the SCM, particularly on the southern side of the site because o f the off-site C-8 impacts to the south. Currently, four bedrock monitoring wells are located at the site, two downgradient of the landfill cells (LLMW-4 and LLMW-6), one upgradient of the cells (LLMW-9) near the southern property boundary, and one located within the cell located in the center of the property (LLMW-10) (see Figure 2). All groundwater elevation maps using data ftom these four wells show bedrock groundwater flow toward tire north. Additional monitoring wells are required to confirm groundwater flow to the
north.
The installation of four new well clusters is recommended to help provide additional monitoring points and additional geological and hydrogeological data for the site. The shallow well in each cluster will be screened in the first waterbearing zone, if present. A determination will be made in the field regarding the installation o f the shallow well. The deep well will be screened in the underlying significant aquifer. Additional well installation details are provided in the SAP (Appendix A).
The locations of the four new well clusters are shown in Figure 2. The first cluster will be located between the creek draining the southern edge of the site and the edge of the western cell. The second cluster will be located along the eastern edge o f the eastern cell.
C-B Plume W ork PlanZ.doc May, 20, 02 Wilmington, D i
ASH018262 EID521422
C-8 Plume Identi'fiesllon/Groundwater Assessment Work Plan
Local Landfill
The third and fourth well clusters will be located along the northern edge o f the site. One cluster will be located where the former LLMW-5 shallow well was located. The other cluster will be located on the eastern side of the easternmost cell. These two well clusters will also be used to evaluate groundwater flow direction and the vertical gradients between the shallow and deep wells.
The fifth data gap identifies the need for additional C-8 concentration data from the monitoring wells for plume delineation in the bedrock The fourth recommendation is that all monitoring wells continue to be sampled, including the newly installed wells. The Consent Order requires monthly sampling of the existing wells for four consecutive months beginning in December 2001, followed by quarterly sampling thereafter.
The final recommended activity for the Local Landfill is the integration o f the new data gathered during implementation o f the work plan into a refined SCM that better represents the geological, hydrogeological, and human health and ecological exposure pathways For the current conditions at the site.
C-B Pluma Work Plandoe May. 20, 02 W llm lnflton, QE
ASH018263
ED521423
0 8 Plume IderitificalioiVGroundwater Assessment Work Plan
Letart Landfill
4.0 LETART LANDFILL
The Letart Landfill is located about 46 river miles downstream of the Washington works facility, just north of the town of Letart in Mason County, West Virginia, It was in operation from the early 1960s to 1995. Letart Landfill received waste from the Fluoropolymer manufacturing process at the plant that consisted primarily of scrap product, scrap metal, wood pallets and bins, and miscellaneous trash. This waste is believed to be the source of C-8 in the groundwater and surface water samples collected from on-site locations.
The landfill was operated and closed under West Virginia Solid Waste/National Pollutant Discharge Elimination System Permit No. WV0076066. This permit requires quarterly groundwater monitoring, surface water monitoring, and engineered cap maintenance.
The Letart Landfill was permanently closed by installing an engineered multi-layer geosynthetic mid soil cap (DuPont, 2001). Included in the closure activities were the installation of a leachate collection system, erosion and drainage control measures, and chain-link fencing. The cap construction was completed in April 2001,
In the following sections, the key findings for the Letart Landfill and the data gaps identified for the Letart Landfill SCM are presented. A summary o f proposed activities to fill these data gaps is then presented. Following the summary o f proposed activities are sections providing a more detailed discussion of each data gap and the justification for the proposed activities to fill the specific data gap.
4.1 Key Findings--Letart Landfill
Based on the historical data report, the monthly monitoring reports, and the results available from the one-mile radius and public water supply monitoring for C-8 in the vicinity of the Letart Landfill, DuPont has identified several key findings:
Stratigraphic analysis of bedrock under the Letart Landfill has shown the presence
of six sandstone units separated by shale units. These sandstone units have been
designated (from shallowest to deepest) as Zones A through F. Zone F has been
designated the underlying sipdficant aquifer because it is laterally continuous
under the landfill.
