Document by7gyEzgngMwBvGj1ODd7QBpk
Inspection Date: Time: Media: Statute(s)/Program(s): Type of inspection: Access:
REGION 5 Enforcement and Compliance Assurance Division
INSPECTION REPORT
08/25/2022
Announced: Yes
Entry: 08:35 AM (ET)
Exit: 02:24 PM (ET)
Water
Clean Water Act, NPDES, WWTP
CEI - Compliance Evaluation Inspection
Granted
Permittee Name: Facility or Site Name: Facility/Site Physical Address: (City, state, zip code) County/Parish: Facility GPS Coordinates:
SAGINAW CHIPPEWA INDIAN TRIBE OF MICHIGAN SAGANING WWTP 2500 EAST WORTH ROAD STANDISH, MI 48658 ARENAC 43.92504, -83.90606
Facility/Site Identifier: Permit Number:
110039409985 MI0058582
Persons Participating in Inspection:
Title
Name
Lead Inspector
Inspector
Operator
Operator
Water and Wastewater Manager
Dean Maraldo Jake Berger Cody Berk Stacy Ancel Jonas Wilcox
Phone 3123532098 (312) 353-8024
(989) 775-5990
Email
Present at Opening Conf.
Maraldo.Dean@epa.gov Yes
Berger.Jake@epa.gov Yes
No
sancel@sagchip.org No
jwilcox@sagchip.org Yes
Present at Closing Conf. Yes
Yes
No
No
Yes
Lead Inspector: Dean Maraldo
[Signature] REGION 5
DINO MARALDO
Digitally signed by DINO MARALDO Date: 2022.08.29 16:47:34 -05'00'
Maraldo.Dean@epa.gov
(312) 353-2098
Supervisor Review: Ryan Bahr
[Signature] REGION 5
Digitally signed by Bahr,
Bahr,
Ryan
Ryan Date: 2022.09.01
13:06:50 -05'00'
bahr.ryan@epa.gov
1 of 92
SAGANING WWTP Inspection Date:
08/25/2022
SECTION I - INTRODUCTION
Site Entry and Inspection Objectives
I, Region 5 Lead Inspector, Dean Maraldo, arrived at the SAGANING WWTP (the "Site" or "Facility"), located at 2500 EAST WORTH ROAD, at 08:35 AM (ET) on 08/25/2022 for an announced inspection. REGION 5 inspector Jake Berger joined me for the inspection and we both presented our credentials to the Water and Wastewater Manager Jonas Wilcox ("Manager") and informed him that this was a REGION 5 inspection to determine compliance with the Clean Water Act (CWA) and the National Pollutant Discharge Elimination System (NPDES) permit program. The inspection was conducted under the authority of the Federal CWA (Section 308). The table above identifies the attendees that participated in the inspection. This report is based on information supplied by Facility representatives, observations made by the Region 5 inspectors, and records and reports maintained by the permittee and the Region 5 inspectors, including: direct observations made by the Region 5 inspectors, photographs taken by Region 5 inspectors, physical evidence collected by the Region 5 inspectors, verbal or written statements made by or information supplied by Facility representatives (the permittee) during or subsequent to the on-site inspection, and materials, processes, data, photographs, or documents shown, demonstrated, or submitted to the Region 5 inspectors by Facility representatives during or subsequent to the on - site Inspection. In addition, information gathered prior to or subsequent to the inspection from a review of USEPA, State, and public records may be included in this report.
After opening introductions, we went over the inspection plan for the day. I asked if there were any questions. The Manager had no questions.
Facility/Site Description
I began by asking about the Facility information provided in the latest NPDES permit. The Manager confirmed the following (Manager responses are in italics):
There are three influent pumps that send the water to a 2mm fine screen. Correct an automatic sampler is located in between the pumps and drum screen. Correct Wastewater is then gravity fed into one of two membrane bioreactor (MBR) units. Correct. Collection
system is all gravity. The water is then pumped through the three chambers located in the MBR unit where Aluminum Sulfate
is added for phosphorus removal. Correct. Mixed liquor is then pumped into the filter unit located at the head of the MBR where it is filtered out at
approximately 75 gallons per minute. Correct. (50-75 gpm) Treated water then flows through a UV disinfection unit where an automatic sampler is located. Correct. Water can be diverted into ponds around the building and/or has the option of discharging through
Outfall 001 (Lat: 43.921478; Long: -83.906254) to an unnamed tributary to Saginaw Bay of Lake Huron. Correct. The plant has a design flow of 0.4 million gallons per day (mgd). At this time, the plant only processes approximately .025 mgd with an average of 1500 gallons of sludge wasted. Now up to about 0.058 mgd. The sludge is wasted from the filter area of the MBR with storage tanks located outside. The sludge is allowed to settle and the decant is brought back into the headworks. We try to decant as best as possible, return to head of the plant influent wet well. The sludge is ultimately taken to the Saginaw Chippewa Indian Tribe of Michigan's Isabella Reservation WWTP for treatment followed by land application. Correct, but currently looking to haul to City of Bay City. Any lift stations? One lift station at the head of the plant. Is a copy of the current permit onsite? Yes.
2 of 92
SAGANING WWTP Inspection Date:
08/25/2022
Facility/Site Information Responses below provided by the Manager.
Responsible official WWTP Design Capacity & Average Daily Flow WWTP Approx. # of residents served
Contributing (or shared) Jurisdictions Outfalls: (and do the numbers, locations, and receiving waters match the permit?) Operation schedule (days of operation, # shifts/day, # operators/shift, coverage overnight, weekends & emergencies), and is staffing sufficient for proper operation? Do you use in-house or contract out for laboratory analyses? (including for metals or WET testing?) Do you accept waste from septage haulers? If so, what problems have you experienced? Is there currently any portion of the treatment train that is non-operational?
Are there any plans for renovation or additional equipment to allow for increased wastewater flow?
Any CBI concerns?
Jonas Wilcox Max 0.4 mgd, avg 0.05-0.06 mgd since hotel added 2019 Casino, campground, tribal center, laundry warehouse, no residential No 001, unnamed tributary, ("private ditch") to the bay.
7am-5pm, 5 days/week; weekends one operator 8am1pm; one certified wastewater operator (Jonas Wilcox)
In-house TSS , BOD, ammonia, Phosphorus, E.coli. mercury and any additional metals sent to outside lab No
One composite effluent composite sampler is down. They have one composite sampler for each of the two MBR units Phase 1 - October will add bypass to wet well for cleaning; Phase 2 - add another MBR and new EQ basin, add mixers in sludge tank, possible sludge treatment. Phase 2 estimated for 2024 Manager not aware of any CBI concerns
Inspection Units
Unit/Area
DMR Review Other Permit Reports Flow Measurement Self Monitoring Operations and Maintenance Sanitary Sewer Overflows Records Review Wastewater Treatment Plant Components Laboratory Headworks MBR Ultraviolet ("UV") Disinfection Outfall Chemical Room Generator SCADA
Description Interview questions and observations
Physical inspection
3 of 92
SAGANING WWTP Inspection Date:
08/25/2022
SECTION II - OBSERVATIONS Observations may not be in sequential order. Unit: Interview/DMR Review Observation #: DM1-OB-001
Contains CBI: No Date: 08/25/2022
According to NetDMR, no monthly discharge monitoring reports ("DMRs") have been submitted to EPA for the Saganing WWTP since September 2020. On May 18, I sent an email to the Manager asking to please submit all late DMRs as soon as possible. The Manager said he will try to submit the overdue DMRs by the end of the week after the inspection. In lieu of DMRs, I asked for copies of the last six months of sampling reports. The Manager provided copies of monthly sampling reports for January thru July 2022.
Unit: Interview/Other Permit Reports Observation #: DM1-OB-002
Contains CBI: No Date: 08/25/2022
We reviewed non-DMR Permit reporting. The Manager provided the responses below.
1) Pollutant Minimization Program for Mercury Status Report due by January 31, each year (Part l.A.4). Status: The Manager was not aware of submitting the Mercury Status Report by January 31, 2022.
2) Operation and Maintenance Plan Report due by January 31, each year (Part I.A.7.b). Status: The Manager was not aware of submitting the O&M Report by January 31, 2022.
3) Sewage Sludge Removal Report by January 31, each year (Part I.C). Status: The Manager was not aware of submitting Sewage Sludge Removal Report by January 31, 2022.
4) As a condition of this permit, the permittee shall monitor the discharge from monitoring point 001 for the constituents listed below. Testing shall be conducted in September 2020, March 2021, May 2022 and July 2023. Status: The Manager said they probably haven't collected additional samples per this requirement.
Total Kjeldahl Nitrogen (TKN) Total Dissolved Solids (TDS) Nitrate plus Nitrite Nitrogen Oil and Grease
The Manager confirmed that records and reports are maintained for at least 3 years.
Unit: Interview/Flow Measurement
Contains CBI: No
Observation #: DM1-OB-003
Date: 08/25/2022
The Manager answered the following flow measurement questions (responses in italics):
1) How do you measure daily influent and effluent flow (Permit Part I.1 and I.2)? Influent flow is measured by a mag meter; effluent flow is measured by a mag meter after each of the two MBR units.
2) Are influent and effluent flow measuring devices professionally calibrated, at least once per year? (40CFR122.41(e). Yes, they are calibrated every year. However, the last calibration was at the end of 2020, due to COVID. The Manager hopes to reschedule calibration for October 2022.
4 of 92
SAGANING WWTP Inspection Date:
08/25/2022
3) Do facility personnel check the calibration of the flow measuring device(s), between the annual professional calibrations, at least three times per year? (Recommendation only) If no, explain frequency. No.
Unit: Interview/Self Monitoring Observation #: DM1-OB-004
Contains CBI: No Date: 08/25/2022
Unless noted otherwise, the Manager provided the responses (in italics) to the self-monitoring questions below:
Are the influent and effluent sampling locations as specified in permit representative of the waste stream? Influent samples are collected at the head of plant at the pump control room. Effluent samples are collected after each of the MBR units. One autosampler (MBR #2) is out of service (approximately 1.5 years). Currently, for compliance sampling they collect composite samples from MBR #1 and grab samples from MBR #2. Stacy Ancel added that for DMR reporting for effluent parameters requiring 24-composite samples, they use only composite samples from MBR #1, which has the only working composite sampler. Required effluent grab samples are collected from one MBR train or the other on any given day. They usually alternate.
Conduct sampling and analysis in frequency specified by permit? Yes.
Are the correct effluent sample types (grab or composite) taken? Not currently, they cannot collect composite samples from MBR #2.
If composite samples are required, are they flow proportioned (note permit allows time or volume flow proportioning)? flow proportioned.
Are composite samples cooled to <4C to properly preserve them during the compositing period? Composite samplers are refrigerated.
a) If the composite sample is cooled with ice or gel packs, do you measure the final composite sample temperature to make sure that the cooling is sufficient? Yes.
b) Do you record these results? The facility does not keep logs of temperatures within each composite sampler.
If a refrigerator is used for preserving composite samples, is there a thermometer in the refrigerator? Yes, and they maintain a temperature log.
Are all grab samples cooled with ice, gel packs or refrigerated to <6 C from the time of collection until analysis including shipping time, if applicable? E.coli - 100ml sterile container, sample collected right from container. Samples are processed immediately so no need for cooling.
Are all samples which require preservation properly preserved? Most samples analyzed immediately, so no need. Unless they are samples sent out to lab, then yes.
Are pH and DO readings collected within 15 minutes of sample collection and is this documented? Samples are collected and analyzed in the on-site laboratory within 15 minutes.
I commented about the consistent record of 0 E.coli/100ml for effluent samples. Stacy Ancel said they also consistently measure "0" E.coli/100ml before UV disinfection. I asked if they could collect an E.coli sample preMBR, just to confirm that their E.coli laboratory analysis procedures are able to detect E.coli. Stacy Ancel agreed to collect the sample and provide the results.
5 of 92
SAGANING WWTP Inspection Date:
08/25/2022
Unit: Interview/Operations and Maintenance Observation #: DM1-OB-005
Contains CBI: No Date: 08/25/2022
The Manager answered (in italics) the following O&M-related questions:
Maintenance record system exists and include: a. As-built drawings - yes b. Shop drawings -yes c. Construction specifications- yes d. Maintenance history- daily log book. No other maintenance tracking. e. Repair history- also daily log book. Each MBR has a maintenance record. f. Records of equipment repair and timely return to service - no g. instruction files for operation and maintenance of each item of major equipment. Yes. h. Operation and maintenance manual is available? Other than manufacturers manuals, they are working on a comprehensive O&M plan.
Does the facility have an adequate, qualified operating staff to carry out the operations at the facility? The Manager is the only certified wastewater operator (Class C&D, Michigan). The two other non-certified operators are trying to work on wastewater certificates. According to the Manager, they could use "2 or 3 more wastewater operators" to help stay on top of maintenance, recordkeeping, and reporting requirements.
Operators conduct settleability tests 3x/week, and they need to get back to daily testing. They collect samples from mixed liquor after the MBR bio tank and filters.
Any Bypasses over the last three years? No bypasses.
Does the wastewater treatment facility have an alarm system for all essential equipment? Yes, they have a Sensaphone application that alerts operators if generator runs, influent is high level, or MBR is high level. Alarm capability will be upgraded with a new SCADA system (approx. 2023).
Are alarms sent to qualified personnel who can respond immediately to remedy the problem? Yes, alarm sent in series and to all operators.
Does the facility maintain written procedures for responding to emergencies such as power failures, floods, fires, and other natural disasters? Yes, follow an emergency plan.
Is a logbook kept which documents all plant activities on a daily basis? Yes.
Does the facility maintain an inventory of spare parts, either at the facility or close by, sufficient to keep all of its treatment units operational? Not currently, but working on it.
Does the facility have standby power for all treatment units? ((40CFR122.41(e). Yes
Is the standby power regularly exercised under load? ((40CFR122.41(e). Yes, monthly. Diesel generator.
The Manager provided copies of the MBR Maintenance Procedure Plan, and the Saganing Water and Wastewater Improvements presentation (see Appendix 2, Inspection Documents).
Document(s)
6 of 92
SAGANING WWTP Inspection Date:
08/25/2022
1. Pages from Saganing Inspection_Records Received_OM Records.pdf
Unit: Interview/Sanitary Sewer Overflows Observation #: DM1-OB-006
Contains CBI: No Date: 08/25/2022
I asked if there had been any backups or overflows in the sanitary sewer collection system, including pump stations, manholes and piping over the last three years? The Manager said that they have not experienced any backups or overflows in the collection system.
Unit: Physical Inspection/Laboratory Observation #: DM1-OB-007
Contains CBI: No Date: 08/25/2022
We began the physical inspection of the Facility at 12:05 pm ET. We started in the laboratory. Stacy Ancel and Cory Berk represented the Facility to start the lab inspection. The Manager arrived shortly after we began.
I asked Stacy Ancel to review the sample analysis procedures for E.coli, BOD, Ammonia, Phosphorus, pH, and TSS. Some observations are provided below:
E.coli: I noted that one of the E.coli M-Coliblue 24 sample broths was expired (5/31/2019). Some of the MColiblue 24 sample broth packages were still within expiration dates.
Facility representatives could not locate the written procedure currently used for E.coli analysis.
