Document jK7pymEwd9ELpydNYyXdax9Z
UKAS ISO/IEC 17025 Accredited Testing Laboratory No. 4279 Element Materials Technology Environmental UK Limited trading as Element and Element Ireland
Unit C5, Emery Court, The Embankment Business Park, Stockport, SK4 3GL
Element, Unit C6, Emery Court, The Embankment Business Park, Heaton Mersey, Stockport, SK4 3GL Your Element Contact: E
Site Specific Protocol (SSP) Commissioned by AGC Chemicals Europe Ltd
Installation Name & Address AGC Chemicals Europe Ltd PO Box 4 York House Hillhouse International Thornton Cleveleys FY5 4QD
A4 L168 Lubricant Oven
EPR Permit: EPR/BU5453IY/V004
Dates of the Proposed Monitoring Campaign 9th - 12th May 2023
SSP Reference Number EMT-SSP-05959
Release Point References A5 ARK Inlet
A5 ARK Outlet
Report Written by Report Date & Version 2nd May 2023, Version 1 Report Approved by
Signature of Report Approver (Element)
Name of Client
I confirm that I have read and understood the sampling protocol contained in this report, that the sampling location complies with the requirements of all relevant legislation, and
I am happy for the sampling to proceed.
Date of Client Approval
Signature of Client (for SSP Approval)
EL-LS-OP-SE-X-EWB 002 UK SSP (Version BF) EMT-SSP-05959 - AGC Chemicals Europe Ltd (May 2023)
SSP Part 1
CONTACT DETAILS, MONITORING DATES & PERSONNEL
This SSP (Site Specific Protocol) will be updated, if required to include feedback from each visit. Operator Contact Details
Operator Name Site Location Full Installation Address
AGC Chemicals Europe Ltd
Lancashire
PO Box 4 York House Hillhouse International Thornton Cleveleys FY5 4QD
EPR Permit
Contact Name Telephone Number Fax Number Mobile Phone Number Email Address
Monitoring Dates
Dates of Previous Campaign Job No. of Previous Campaign Planned Dates of Campaign
EPR/BU5453IY/V004 Primary Site Contact -
9th March 2023 EMT05518 9th - 12th May 2023
Analysis Laboratories (with short name reference as referenced in Part 2 of the SSP)
Element Stockport (EET) Element Deeside (ELD) i2 Analytical Ltd
ISO17025 Accreditation Number: 4279 ISO17025 Accreditation Number: 4225
ISO17025 Accreditation Number:
Alternative Site Contact
-
(If the Planned Dates of the Campaign change at late notice, the SSP will not be re-issued. The final test report will detail the actual monitoring dates.)
Stack Emissions Monitoring Personnel
where SCM = Site Campaign Manager
Position
Name
SCM Team Leader Technician
MCERTS Accreditation MCERTS Number & Expiry Date
Technical Endorsements
Element Site Campaign Manager Contact Details
Name
Mobile Phone Number
Email Address
Further Notes on Stack Emissions Monitoring Personnel
There may be, in exceptional circumstances, a need to change the personnel who will be performing the monitoring. If this was to occur, the sampling team sent to site will hold all the necessary MCERTS Technical Endorsements for the required tests. As this scenario would most likely happen at late notice, the SSP will not be re-issued. The names of the monitoring personnel will be available to the client on the day of sampling (or before if required for inductions / site security / permits to work). The names of the monitoring personnel along with their personal MCERTS accreditation details will also be detailed in the final test report.