'
'
Maximum concentrations of C-8 in the individual zones at Letart are as follows: Zone A - 294,000 ug/L, Zone C - 3,700 ug/L, Zone D/E = 3,060 ug/L, Zone F =
1,890 ug/L,
Zone F groundwater flows mainly west/southwesterly. However, a component of flow was observed towards the north in a newly installed monitoring well (LMW11), but additional monitoring is required to verify this component of flow.
q The quantity o f leachate collected by the leachate collection system has dramatically decreased following the installation of the engineered cap system. The concentration of C-8 in the leachate has also been decreasing since October 1999 (from 3240 to 50.1 ug/L as of January 2002).
OB Plume Work Plan2.doc May: 20; 02 W ilm ington, DE
SH 018264
EID521424
I C-8 Plume Idenmcatton/Broundwater Assessment Work Plan
Letart Landfill
The concentration of C-8 in the Rt. 33 stream has ranged from 0.573 to 2.23 ug/L with the most recently measured value of 1.9 Ug/L.
Results from the one-mile radius sampling event shows that 30 off-site wells were sampled. Twelve of the samples collected were from wells used for drinking water. O f these, eight had non-detectable levels o f C-8, three had levels that were detected at a level above the limit o f detection (0.01 ug/L) but below the limit of quantification (0.05ug/L) and only one sample had C-8 concentration above the limit o f quantification at a value of 0.139 ug/L.
4.2 Data Gaps for the Letart Landfill
In the historical data report, the following data gaps wore identified during the development o f the Letart Landfill SCM:
Identify and sample seeps (for C-8) in the valley walls, particularly in the steep valley wall along the Ohio River and to the northwest of the landfill.
Measure the C-8 concentrations in surface water features, particularly in the Rt. 33 stream.
Measure the C-8 concentrations in the Ohio River.
Acquire additional geological data to refine the SCM.
O Install additional monitor wells to provide additional groundwater flow data and groundwater quality data.
u Gather additional C-8 concentration data from monitoring wells for plume delineation.
4.3 Summary-- Recommended Activities to Fill Letart Landfill Data Gaps
The following activities are proposed to fill the above-described data gaps in the Letart
Landfill SCM:
.
Conduct additional sampling to better characterize the C-8 concentrations of known surface water features located on-site, particularly in the Rt. 33 stream,
Combine topographic map analysis and field reconnaissance to identify additional surface water features, particularly searching for seeps along the northwestern side o f the landfill and along the southwestern area near the Ohio River. Integrate these new surface water features in the field-sampling program to determine if C8 impacts have occurred.
Install six wells [screened in the first water-bearing zone encountered and in the Zone F aquifer] along the edges of the landfill in locations where wells do not currently exist (see Figure 3). Conduct slug tests in the newly installed wells to determine the hydraulic conductivity of the aquifers. Conduct hydrogeological investigations to evaluate the relationships between the bedrock aquifers and to verify groundwater flow directions at the site.
C-B Plume W ork PlanZ.doc May. 20.02 W ilmington, DE
j ASH018265 EID521425
C-S Plume IdentificaCoalGroundwaier Assessment Work Plan
Letart Landfill
Refine the Letart Landfill SCM based on the additional data gathered during the above listed activities.
4,4 Detailed Justification
The first and second data gaps listed for die Letart Landfill show the need for additional data on the location of surface water features and seeps in the valley walls around the landfill. In addition, better characterization o f water quality (with respect to C-8) is needed. The first two recommended activities address these data gaps.
The first activity is the continued monitoring of known surface water features at the site to better characterize C-8 concentration in these surface waters. The Consent Order requires monthly sampling of specific outfalls for four consecutive months beginning in December 2001, followed by quarterly sampling, thereafter. Several other surface water monitoring points (not required by the permit or Consent Order) are also being sampled. In particular, additional monitoring points will be selected along the Rt. 33 stream to better characterize C-8 concentrations downstream o f the landfill.