I noted several instances where "dates received" and "dates opened" were left blank on opened laboratory chemical and standards containers.
Before concluding the laboratory review, I asked for copies of the SOPs for Phosphorus and Ammonia-Nitrogen analyses (see Appendix 2, Inspection Documents). I also received copies of a lab equipment list and an analytical methods summary (see Appendix 2, Inspection Documents).
Document(s): Saganing Inspection_Records Received_Lab SOPs_EquipList_Methods.pdf
Unit: Physical Inspection/Headworks Observation #: DM1-OB-008
Contains CBI: No Date: 08/25/2022
The Manager led the tour of the wastewater plant, along with Cody Berk. We started at the influent wet well (see Photo Log image SAGA0100). The influent wet well has a basket/rag screen at the bottom of the rail (see Photo Log image SAGA0101). The Manager pointed out where the sludge decant flows returned to the influent wet well and noted that they estimate the amount of return flows and subtract from influent flow totals to avoid double counting of flows. We then entered the treatment plant building and stopped in the influent room to observe the influent flow meter (see Photo Log image SAGA0102) and ISCO influent composite sampler. I noted a thermometer in the ISCO sampler (see Photo Log image SAGA0103).
Next we entered the fine screen room and observed the twin fine screen units (see Photo Log image SAGA0104). The Manager said the fine screens are working well.
7 of 92
SAGANING WWTP Inspection Date:
08/25/2022
Photo(s) 1. SAGA0101.JPG 2. SAGA0102.JPG 3. SAGA0103.JPG 4. SAGA0100.JPG 5. SAGA0104.JPG
Unit: Physical Inspection/MBR
Observation #: DM1-OB-009
Contains CBI: No Date: 08/25/2022
We observed the twin MBR units from the upstairs balcony (see Photo Log image SAGA0105). The Manager explained that flows go from the fine screens and split to each of the two MBR units, MBR #1 and MBR #2. Each MBR unit has three tanks (aerated anoxic 1, aerated anoxic 2, and aerobic). From the tanks, flows go to the MBR membrane units. Each MBR membrane unit consists of two tanks, each with four racks. Each rack has five filters. So each MBR membrane unit has a total of 40 membrane filters. The inside of one of the tanks is shown in Photo Log image SAGA0106. We walked down to floor level and observed the MBR control panel and screen (see Photo Log image SAGA0107). Last, I observed the composite sampler for MBR #2, which is currently out of service (see Photo Log image SAGA0108). The Manager showed us the port where they are currently collecting grab samples in lieu of composite samples for the MBR #2 treatment train.
Photo(s) 1. SAGA0106.JPG 2. SAGA0107.JPG 3. SAGA0108.JPG 4. SAGA0105.JPG
Unit: Physical Inspection/UV
Observation #: DM1-OB-010
Contains CBI: No Date: 08/25/2022
I observed the ultraviolet light (UV) disinfection units for MBR #1 (see Photo Log image SAGA0109), and MBR #2 (see Photo Log image SAGA0110).
Photo(s) 1. SAGA0110.JPG 2. SAGA0109.JPG
Unit: Physical Inspection/Outfall
Contains CBI: No
Observation #: DM1-OB-011
Date: 08/25/2022
After viewing the UV systems, we left the building and headed to final outfall 001. First, we stopped at the manhole used to control the direction of treated flow to the ponds or the final outfall (see Photo Log image SAGA0111). At the time of the inspection, treated flows in the manhole were clear and were directed to the final outfall. We then walked to final outfall 001, where I observed a turbid discharge into the receiving water (see Photo Log image SAGA0112). The Manager attributed the turbidity to muskrat activity within outfall piping.
8 of 92
SAGANING WWTP Inspection Date:
08/25/2022
He said they will install a screen to keep muskrats from entering the outfall. Before leaving the outfall, I recorded the coordinates 4355'17"N; 8354'23"W.
Photo(s) 1. SAGA0112.JPG 2. SAGA0111.JPG
Unit: Physical Inspection/Chemical Room
Observation #: DM1-OB-012
Contains CBI: No Date: 08/25/2022
We returned to the treatment building and viewed the Chemical Room. I observed the areas where MBR cleaning chemical are stored, including the sodium hypochlorite area (see Photo Log image SAGA0113), and 50% citric acid area (see Photo Log image SAGA0114). I also observed the aluminum sulfate storage area (see Photo Log image SAGA0115). Aluminum sulfate is used for phosphorus removal.
I asked about the cleaning schedule for the MBR units. The Manager explained that each MBR is cleaned with chlorine once every two weeks, and with citric acid once a month.
Photo(s) 1. SAGA0114.JPG 2. SAGA0115.JPG 3. SAGA0113.JPG
Unit: Physical Inspection/Generator
Observation #: DM1-OB-013
Contains CBI: No Date: 08/25/2022
I observed the diesel Caterpillar generator which provides backup power for the Facility (see Photo Log image SAGA0116).
Photo(s) 1. SAGA0116.JPG
Unit: Physical Inspection/SCADA Observation #: DM1-OB-014
Contains CBI: No Date: 08/25/2022
Before concluding the physical inspection we stopped in the office and viewed the wastewater SCADA system display. See Photo Log image SAGA0117 of the SCADA totalizer screen.
We concluded the physical inspection and returned to the conference room to review our notes prior to the closing conference.
Photo(s) 1. SAGA0117.JPG
9 of 92
SAGANING WWTP Inspection Date:
08/25/2022
SECTION III - RECORDS REVIEW
Record: Laboratory Analysis Reports Ref #: DM1-RR-001 Reviewed By: Dean Maraldo
AOC: No Reviewed Date: 08/25/2022
We reviewed Lab Analysis Reports for January - July 2022. No issues were identified. The reports are included in Appendix 2 (Inspection Documents).
Document(s)
1. Saganing Inspection_Records Received_Lab Reports.pdf
Record: Facility Map
AOC: No
Ref #: DM1-RR-002 Reviewed By: Dean Maraldo
Reviewed Date: 08/25/2022
The map below is included in Appendix 2 (Inspection Documents).
Area Topo Map Document(s)
1. Saganing Inspection_Records Received_Facility Map.pdf Record: Other - Wastewater Improvement Plan Ref #: DM1-RR-003 Reviewed By: Dean Maraldo
AOC: No Reviewed Date: 08/25/2022
The Wastewater Improvement Plan is included in Appendix 2 (Inspection Documents).
Document(s) 1. Saganing Inspection_Records Received_WW Improvement Plan.pdf
Record: Process Description/Flow Diagram Ref #: DM1-RR-004 Reviewed By: Dean Maraldo
AOC: No Reviewed Date: 08/25/2022
The maps and diagrams below are included in Appendix 2 (Inspection Documents).
Flow schematic of Saganing WWTP Saganing District Sanitation Map (2) Saganing WWTP discharge map Saganing WWTP Piping Plans (2) Document(s) 1. Saganing Inspection_Records Received_Schematics_flow.pdf
SECTION IV - SAMPLING ACTIVITIES AND ANALYTICAL RESULTS No sampling was conducted.
SECTION V - AREAS OF CONCERN Areas of Concern may not be in sequential order. The presentation of areas of concern does not constitute a formal compliance determination or violation.
10 of 92
SAGANING WWTP Inspection Date:
08/25/2022
Unit: Interview DM1-OB-001
Area: DMR Review
According to NetDMR, and confirmed by the Manager, no monthly discharge monitoring reports have been submitted to EPA for the Saganing WWTP since September 2020.
Unit: Interview DM1-OB-002
Citations: Permit Part I.A.6 Area: Other Permit Reports
As a condition of this permit, the permittee shall monitor the discharge Citations: Permit Part I.A.3.b from monitoring point 001 for the constituents listed below. Testing shall be conducted in September 2020, March 2021, May 2022 and July 2023. The Manager said they probably haven't collected additional samples per this requirement.
Total Kjeldahl Nitrogen (TKN) Total Dissolved Solids (TDS) Nitrate plus Nitrite Nitrogen Oil and Grease
The Manager was not aware of submitting a Sewage Sludge Removal Citations: Permit Part I.C Report by January 31, 2022.
The Manager was not aware of submitting a Mercury Status Report by Citations: Permit Part I.A.1 January 31, 2022.
The Manager was not aware of submitting an Operation and Maintenance Plan Report by January 31, 2022.
Unit: Interview DM1-OB-003
Citations: Permit Part I.A.7.b Area: Flow Measurement
Influent and effluent flow measuring devices are usually professionally Citations: 40 CFR Part 122.41(e) calibrated at least once per year. However, the last calibration was at the end of 2020, due to COVID. The Manager hopes to reschedule calibration for October 2022.
Unit: Interview DM1-OB-004
Area: Self Monitoring
The Facility does not keep logs of temperatures within each composite
sampler.
Citations: 40 CFR Part 136
11 of 92
SAGANING WWTP Inspection Date:
08/25/2022
Effluent samples are collected after each of the MBR units. One autosampler (MBR #2) is out of service (approximately 1.5 years). Currently, for compliance sampling they collect composite samples from MBR #1 and grab samples from MBR #2. Stacy Ancel explained that they only use composite samples from MBR #1 for DMR reporting for effluent parameters requiring 24-composite samples.
Citations: Permit Part I.A.1; Permit Part I.A.7
Unit: Interview DM1-OB-005
Area: Operations and Maintenance
The Facility does not maintain an inventory of spare parts sufficient to Citations: 40 CFR Part 122.41(e);
keep all of its treatment units operational.
Permit Part I.A.7.a.G
The Manager said they could use "2 or 3 more wastewater operators" Citations: Permit Part I.A.7.a.B to help stay on top of maintenance, recordkeeping, and reporting requirements.
Unit: Physical Inspection DM1-OB-007
Area: Laboratory
I noted that one of the E.coli M-Coliblue 24 sample broths was expired Citations: 40 CFR Part 136; Permit
(5/31/2019).
Part II.B.1
Facility representatives could not locate the written procedure currently used for E.coli analysis.
Citations: 40 CFR Part 136; Permit Part II.B.1
I noted several instances where "dates received" and "dates opened" were left blank on opened laboratory chemical and standards containers.
Citations: 40 CFR Part 136; Permit Part II.B.1
Unit: Physical Inspection DM1-OB-011
Area: Outfall
I observed a turbid discharge from final outfall 001 into the receiving water (see Photo Log image SAGA0112). The Manager attributed the turbidity to muskrat activity within outfall piping.
Citations: Permit Part I.A.1.a
SECTION VI - CLOSING CONFERENCE AND FOLLOW UP
Closing Conference I held the inspection closing conference with Facility personnel at 02:15 PM (ET) on 08/25/2022. During the closing conference, I discussed the observations and potential Areas of Concern identified during the inspection. Observations and Areas of Concern have not yet been evaluated for a formal compliance determination.
12 of 92
SAGANING WWTP Inspection Date:
08/25/2022
Next, I reviewed records received during the inspection, including:
1) Area Topo Map 2) Flow schematic of Saganing WWTP 3) Saganing District Sanitation Map (2) 4) Saganing WWTP discharge map 5) Saganing WWTP Piping Plans (2) 6) Wastewater Improvement Plan 7) Lab Instrument list 8) Lab Methods 9) MBR O&M Procedures 10) Plant influent and effluent sheets - Jan-July 2022 11) Saganing Water and Wastewater Improvements Presentation 12) Hach SOPs sheets for Nitrogen-ammonia and Phosphorus
Copies of the above records are included in Appendix 2 of this report.
There was one follow-up item. I asked that they collect an E.coli sample pre-MBR, just to confirm that their E.coli laboratory analysis procedures are able to detect E.coli. Stacy Ancel agreed to collect the sample and provide the results.
Before concluding, I asked if there were any questions. The Manager asked if we observed any safety concerns. I replied that we did not observe any safety issues.
I provided a timeframe for completing the inspection report and we concluded the inspection.
Communication Log
No additional information was received by EPA after exiting the Facility on 08/25/2022.
SECTION VII - LIST OF APPENDICES
1. Photo Log 2. Inspection Documents
13 of 92
SAGANING WWTP Inspection Date:
Influent wet well SAGA0100.JPG 08/25/2022 12:35 PM (ET) Dean Maraldo Physical Inspection/Headworks No CBI No PII
APPENDIX 1: PHOTOLOG
Influent wet well SAGA0101.JPG 08/25/2022 12:35 PM (ET) Dean Maraldo Physical Inspection/Headworks No CBI No PII Note basket/rag screen at bottom of rails.
Influent flow meter SAGA0102.JPG 08/25/2022 12:38 PM (ET) Dean Maraldo Physical Inspection/Headworks No CBI No PII
14 of 92
08/25/2022
SAGANING WWTP Inspection Date: Influent Autosampler (ISCO) SAGA0103.JPG 08/25/2022 12:39 PM (ET) Dean Maraldo Physical Inspection/Headworks No CBI No PII Note, thermometer located inside unit.
Twin fine screens SAGA0104.JPG 08/25/2022 12:45 PM (ET) Dean Maraldo Physical Inspection/Headworks No CBI No PII
View of MBR units SAGA0105.JPG 08/25/2022 12:42 PM (ET) Dean Maraldo Physical Inspection/MBR No CBI No PII
15 of 92
08/25/2022
SAGANING WWTP Inspection Date: View of MBR Tank SAGA0106.JPG 08/25/2022 12:48 PM (ET) Dean Maraldo Physical Inspection/MBR No CBI No PII
MBR control screen SAGA0107.JPG 08/25/2022 12:50 PM (ET) Dean Maraldo Physical Inspection/MBR No CBI No PII
Effluent Autosampler SAGA0108.JPG 08/25/2022 12:52 PM (ET) Dean Maraldo Physical Inspection/MBR No CBI No PII
16 of 92
08/25/2022
SAGANING WWTP Inspection Date: MBR#1 UV system SAGA0109.JPG 08/25/2022 12:54 PM (ET) Dean Maraldo Physical Inspection/UV No CBI No PII
MBR#2 UV system SAGA0110.JPG 08/25/2022 12:56 PM (ET) Dean Maraldo Physical Inspection/UV No CBI No PII
Manhole with access to pond/outfall flow controls SAGA0111.JPG 08/25/2022 12:58 PM (ET) Dean Maraldo Physical Inspection/Outfall No CBI No PII
17 of 92
08/25/2022
SAGANING WWTP Inspection Date: Final outfall 001 SAGA0112.JPG 08/25/2022 1:03 PM (ET) Dean Maraldo Physical Inspection/Outfall No CBI No PII Note turbid discharge.