AGC Chemicals Europe Ltd Lancashire
EL-LS-OP-SE-X-EWB 002 UK SSP (Version BF) 2 of 9
SSP Reference: EMT-SSP-05959, Version 1 EPR Permit: EPR/BU5453IY/V004
SSP Part 2
DETAILS OF MONITORING: STACK AND LOCATION DETAILS
Release Point Reference
A4 L168 Lubricant Oven
Sampling Location and Stack Photos
Operating & Process Information Type of Process Batch or Continuous Process Feedstock / Fuel Type Load / Throughput / Continuous Rating of Plant Expected Velocity, Temperature & Moisture Details of Abatement System Details of any CEMS Installed (including DCS) Process Details Required Reference Conditions 1 Reference Conditions 2
Sampling Location Details Stack Type / Shape Diameter / Dimensions (m) Access Platform Type and Location Orientation of Duct Sample Port Size / Diameter Sample Port Depth (cm) Sample Ports Correctly Located? Number of Sampling Lines Available Number of Sampling Lines to be Used Number of Sample Points to be Used (per line) Total Number of Sample Points to be Used EN 15259 / Homogeneity Representative Point/s
Details Oven Continuous Process Oven Normal Load 14.6 m/s | 107 C | 0.1 % v/v N/A N/A Operating conditions to be Provided by Site Contact 273K, 101.3kPa, without correction for water vapour content. N/A
Value Circular
0.25 On Ground On Ground Horizontal
Hole 0 Yes 1 1 1 1 -
Outside - no shelter N/A
Details
Availability of Utilities
Power
240V
Lighting
Yes
Water
Yes
EA Technical Guidance Note M1 / EN 15259 Platform Requirements
Value
Sufficient working area to manipulate probe and operate the measuring instruments
Yes
Platform has 2 levels of handrails (approx. 0.5m & 1.0m high)
Yes
Platform has vertical base boards (approx. 0.25m high)
Yes
Platform has chains / self closing gates at top of ladders
Yes
There are no obstructions present which hamper insertion of sampling equipment
Yes
Safe Access Available
Yes
Easy Access Available
Yes
Sampling Platform / Improvement Recommendations:
The sampling location meets all the requirements specified in EA Guidance Note M1 and EN 15259, and therefore there are no improvement recommendations.
Sampling Plane Validation Criteria
Requirement Lowest Differential Pressure (Pa) Ratio of Gas Velocities (:1) Maximum Angle of Swirl () No Local Negative Flow
Value 140 1.0 0 Yes
Compliant Yes Yes Yes Yes
AGC Chemicals Europe Ltd Lancashire
EL-LS-OP-SE-X-EWB 002 UK SSP (Version BF) 3 of 9
SSP Reference: EMT-SSP-05959, Version 1 EPR Permit: EPR/BU5453IY/V004
SSP Part 2
DETAILS OF MONITORING: SAMPLING METHOD INFORMATION
Release Point Reference
A4 L168 Lubricant Oven
In the "Units" column, = Reference Conditions 1, = Reference Conditions 2
(continued)
Determi na nd
Hydrogen Fluoride PFOA Water Vapour Vel oc i ty
Number of
Runs | Blanks
Uni ts
Emi s s i on Limit
Expected Emi s s i on
PERIODIC SAMPLING: MANUAL METHODS
Projected Standard
Element Absorption Media /
LOD
Reference Technical Analysis Technique
Method
Procedure
Ana l ys i s Lab |
ISO17025 Status
Sa mpl e Duration