The second activity will include evaluating topographic maps and conducting field reconnaissance to identify additional surface water features, especially seeps located along the steep slopes northwest of the landfill and the southeast sides of the landfill adjacent to the Ohio River. If unidentified surface water features are found, these surface water features will be integrated into the field-sampling program to determine if C-8 impacts have occurred.
Pilling the third data gap will evaluate if C-8 from the landfill is detected the Ohio River. A separate proposal, the Ohio River Water Sampling Proposal for the Washington Works facility and the Letart Landfill (DuPont 2002f), describing river water sampling activities and locations was submitted to the GIST for approval.
The fourth, fifth, and sixth data gaps (related to the acquisition of additional geological, groundwater flow data and groundwater quality data for SCM refinement and plume identification) are addressed in part by the proposed installation o f six new wells. Figure 3 shows the location of the proposed wells. Details o f the monitoring well installation are provided in the SAP (Appendix A).
One F Zone well, LMW-12 will be located downslope and northwest o f monitoring wells LMW-1 and LMW-7. At two locations, LMW-13, and LMW-14, well clusters are ` proposed. For each well cluster, one well will be screened in the first water-bearing zone encountered and the other well will be screened in the F Zone. A determination will be made in the field regarding the depth o f screened interval for the shallow well. Well cluster LMW-13 will be positioned to the southwest o f the landfill. Well duster LMW14 will be installed east of the landfill, on the edge of the steep slope overlooking the Ohio River. LMW-15, an F Zone well, will be located In the valley at the toe o f the landfill.
Data collected at the proposed well and well cluster locations will allow for more a accurate determination of vertical gradients and groundwater flow direction around the landfill. In addition, because clusters of wells will be installed at these locations, the hydraulic gradients between the upper water-bearing unit and Zone F can be better
C-8 Plume W ork Plan2.doc May, 20. 02 Wilmington. D
14
SH018266 ED521426
C-8 Plume Identlficallon/Groundwater Assessment Work Plan
Letart Landfill
characterized. Finally, the positioning of a well cluster in the valley at the toe of the landfill will allow for further evaluation o f groundwater flow towards the Ohio River and to determine if a high conductivity zone is present in the valley center, where bedrock fracturing is most likely.
Continued monitoring of groundwater quality is required by the Consent Order and is needed for plume delineation. Refinement of the SCM (the final proposed activity) based on new data obtained during the installation o f the new well clusters and continued monitoring o f existing and proposed monitoring wells and surface water features will allow for more accurate C-8 plume delineation, filling the final data gap listed.
CU8 Plume W ork Plan2.doc May. 20, 02 W ilmington, DE
ASH018267 EID521427
C-8 Pluma IdenUfteaUgn/GroundwatBr Assessment W ork Plan
Dry Run Landfill
5.0 DRY RUN LANDFILL
The Dry Run Landfill is located west o f the town of Lubeck, in Wood County,
West Virginia, about eight miles southwest of die Washington Works facility Lid the
Local Landfill. The landfill covers approximately 17 acres of a 535-acre parcel of land
owned by DuPont. The landfill was constructed within the drainage basin o f Dry Run, a
tributary o f the North Fork of Lee Creek, which is a tributary of the Ohio River. The '
landfill began operation in 1986 and is still active at present, operated under West
Virginia Solid Waste/National Pollutant Discharge Elimination System Permit No WV
0076244.
The Dry Run Landfill receives waste from the Washington Works facility consisting of
non-hazardous waste including scrap product, scrap metal, wood pallets, fly ash and bins, and miscellaneous trash. The primary C-8 source is believed to be the sludge from the ' closure o f the Washington Works facility anaerobic digestion ponds that were placed in
the landfill at Dry Run in 1990. The Dry Run Landfill remaining capacity calculations for 2001 show 4.4 years of remaining life on (he existing cell based on a 128,000 yd3/yr net fill volume consumption (DuPont, 2000).