Sodium hypochlorite area SAGA0113.JPG 08/25/2022 1:08 PM (ET) Dean Maraldo Physical Inspection/Chemical Room No CBI No PII
50% citric acid area SAGA0114.JPG 08/25/2022 1:09 PM (ET) Dean Maraldo Physical Inspection/Chemical Room No CBI No PII
18 of 92
08/25/2022
SAGANING WWTP Inspection Date: Aluminum sulfate storage area SAGA0115.JPG 08/25/2022 1:09 PM (ET) Dean Maraldo Physical Inspection/Chemical Room No CBI No PII
Facility backup generator (Diesel) SAGA0116.JPG 08/25/2022 1:11 PM (ET) Dean Maraldo Physical Inspection/Generator No CBI No PII
WWTP SCADA Totalizer Screen SAGA0117.JPG 08/25/2022 1:17 PM (ET) Dean Maraldo Physical Inspection/SCADA No CBI No PII
19 of 92
08/25/2022
SAGANING WWTP Inspection Date:
08/25/2022
APPENDIX 2: INSPECTION DOCUMENTS (attached below)
Document Type Document Name
Contains Contains Date Received
CBI
PII
Process Description/Flow Diagram
Saganing Inspection_Records Received_Schematics_flow.pdf
No
No
08/25/2022
Facility Map
Saganing Inspection_Records Received_Facility Map.pdf
No
No
08/25/2022
Laboratory Analysis Reports
Saganing Inspection_Records Received_Lab Reports.pdf
No
No
08/25/2022
Other -
Saganing Inspection_Records
No
No
08/25/2022
Wastewater
Received_WW Improvement Plan.pdf
Improvement Plan
Facility SOPs
Pages from Saganing Inspection_Records No Received_OM Records.pdf
No
08/25/2022
Laboratory SOPs Saganing Inspection_Records
No
No
08/25/2022
Received_LabSOPs_EquipList_Methods.pdf
20 of 92
TTTT
I;
-c
I Ii/tpt .
LJ4 -
-
_____\ \ ,
\
'/
\
'
-
-
1-
'
E-'
E
41
[Ti! H> i;--
1:
-
-
L
IL
/,
jk V'f 01
I
IJ
-7i--- T
--
.$)$
I
.
+
)
-_--
\/* t4
-
Saganing WWTP Inspection Report Appendix 2
page 21 of 92
L
'
?
6
IA
LL ;-.;_r. -3.
-
-
/:
-
/
a
I __
SIEMENS
Industry, Inc.
The diagram below depicts the overall flow scheme for the Saganing WWTP:
Biological Blower
Membrane Air Scour Blower
Recirculation Pump
Saganing WWTP- FDS Saganing WWTP Inspection Report Appendix 2
14 of 67
page 22 of 92
(T
fluent WAS
-
-
___________________
______________________________
N
SCIT Sanin.g District Sanitation
-
----.
'-'T
2
\-
n
-
/1 /Tur tJL1
(p1
rt1Tr1
is-
______
___JT
.-
-
' \ T.
_________________
Buildings
o Sewer-Cleanout I
Catch Basins Sewer Manholes -Storm Mains -Sewer Mains
- Rivers & Drains
rL,itCiLi
:.
- -----
pc Q4r i7 2
I
Ste
\
4k-
--
),
.
I
jk
_.
I
- --
T1
ir --'
-
-
rJ
fs
__
jt
t
,.
I;
.
+
A
I
...
-
L Fiue
-
-
_________
1 -H-Y1 -J
. .
,f
\
J
.
,
'
u-.--
j
.5 1,
tL
L
----
..
I
.
.
-.-
Saganing WWTP Inspection Report Appendix 2
.
page 23 of 92
Source SCIT GIS :2O22
IPPe
SCIT Saganing District Sanitation
OF
Sagring
White BabhRid
Saganing Casino
Resort
I
(I)
\3 lklkl 0)
Li
a
/
Community
Center
lrrlg0n. pump house StoraBarn
V3aehouse
Storage Barn
Sanitation Station
-
Whites
0)
Worth Road
Bull dings c Sewer Cleanout
Catch Basins Sewer Manholes -Storm Mains -Sewer Mains - Rivers & Drains Ditch River_LaksPoly Ponds
Saganing WWTP Inspection Report Appendix 2
-
page 24 of 92
r:se 'ff1
Cl r_1D L
L. ri
Source SCIT GIS :2O2 I
Saganing WWTP Inspection Report Appendix 2
page 25 of 92
Docu me ci Path: F 'P rol actaiS aga ningiSaga flingWrPDacha ng a mc
-rf [C01AN08 r.SCAtEi 210
j
-
6V80&00.t ._FrEiaLi I ___
10
TANY
1- El
S2nUH-i 6 Elk
N 0 I
82V1N50165
_______
6 NV 10:583.00
SW 00060-3
-
_
-.
.11'i'
6flRM58JjH
_____________________________________
II
a!
//
-fl 4 Dlk
20010572.70
o
2 NV DiV 575.60
81-10 8 118. Ni 585.57
2 IWO IN: 030.00
.::2..a
2.T 2
MANHOLE DROP PIPE DETAIL
100000
00
U A
'
1,
-
/
.
\\
__________
-a
I'II IIijLaa2ao
___
I
FAGUTY AREA
___
[fj
w.0itwA1
I j
1Rttz
855.0100 82258 100560.13 I'
_
_
,a 6601685
;:- --
___
2002 7///
/
/
\
r_____________ 0.620006662001 6H
6000 6621000 0666005396
;5f8LET T0-40kJ? l 'M, AND EKTM.S
-
.
.
-;v
10
;- ii
..l .. /
___
II -
/t
______-
\.\
K'/
O7E
-
-. -=-
raDio
/i J2YAI.00 J
I .-2 NO IN: 082.20
-' h2 160 06312 582101
jjj582.I4 rcA1EvAt85.688 rItz
II
I
0610
I
ii
I
PEElS 01.058010 .-I 4 VIA.
SLUDGE TANK PLAN VIEW
INV Ni 583.20
INV OUT: 583.1oil
102.00
(822-106600002
1
I
I
I
'CFIUCVJLSS
91 I
58 8 ___ 026b g
ZO
6326
nil
dEItz:aiir
isw00.36
500 231010
_________
6DI
Wa+'
I
-
L.
00010600
cI)
LU
-O
-
L)
------------
I
h
PLN6 66800 5-1
AS CONSTRUCTED
TELE500PII2O VALVE DETAI
s--- 002060 U
100 20226 0666010
SLUDGE TANK SECI100AL ViEW
SCALE
FILNU63005
WW-0026
SHEET SUM 005
0.2
Saganing WWTP Inspection Report Appendix 2
page 26 of 92
r,-ri
SCLE 2
-
-
-
-'-
-I dNS h "tasAMTMy
j_.'
YB\ \ J
I
\
\
___
M4-I r 01k
_, .
-
(1I ti*:y :f 2/lL\iV it / 7' /
_________
/
-
?
.
'.- /01 /(
A,'>.>
A
- 4;.
4
0
;.;-;-?
0T I
II ,
Tl /4JIVi I
L VlI =1
1iffi
- L--ILO
I
'
1801 1811011
01011180
WAIU1 WI0010II08T FAIJW 0EA
.......8
ii in 7L _-'l -.-- I
18808
/
-//->-
8o1E 00011011
7' 1.',':'
4
'I,;,o ,":/:: /
S
..,,A,
:k
='-
--
_______
FWUOZ 0I18I010 LEA
./,A ;.'-,
/.,/V/Y.' ;' .' .
f"A,'' /(J'/,',/ '
/ I
I
/
/
I
..
_______
--
v-o I F-.i
1101 00T110,S I
:
_______
/f114 0111,
r81-i0 6' 0111. 0807 010100 000.00 _, 2 01101 111J0111 075
____
row ii, Eo2o
188;l:
r, ,
MANHOLE DROP PIPE DETAIL
180808
08
'
'
'-,o,ovo,.
:JL1HI
'1!
____________
____
01
01
K _________
8%
011118
I
,.-ow 000115
I
0-001 10810
-
AS CONSTRUCTED
III!I
--
1flESC08INC VALVE wTA'I
rCO t
I-'
-""-'S-
SWDGETAIJKSECIIOOLVL18EW
0101011
011011118010 WN-OI8 SICETIIA1200
_______
Saganing WWTP Inspection Report Appendix 2
page 27 of 92
Saganing Wastewater Improvement Plan Developed by Fishbeck (ftch) Engineering
9- 17-20
To: Mr. Dean Maraldo Water Enforcement and Compliance Assurance Branch U.S. EPA - Region 5
Wastewater Treatment System Improvements
The following improvements to the wastewater treatment system are recommended to increase capacity and improve reliability to handle current wastewater flow from existing Tribal operations and projected future wastewater flow from the Standish Township Whites Beach Service Area (WBSA). The recommended wastewater treatment improvements presented in the study are as follows. SCIT Tribal Council and Tribal Administration has committed to developing these ftch recommendations. Ftch expects to complete the WWTP improvement design by 9-30-22. Finally, SCIT has an agreement with Kennedy Industries for headwork's pump replacement those improvements should be completed soon.
Influent Pumping Station/Screen Building
Provide an odor control system at the location of the onsite WBSA junction manhole. Install a new bar screen or influent chopper pumps to handle excessive solids and rags in the influent
wastewater.
Replace the combustible gas detection system in the Screen Building.
Influent Equalization
Construct a new 100,000-gallon above grade equalization tank. Fishbeck will consider steel versus concrete and present advantages of each alternative.
MBR System
Add a third EVOQUA Xpress membrane bioreactor (MBR) unit. Install overflow pipes on bioreactor tanks and route to equalization tank.
Effluent Discharge and Disinfection System
Install a new effluent sampler on common effluent discharge piping from all MBR systems. Install redundant ultraviolet (UV) disinfection units on each MBR system, or provide a centralized UV disinfection system with an appropriate level of redundancy.
Biosolids Storage and Treatment
Evaluate biosolids stabilization systems and current biosolids storage capacity. Design the selected biosolids stabilization system.
Remote Monitoring System
Provide a SCADA system to be able to remotely monitor and control lift stations. Upgrade the WWTP SCADA system to include remote monitoring and control capabilities, and an alarm callout system.
Saganing WWTP Inspection Report Appendix 2
page 28 of 92
furnace autoclave refrigerator dessicator spectrophotometer oven scale pH probe D.O. probe Ambient Chamber Water Bath Flow Meter Influent Flow Meter Effluent
manual manual manual manual manual manual manual manual manual manual manual manual manual
fl
Thermo Scientific Thermolyne FB1415M 10-6226-D 230-250 F 0-30 psi Da nby Designer Bel-Art Secador Scienceware 8255 Hach DR3900 2020513 Fisher Isotemp 151030503 Ohaus Adventurer-Pro AV264 B033141159 Orion 81O2BNUWP Thermo Fisher Optical RDO Fisher Isotemp 3720 Incubator Fisher Isotemp 205 Water Master Hart fex 100 ABB FET1211AOY1B1A
Magflo Mag 5000/ Siemens Sitrans F M MAG 3100
Saganing WWTP Inspection Report Appendix 2
page 29 of 92
L\
p41
CI
p4
I
I5C I
Uichi Qglfr(e ctd ia ____
_________
'1dLL2 9fl hffL5'o C I U? )
mp c
I
--
V
IiLiikj +(1C}flC
(V?'oqU1
ph'iru VT
4.
0
1LO \
5Q I
crtd
_____________________________
JOZ9
'7-
coL' iu 2 4 i 1 U -
()
_____
Saganing WWTP Inspection Report Appendix 2
page 30 of 92
SIEMENS
SECTION 6: MAINTENANCE PROCEDURES
,...
The maintenance procedures for the Memjet Xpress are minimal. The following document details the maintenance procedures for the mechanical equipment as well as the membranes cleaning procedures and repair as required. The instructions and recommendations in this document are intended to assist the Plant Operator and Maintenance Personnel.
6.1
Summary of Maintenance Requirements
The following table gives a quick lookup of the maintenance requirements for major equipment and components of the Xpress Unit.
In11I111 [
11i
.IThtifli1
Re-grease bearings
-
Check Mechanical Seal
Record suction and charge
Pump
pressures (Pressure indicators)
1TI
_______ ________
14II lL1ili1
X ________
________
_________
LIT!T1 WT1t1
X _______
________
________
________
________
Blower
Check oil levels _______ Lubrication - fill the oil sump n
each end of the blower Check for hot spots - detected by observing_the_surface_of_the_casing _______ Check for changes in vibration &
noise _______
Record operating pressures and temperatures
X ________
________ _____
________
_________ _________
________
_______
_______
________ ________ ________
________ ________ ________
Re -grease bearings _______
________
________
Check oil levels -
_______
________
________
Screen Check nozzles for blockages _______
________
________
________
X
________
X
_______
X
Mixer
Monitor the current consumption ________ ________
Check power supply cable
insulation resistance
________
______
Visual inspection of power supply
cable
_______
________
Visual inspection of the cable holder
and the cable bracing
_______
________
Visual inspection of accessories,
e.g. lowering device, hoisting gears,
etc. ________
Oil check and oil change of sealing
chamber, if necessary
_____-
________
Functional inspection of the safety
and monitoring devices and
auxiliary hoisting gear
________
________
Coating check and touch-up as
required
_______
________
XPRESS MAINTENANCE PROCEDURE lOOK XPRESS
X
_________ _________ _________
________ ________
_________ ________
________
________
________
________
________
________
________
X
________
________ ________
________ __________________
________
x
_________________
Private and Confidential Page 1
Saganing WWTP Inspection Report Appendix 2
page 31 of 92
SIEMENS
.]Hi
Chemical
Dosing Pumps
_____________
Dissolved Oxygen Probe
____________
Turbidimeter
___________
Pressure Transmitters
The pump should be run with water for_one_minute
The tubing should be flushed out with water after every chemical
clean A visual check should be performed on the motor flange and the stroke
adjustment_knob_for_leaks. Clean sensor with a soft, wet cloth
Check sensor cap inspected for
damage
Calibrate probe Clean sensor with a soft, wet cloth
Calibrate sensor Check lamp assembly
Check calibration of instrument
___________________________________
IbIJL
________
________
________ ________
_______ _______ ________ ________ _______ ________
I1A!IIj IYr11iWJ [TTF111 V4.i1iiiiJ
x
________
X
________
_________
________ ________
________ ________ ________ ________ _______
________
_________ _________
_________ _________ _________ _________ ________
__________
X
________
X
x
________
________
X X
_______
________
_______
X
________ ________
X
x
Fine bubble diffusers
Membranes
____________
lnfluent/ Effluent
Quality
____________
Valves
_____________
Check aeration patterns Dewater and clean diffusers
_______
________
_________
X ________
AS REQUIRED - LONGER THAN ANNUAL
Check TMP, aeration & MLSS level
X _______
________
Check alarwmasrn- insghutdown & x
_______
________
________
Clean-in-Place
_______
________
________
Perform leak test
_______
________
________
lnfluent - BOD, TKN, NH3-N, TP,
TSS,_pH,_Alkanity,_Flow_rates _______
x
_______
________
Mixed Liquor - MLSS, SRT _______
X ________
Effluent - BaD, TN, TP, TSS,
Turbidity, other parameters required
X
for_permit
_______
________
_________
Manually stoke to ensure valves are
not sticking
________
________
__________
_______
_______
________ ________
X
________
________
X
_______ _______
_______ _______
________
_______
X
_________
________
For details of how to perform the preventive maintenance schedule see specific Vendor Literature.
XPRESS MAINTENANCE PROCEDURE lOOK XPRESS
Saganing WWTP Inspection Report Appendix 2
page 32 of 92
Private and confidential Page 2
______________________
-
Day
________
1
Type
2
3
4
5
snow
6
sunny
7
sunny
8
9
10
11
12
cloudy
13 cloudy
14
cloudy
15
16
17
18
19
p/c
20
p/c
21
sunny
22
23
24
25
26
clear
27
28
cloudy
29
30
31
Total
X
Avg.
X
Mm.
X
Max.