(mi ns )
Sa mpl e Fl owra te (ACTUAL) (l /mi n)
Sa mpl e Vol ume
(REF) (m)
Projected Status
MU
of
(%) Testing
10 1 mg/m N/A
10 1 mg/m N/A
10 0 % v/v N/A
1 0 m/s
N/A
59.0
0.045 CEN/TS 17340 CAT-TP-10
NaOH / IC
EET MCERTS 60
-
0.045
EN 1911
CAT-TP-11
C3H8O
EET MCERTS 60
0.10
0.10
EN 14790 CAT-TP-05
Gravimetric EET MCERTS 60
14.6
3.0 EN ISO 16911-1 CAT-TP-41 Pressure & Temp EET MCERTS N/A
10
0.550
15% MCERTS
10
0.550
15% MCERTS
10
N/A
5% MCERTS
N/A
N/A
10% MCERTS
Velocity Profile - Source: Previous Testing Campaign
P Pt Pa 1 139.5
Line A Temp
C 107.2
Velocity m/s 14.65
Monitoring Objectives / Unusual Occurrences / Comments / Health & Safety / Expected Deviations from Standard Reference Methods
1 Perform testing, as requested by the customer, for a number of prescribed pollutants. There are no emission limits set for any of the pollutants at this time
AGC Chemicals Europe Ltd Lancashire
EL-LS-OP-SE-X-EWB 002 UK SSP (Version BF) 4 of 9
SSP Reference: EMT-SSP-05959, Version 1 EPR Permit: EPR/BU5453IY/V004
SSP Part 2
DETAILS OF MONITORING: STACK AND LOCATION DETAILS
Release Point Reference
A5 ARK Inlet
Sampling Location and Stack Photos
Operating & Process Information Type of Process Batch or Continuous Process Feedstock / Fuel Type Load / Throughput / Continuous Rating of Plant Expected Velocity, Temperature & Moisture Details of Abatement System Details of any CEMS Installed (including DCS) Process Details Required Reference Conditions 1 Reference Conditions 2
Sampling Location Details Stack Type / Shape Diameter / Dimensions (m) Access Platform Type and Location Orientation of Duct Sample Port Size / Diameter Sample Port Depth (cm) Sample Ports Correctly Located? Number of Sampling Lines Available Number of Sampling Lines to be Used Number of Sample Points to be Used (per line) Total Number of Sample Points to be Used EN 15259 / Homogeneity Representative Point/s
Details Pre-Scrubber Batch PTFE Parts TBC on day of testing 5.3 m/s | 68.7 C | 0.8 % v/v ARK Plant None Operating conditions to be Provided by Site Contact 273K, 101.3kPa, without correction for water vapour content. N/A
Value Circular
0.79 Stairs On Roof Horizontal 5" Flange
10 Yes 1 1 1 1
-
Details Outside - shelter in the adjacent building
N/A
Availability of Utilities
Power
110V
Lighting
No
Water
No
EA Technical Guidance Note M1 / EN 15259 Platform Requirements
Value
Sufficient working area to manipulate probe and operate the measuring instruments
Yes
Platform has 2 levels of handrails (approx. 0.5m & 1.0m high)
Yes
Platform has vertical base boards (approx. 0.25m high)
Yes
Platform has chains / self closing gates at top of ladders
N/A
There are no obstructions present which hamper insertion of sampling equipment
Yes
Safe Access Available
Yes
Easy Access Available
Yes
Sampling Platform / Improvement Recommendations:
The sampling location meets all the requirements specified in EA Guidance Note M1 and EN 15259, and therefore there are no improvement recommendations.