Li the following sections key Findings for the Dry Run Landfill and the data gaps identified for the Dry Run SCM are presented. A summary of proposed activities to fill these data gaps is then presented. Following the summary o f proposed activities arc sections providing a more detailed discussion of each data gap and the justification for implementing the proposed activities to fill the data gaps.
5.1 Key Findings--Dry Run Landfill
Based on the historical data report, the monthly monitoring reports, and the results available from the one-mile radius monitoring for C-8 in the vicinity of the Dry Run Landfill, DuPont has developed several key findings:
C-8 concentrations in groundwater at the Dry Run Landfill range from non detectable to 16.5 ug/L.
The highest concentrations of C-8 in groundwater were detected in monitoring wells DRMW-13 and DRMW-13A, abedroek well and a shallow well cluster ` located at the base of the landfill (western end).
Q The geology at the western end o f die landfill is fairly well characterized. No data is available for the bedrock in the central portion o f the landfill or for the upper portion of the landfill (eastern end).
C-8 concentrations in surface water features have ranged from 0.88 to 87 ug/L. Higher concentrations (17 to 398 ug/L) are associated with the leachate collection system and sampling points downgradient of the system.
Results from the one-mile radius-sampling event for the Dry Run Landfill show a total o f 54 wells, springs, and cisterns were sampled. Of these, 13 wells, one spring and one cistern are used for drinking water. Five o f these samples showed
C-8 Plums Work Plan2.doc May. 20. 02 W ilmington. DE
3HQ18268 EID521428
C-8 Plume I(tentiticaiion/SroundwaterAssessmentWorn Plan
Dry Run Landfill
non-detectable C-8 levels (<0.01 ug/L). Two wells showed levels between the limit of detection (O.Olug/L) and the limit of quantification (0.05 ug/L). Samples from six of die wells and the spring and cistern had quantifiable levels o f C-8, ranging from 0.0505 to 0.339 ug/L.
5.2 Summary-- Data Gaps for the Dry Run Landfill
In the historical data report, the following data p p s were identified during the development o f the Dry Run Landfill SCM:
Q Identify and sample seeps (for C-8) in the valley walls. Measure the C-8 concentration in streams and other surface water features.
Install additional monitoring wells to provide additional groundwater flow data and to further characterize groundwater quality
Acquire additional geological data to refine the SCM. Gather additional C-8 concentration data from monitoring wells for plume
delineation.
5.3 Summary-- Recommended Activities to Fill Dry Run Landfill Data Gaps
The following activities are proposed to fill the above-described data gaps in the Dry Run SCM:
Conduct additional sampling to better characterize the C-8 concentrations of known surface water features located on-site and of those crossing over the site boundaries, specifically sampling surface water from Lee Creek.
Combine topographic map analysis and field reconnaissance to identify additional surface water features, particularly seeps. Integrate these new surface water features in the field-sampling program to determine if C-8 impacts have occurred.
Install six new well clusters, three located along the perimeter o f the landfill and
one located further downgradient from the existing downgradient well cluster (see
Figure 4).
>
Refine the Dry Run Landfill SCM based on the additional data gathered during the above listed activities.
5.4 Detailed Justification
The first and second data gaps listed for the Dry Run landfill indicate the need for locating unidentified surface water features and seeps in the valley walls around the landfill. In addition, further characterization o f water quality (with respect to C-8) is needed. The first two recommended activities address these data gaps.
The first activity includes the continued monitoring o f known surface water features at the site to better characterize C-8 concentrations in these surface waters. The Consent
e-B Plume Work P ta n id o c May. 20, 02 W ilmington, D
17
ASH0182 EID521429
C-8 Plums IdentiileattofVSroundvrater AssessmentWork Ran
Dry Run Landfill
Order requires monthly sampling o f specific outfalls for four consecutive months beginning in December 2001, followed by quarterly sampling, thereafter.