X
Weather
Saganing WWTP January 2022
_______ Plant_Influent_Sheet
Flow
Raw Sewage
Temp.
Precip.
Total Temp.
pH
DO
TSS
BOD
F
inches
MGD
C
S.U.
mg/L
mg/L
mg/L
30
0.02
0.053
17
0
0.058
19
0
0.056
21
0
0.056
37
0
0.051
16.5
7.7
6
68
308
23
0
0.05
15.9
7.6
6.3
50
374
0
0.07
0.05
16.2
7.7
7.8
41
224
15
0.01
0.056
30
0
0.06
11
0
0.054
7
0
0.057
35
0
0.054
15.8
7.6
6.7
95
160
32
0
0.061
16.4
7.5
7.1
96
21
0
0.072
16.6
7.7
7.4
161
172
22
0
0.069
46
0
0.061
31
0
0.057
29
0
0.059
37
0.01
0.061
16.9
7.6
7.6
99
191
20
0
0.061
16.8
7.6
7.6
31
160
15
0
0.062
16.6
8.1
8.2
47
145
21
0
0.063
14
0
0.06
20
0
0.061
7
0
0.056
2
0
0.059
17.7
6.9
7
114
241
18
0
0.052
15.2
7.7
8.1
31
151
10
0
0.056
15.1
7.7
8.1
70
152
2
0
0.059
14
0
0.066
25
0.01
0.061
X
0.12
1.811
X
X
X
X
X
20.35484 0.00387097 0.0584194 16.3083 7.61667 7.325 73.36363636 197.8333333
0
0
0.05
15.1
6.9
6
31
96
46
0.07
0.072
17.7
8.1
8.2
161
374
___________
CBOD mg/L
312 390 197
179 103 205
222 58 248
257 150 144
X 205.4166667
58 390
___________
TSS mg/L 7 Day Average
53
128
59 71.66666667 77.91666667
Saganing WWTP Inspection Report Appendix 2
page 33 of 92
-
-
-
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2.6 27 28 29 30 31
Total Avg. Mm. Max.
_____________
Weather
Type
Temp.
_______
0
F 30
0
17
0
19
0
21
snow
37
sunny
23
sunny
0
0
15
0
30
0
11
0
7
cloudy
35
cloudy
32
cloudy
21
0
22
0
46
0
31
0
29
p/c
37
p/c
20
sunny
15
0
21
0
14
0
20
0
7
clear
2
0
18
cloudy
10
0
2
0
14
0
25
X
X
X
20.35484
X
0
X
46
Saganing WWTP January 2022
Plant Effluent Sheet
_____
Flow Total
_______
Temp.
-
_______
pH
DO
Treated Sewage__________ ________
TSS
CBOD Ammonia
MGD
C
S.U. mg/L mg/L mg/L
mg/L
Phos mg/L
________
E.coli
ct/looml
0.065
_______
_______
-
_______
______
_______
_________
0.07
_______
-
_______
______
_______
_________
_______
0.067
_______
_______
-
_______
______
_______
_________
0.064
0 0 0 0
0.061
21.7
7.6
8.4
0.02
-1.06
0.06
0.11
0
0.062
17.6
7.4
8.3
0.06
-0.38
0.09
0.85
0
0.062
21.5
7.4
8.7
0.07
-0.21
0.08
0.62
0
0.078
_______
_______
-
_______
______
_______
_________
0
0.091
_______
-
_______
______
_______
_________
_______
0
0.092
_______
_______
-
_______
______
_______
_________
0
0.091
_______
-
_______
______
_______
_________
_______
0
0.087
15.7
7.4
9
0.14
-0.16
0.03
0.14
0
0.074
18.9
7.2
7.8
-0.7
0.01
0.12
0
0.082
20.8
6.6
8.6
0.18
0.21
0.02
0.15
0
0.077
_______
-
_______
______
_______
__________
_______
0
0.071
_______
_______
-
_______
______
_______
_________
0
0.066
_______
-
_______
______
_______
__________
_______
0
0.07
_______
_______
-
_______
______
_______
_________
0
0.07
18.8
7.4
8.3
0.04
0.15
0.02
0.15
0
0.072
17.4
7.4
7.5
0.03
0.09
0.01
0.13
0
0.072
15.9
7.7
8.9
0.07
1.18
0.04
0.05
0
0.071
_______
_______
-
______
______
_______
_________
0.069
_______
-
______
______
_______
_________
_______
0.071
_______
_______
-
______
______
_______
_________
0.056
0 0 0 0
0.07
15.7
7.7
8.9
0.02
-0.51
0.01
0.16
0
0.055
17.2
7.7
8.7
0.02
0.49
0.02
0.22
0
0.066
17.7
7.6
8.2
0.05
-1.09
0.01
0.16
0
0.069
0
0.068
_______
0.069
_______
2.218
X
-
______
-
______
X
X
______
______
X
_______
_______
X
_________ _________
X
_______
_______
X
0 0 0
0.07155 18.24167 7.425 8.44167 0.06455 -0.16583 0.03333333 0.238333
0
0.055
15.7
6.6
7.5
0.02
-1.09
0.01
0.05
0
0.092
21.7
7.7
9
0.18
1.18
0.09
0.85
0
Saganing WWTP Inspection Report Appendix 2
page 34 of 92
________
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Average Mm. Max.
Saganing WWTP January 2022
CBOD %Removal
TSS %Removal
#DIV/0! #DIV/0! #DIV/O!
#DIV/0! #DIV/O! #DIV/0!
#DIV/0!
#DIV/0!
100.816036
99.92966719
100.2419333
99.70284217
100.2647154
99.57747987
#DIV/0!
#DIV/0!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/0!
#DIV/O!
#DIV/0!
100.2884352
99.52627096
101.6626011 99.76693857
#DIV/0!
99.74566546
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
99.84504704
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
99.90731239
99.63436103
99.7718101
98.90097381
99.65468099
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
100.4719943
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
99.95837917
99.31135372
99.86361664
101.8002868
99.79816308
#DIV/0! #DIV/0! #DIV/0! #DIV/O! #DIV/O! #DIV/O!
#DIV/0! #DIV/0! #DIV/0! #DIV/O! #DIV/0! #DV/0!
Saganing WWTP Inspection Report Appendix 2
page 35 of 92
______
______
Day 1 2 3 4
~
6 7 8 9 10 11
~~
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total Avg. Mi Max.
____________
Areation Vol. MGD 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 X X
X X
________
F:M
Ratio
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
0.216328
0.320843
0.318435
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
0.121335
#DlV/0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0.27924
0.131607
0.094164
#DIV/0! #DIV/0! #DIV/ol #DIV/0!
0.230573
0.185626
0.122828
#DIV/0! #DIV/0! #DIV/0!
X
#DIV/0! #DIV/0! #DIV/0!
Saganing WWTP January 2022
MISS mg/I
MLVSS
mg/I
Settle
30 mm.
________
_______
________
_______
12708 8656 5608
________
_______
________
_______
2017 1619 977
________
_______
________
_______
990 950 960
________ ________ ________ ________
12036
________ ________ ________ ________
1978
________ ________ ________ ________
990
________
________
12200
________
________
________
________
________
________
________
________
14016 12452 12460
________
1159 2060 2652
________
990
________
________
________
________
990 980 970
________
________
________
________
_______
________
________
12988 9032 12816
________
1713 1175 1925
________
________
________
________
990 990 970
_______
________
________
_______
________
________
________
X
________
X
11361.09 1727.5
5608
977
14016
2652
________
X 979.0909
950 990
_______
SVI
______
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
77.904
109.75
171.18
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
82.253
#DIV/0!
81.148
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
70.634
78.702
77.849
#DlV/0 #DIV/0! #DIV/0! #DlV/0
76.224
109.61
75.687
#DIV/0! #DIV/0! #DIV/0!
X
#DIV/0! #DIV/0! #DIV/0!
________
Wasted Gallons
0 0 1500 0 1500 0 0 0 0 1500 0 0 1500 0 0 0 0 0 3000 0 0 0 0 0 0 0 0 3000 0 0 3000 15000 483.871 0 3000
_________
CRT
Days
#DIV/0! #DIV/0!
24
#DIV/0!
17.06161
19.35484
16.58986
#DIV/0! #DIV/0!
24
#DIV/0!
5.91133
24
4.878049
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
8.181818
33.33333
14.28571
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
51.42857
65.45455
7.228916
#DIV/0! #DIV/0!
12
X
#DIV/0! #DIV/0! #DIV/0
Saganing WWTP Inspection Report Appendix 2
page 36 of 92
________________
Day 1 2
3 4 5 6 7 8 9
10 11 12
13 14 15 16 17 18 19 20 21
22
23 24 25 26 27 28 29 30 31 Total Lbs. Soln. Total Lbs. Chemical
Average Max.
Mm.
________________
Aluminum Sulfate, 50%
Pounds 48 40 48 46 46 46 20 28 34 32 32 22 24 28 32 28 24 22 28 30 26 26 30 28 28 30 28 28 28 26 30 966 483
31.16129032
48
20
Saganing WWTP January 2022
Citric Acid, 50% (cleaning)
Pounds
_________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ __________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ ___________________ __________________ _________________ _________________
0 0
#DIV/0!
0 0
Sodium Bicarb
Pounds 0 0 0 0 100 0 0 0 0 0 50 0
100 0 0 0 0 0 100 100 0 0 0 0 0 0 50 100 0 0 100
700 693 22.58064516 100
0
___________________________
Sodium Hypochlorite, 12.5% (cleaning)
Pounds
__________________________ _________________________ _________________________ _________________________ __________________________ __________________________ __________________________ __________________________ __________________________ _________________________ ___________________________ __________________________ __________________________ _________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ ___________________________ __________________________ _________________________ _________________________
0 0
#DIV/0!
0 0
Saganing WWTP Inspection Report Appendix 2
page 37 of 92
LL)
-
________
Type
Day
1
2
snow
3
cloudy
4
sunny
5
6
7
8
9
cloudy
10
cloudy
11
snow
12
13
14
15
16
cloudy
17
p/c
18
cloudy
19
20
21
22
23
p/c
24
sunny
25
snow
26
27
28
Weather Temp.
F 27 34 15 2 11 18 24 21 24 32 35 25 10 1 17 42 35 15 20 20 28 32 23 19 17 15 26 23
Saganing WWTP February 2022
Plant Influent Sheet
Flow
Row Sewage
Precip.
inches
Total
Temp.
pH
MGD
C
S.U.
DO mg/L
TSS mg/L
BOD mg/L
0
0.061
0.02
0.059
14.3
7.4
8.8
67
185
0
0.054
17.6
7.6
7.8
112
256
0
0.055
17.4
7.6
7.1
154
110
0.03
0.055
___________
___________
0.01
0.067
___________
___________
0.02
0.064
__________
__________
0.01
0.086
0
0.049
17.6
7.7
7.2
150
108
0.03
0.103
17.6
7.7
7.3
134
74
0
0.077
17.6
7.6
7.4
220
59
0.07
0.057
___________
___________
0.01
0.069
___________
0
0.064
___________
___________
0
0.07
0
0.064
15.2
7.3
7.9
91
227
0.26
0.058
16.1
8
7.9
214
175
0
0.054
15.7
7.8
6.8
78
27
0.1
0.062
___________
0
0.062
___________
___________
0
0.064
___________
0.3
0.06
0.66
0.063
14.4
7.5
8.1
98
282
0
0.058
15.4
6.9
8.1
45
239
0.01
0.07
15.4
7.1
8.1
87
172
0.2
0.068
__________
0
0.068
___________
0
0.066
___________
___________
___________
CBOD mg/L
166 203 -154
___________ ___________ __________
147 69 110
___________ ___________ ___________
224 187 90
___________ ___________ ___________
243 206 142
__________ ___________ ___________
___________
TSSmg/L7 Day Average
111
___________
168
___________
127.6666667
___________
76.66666667
Total
X
X
1.73
1.807
X
X
X
X
X
X
Avg.
X
21.82143 0.06178571 0.0645357 16.1917 7.51667 7.708333 120.8333333
159.5
136.0833333 120.8333333
Mm.
X
1
0
0.049
14.3
6.9
6.8
45
27
-154
Max.
X
42
0.66
0.103
17.6
8
8.8
220
282
243
Saganing WWTP Inspection Report Appendix 2
page 38 of 92
Saganing WWTP February 2022
Plant Influent Sheet
-
Day
Flow MGD
Raw Sewage
TSS
BOD
lbs.
lbs.
_________
CBOD lbs.
1
0.061
0
0
0
2
0.059 32.96802 91.0311 81.68196
3
0.054 50.44032 115.29216 91.42308
4
0.055 70.6398 50.457 -70.6398
5
0.055
0
0
0
6
0.067
0
0
0
7
0.064
0
0
0
8
0.086
0
0
0
9
0.049
61.299 44.13528 60.07302
10
0.103 115.1087 63.56748 59.27238
11
0.077 141.2796 37.88862 70.6398
12
0.057
0
0
0
13
0.069
0
0
0
14
0.064
0
0
0
15
0.07
0
0
0
16
0.064 48.57216 121.16352 119.56224
17
0.058 103.5161 84.651 90.45564
18
0.054 35.12808 12.15972 40.5324
19
0.062
0
0
0
20
0.062
0
0
0
21
0.064
0
0
0
22
0.06
0
0
0
23
0.063 51.49116 148.16844 127.67706
24
0.058 21.7674 115.60908 99.64632
25
0.07
50.7906 100.4136 82.8996
26
0.068
0
0
0
27
0.068
0
0
0
28
0.066
0
0
0
__!_ __.2_
---
Total
0 0 0 1.807
0 0 0 783.0009
0 0 0 984.537
0 0 0 853.2237
Avg. 0.064536 25.25809 31.7592581 27.523345
Mm. 0.049 21.7674 12.15972
0
Max. 0.103 141.2796 148.16844 127.67706
Saganing WWTP Inspection Report Appendix 2
page 39 of 92
-
_______
Plant Effluent Sheet
________
_______
_______
-
-
Day
1
2
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
23
-
24
-
25
-
26
27
-
28
-
29
30
-
31
-
Total
-
Avg.
Mm.
Max.
-
-
-
-
-
Flow MGD 0.067 0.065 0.063 0.063 0.059 0.064 0.053 0.055 0.044 0.087 0.067 0.071 0.07 0.077 0.082 0.078 0.07 0.07 0.075 0.077 0.077 0.075 0.076 0.076 0.079 0.083 0.078 0.083
0 0 0 1.984 0.07085 0.044 0.087
_______
_______
_______
_______
TSS lbs. 0 0.016263 0.005254 0.005254 0 0 0 0 0.022018 0.021767 0.016763 0 0 0 0 0.006505 0.046704 0.052542 0 0 0 0 0.050707 0.069722 0.039532 0 0 0 0 0 0 0.353032 0.011388 0 0.069722
________
________
________
________
CBOD lbs. 0
-0.0705 0.83542 -1.1717
0 0 0 0 0.28256 0.31926 0.2738 0 0 0 0 -1.6003 -0.5955 0.25687 0 0 0 0 1.2867 1.16627 -0.9158 0 0 0 0 0 0 0.06714 0.00217 -1.6003 1.2867
_______
_______
_______
_______
Amm. Phos. Day
lbs.
lbs.
