UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5
77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604
DATE: SUBJECT: FROM: THRU: TO:
07/27/2021
CLEAN AIR ACT INSPECTION REPORT Alsip MiniMill LLC, Alsip, IL 60803
Karyn DeFranco, Inspector AECAB (MN/OH)
Brian Dickens, Section Chief AECAB (MN/OH)
File
BASIC INFORMATION Facility Name: Alsip MiniMill LLC
Facility Location: 13101 South Pulaski Road, Alsip, IL 60803
Date of Inspection: 06/30/2021
EPA Inspector(s): 1. Karyn DeFranco, Inspector 2. Natalie Schulz, Inspector
Other Attendees: 1. Neil Burchard, Environmental and Quality Manager, Alsip MiniMill LLC 2. Richard Hordyke, General Manager, Alsip MiniMill LLC
Contact Email Address: rhordyke@alsipminimill.com and nburchard@alsipminimill.com
Purpose of Inspection: To investigate compliance with the Lifetime Operating Permit and VOM emission limits.
Facility Type: Paper products manufacturing
Regulations Central to Inspection: The Lifetime Operating Permit limits VOC emissions from the boilers and the paper machine solvents.
Arrival Time: June 30th, 2021, 8:45 AM Departure Time: June 30th, 2021, 11:08 AM
Inspection Type: Unannounced Inspection Announced Inspection
OPENING CONFERENCE
Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet Small Business Resource Information Sheet not provided. Reason: Not a small business. Provided CBI warning to facility
The following information was obtained verbally from Alsip MiniMill LLC (Alsip MiniMill) unless otherwise noted.
Process Description: Alsip MiniMill operates a paper product manufacturing integrated mill. Corrugated cardboard is first fed to the pulping tub and broken down to pulp slurry, consisting of approximately 5% solids. The pulp slurry is then gravity and vacuum fed to the paper machine where it is dewatered using fabric sheets in the press section to create a mixture that is approximately 50% solids and 50% water. This mixture is further dewatered with steam-heater dryers to drive moisture down to 8%, the desired moisture for the final product.
Staff Interview: The facility currently has approximately 125 employees and typically run 24 hours per day, seven days per week. The ownership of the facility changed approximately six years ago. The facility typically produces 675-680 tons of finished product per day, and discharge approximately one-million gal/day of excess water to MWRD.
The facility operates a dust collection system on the conveyor, which was left over from the previous company. The dust collector controls dust emissions from the cutting process before the corrugated cardboard enters the pulper. The pulper water is kept between 80-120F. The pulp slurry goes through centrifuge and screening to remove anything that is not pulp. A few process chemicals are added to the process to agglomerate paper fibers in the wetting process.
Page 2 of 4
Alsip MiniMill operates two boilers and one rental boiler in their Power House. The rental boiler was used for a project starting in 2018 and has recently been removed. Boilers use city water purified with chemicals.
TOUR INFORMATION EPA Tour of the Facility: Yes Data Collected and Observations: Inspectors observed the preparation of raw materials for processing, as well as the paper machine. Inspectors went to the powerhouse to observe the boilers. Photos and/or Videos: were taken during the inspection.
Field Measurements: were not taken during this inspection.
CLOSING CONFERENCE
Provided U.S. EPA point of contact to the facility
Requested documents: FESOP application; Monthly running 12-month emissions calculation spreadsheet (2019-June 2021); SDS sheets for all chemicals used in process; Chemical usage of Boilers (2019 and 2020); Dust collector maintenance records and procedure; and CFM capacity of the dust collector hood.
DIGITAL SIGNATURES
KARYN
Digitally signed by KARYN DEFRANCO
Report Author: _D__E_F__R__A__N_C__O____D-_0a_5t'e0_:0_2' 0_2_1_.0_7._26_1_3_:5_4_:3_1_
Section Chief: __________________________________
Page 3 of 4
Facility Name: Alsip MiniMill LLC Facility Location: 13101 South Pulaski Road, Alsip, IL 60803 Date of Inspection: June 30, 2021 APPENDICES AND ATTACHMENTS 1. Appendix A: Digital Image Log
Page 4 of 4
Contains Items Claimed as CBI - Non-Releasable Facility Name: Alsip MiniMill LLC Facility Location: 13101 South Pulaski Road, Alsip, IL 60803 Date of Inspection: 06/30/2021 CONFIDENTIAL BUSINESS INFORMATION ATTACHMENT NONE.
CBI Page 1 of 1
Facility Name: Alsip MiniMill LLC Facility Location: 13101 South Pulaski Road, Alsip, IL 60803 Date of Inspection: June 30, 2021
APPENDIX A: DIGITAL IMAGE LOG
1. Inspector Name: Natalie Schulz
2. Archival Record Location: C:\Users\kdefranco\OneDrive - Environmental Protection Agency (EPA)\Alsip Mini Mill, IL\Inspection 2021\063021 Inspection Photos
Image Number
1
File Name IMG_0009.JPG
Date and Time (incl. Time zone and DST) June 30, 2021 10:02 a.m.
Latitude and Longitude
Description of Image Facility entrance.
IMG_0010.JPG June 30, 2021
2
11:12 a.m.
Dust collection system.
IMG_0011.JPG June 30, 2021
3
11:13 a.m.
Raw material stream.
IMG_0012.JPG June 30, 2021
4
11:16 a.m.
Agitator.
IMG_0013.JPG June 30, 2021
5
11:16 a.m.
Agitator.
IMG_0014.JPG June 30, 2021
6
11:18 a.m.
Example of dust buildup near agitator.
IMG_0015.JPG June 30, 2021
7
11:23 a.m.
Material screening area.
IMG_0016.JPG June 30, 2021
8
11:24 a.m.
Paper machine.
IMG_0017.JPG June 30, 2021
9
11:25 a.m.
Paper machine.
IMG_0018.JPG June 30, 2021
10
11:28 a.m.
Paper machine.
IMG_0019.JPG June 30, 2021
11
11:29 a.m.
Paper machine.
Appendices Page 1 of 2
Facility Name: Alsip MiniMill LLC Facility Location: 13101 South Pulaski Road, Alsip, IL 60803 Date of Inspection: June 30, 2021
IMG_0020.JPG June 30, 2021
12
11:33 a.m.
IMG_0021.JPG June 30, 2021
13
11:34 a.m.
IMG_0022.JPG June 30, 2021
14
11:38 a.m.
IMG_0023.JPG June 30, 2021
15
11:47 a.m.
IMG_0024.JPG June 30, 2021
16
11:50 a.m.
IMG_0025.JPG June 30, 2021
17
11:52 a.m.
IMG_0026.JPG June 30, 2021
18
11:52 a.m.
IMG_0027.JPG June 30, 2021
19
11:52 a.m.
Rollers on paper machine. Steam dryer area. Winding and cutting area. Materials that have been filtered out of feed. Powerhouse entrance. Boiler. Tanks in powerhouse. Tanks in powerhouse.
Appendices Page 2 of 2