Document m1b864eL4dbRZBKqnqQzbvBJ
*
* UNION * * CARBIDE *
HEALTH, SAFETY & ENVIRONMENTAL AFFAIRS SOLVENTS & COATINGS MATERIALS
P. O. BOX 471 TEXAS CITY,TX 77592
May 11, 1987
Mr. Eli Bell Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723
^
Re: Renovation Notification
Dear Mr. Bell:
This is to notify you, as required by 40 CFR 61.146, that Union Carbide Corporation, Old Ridgebury Road, Danbury, Connecticut 06817, as owner, plans to engage in renovation activities as described below:
Insulation will be removed from 700 linear feet of pipe located around #5 and 6 pits at the In Plant Disposal Area, at 3301 5th Avenue South, Texas City, Texas 77590. The equipment is approximately 20 years old.
Removal of the insulation is scheduled to start on June 15,
1987, with completion by July 15, 1987.
Procedures to be
employed in the handling and disposal of the asbestos material
will conform to the requirements in 40 CFR 61.147 and 61.152.
All asbestos materials removed will be disposed at Gulf Coast Waste Disposal Authority, Loop 197, Texas City, Texas.
Yours very truly
G. L. Rivera
cc: Dr. E. R. Ibert - GCACD, La Marque kem/asb
Bcc: C. L. Dudnick - 500 J. B. Evans - 500 K. E. Martin L. D. Pell G. M. Whipple - 500 P. E. White R. E. Woodcock
eBSSSpSIKYaxc'inkaya ,
UCTC 18887
UNION CARBIDE CORPORATION TEXAS CITY PLANT
Plant Procedure 1-8-6 Attaciment #1
NOTICE Of INTENTION TO OEMOLISH OR RENOVATE A STRUCTURE OR
EttiLiTy"CM>T*iin ASBEsr&rnaTFmr--------------
1. Description of the fac 111 ty:
/ O /tf'crc.'"'forc
r; v-r
0 c^D/- C?(s7^ &/~ 5'Jr~/<Pl//t2 g
.^^tFsTc?c -Z/C/.S
Age (approx, years)
Size
Prior Use.
2. Estimate of approximate amount of friable asbestos materials present:
(Area In sq. ft. or linear ft.}
'V'&O
______________________
Estimation technique used: (>Lov^ 3. Location of facility:
_______________________________
/hou>vh> -TPiw
P> Pi 1/
4. Scheduled starting day: ~JC(fu~
(^<1.
Scheduled completion day:
H
______________________________
5. Nature of planned demolition or renovation: d.o>^n L BTiy ^ct-Asy-e.
______/~y$l qm^\______fPt'i.Grt.,
-r7 --Q>^~ O P~ -Tt^V /'C_f
Method to be used:
6. Name of person that prepared the form: Xfckx \
LUHlTP
/rrfT*Jo'&_
Location and telephone number:
L4-CjFY-T~ => c2~S~Co
Oate:
ST// f /&7_______________________________________________ _
NOTE: This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation
operation.
April/1985:1670s
UCTC 18888
i I