25
0
0
26
0.032526 0.043 27
0.010508 0.005254
0 0
0.053 28
-_
0.053 29
-_
0
30
-
0
31
0 0 0.014678 0.021767 0.005588
0
1
-_
0
2
-_
0.037
3
-
0.007
4
-
0.056
5
0 0 0 0 0.058547
0
6
-
0
7
-_
0
8
-
0
9
-_
0.52
10
0.017514 0.058 11
-_
0.02919 0.082 12
0
0
13
-_
0
0
14
0
0
15
-
0
0
16
0.03803 0.101 17
0.012677 0.019 18
-
0.006589 0.02
19
_
0
0
20
0
0
21
-_
0
0
22
0
0
23
0
0
24
0 0.252869 0.008157
0
25
-_
1.049 26
_
0.034 27
0
0
28
0.058547 0.52
29
30
-_
31
_______
-
Avg.
_______
-
Mm.
_______
-
Max.
_______
-
Total
7 Day Averages
CBOD
TSS
mg/L
ibs.
mg/L
lbs.
0.59 0.110302
0.03
0.005397
1.16143 0.222535 0.04142857 0.00795
1.25571 0.242325 0.04428571 0.009174
1.39 0.261888 0.03857143 0.007697
1.27714 0.265498
0.06
0.01395i
1.23286 0.254179
0.09
0.019635
___
1.41 0.294926 0.08714286 0.01942
1.18816 0.235951 0.05591837 0.01189
1.27362 0.2539 0.05962099 0.012818
1.28964
-
1.29449 1.28084
0.258381
0.260675
___
0.260501
0.06221991 0.06478194 0.06852629
0.013512 0.014132 0.015051
1.28137 1.2883 -0.2567
0.259788
0.260589
_
-0.05811
0.06974434 0.06685057 0.01666667
0.015208
_
0.014576
0.003824
-0.2567 -0.05811 0.01666667 0.003824
0.04333 -0.00767 0.02666667 0.004647
-0.34 -0.08141 0.03333333 0.007006
0.56667 0.125088
0.04
0.00865
0.56667 0.125088
0.04
0.00865
0.56667 0.125088
0.04
0.00865
0.56667 0.125088
0.04
__
0.56667 0.125088
0.04
0.00865 0.00865
-0.51 -0.14389 0.02333333 0.006434
-0.9967 -0.27456
0.04
0.009996
-1.0133 -0.27698
0.06
0.015107
-1.0133 -0.27698
0.06
0.015107
-1.0133 -0.27698
0.06
0.015107
-1.0133 -0.27698
0.06
0.015107
-1.0133 -0.27698
0.06
0.015107
0.48333 0.135442 0.08333333 0.021422
1.43667 0.387119 0.09333333 0.02471
0.82667 0.219592 0.08333333 0.022852
0.82667 0.219592 0.08333333 0.022852
0.82667 0.219592 0.08333333 0.022852
0.82667 0.219592 0.08333333 0.022852
0.82667 0.219592 0.08333333 0.02285i
0.225 0.035779 0.085 0.015608
0.34273 0.066544 0.05750524 0.013797
-1.0133 -0.27698 0.01665567 0.003824
1.43667 0.387119 0.09333333 0.02471
X
2.06286
X
0.427703
______
E. coil
ct/100m1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
_
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
________
Ammonia lbs.
0.187459371 0.2345208
0.240334971 0.243813943 0.258182571 0.225656571 0.189163114 0.225590192 0.231037452 0.230539831 0.229140525 0.227044322 0.222596001 0.222158777 0.006898371 0.006898371 0.004348714 0.005957143
0.0060048 0.0060048 0.0060048 0.0060048 0.0060048 0.012271714 0.011664086 0.015035829 0.015035829 0.015035829 0.015035829 0.015035829 0.012104914 0.011413886 0.008185114 0.008185114 0.008185114 0.008185114 0.008185114 0.0027522 0.058340168 0.0027522 0.231037452 1.808545214
Saganing WWTP Inspection Report Appendix 2
page 40 of 92
________
Day 1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17 18
19 20 21 22 23 24 25 26 27 28 29 30 31
Average Mm. Max.
Saganing WWTP February 2022
CBOD %Removal
TSS %Removal
#DIV/0!
#DIV/0!
100.1727036
99.9013894
98.18896292
99.97916884
96.73677108
99.98512507
#DIV/O!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DJV/0!
99.0636849
99.92818906
98.92852344
99.962 18654
99.22778651
99.976272
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0
#DIV/0!
#DIV/0!
#DIV/0!
102.7132123
99.97321787
101.3253392
99.90980544
98.74049235
99.70130147
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
98.00456307
99.80323879
97.68626984
99.36143235
102.2341379
99.84445604
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! - - #DIV/0!
#DIV/0!
#DlV/0
#DIV/0!
- #DIV/0!
Saganing WWTP Inspection Report Appendix 2
page 41 of 92
________________
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
24 25 26 27 28
________________
Aluminum Sulfate, 50%
Pounds 30 28 30 30 30 28 30 32 36 30 36 38 38 38 44 46 52 40 46 48
44 52 40 46 50 40 44 46
Saganing WWTP February 2022
Citric Acid, 50% (cleaning)
Pounds
__________________ __________________ __________________ __________________ __________________ ___________________ __________________ __________________ __________________ __________________ __________________ ___________________ ___________________ ___________________ __________________ ___________________ ___________________ __________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ __________________
Sodium Bicarb
Pounds 0 100 0 50 0 0 0 0 0 0 0
100 0 50 0
100 50 0 0 0 0 0 0 100 0 0 0 0
___________________________
Sodium Hypochlorite, 12.5% (cleaning)
Pounds
__________________________ __________________________ __________________________ __________________________ __________________________ ___________________________ __________________________ __________________________ __________________________ __________________________ __________________________ ___________________________ ___________________________ ___________________________ __________________________ ___________________________ ___________________________ __________________________ __________________________ __________________________ _________________________ _________________________ __________________________ __________________________ __________________________ __________________________ _________________________ __________________________
Total Lbs. Soln. Total Lbs. Chemical
Average Max.
Mm.
1092 546 39 52 28
0 0
#DIV/0!
0 0
550 544.5 19.64285714 100
0
0 0
#DlV/0
0 0
Saganing WWTP Inspection Report Appendix 2
page 42 of 92
-
_______________________
-
-
Day
_______
Type
1
2
sunny
3
clear
4
sunny
5
6
7
8
9
p/c
10
sunny
11
p/c
12
13
14
Weather Temp.
F
Precip. inches
Saganing WWTP March 2022
Plant Influent Sheet
_______
Flow
Raw Sewage
Total Temp.
pH
DO
TSS
BOD
MGD
C
S.U.
mg/L
mg/L
mg/L
22
0
19
0
17
0
_ __
32
0
29
0
22
0
0.078
17.2
8
7.9
180
0.064
17.2
8
8
192
0.065
16.8
8.1
8.2
44
_________
_________
__________
______________
___________
________ ________
_________ _________
__________ __________
______________ ______________
__
0.058
17.1
__
7.4
7.8
0.059
17.2
7.4
7.9
0.06
13.2
7.8
8.2
28 63 92
__________
_______ _______ _______
_______ _______ _______
_________ _________ ________
_____________ _____________ ____________
345 306 245
_____________ _____________ _____________ __
123 -57 260
____________ ____________ ___________
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total Avg. Mm. Max.
p/c sunny
p/c
______
32 42 38
0.06 0 0
0.062 0.062 0.066
__________
15.9
7.7
15.9
7.8
16.3
7.7
_______ _______
_______ _______ _______
__
7.6 7.6 8.5
_________
_________
________
114 58 44
____________ ____________ ___________
__
228 100 227
____________
____________
___________
rain p/c p/c
rain rain
X X X X
39
0.51
0.067
17.6
8
7.9
192
218
39
0.58
0.06
17.4
8.2
7.8
155
69
38
0.14
0.048
120
149
_______
_______
________
___________
___________
_______
________
___________
___________
_______
________
___________
___________
35
_________
_______
_______
________
___________
___________
0.15
0.066
16.9
7.9
8.3
344
55
1
0.066
17.9
7.9
8.4
386
X
2.44
0.881
X
X
X
X
32.78571 0.17428571 0.0629286 16.6615 7.83846 8.007692 143.7142857
17
0
0.048
13.2
7.4
7.6
28
55
1
0.078
17.9
8.2
8.5
386
264 288
X 197.5 -57 345
__________
CBOD mg/L
___________
263 205 151
__________
TSS mg/L 7
Day Average
138.6666667
_____________ _____________ _____________
______________
85 -116 204
61
____________ ____________ ___________
____________
230 107 171
72
_____________
_____________
___________
___________
239 120 359
____________
155.6666667
___________
___________
___________
___________
238 226 X 177.2857143 -116 359
239.5 133.3666667
Saganing WWTP Inspection Report Appendix 2
page 43 of 92
-
-
Day
_____________
Weather
Type Temp. F
1
0
0
2
sunny
22
3
clear
19
4 sunny
17
__!_ 0
0
_!_ 0
0
_2._ 0
0
_!_ 0
0
9
p/c
32
10 sunny
29
11
p/c
22
0
0
__
_1:_ 0
0
0
0
__
0
0
16
p/c
32
17 sunny
42
18
p/c
38
0
0
___
0
0
__
0
0
__
22'
0
0
23
rain
39
24
p/c
39
25
p/c
38
_!_ 0
0
__Z_ 0
0
0
0
___
0
0
--
30
rain
35
31
rain
55
x
x
Avg.
X
32.78571
Mm.
X
17
Max.
X
55
Saga fling WWTP March 2022
Plant Effluent Sheet
_____
Flow
_______
-
_______
Treated Sewage
Total MGD
Temp. C
_!!:!_
S.U.
DO mg/L
TSS mg/L
CBOD mg/L
Ammonia mg/L
_______
Phos mg/L
________
E. coD
ct/looml
0
0.094
14.4
7.9
8.9
0.05
3.98
0.01
0.06
0
0.08
14.6
7.9
8.8
0.01
3.2
0.01
0.1
0
0.082
14.3
7.9
8.7
0.02
-0.67
0.03
0.06
0
______
_______
______
_______
______
_______
______
0.075
_______
17.2
-
_______
-
_______
-
_______
-
_______
7.5
8.3
______ ______
_______ _______
_________ _________
______
_______
_________
______
0.01
_______
-1.09
_________
0.04
_______ _______ _______ _______
0.06
0 0 0 0 0
0.075
17.2
7.5
8.3
0.02
-0.61
0.02
0.08
0
0.074
14.2
8.1
8.1
0.01
2.4
0.01
0.08
0
_____
______
-
______
______
_______
_________
_______
0 0
_____
______
-
______
______
_______
_________
_______
0
_____
______
-
______
______
_______
_________
_______
0
0.079
21.3
8.1
8.7
0.01
1.33
0.01
0.03
0
0.079
21.2
8
8.6
0.01
0.14
0.01
0.02
0
0.072
17.8
7.7
8.1
0.01
0.95
0.04
0.03
0
___
___
-
___
___
___
_____
___
___ ___
-
___
___ ___
____
___
___
___
___
-
___
___
___
____
0 0 0 0
0.083
16.8
7.9
8.9
0.01
0.3
0.02
0.07
0
0.076
16.7
7.9
8.2
0.01
0.22
0.02
0.06
0
0.066
17.3
7.6
8.5
0.01
0.64
0.01
0.07
0
___ ___
-
___
___ ___
_____
___
0
___
___
-
___
___
___
_____
___
0
___
___ ___
-
___
___
___
_____
0
___ ___
-
___
___ ___
_____
___
0
0.079
16.9
7.8
8.6
0.03
0.09
0.01
0.08
0
0.077
18.5
7.8
8.7
0.03
-0.55
0.06
0.08
0
1.091
X
X
X
X
X
X
X
0
0.07793 17.02857 7.829 8.52857 0.01714 0.737857 0.02142857 0.062857
0
0.066
14.2
7.5
8.1
0.01
-1.09
0.01
0.02
0
0.094
21.3
8.1
8.9
0.05
3.98
0.06
0.1
0
Saganing WWTP Inspection Report Appendix 2
page 44 of 92
_____
_____
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Total
Avg. Mi Max.
____________
Areation Vol. MGD 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 X X X X
_________
F:M
Ratio
#DlV/0!
0.994016
0.680851
0.773359
#DlV/0! #DIV/0l #DIV/0! #DIV/0!
0.224679
-0.15339
0.439932
#DIV/0! #DIV/0! #DIV/0! #DlV/ol
0.164364
0.430556
0.274335
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
0.507788
0.073342
0.149824
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
0.44
0.326531
X
#DIV/0! #DIV/0! #DIV/0!
Saganing WWTP March 2022
MISS mg/I
MLVSS mg/I
Settle
30 mm.
________
3504 5088 3884
________
752 799 572
________
440 970 810
_______
________
________
________
5060 4840 4748
_______
________
________
________
882 609 985
_______
________
________
________
980 910 870
________
________
_______
________
________
________
________
12320 3956 12896
________
2389 400 1517
________
_______
________
________
960 850 980
________
________
________
________
________
________
________
5088 11920 13816
________
799 1568 1326
________
________
________
________
970 980 970
_______
________
________
_______
________
________
_______
________
________
_______
7260 13328
X 7693.429
3504 13816
________
1100 1617
X 1093.929
400 2389
________
960 990
X 902.8571
440 990
_______
SVI
______
#DIV/0l
125.57
190.64
208.55
#DIV/0! #DIV/0! #DlV/0! #DIV/0!
193.68
188.02
183.24
#DIV/0! #DIV/01 #DIV/0! #DIV/0!
77.922
214.86
75.993
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
190.64
82.215
70.208
#DIV/oi #DIV/0! #DIV/0! #DIV/01
132.23
74.28
X
#DIV/0! #DIV/0! #DIV/0!
________
Wasted Gallons
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1500 0 0 0 0 0 0 0 1500 48.3871 0 1500
_________
CRT
Days
#DIV/0!
15.31915
90
43.90244
#DIV/0! #DIV/ol #DIV/0! #DIV/0!
96
48
97.2973
#DIV/0! #DIV/0! #DIV/0! #DIV/ol
91.13924
91.13924
100
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
86.74699
19.14894
109.0909
#DIV/0! #DIV/ol #DIV/ol #DIV/0!
30.37975
31.16883
X
#DIV/O! #DIV/0! #DIV/0!
Saganing WWTP Inspection Report Appendix 2
page 45 of 92
________________
________________
Aluminum Sulfate, 50%
Day
Pounds
1
48
2
44
3
36
4
42
5
50
6
46
7
40
8
46
9
46
10
46
11
44
12
46
13
46
14
44
15
44
16
34
17
44
18
14
19
32
20
26
21
24
22
56
23
28
24
28
25
30
26
30
27
32
28
0
29
28
30
26
31
24
Total Lbs. Soln.
1124
Total Lbs. Chemical
562
Average
36.25806452
Max.
56
Mm.
o
Saganing WWTP March 2022
Citric Acid, 50% (cleaning)
Pounds
_________________ _________________ __________________ _________________ __________________ __________________ _________________ __________________ __________________ ________ _________________ __________________ __________________ _________________ _________________ __________________ _________________ __________________ _________________ _________________ __________________ __________________ ___________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ _________________
0 0
#DIV/0!
