CLEAN AIR ACT INSPECTION REPORT Mondelez Global LLC, Chicago, IL 60629
Karyn DeFranco, Inspector AECAB (MN/OH)
Brian Dickens, Section Chief AECAB (MN/OH)
File
BASIC INFORMATION
Facility Name: Mondelez Global LLC Facility Location: 7300 South Kedzie Avenue
Date of Inspection: 08/10/2021
EPA Inspector(s): 1. Karyn DeFranco, Inspector 2. Karina Kuc, Inspector
Other Attendees: 1. John St. Lewis, Health and Safety and Environmental Manager, Mondelez Global LLC 2. Tom Betlejeski, Maintenance Manager, Mondelez Global LLC 3. Mike Ventrella, Plant Manager/Operations Lead, Mondelez Global LLC
Contact Email Address: john.stlewis@mblz.com
Purpose of Inspection: To investigate compliance with their CAAPP permit and VOC emissions.
Facility Type: Cookie and cracker manufacturing facility
Regulations Central to Inspection: The CAAP permit requires compliance with VOC limits.
Arrival Time: August 10th, 2021, 9:20 AM Departure Time: August 10th, 2021, 10:55 AM
Inspection Type: Unannounced Inspection Announced Inspection
OPENING CONFERENCE
Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet Small Business Resource Information Sheet not provided. Reason: Not a small business. Provided CBI warning to facility
The following information was obtained verbally from Mondelez Global LLC unless otherwise noted.
Process Description: Mondelez Global LLC (Mondelez) operates a cookie and cracker manufacturing facility. Raw materials such as flour, sugar, and oil are imported via truck or rail and stored in silos or tanks at the facility. Dough is mixed in 2500-5000 lbs batches, allowed to proof (if yeast dough), extruded, and laid out to bake between 300-500F for 3-7 minutes. The baked product is then cooled and packaged. The packages are then printed with liquid ink before being stored in the internal distribution center and shipped out.
Staff Interview: Mondelez currently has 503 employees. The boilers at the facility operate 24/7. Lines of production operate 24 hours per day for 12 days followed by two days off.
Raw materials are added to the mixers via a portable hopper and carbon dioxide (CO2) is injected into the mixers to cool the dough. The facility operates five lines (#2, #4, #6, #9, and #12). Each line produces one different product, with the exception of Line #12 that alternates producing two products. Approximately 30% of their products consist of yeast dough. There are five ovens, three boilers, six vegetable oil tanks, and 24 printing heads at the facility. No coolant is added to the cooling conveyors, and all products are cooled over distance or HVAC cooling. All emissions are vented to atmosphere except for emissions from the printing heads, which are vented through a HEPA filter.
TOUR INFORMATION
EPA Tour of the Facility: Yes
Page 2 of 4
Data Collected and Observations: EPA toured the facility. EPA inspected the mixing machines, oil tanks, and Line 2 process from start to finish.
Photos and/or Videos: were not taken during the inspection.
Field Measurements: were not taken during this inspection.
CLOSING CONFERENCE
Provided U.S. EPA point of contact to the facility
Requested documents: Annual emissions reports (AER) and calculation spreadsheets for 2019 through June 2021; SDS sheets of printing ink and usage for 2020; HEPA filters model and maintenance records for 2020; Most recent stack test (for regulatory purposes); and BTU ratings of ovens.
DIGITAL SIGNATURES
KARYN
Digitally signed by KARYN DEFRANCO
Report Author: _D__E_F_R__A_N__C_O_____D-0_a5t'e_0:0_2' 0_21_.0_9_.08_1_4_:07_:1_7_____
Digitally signed by Brian
Brian
Dickens
Dickens Date: 2021.09.09 07:11:43
Section Chief: _________________-0_5_'0_0'______________
Page 3 of 4
Facility Name: Mondelez Global LLC Facility Location: 7300 South Kedzie Ave Date of Inspection: August 10, 2021 APPENDICES AND ATTACHMENTS NONE
Page 4 of 4
Contains Items Claimed as CBI - Non-Releasable Facility Name: Mondelez Global LLC Facility Location: 7300 South Kedzie Ave Date of Inspection: August 10, 2021 CONFIDENTIAL BUSINESS INFORMATION ATTACHMENT NONE
CBI Page 1 of 1