Sampling Plane Validation Criteria
Requirement Lowest Differential Pressure (Pa) Ratio of Gas Velocities (:1) Maximum Angle of Swirl () No Local Negative Flow
Value 13 1.4 7 Yes
Compliant Yes Yes Yes Yes
AGC Chemicals Europe Ltd Lancashire
EL-LS-OP-SE-X-EWB 002 UK SSP (Version BF) 5 of 9
SSP Reference: EMT-SSP-05959, Version 1 EPR Permit: EPR/BU5453IY/V004
Determi na nd
SAA 1000 PFOA Water Vapour Vel oc i ty
SSP Part 2
DETAILS OF MONITORING: SAMPLING METHOD INFORMATION
Release Point Reference
A5 ARK Inlet
In the "Units" column, = Reference Conditions 1, = Reference Conditions 2
(continued)
Number of
Runs | Blanks
Uni ts
Emi s s i on Limit
Expected Emi s s i on
PERIODIC SAMPLING: MANUAL METHODS
Projected Standard
Element Absorption Media /
LOD
Reference Technical Analysis Technique
Method
Procedure
Ana l ys i s Lab |
ISO17025 Status
Sa mpl e Duration
(mi ns )
Sa mpl e Fl owra te (ACTUAL) (l /mi n)
Sa mpl e Vol ume
(REF) (m)
Projected Status
MU
of
(%) Testing
2 1 mg/m N/A
2 1 mg/m N/A
4 0 % v/v N/A
2 0 m/s
N/A
41.0
0.006
EN 1911
CAT-TP-11
10% DMSO
EET MCERTS 240
0.10
0.006
EN 1911
CAT-TP-11
50% Methanol EET MCERTS 240
1.0
0.10
EN 14790 CAT-TP-05
Gravimetric EET MCERTS 240
2.8
3.0 EN ISO 16911-1 CAT-TP-41 Pressure & Temp EET MCERTS 5
10
2.216
15% MCERTS
10
2.216
15% MCERTS
10
N/A
5% MCERTS
N/A
N/A
10% MCERTS
Velocity Profile - Source: Previous Testing Campaign
Line A
P Temp Velocity
Pt Pa
C
m/s
1 16.8 68.6 4.86
2 13.4 68.7 4.35
3 25.4 68.7 5.98
4 24.6 68.7 5.89
Monitoring Objectives / Unusual Occurrences / Comments / Health & Safety / Expected Deviations from Standard Reference Methods
1 Perform testing of an investigative nature under trial operation 2 A5 ARK Inlet and Outlet to be tested similtaneously
AGC Chemicals Europe Ltd Lancashire
EL-LS-OP-SE-X-EWB 002 UK SSP (Version BF) 6 of 9
SSP Reference: EMT-SSP-05959, Version 1 EPR Permit: EPR/BU5453IY/V004
SSP Part 2
DETAILS OF MONITORING: STACK AND LOCATION DETAILS
Release Point Reference
A5 ARK Outlet
Sampling Location and Stack Photos
Operating & Process Information Type of Process Batch or Continuous Process Feedstock / Fuel Type Load / Throughput / Continuous Rating of Plant Expected Velocity, Temperature & Moisture Details of Abatement System Details of any CEMS Installed (including DCS) Process Details Required Reference Conditions 1 Reference Conditions 2
Sampling Location Details Stack Type / Shape Diameter / Dimensions (m) Access Platform Type and Location Orientation of Duct Sample Port Size / Diameter Sample Port Depth (cm) Sample Ports Correctly Located? Number of Sampling Lines Available Number of Sampling Lines to be Used Number of Sample Points to be Used (per line) Total Number of Sample Points to be Used EN 15259 / Homogeneity Representative Point/s
Details Post-Scrubber Batch PTFE Parts TBC on day of testing 5 m/s | 38.3 C | 7.9 % v/v Scrubber None Operating conditions to be Provided by Site Contact 273K, 101.3kPa, without correction for water vapour content. N/A
Value Circular
0.73 Ladder Permanent Vertical 5" Flange
10 Yes 2 2 1 1
-
Outside - no shelter N/A
Details
Availability of Utilities
Power
110V
Lighting
No
Water
Yes
EA Technical Guidance Note M1 / EN 15259 Platform Requirements
Value
Sufficient working area to manipulate probe and operate the measuring instruments
Yes
Platform has 2 levels of handrails (approx. 0.5m & 1.0m high)
Yes
Platform has vertical base boards (approx. 0.25m high)
Yes
Platform has chains / self closing gates at top of ladders
Yes
There are no obstructions present which hamper insertion of sampling equipment
Yes
Safe Access Available
Yes
Easy Access Available
Yes
Sampling Platform / Improvement Recommendations:
The sampling location meets all the requirements specified in EA Guidance Note M1 and EN 15259, and therefore there are no improvement recommendations.