0 0
Sodium Bicarb
Pounds 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 0 50
49.5 1.612903226
50 0
___________________________
Sodium Hypochlorite, 12.5% (cleaning)
Pounds
_________________________ _________________________ __________________________ _________________________ __________________________ __________________________ _________________________ __________________________ __________________________ ____________ _________________________ __________________________ __________________________ _________________________ _________________________ __________________________ _________________________ __________________________ _________________________ _________________________ __________________________ __________________________ ___________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ _________________________
0 0
#DlV/0!
0 0
Saganing WWTP Inspection Report Appendix 2
page 46 of 92
-
_______________________
-
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Type p/c
rain rain p/c
p/c sunny sunny
p/c sunny
p/c
p/c sunny
p/c
Weather
Temp. F 34 46 48 34. 37
39 45 39 40 43 45 40 44 38 52 42 53 38 37 29 50 41 50 62 51 45 32 30 39 43
Precip. inches 0.06
0 0.01
0 0.2 0.01 0.89 0.05 0.15 0 0.03 0 0.05 0.52 0 0 0 0 0.19 0 0.18 0 0.12 0 0.04 0 0.03
0 0 0
Saga fling WWTP April 2022
Plant Influent Sheet
_______
Flow
Raw Sewage
Total
Temp.
pH
DO
TSS
BOD
MGD
C
S.U.
mg/L
mg/L
mg/L
0.066
16.9
7.9
8.3
199
162
0.065 0.068 0.065 0.064 0.064 0.063 0.07
15.4 15.8 15.6
___________
________
___________
______
__________
8
9.2
61
8.1
9.1
65
8.1
9.1
66
___________
___________
______
___________
97 80 100
0.071 0.072 0.066
________
___________ ___________ ___________
___________ ___________ ___________
0.077 0.076 0.052 0.047
19.8 16.6 16.5
7.5
________
6.7
7.8
6.6
7.7
6.5
__________
61 47 66
___________
163 263 153
0.066 0.07 0.065 0.065 0.07 0.066 0.081
17.3 17.5 18.2
________
7
7.8
7.4
7.5
7.7
7.6
___________
__________
__________
___________
82 61 47
___________
__________
__________
___________
268 81 60
0.073 0.072 0.072 0.072 0.077 0.066 0.07
17.7 19.2 17.5
__________
________
__________
___________
7.8
7.5
___________
51
7.8
8.4
44
7.9
7.4
42
__________
__________
___________
___________
132 126 126
0.066
__________
___________
__________
CBOD mg/L 137
___________
___________
______
___________
181 138 79
___________
___________
___________
__________
184 154 143
___________
__________
__________
___________
240 132 58
__________
__________
___________
___________
122 94 96
__________
__________
TSS mg/L 7 Day Average
199
64
58
63.33333333
45.66666667
Total
X
Avg.
X
Mm.
X
Max.
X
X
2.53
2.037
X
X
X
X
X
X
42.2 0.08433333 0.0679 17.2308 7.74615 7.823077 68.61538462 139.3076923 135.2307692 96.08333333
29
0
0.047
15.4
7
6.5
42
60
58
62
0.89
0.081
19.8
8.1
9.2
199
268
240
Saganing WWTP Inspection Report Appendix 2
page 47 of 92
-
-
-
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
_____________
Weather
Type Temp.
F
______
p/c
34
0
46
0
48
0
34
0
37
rain
39
rain
45
p/c
39
0
40
0
43
0
45
0
40
p/c
44
sunny
38
sunny
52
0
42
0
53
0
38
0
37
p/c
29
sunny
50
p/c
41
0
50
0
62
0
51
0
45
p/c
32
sunny
30
p/c
39
0
43
Saganing WWTP April 2022
Plant Effluent Sheet
_____
Flow Total
________
Temp.
-
_______
pH
DO
Treated Sewage
TSS
CBOD Ammonia
MGD
C
S.U. mg/L mg/L mg/L
mg/L
0.08
17
7.8
8.5
0.02
-0.18
0.05
0.078
_______
-
_______
______
_______
_________
0.08
_______
-
_______
______
_______
_________
0.079
_______
-
_______
______
_______
_________
0.078
0.076 17.3
8
9.1
0.1
0.6
0.04
0.077
17.3
8.1
9.1
0.01
0.65
0.09
0.081
17.2
8.1
9.1
0.07
0.96
0.06
0.082 0.083 0.079 0.087 0.086
_______ _______ _______ _______
21.4
-
_______
-
_______
-
_______
-
_______
7.9
7.4
______
_______
______
_______
______
_______
______
0.05
_______
0.14
_________ _________ _________ _________
0.03
0.068
17
8
9
0.04
0.62
0.05
0.068
16.5
7.7
6.5
0.05
0.35
0.19
0.078
_______
0.082
_______
0.079
_______
0.077
_______
0.083
15.1
-
_______
-
_______
-
_______
-
_______
7
8.2
______
_______
______
_______
_______
_______
______
0.05
_______
2.17
_________ _________ __________ _________
0.15
0.077
16.7
8.1
8
0.14
0.56
0.25
0.089
20.3
7.8
8.4
0.03
1.26
0.17
0.084 0.075 0.077 0.081 0.085
_______ _______ _______ _______
20.5
-
_______
-
_______
-
_______
-
_______
7.9
8.5
______ ______ ______
_______ _______ _______
_________ _________ _________
______
_______
_________
0.02
0.85
0.1
0.078
20.1
7.9
8.2
0.02
0.46
0.09
0.082
20.4
7.9
8.4
0.09
0.65
0.19
0.078
_______
-
_______
______
_______
_________
_______
Phos mg/L 0.07
_______
_______ _______
0.08 0.07 0.07
_______ _______
_______
_______
0.08 0.08 0.07
_______ _______
_______
_______
0.08 0.08 0.07
_______ _______ _______
_______
0.09 0.08 0.08
_______
________
E.coli
ct/lo0ml
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total
X
Avg.
X
Mm.
X
Max.
X
X
2.387
X
X
X
X
X
X
X
0
42.2 0.07957 18.21538 7.862 8.33846 0.05308 0.699231 0.11230769 0.076923
0
29
0.068
15.1
7
6.5
0.01
-0.18
0.03
0.07
0
62
0.089
21.4
8.1
9.1
0.14
2.17
0.25
0.09
0
Saganing WWTP Inspection Report Appendix 2
page 48 of 92
________
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Average Mm. Max.
Saganing WWTP April 2022
CBOD %Removal
TSS %Removal
100.3190217
99.97563872
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
99.21579418
99.61141221
98.85522155
99.96240023
97.22670014
99.75484632
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
99.82795133
99.81466716
98.9525674
99.77766152
99.29427114
99.7810266
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
*tDIV/0!
#DIV/0!
97.87857676
99.85550517
99.01497638
99.46591095
95.33734985
99.85983038
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
98.47352436
99.91345738
98.84997788
99.89261967
98.42617336
99.49921625
#DIV/0!
#DIV/0!
#DIV/0
#DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
Saganing WWTP Inspection Report Appendix 2
page 49 of 92
________________
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
________________
Aluminum Sulfate, 50%
Pounds 26 30 26 26 28 32 28 30 30 30 28 30 32 36 36 34 28 30 36 34 40 40 42 50 50 42 44 46 46 50
Saganing WWTP April 2022
Citric Acid, 50% (cleaning)
Pounds
___________________ __________________ __________________ _________________ ___________________ __________________ __________________ __________________ __________________ __________________ ___________________ __________________ __________________ _________________ ___________________ __________________ __________________ __________________ __________________ __________________ _________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________
Sodium Bicarb
Pounds 50 0 0 0 0 0 0 0 0 0 0 0 0 0 50 0 0 0 0 50 0 0 0 0 0 0 0 0 0 0
___________________________
Sodium Hypochlorite, 12.5% (cleaning)
Pounds
____________________________ __________________________ __________________________ _________________________ ___________________________ __________________________ __________________________ __________________________ ___________________________ __________________________ ___________________________ __________________________ __________________________ _________________________ ___________________________ __________________________ __________________________ __________________________ __________________________ __________________________ _________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________
Total Lbs. Soln. Total Lbs. Chemical
Average Max.
Mm.
1060 530 35.33333333 50 26
0 0
#DIV/0!
0 0
150 148.5
5 50 0
0 0
#DIV/0!
0 0
Saganing WWTP Inspection Report Appendix 2
page 50 of 92
-
______________________
-
________
-
Day
Type
1
2
3
4
clear
5
clear
6
cloudy
7
8
9
10
11
rain
12
sunny
13
sunny
14
15
16
17
18
p/c
19
sunny
20
sunny
21
22
23
24
25
p/c
26
p/c
27
p/c
28
29
30
31
Total
X
Avg.
X
Mm.
X
Max.
X
Weather Temp.
F 50
Precip. inches 0.42
Saganing WWTP May 2022
Plant Influent Sheet
_______
Flow
Row Sewage
Total Temp.
pH
DO
TSS
BOD
MGD
C
S.U.
mg/L
mg/L
mg/L
0.07
___________
CBOD mg/L
___________
TSS mg/L 7 Day Average
54
48
0.04
0.066
__________
___________
___________
52
0
0.063
___________
___________
___________
48
0.45
0.071
21.6
7
8.7
67
230
187
42
0
0.07
15.6
7.4
7
49
237
215
46
0
0.065
16.7
8.3
6.3
46
152
168
48
0
0.061
49
0
0.052
__________
___________
___________
___________
50.66666667
54
0
0.054
___________
___________
___________
61
0
0.061
___________
___________
___________
63
0
0.065
17.2
6.1
8.1
39
217
224
63
0.03
0.061
17.9
7.4
7
50
165
191
67
0
0.07
19.4
8.6
8.3
63
185
242
78
0
0.057
78
0.04
0.066
___________
___________
___________
___________
145
61
0.02
0.066
___________
___________
___________
52
0
0.064
__________
__________
__________
55
0
0.064
17.2
7.4
8.3
91
151
232
58
0.02
0.061
18
7.6
8.1
168
163
135
70
0
0.061
18.1
7.7
8.2
176
-49
79
64
0.75
0.06
52
0.1
0.065
__________
__________
__________
___________
60.66666667
___________
46
0
0.069
__________
__________
__________
51
0
0.065
__________
__________
__________
54
0
0.069
16.8
6.9
7.4
51
284
303
70
0.2
0.076
17.5
7.3
4.5
38
187
236
62
0.19
0.079
17.5
7.5
8.1
93
188
192
56
0.06
0.055
___________
___________
___________
66
0
0.064
__________
__________
__________
72
0
0.066
___________
___________
___________
77
0
0.066
X
2.32
2.012
X
X
X
___________
X
___________
X -
___________
X
58.48387 0.07483871 0.0649032 17.7917 7.43333
7.5
77.58333333 175.8333333 200.3333333 77.58333333
42
0
0.052
15.6
6.1
4.5
38
-49
79
78
0.75
0.079
21.6
8.6
8.7
176
284
303
Saganing WWTP Inspection Report Appendix 2
page 51 of 92
-
Day
_____________
Weather
Type Temp.
F
_______
1
0
50
2
0
48
3
0
52
Saga fling WWTP May 2022
Plant Effluent Sheet
_____
Flow Total
_______
Temp.
-
_______
pH
DO
Treated Sewage
TSS
CBOD Ammonia
MGD
C
S.U. mg/L mg/L mg/L
mg/L
0.082
_______
-
_______
______
_______
_________
0.08
_______
-
_______
______
_______
_________
0.076
_______
Phos mg/L
_______
_______
________
E. coil
ct/looml
0 0 0
4
clear
48
0.083
16
7
7.5
0.15
0.37
0.1
0.09
0
S
clear
42
0.082
19.6
8.7
7.7
0.1
-1.87
0.07
0.09
0
6 cloudy
46
0.078
19.7
7.8
7.7
0.02
0.07
0.04
0.09
0
7
0
48
0.076
_______
-
_______
______
_______
_________
_______
0
8
0
49
0.069
0
9
0
54
0.072
_______
-
_______
______
_______
_________
_______
0
10
0
61
0.076
_______
_______
-
_______
______
_______
_________
0
11
rain
63
0.076
19.3
8.7
8.3
0.39
-0.1
0.04
0.07
0
12 sunny
63
0.073
19.2
8.2
8.6
0.09
-0.22
0.05
0.07
0
13 sunny
67
0.082
19.4
8.6
8.3
0.11
0.73
0.04
0.07
0
14
0
78
0.079
0
15
0
78
0.079
_______
-
_______
______
_______
_________
_______
0
16
0
61
0.08
_______
-
_______
______
_______
_________
_______
0
17
0
52
0.077
_______
-
_______
______
_______
_________
_______
0
18
p/c
55
0.078
18.1
8.6
8.5
0.07
-0.94
0.04
0.04
0
19 sunny
58
0.073
18.3
8.6
8.4
0.13
-1.51
0.04
0.05
0
20 sunny
70
0.076
18.4
8.5
8.3
0.12
-1.31
0.04
0.08
0
21
0
64
0.074
_______
-
______
______
_______
_________
_______
0
22
0
52
0.078
_______
-
_______
_______
_______
__________
_______
0
23
0
46
0.083
0
24
0
51
0.078
_______
-
______
______
_______
_________
_______
0
25
p/c
54
0.081
19.1
8.5
7.5
0.09
-1.49
0.18
0.07
0
26
p/c
70
0.087
17.9
7.9
7.9
0.09
-0.66
0.19
0.07
0
27
p/c
62
0.089
17.4
7.8
8.5
0.03
-1.53
0.14
0.07
0
28
0
56
0.066
0
29
0
66
0.078
_______
-
______
______
_______
_________
_______
0
30
0
72
0.081
_______
_______
-
______
______
_______
_________
0
31
0
77
0.081
_______
-
______
______
_______
_________
_______
0
Total X
X
2.423
X
X
X
X
X
X
X
0
Avg.
X
58.48387 0.07816 18.53333 8.242 8.1 0.11583 -0.705 0.08083333 0.071667
0
Mm.
X
42
0.066
16
7
7.5
0.02
-1.87
0.04
0.04
0
Max.
X
78
0.089
19.7
8.7
8.6
0.39
0.73
0.19
0.09
0
Saganing WWTP Inspection Report Appendix 2
page 52 of 92
_____
_____
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Total Avg. Mi Max.
___________
Areation Vol. MGD 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 X X X X
________
F:M
Ratio
#DIV/01 #DIV/0! #DIV/ol
0.121873
0.136462
0.078078
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
0.290873
0.143819
0.553419
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
0.04774
0.923727
-0.05973
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
0.256277
0.376696
0.604034
#DIV/0! #DlV/0! #DIV/0! #DIV/0!
X
#DIV/0! #DIV/0! #DIV/0!
Saganing WWTP May 2022
MISS
mg/I
MLVSS
mg/I
Settle
30 mm.
_______
_______
_______
_______
_______
_______
_______
17000 16968 15226
_______
3722 3377 3515
________
950 970 980
________
________
________
________
6408 15296 6332
________
________
________
________
1347 1944 650
________
________
________
________
950 970 970
________
________
________
________
________
________
________
16236 4332 12644
________
5623 299 1390
________
________
________
________
980 950 970
_______
________
________
________
________
________
________
15576 14032 7040
________
2124 1048 683
________
________
________
________
990 980 950
________
_______
_______
________
________
________
________
________
________
________
X 12257.5
4332 17000
________
X 2143.5
299 5623
________
X 967.5 950 990
_______
SVI
______
#DIV/0! #DlV/0! #DIV/0!