The second activity involves evaluating topographic maps and conducting field reconnaissance to identify additional surface water features, with specific emphasis on
seeps located northwest and downgradient o f the landfill. If unidentified surface water
features are found, the seeps will be included in the field-sampling program to determine the presence o f C-8.
The third data gap identifies foe need for additional groundwater flow and groundwater quality data. The fourth data gap recognizes that these additional data will be required to refine the SCM. The fifth data gap involves foe collection of additional C-8 data to allow for plume delineation. Three activities are recommended to address these data gaps. The first activity involves foe installation o f new well clusters and evaluating the new
geologic data generated during the installation. The second activity involves collecting additional groundwater quality data by continued monitoring o f foe existing and the newly installed monitoring well clusters. The third activity involves using this newly acquired data to refine the SCM and to delineate foe C-8 plume.
The installation o f six new well clusters is recommended to help provide additional
monitoring points as well as additional geological and hydrogeological data for the site. The geologic and hydrogeological data obtained during foe installation of these well
clusters will be used to refine the SCM and for plume delineation. Groundwater samples from these wells will be used to further characterize C-8 concentrations and to monitor changes in concentration over time.
The installation o f six new well clusters is proposed. The shallow well in each cluster
will be screened in the first water bearing zone, if present. A determination will be made m the field regarding the installation o f the shallow well. The deep well will be screened
m the underlying significant aquifer. Additional well installation details are provided in foe SAP (Appendix A).
Figure 4 shows the proposed locations for these clusters. Five o f these well clusters will
be located adjacent to the edges o f the landfill boundary with three clusters located on the
southwest side and two on the north side. Data from these four well clusters will more
accurately define foe stratigraphy and hydrogeology under the landfill. A sixth well
cluster is proposed that will be located further downgradient that the existing
.
downgradient cluster, DRMW-13 and DRMW-13A (see Figure 4). Because DRMW-13
and DRMW-13A have shown foe highest concentrations historically and are the furthest
downgradient from the landfill, additional downgradient wells are required for plume delineation.
Continued monitoring of foe existing monitoring well clusters and foe proposed monitoring well clusters will provide additional data on foe C-8 concentrations in groundwater and foe changes in concentration over time. The Consent Order requires
monthly sampling of all landfill monitoring wells for four consecutive months beginning in December 2001, followed by quarterly sampling, thereafter. Additional monitoring
may be proposed for the new wells to accurately characterize groundwater quality with respect to C-8 and for plume delineation.
C-8 Plume Work Plan2.dqq May. 21,02 W ilmington, DE
.... "
TM
-- -------------------------- ------------------ -- IB
ASH018270 EID521430
C-8 Plume Identlfication/Groundwater Assessment Work Plan
Dry Run Landfill
The geologic and hydrologic data obtained during the installation of the well clusters will also be used to refine the SCM. Refinement of the SCM , another proposed activity,
based on new data obtained during the installation o f the new well clusters and continued monitoring o f existing and proposed monitoring wells and surface water features will allow for more accurate C-8 plume delineation.
C-B Plume W ork Plart2.doc May. 20, 02 Wilmington, DE
ASH018271 EID521431
C-8 Plume Identification/Groundwatsr Assessment Work Plan
Path Forward
6.0 PATH FORWARD
The objective o f the work proposed in this work plan, is to determine the vertical and horizontal extent of C-8 concentrations in groundwater exceeding 1 ug/L. To meet this objective, the work proposed in this plan has been prioritized by task at the Washington Works facility and each of the three landfills. The general order for starting these tasks is the same for all sites and a preliminary schedule is provided.
June 2002 - GIST Reviews and comments on the Proposed Work Plan. Compilation of data needed for the groundwater model refinement began in the end o f February 2002 and model calibration and refinement is near completion. The first task is the Preparation for field activities, which will take place during June.