Sampling Plane Validation Criteria
Requirement Lowest Differential Pressure (Pa) Ratio of Gas Velocities (:1) Maximum Angle of Swirl () No Local Negative Flow
Value 16 1.3 NM Yes
Compliant Yes Yes No Yes
AGC Chemicals Europe Ltd Lancashire
EL-LS-OP-SE-X-EWB 002 UK SSP (Version BF) 7 of 9
SSP Reference: EMT-SSP-05959, Version 1 EPR Permit: EPR/BU5453IY/V004
Determi na nd
SAA 1000 PFOA Water Vapour Vel oc i ty
SSP Part 2
DETAILS OF MONITORING: SAMPLING METHOD INFORMATION
Release Point Reference
A5 ARK Outlet
In the "Units" column, = Reference Conditions 1, = Reference Conditions 2
(continued)
Number of
Runs | Blanks
Uni ts
Emi s s i on Limit
Expected Emi s s i on
PERIODIC SAMPLING: MANUAL METHODS
Projected Standard
Element Absorption Media /
LOD
Reference Technical Analysis Technique
Method
Procedure
Ana l ys i s Lab |
ISO17025 Status
Sa mpl e Duration
(mi ns )
Sa mpl e Fl owra te (ACTUAL) (l /mi n)
Sa mpl e Vol ume
(REF) (m)
Projected Status
MU
of
(%) Testing
2 1 mg/m N/A
2 1 mg/m N/A
4 0 % v/v N/A
2 0 m/s
N/A
41.0
0.006
EN 1911
CAT-TP-11
10% DMSO
EET MCERTS 240
0.10
0.006
EN 1911
CAT-TP-11
50% Methanol EET MCERTS 240
1.00
0.100
EN 14790 CAT-TP-05
Gravimetric EET MCERTS 240
2.80
3.000 EN ISO 16911-1 CAT-TP-41 Pressure & Temp EET MCERTS 5
10
2.387
15% MCERTS
10
2.387
15% MCERTS
10
N/A
5% MCERTS
N/A
N/A
10% MCERTS
Velocity Profile - Source: Previous Testing Campaign
P Pt Pa 1 24.7 2 19.8
Line A
Temp Velocity P
C
m/s Pa
38.2 5.71 17.0
38.3 5.11 15.7
Line B Temp
C 38.4 38.4
Velocity m/s 4.73 4.55
Monitoring Objectives / Unusual Occurrences / Comments / Health & Safety / Expected Deviations from Standard Reference Methods
1 Perform testing, as requested by the customer, for a number of prescribed pollutants. There are no emission limits set for any of the pollutants at this time 2 Perform testing of the required parameters simultaneous with the ARK inlet
AGC Chemicals Europe Ltd Lancashire
EL-LS-OP-SE-X-EWB 002 UK SSP (Version BF) 8 of 9
SSP Reference: EMT-SSP-05959, Version 1 EPR Permit: EPR/BU5453IY/V004
SSP Part 3
DEVIATIONS FROM THE SSP THAT MAY HAVE OCCURED ON SITE DURING THE SAMPLING CAMPAIGN
Make a note of any deviations from this SSP below:
(Deviations may include: modification to a sampling duration, removal of a test, change to the number of sampling runs etc.)
At the end of the sampling campaign, the Team Leader must select one of the statements below and complete the required boxes:
(1) I certify that all testing performed for this sampling campaign followed the testing programme as detailed in this SSP, and no deviations (unless specified in the original SSP and approved by the client) were required.
Signature of Team Leader
Date of Signature
(tick)
(2) It was necessary to deviate from the testing programme as detailed in this SSP. All deviations are listed above. The client was informed of the deviations and was happy for the testing to proceed / continue on this basis.
(A client signature MUST be obtained for Contract Review purposes)
Signature of Team Leader
Date of Signature
(tick)
Signature of Client
Date of Signature
AGC Chemicals Europe Ltd Lancashire
EL-LS-OP-SE-X-EWB 002 UK SSP (Version BF) 9 of 9
SSP Reference: EMT-SSP-05959, Version 1 EPR Permit: EPR/BU5453IY/V004