55.882
57.166
64.364
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
148.25
63.415
153.19
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
60.36
219.3
76.716
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
63.559
69.84
134.94
#DIV/ol #DIV/0! #DIV/0! #DIV/0!
X
#DIV/0!
#DIV/0! #DIV/0!
________
Wasted Gallons
0 0 0 1500 1500 0 0 0 0 1500 0 0 0 0 0 0 0 1500 0 0 0 0 0 1500 0 0 1500 0 0 0 0 9000 290.3226 0 1500
________
CRT
Days
#DIV/0! #DIV/0! #DIV/0!
4.660194
6.428571
46.15385
#DIV/0! #DIV/0 #DIV/0!
24
2.42915
10.9589
7.982262
#DlV/0! #DIV/0! #DIV/0! #DlV/0!
8.510638
7.586934
7.894737
#DIV/0! #DIV/0! #DIV/0!
24
9.876543
9.195402
12.69841
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
X
#DIV/0! #DIV/0! #DIV/0!
Saganing WWTP Inspection Report Appendix 2
page 53 of 92
________________
________________
Aluminum Sulfate, 50%
Day
Pounds
1
46
2
46
3
48
4
46
5
46
6
48
7
46
8
46
9
46
10
46
11
50
12
44
13
48
14
48
15
48
16
42
17
48
18
30
19
36
20
42
21
40
22
38
23
36
24
40
25
42
26
46
27
48
28
42
29
46
30
48
31
52
Total Lbs. Soln.
1378
Total Lbs. Chemical
689
Average
44.4516129
Max.
52
Mm.
30
Saganing WWTP May 2022
Citric Acid, 50% (cleaning)
Pounds
__________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ _________________ _________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ _________________ __________________ _________________ __________________ __________________ ___________________ __________________
_________________ _________________ __________________
0
0
#DIV/0!
0 0
Sodium Bicarb
Pounds 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
___________________________
Sodium Hypochlorite, 12.5% (cleaning)
Pounds
__________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ _________________________ _________________________ __________________________
__________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ _________________________ __________________________ _________________________ __________________________ __________________________ ___________________________ __________________________ __________________________ __________________________ ___________________________
0 0
#DIV/0
0 0
Saganing WWTP Inspection Report Appendix 2
page 54 of 92
-
______________________
-
________
Type
Day
1
p/c
2
p/c
3
p/c
4
5
6
7
8
sunny
9
sunny
10
sunny
11
12
13
14
15
p/c
16
sunny
17
sunny
18
19
20
21
22
sunny
23
clear
24
sunny
25
26
27
28
29
sunny
30
sunny
)u
Weather Temp.
F 73 58 55 55 65 63 60 58 61 58 67 69 56 62 73 75 69 58 57 65 69 78 65 69 91 84 63 59 67 70
Precip. inches 0.25
0 0 0 0 0.05 0.07 0 0.16 0 0.03 0.18 0 0.07 0 0.05 0 0 0 0.46 0.08 0 0 0 0 0 0 0 0.63 0
Saganing WWTP2O22
Plant Influent Sheet
_______
Flow
Raw Sewage
Total
Temp.
pH
DO
TSS
BOD
MGD
C
S.U.
mg/L
mg/L
mg/L
0.067
20.2
6.5
6.2
90
234
0.062
18.4
6.5
6.3
38
162
0.063
18.4
6.6
6.3
41
188
0.06
0.074
0.068
0.066
0.066
18.2
7.9
7.8
45
206
0.062
18.3
7.8
7.4
45
227
0.064
18.4
7.7
7.3
48
238
0.064
0.064
0.064
0.066
0.064
18.6
7.8
7.4
72
-60
0.067
21.3
7.4
1.8
42
182
0.066
20.7
7.3
4.2
416
202
0.057
0.099
0.115
0.157
0.061
19.8
7.4
6.4
44
175
0.064
19.4
6.5
6.7
52
205
0.066
19.6
7.8
6.6
51
403
0.065
0.066
0.08
0.072
0.068
19.4
7.2
6.8
128
230
0.063
18.2
8.6
4.1
154
-85
()
___________
CBOD mg/L 266 188
96
__________
TSS mg/L 7 Day Average
56.33333333
180
46
211
248
-100
176.6666667
204
207
___________
___________
159
189
328
49
__________
204 -97
141
Total
X
X
2.03
2.145
X
X
X
X
X
X
Avg.
X
65.73333 0.06766667 0.0715 19.2071 7.35714 6.092857 90.42857143 179.0714286 163.0714286
93.8
Mm.
X
55
0
0.057
18.2
6.5
1.8
38
-85
-100
Max.
X
91
0.63
0.157
21.3
8.6
7.8
416
403
328
Saganing WWTP Inspection Report Appendix 2
page 55 of 92
-
_____________
Weather Type Temp.
Day
F
_______
1
p/c
73
2
p/c
58
3
p/c
55
4
0
55
5
0
65
6
0
63
7
0
60
8 sunny
58
9
sunny
61
3.0 sunny
58
11
0
67
12
0
69
13
0
56
14
0
62
15
p/c
73
16 sunny
75
17 sunny
69
18
0
58
19
0
57
20
0
65
21
0
69
22 sunny
78
23 clear
65
24 sunny
69
25
0
91
26
0
84
27
0
63
28
0
59
29 sunny
67
30 sunny
70
Saganing WWTP June 2022
Plant Effluent Sheet
_____
Flow Total
_______
Temp.
-
_______
pH
DO
Treated Sewage
TSS
CBOD Ammonia
MGD
C
S.U. mg/L mg/L mg/L
mg/L
0.083
19.4
7
7.8
0.02
-1.28
0.17
0.078
19
7.8
7.7
0.03
-0.14
0.19
0.079
19.1
7.8
7.6
0.08
-1.09
0.17
0.078
_________
0.089
_______
__________
0.081
__________
0.082 0.079
_______
18.1
-
_______
7.8
8.6
______
0.07
_______
1.23
_________
0.03
0.078 19.5
9
8
0.36
-2.05
0.11
0.078
19.4
8.9
7.6
0.15
-2.01
0.18
0.079
__________
0.079
_________
0.079
__________
0.08
0.081
18.5
8.6
7.6
0.05
-1.35
0.19
0.081
19.8
8.1
7.6
0.07
-1.38
0.05
0.079 19.2 8.4
7.4
0.13
-1.1
0.19
0.07
0.024
_________
0.03
__________
0.031
0.054
20.1
8.6
8.8
0.12
__________
-1.47
0.19
0.08
19.7
6.8
8.1
0.08
0.78
0.03
0.082
20
8.2
8.6
0.02
-2.36
0.19
0.08
0.091
_________
0.089
0.081
0.083
18.4
8.1
7.4
0.06
-1.73
0.18
0.079
17.3
8.3
6.2
0.13
-2.45
0.02
_______
Phos mg/L 0.07 0.07 0.07
_______
_______
_______
_______
0.04 0.02 0.06
_______
_______
_______
_______
0.07 0.02 0.08
_______
_______
_______
_______
0.08 0.04 0.08
_______
_______
_______
_______
0.07 0.07
________
E. coil
ct/looml
0 0 0
________
________
________
________
0 0 0
________
________
________
________
0 0 0
________
________
________
________
0 0 0
________
________
________
________
0 0
Total
X
X
2.237
X
X
X
X
X
X
X
0
Avg.
X
65.73333 0.07457 19.10714 8.1 7.78571 0.09786 -1.17143 0.135
0.06
0
Mm.
X
55
0.024
17.3
6.8
6.2
0.02
-2.45
0.02
0.02
0
Max.
X
91
0.091
20.1
9
8.8
0.36
1.23
0.19
0.08
0
Saganing WWTP Inspection Report Appendix 2
page 56 of 92
________
Day 1 2 3 4 5
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
23 24 25
26
27 28 29 30 31 Average Mi Max.
Saganing WWTP June 2022
CBOD %Removal
TSS %Removal
101.1993841
99.94495711
100.187547
99.80155533
102.8886813
99.51184095
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
98.37741303
99.62830151
102.4748299
98.00715381
101.9952632
99.24117132
#DIV/0!
#DIV/0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
96.64021753
99.82437311
101.6491323
99.59782528
101.2802852
99.92521737
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
101.650377
99.51830157
98.97354915
99.61612284
101.8040055
99.90260242
#DIV/0
#DIV/0!
#DIV/0!
#DIV/0
#DIV/0 #DIV/0!
102.0918664
#DIV/0! #DIV/0!
99.88563529
93.85999001
99.78851494
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Saganing WWTP Inspection Report Appendix 2
page 57 of 92
________________
Day 1 2 3 4
5 6 7
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
________________
Aluminum Sulfate, 50%
Pounds 46 44 50 46 50 46 48 48 46 50 48 50 46 46 50 46 50 26 32 34 32 28 30 32 34 30 22 40 34 32
Saganing WWTP June 2022
Citric Acid, 50% (cleaning)
Sodium Bicarb
Pounds
Pounds
__________________ __________________ __________________ _________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ ___________________ ___________________ __________________ ___________________ __________________ ___________________ ___________________ ___________________ __________________ ___________________ __________________ __________________ __________________ ___________________ ___________________ ___________________ __________________ ___________________ _________________
___________ ___________ ___________ ___________ ___________
___________ ___________ ___________ ___________ ___________ ____________ ____________ ___________ ____________ ___________ ____________ ____________ ____________ ___________ ____________ ___________ ___________ ___________ ____________ ____________ ____________ ___________ ____________ ___________
50
___________________________
Sodium Hypochlorite, 12.5% (cleaning)
Pounds
__________________________ __________________________ __________________________ _________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ ___________________________ ___________________________ __________________________ ___________________________ __________________________ ___________________________ ___________________________ ____________________________ __________________________ ___________________________ __________________________ __________________________ __________________________ ___________________________ ___________________________ ___________________________ __________________________ ___________________________ _________________________
Total Lbs. Soln.
1216
0
50
Total Lbs. Chemical
608
0
49.5
Average
40.53333333
#DlV/0!
50
Max.
50
0
50
Mm.
22
0
50
0 0
#DIV/0!
0 0
Saganing WWTP Inspection Report Appendix 2
page 58 of 92
(L)
-
______________________
-
-
Day 1
________
Type
_______
p/c
2
3
4
5
6
p/c
7
p/c
8
p/c
9
10
11
12
13
p/c
14
sunny
15
sunny
16
17
18
19
20
p/c
21
p/c
22
sunny
23
24
25
26
27
sunny
28
sunny
29
sunny
30
31
Total
X
Avg.
X
Miii.
X
Max.
X
Weather Temp.
F 73 61 64 70 72 69 62 66 80 72 69 66 64 62 71 70 68 68 76 77 74 70 76 70 61 63 69 68 65 61 79 X 68.90323 61 80
Precip. inches 0.04
0 0 0 0.13 0 0 0 0 0 0 0.29 0.15 0.3 0 0 0 0 0 0 0.03 0 0 0.8 0.05 0 0 0.12 0 0 0 1.91 0.0616129 0 0.8
Saganing WWTP July 2022
Plant Influent Sheet
_______
Flow
Raw Sewage
Total Temp.
pH
DO
TSS
BOD
MGD
C
S.U.
mg/L
mg/L
mg/L
0.062
20.7
7.1
4.8
71
205
0.064
0.063
__________
0.065
0.06
0.067
20
7
3.4
71
597
0.061
19.7
7.2
5.3
107
222
0.069
19.6
7.2
5.4
107
175
0.061
0.065
0.061
0.064
0.088
20.4
7.6
6.7
38
110
0.051
20.3
7.6
6.5
48
439
0.059
20.8
7.8
5.3
129
161
0.051
0.067
0.055
0.053
0.051
105
239
0.042
135
184
0.039
19.8
7.8
4
129
-52
0.048
0.067
__________
0.053
0.074
0.055
19.7
8
3.8
23
326
0.045
19.9
8
3.6
39
158
0.054
19.9
7.6
6.7
39
0.33
0.048
0.05
1.812
X
X
X
X
X
0.0584516 20.0727 7.53636 5.045455 80.07692308 212.6407692
0.039
19.6
7
3.4
23
-52
0.088
20.8
8
6.7
135
597
__________
CBOD mg/L 214
___________ __________
568 260 223
__________
___________
120 328 158
__________
___________
207 174 -51
__________
___________
345 172 10
___________
X 209.8461538
-51 568
__________
TSS mg/L 7
Day Average 71
95
71.66666667
123
33.66666667 90.16666667
Saganing WWTP Inspection Report Appendix 2
page 59 of 92
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Total
Avg. Mm. Max.
____________
Weather
Type Temp.
F
p/c
73
0
61
0
64
0
70
0
72
p/c
69
p/c
62
p/c
66
0
80
0
72
0
69
0
66
p/c
64
sunny
62
sunny
71
0
70
0
68
0
68
0
76
p/c
77
p/c
74
sunny
70
0
76
0
70
0
61
0
63
sunny
69
sunny
68
sunny
65
0
61
0
79
X
X
X
68.90323
X
61
X
80
Saga ning WWTP July 2022
_____ Plant_Effluent_Sheet
Flow
________
-
_______
Treated Sewage__________ _______
Total Temp. pH
DO
TSS
CBOD Ammonia Phos
________
E. coli
MGD
C
S.U. mg/L mg/L mg/L
mg/L
mg/L ct/looml
0.078
20.3
8.1
8.4
0.09
2.1
0.04
0.02
0
0.079
_________
_______
_______
-
_______
_______
_______
0
0.079 _______
_________
_______
-
_______
_______
_______
0
0.079 _______
_________
_______
-
_______
______
_______
0
0.078 - _______
_______
_______
_______
_________
_______
0
0.081
19.8
8.8
7.9
0.1
-5.73
0.17
0.07
0
0.078
19.9
8.6
8.1
0.01
-1.23
0.02
0.06
0
0.084
19.9
8.4
8.1
0.14
-1.63
0.01
0.07
0
0.075
_______
_________
_______
-
_______
______
_______
0
0.08 _______
__________
_______
-
_______
_______
_______
0
0.076
_______
_______
-
_______
______
_______
_________
0
0.08 _______
_________
_______
-
_______
______
_______
0
0.095
20.7
7.8
6.8
0.15
0.15
0.17
0.07
0
0.096
20.7
7.8
6.7
0.01
-0.32
0.19
0.07
0
0.058
19.2
8.8
9.2
0.01
-0.08
0.03
0.08
0
0.042
_______
_______
-
_______
______
_______
_________
0
0.074
_________
_______
_______
-
_______
______
_______
0
0.054 _______
_________
_______
-
_______
______
_______
0
0.054
_______
_________
_______
-
_______
______
_______
0
0.055
23.2
8.1
9.1
0.03
-2.29
0.02
0.06
0
0.044
19.6
8.4
9.3
0.05
-2.07
0.01
0.06
0
0.042
20.1
6.1
7
0.03
-1.11
0.02
0.07
0
0.048 _______
__________
_______
-
_______
______
_______
0.069
_______
_______
-
______
______
_______
_________
0.064 _______
_________
_______
-
______
______
_______
0.076
0 0 0 0
0.057
18.4
7.8
9.5
0.02
-3.81
0.02
0.07
0
0.047
18.5
7.7
9.3
0.02
-1.8
0.03
0.07
0
0.056
19.9
7.8' 6.7
0.1
0.04
0.01
0.22
0
0.049
0
0.05
_______
_______
-
_______
______
_______
__________
0
2.077
X
X
X
X
X
X
X
0
0.067 20.01538 8.015 8.16154 0.05846 -1.36769 0.05692308 0.076154
0
0.042
18.4
6.1
6.7
0.01
-5.73
0.01
0.02
0
0.096
23.2
8.8
9.5
0.15
2.1
0.19
0.22
0
Saganing WWTP Inspection Report Appendix 2
page 60 of 92
________
Day 1 2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
22 23 24 25
26 27 28
29 30 31 Average
Mm.