July/August 2002 - The second task is the installation o f the proposed monitoring wells at each site. During installation of these wells, additional geological data will be gained that will be utilized to further refine the SCMs for the three landfills and the Washington Works facility. Sampling o f monitoring wells will continue as required by the Consent Order. The newly installed monitoring wells will become incoiporated into the sampling program as soon as possible. Concurrent with the monitoring well installation will be the surface water investigation for each site. Identified surface water features and seeps will be sampled and flagged and the locations will be noted on maps so that these new surface water features can be included in future surface water sampling events. Sampling of already identified surface water features will continue as required by the Consent Oder.
G August/September 2002 - The third task is the hydrogeologic characterization of the aquifer using the newly installed wells. The data acquired from this testing will be utilized in refining the SCMs for the three landfills and the Washington Works facility.
October 2002 - The fourth task is the actual refinement of the SCMs for each site using the data acquired in the first three tasks.
October/November 2002 The fifth task is the C-8 plume delineation task. This, involves combining the surface and groundwater monitoring data with the refined SCMs to delineate and further characterize tile C-8 plumes.
December 2002 - The final activity will include documenting the activities completed in a report. However, while the above-listed tasks are being completed, a monthly update report will be issued to the GIST. Each monthly report will include a summary o f completed activities, the status o f current activities and a schedule of the next planned activities. In this report, any significant issues encountered during the reporting period will be documented. In addition, any changes in procedures that are required or recommended will be included. The final report issued will follow the same format as the historical data report with a separate section for the Washington Works facility, and the three landfills.
C-8 Plume W ork Plan2.doc May. 20. 02 W ilmington, DE
20
ASH0X8272 EID521432
J
I i
::l
i
C-8 Plume lenSfieaBon/Groundwater Assessment Work Plan
References
7.0 REFERENCES
DuPont. 2002a. One-mile Radius Survey and C-8 Sampling Report and OMo River Public Water Supply Sampling, DuPont Washington Works (December 2001February 2002), April 2002. DuPont Corporate Remediation Group and URS Diamond.
_____ _ 2002b. Compilation o f Historical C-8 Data, DuPont Washington Works Main Plant and Landfills January 2002. DuPont Corporate Remediation Group and URS Diamond.
, 2002c. December 2001 Groundwater Monitoring Report For Washington Works Main Plant and Local, Letart and Dry Run Landfills Washington, WV January 2002. DuPont Corporate Remediation Group and URS Diamond.
2Q02d, January 2002 Surface Water and Groundwater Monitoring Report For Washington Works Facility and Local, Letart and Dry Run Landfills Washington, WV March 2002. DuPont Corporate Remediation Group and URS Diamond.
2002e. February 2002 Surface Water and Groundwater Monitoring Report For Washington Works Facility and Local, Letart and Dry Run Landfills Washington, WV April 2002. DuPont Corporate Remediation Group and URS Diamond.
_2002f. Proposed Groundwater Monitoring Plan for Washington Works Facility Plant and Landfills January 2002. DuPont Corporate Remediation Group and URS Diamond.
_2002g. Emm] with attached map from Andrew Hartten of DuPont to the Groundwater Investigation Steering Team 2/25/02.
20Q2L Ohio River Water Sampling Proposal for the Washington Works Facility and the Letart Landfill January 2002. DuPont Corporate Remediation Group and URS Diamond.
. 1999. RCRA Facility Investigation Report, DuPont Washington Works, June 30, 1999. DuPont Corporate Remediation Group and URS Diamond.
. 2001. Certification Report Letart Landfill Cap Construction, June 2001. DuPont Corporate Remediation Group and URS Diamond.
. 2000. 2000 Dry Run Landfill Operational Report. Submitted January 26,20
C-8 Plume Work Ptan2.doo May. 20.02 W ilmington, DE
21
ASH018273 EID521433
FIGURES
ASH018274 EID521434
ASH018275
ASH018276 ED521436
I;
ASBQ18277 EID521437
ASHOl827 B EID521438