Max.
Saganing WWTP July 2022
CBOD %Removal
TSS %Removal
97.56101193
99.68156189
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0
#DIV/O!
#DIV/0!
#DIV/0!
102.4693105
99.66002812
101.2171991
99.97610214
101.7956627
99.68193694
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
99.73047734
99.15134371
100.3679641
99.92159937
100.099599
99.98476006
#DIV/01
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
102.4149055
99.93839433
102.5240684
99.92242869
95.41957733
99.9499231
#DIV/0!
#DIV/0!
#DIV/0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
102.315513
99.81992513
102.2102046
99.89293484
99.17379758
99.46959651
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Saganing WWTP Inspection Report Appendix 2
page 61 of 92
________________
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Total Lbs. Soln. Total Lbs. Chemical
Average Max. Mm.
________________
Aluminum Sulfate, 50%
Pounds 34 30 30 40 30 36 34 34 38 38 38 28 36 36 36 32 32 36 36 38 38 36 40 36 50 48 46 46 46 42 54
1174 587 37.87096774 54 28
Saganing WWTP July 2022
Citric Acid, 50% (cleaning)
Pounds
_________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ __________________ __________________ _________________ __________________ __________________ ________________ ___________________ __________________ ___________________ __________________ __________________ __________________ __________________ __________________ __________________ _________________ __________________ _________________ __________________ __________________ __________________ _________________ __________________
0 0
#DIV/0!
0 0
Sodium Bicarb
Pounds 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
___________________________
Sodium Hypochlorite, 12.5% (cleaning)
Pounds
__________________________ __________________________ __________________________ _________________________ _________________________ __________________________ __________________________ __________________________ __________________________ __________________________ _________________________ __________________________ __________________________ ________________________ ___________________________ __________________________ ___________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ _________________________ __________________________ _________________________ __________________________ __________________________ __________________________ _________________________ __________________________
0 0
#DIV/0!
0 0
Saganing WWTP Inspection Report Appendix 2
page 62 of 92
(T
Saga nng Water ;3nd Wastewater
mprovements
Prepared by Fish beck fortheSaginawChippewalndianTribe(scll)
Of M1G'
TfShbCft Engineers I Architects I Scientist
Saganing WWTP Inspection Report Appendix 2
page 63 of 92
Introduction
Saginaw Chippewa Indian Tribe (SCIT) retained Fishbeck to complete a water and wastewater treatment system evaluation of their facility in Saganing, Michigan. SCIT recently opened a 148-room hotel and signed an agreement with Standish Township to provide water and wastewater services to the nearby Whites Beach Service Area (WBSA).
In July of 2020, a report was prepared entitled "Saga ning Casino Water and Wastewater Treatment System Evaluation"
Fishbeck evaluated the existing water demands and
I
wastewater flows, estimated the impact of the future demand
and flow associated with the Whites Beach Service Area, and
then determined if the SCIT facilities could reliably handle the projected future water demand and wastewater flow
', J
_____
Saganing WWTP Inspection Report Appendix 2
page 64 of 92
Background
In 2018 the SCIT signed an agreement with Standish Township to provide potable water and wastewater treatment services to a defined area in the Township identified as the Whites Beach Service Area (WBSA).
A 2016 Master Plan prepared by Rowe Engineering is the planning document that projected demands from the Casino and from the 240 acres adjacent to the casino that may be developed.
Fishbeck has prepared drawings and specifications for Phase 1 improvements at the Water Wastewater Plant in Sagan ing. The project is out for bids currently.
Fishbeck is also finishing a Scoping Study for a Phase 2 Expansion at the Saganing plant that will establish future treatment and facilities for the demands on the system over a 20-year planning period. Short Term Phase 1 Improvements are intended to cover a 4-year timeline.
Fishbeck has prepared a Water System Evaluation Study which looked at the water system, future water system demands, and the location of a possible elevated storage tank. Fish beck will proceed with the design of the elevated storage tank upon authorization from the SCIT.
Upon completion of the Scoping Phase Fishbeck will proceed with the design of the selected improvements and facilities for the Phase 2 improvements.
Saganing WWTP Inspection Report Appendix 2
page 65 of 92
Water System
Current Water Treatment Plant Description
Constructed in 2011. The water treatment plant (WTP) receives raw water from the Saginaw-Midland
Municipal Water Supply Corporation (SMMWSC). Two Siemens MEMCOR XP18 membrane skids treat the water by using
ultrafiltration to remove particulate contaminants.
B Ti
-
Saganing WWTP Inspection Report Appendix 2
page 66 of 92
Water System
Current Water Treatment Plant Description, Continued
Each skid has a nominal capacity of 75,000 gallons per day (gpd). Filtered water is disinfected and stored in clear wells in the building until it is
pumped out to the distribution system that services the casino, hotel, and tribal facilities. Medium and high flow pumps deliver treated water to the distribution system. S Pumps are running continuously to maintain pressure on the system, and a pressure sustaining valve vents water back into the clear wells if not needed in the system.
Saganing WWTP Inspection Report Appendix 2
page 67 of 92
Water System
Current Demands
% ccc c ccc
7C CCC 6C CX
sc ccc
4C CCC
ccc
LI 2C CCC
1C CCC
Saganing WWTP Inspection Report Appendix 2
page 68 of 92
Future Development
Rowe Study
Other Land Use Planning studies
Water Demand Projections
Water System Evaluation Study
projections
Saginaw-Midland Municipal Water Supply Corporation (SMMWSC) and SCIT Agreement
Period
Maximum Allowable Daily Use (gpd)
2011 to 2015, inclusive 2016 to 2020, inclusive 2021 to 2025, inclusive 2026 to 2030, inclusive 2031 to 2034 and thereafter
40,000 130,000 250,000 500,000 1,000,000
gpd - gallons per day
Cumulative Water Demands Through Full Build-Out
2022-2026 2027-2031 2032-2036
Area
Classification
ADD (gal/day) ADD (gal/day) ADD (gal/day)
Existing System*
63,000
WBSA ______________________
18,800
1 Low Density Commercial
-
2 Low Density Commercial
-
3 Residential
-
4 Forest & Recreation 5 High Density Commercial 6 High Density Commercial 7 Low Density Commercial 8 Residential 9 Forest & Recreation 10 High Density Commercial
-
12,091 2,970 6,037 7,996 3,491 9,818
11 High Density Commercial 12 Forest & Recreation
10,728 6,109
14 High Density Commercial
4,455
15 Forest & Recreation
330
18 Forest & Recreation Total System ADD (mgd) Total System MDD (mgd) Total System PKHR (mgd)
1,610 0.15 0.25 0.58
Existing system is atfull buildout according to Rowe's study
63,000 18,800
6,263 4,731
228 1,348 30,228 7,424 15,094 19,990 8,728 19,637 26,819 15,273 8,909
824 4,024
0.25 0.46 0.89
63,000 18,800 18,788 14,193
684 4,044 54,410 13,364 27,169 35,981 15,710 32,728 48,274 27,492 14,849 1,484 7,244
0.40 0.75 1.33
2037-2041 ADD (gal/day)
63,000 18,800 34,445 26,020
1,254 7,414 84,638 20,788 42,262 55,971 24,437 49,092 75,093 42,765 22,273 2,308 11,268
0.58 1.12 1.88
Full Build-Out ADD (gal/day)
63,000 18,800 62,627 47,309
2,280 13,479 120,912 29,698 60,375 79,958 34,910 65,456 107,275 61,093 29,698
3,297 16,097
0.82 1.59 2.58
Saganing WWTP Inspection Report Appendix 2
page 69 of 92
Future Development, Continued
Utility Corridor Map ( I
/
________
-
4 ____________ _____
U
------ -
-
? 1I /
-
I
_
_
(
I
Area No 8 52Aes
-
ao
I.-'
-
, .-'-
7/ AeaN
//// /
/I
/ I fl
-
I
-
-
-
--,
-I -'_ I_--. --
____________
-
II
________
ULEGEND
'-
'.--
-. i
-
-
Roeecntial Freost&Reuea000 LOv.-Oeos8y Conrd HIgh-Deflate COflfl,c,d
%uTIUTYcoRRlDoRMAP
-
Saganing WWTP Inspection Report Appendix 2
page 70 of 92
Future Development, Continued
Utility Corridor Development Timeline
rea
No.
_____________________
Zone
1 Low Density Commercial
2 Low Density Commercial
3 Residential
4 Forest & Recreation
5 High Density Commercial
6 High Density Commercial
7 Low Density Commercial
2022-2026
__________
0% 0% 0% 0% 10% 10% 10%
S Residential
10%
S Forest & Recreation
10%
10 High Density Commercial
15%
11 High Density Commercial
10%
12 Forest & Recreation
10%
13 High Density Commercial
15%
14 Forest & Recreation
10%
15 Forest & Recreation
10%
16 Existing SCIT Water User 17 Existing SCIT Water User
100% 100%
18 Existing SCIT Water User
100%
2027-2031
__________
10% 10% 10% 10% 25% 25% 25% 25% 25% 30% 25% 25% 30% 25% 25% 100% 100% 100%
2032-2036
__________
30% 30% 30% 30% 45% 45% 45% 45% 45% 50% 45% 45% 50% 45% 45% 100% 100% 100%
2037-2041
__________
55% 55% 55% 55% 70% 70% 70% 70% 70% 75% 70% 70% 75% 70% 70% 100% 100% 100%
Saganing WWTP Inspection Report Appendix 2
page 71 of 92
Phase 1 Water System
The following improvements are included in the Phase 1 design documents: Demolition of the low flow pumps and controls. One redundant medium flow pump. One redundant pressure sustaining valve (PSV). Two Ultrafiltration (UF) equipment skids (procured equipment). Installation of the UF procured equipment. New finished water pump control and control panel. An additional inline booster pump and new control panel.
Process piping Improvements.
Associated control and electrical conduit and wiring.
Saganing WWTP Inspection Report Appendix 2
page 72 of 92
Water System Build out Capacity
Memcor XPsr18 Skid Production Volumes
No of Skids Filtrate Produced (gal) One 8-hour Shift
Filtrate Produced (gal) Two 8-hour Shifts
1
25,000
2
50,000
3
75,000
4
100,000
5
125,000
6
150,000
50,000 100,000 150,000 200,000 250,000 300,000
Filtrate Produced (gal) Three 8-hour Shifts
75,000 150,000 225,000 300,000 375,000 450,000
Saganing WWTP Inspection Report Appendix 2
page 73 of 92
Water System
Elevated Tank Recommendations:
The Water System Evaluation Study has recommended the construction of a minimum 250,000-gallon tank.
Various selections of site locations were identified with the most favorable as indicated in the next slides.
Saganing WWTP Inspection Report Appendix 2
page 74 of 92
Water System
Existing Water
Distribution System Pressure Contours
-,
irI
______
-'
:HVTFI- S
-.---- -
-
- ----
Ir
'1): T -,--=---
-- -. Ct.]
/ 3-
-
-
I
--.,
,
-
-
-
nzfJl /.-
'
i'-;:
___
-'--A I
tL__
___
-'.
-
1I LEGEND
r
pant
I: - -
-
prnnre contoo
______
, EXISTING AVERAGE DAY 2O5n
DEMANDPRESSURECONTOURS
tORTH
6
Saganing WWTP Inspection Report Appendix 2
page 75 of 92
-
:,t
0)-i
I--' c-1 -'
0)- -,
0) (1)
CD
B
II/ 7 __J
/
1'
I
-
I -
-
-
-
-I -
6 _______
: ; Z I
m
---
,
h!!'
m
_}.
0
-
Saginaw Chippewa Indian Tribe
ArnoConIy.M hI
SagIng CaIn Wat.r Dl,tribtlon Syst.n d Elev.ted Wte, Strqe Tank EvItin
-
1 r is
Saganing WWTP Inspection Report Appendix 2
page 76 of 92
ec(
Wastewater System
Current Wastewater Flows
0.14
0.12
0.1
0.08
0.06
0.04
0.02
11
\ \2 \ \ \ \
9 \ \ \ \v
Date
-
- ...... -
Covid
.-. -. 0
c 9 \ \ \
0)
I)
Saganing WWTP Inspection Report Appendix 2
page 77 of 92
Wastewater System
Wastewater System Capacity
The current treatment system consists of 2 Siemens Xpress Membrane Biological Reactor (MBR) treatment units.
Table 5 - MBR Treatment Unit Capacity
Allowable
Number of Units
Sustained
in Service
Continuous
Flow (gpm)
1
70
2
140
Net Throughput for Sustained Flow with
Relaxation Periods (gpd)
100,800
201,600
Allowable Peak Flow or Three Day
Sustained Flow (gpm)
Allowable Peak Flow with
Relaxation Period (gpd)
140
201,600
280
403,200
Saganing WWTP Inspection Report Appendix 2
page 78 of 92
Wastewater System
Projected Wastewater Treatment plant flows:
Typical wastewater generation is about 80% of the water flow. Assuming that relationship holds true for future water wastewater design flows the
following projections of wastewater flow are made over the 20-year planning period.
Saganing WWTP Inspection Report Appendix 2
page 79 of 92
Wastewater Treatment System
Wastewater Flows Projections
Area
Classification
2022-2026 ADF (gal/day)
2027-2031 ADF (gal/day) 2032-2036 ADF (gal/day) 2037-2041 ADF (gal/day) Full Bud-Out ADF
Existing System
WBSA
1
Low Density Commercial
2
Low Density Commercial
3
Residential
4
Forest & Recreation
5
High Density Commercial
6
High Density Commercial
7
Low Density Commercial
8
Residential
9
Forest & Recreation
10
High Density Commercial
11
High Density Commercial
12
Forest & Recreation
14
High Density Commercial
15
Forest & Recreation
18
Forest & Recreation
Eotal System ADF (mgd)
rotal System MDF (mgd)
fatal System PKI-IR (mgd)
49,500 15,000
0 0 0 0 9,673 2,376 4,830 6,397 2,793 7,854 8,582 4,887 3,564 264 1,288 0.12 0.16 0.46
49,500 15,000 5,010 3,785
182 1,078 24,182 5,939 12,075 15,992 6,982 15,710 21,455 12,218 7,127 659 3,219 0.20 0.28 0.78
49,500 15,000 15,030 11,354
547 3,235 43,528 10,691 21,735 28,785 12,568 26,182 38,619 21,994 11,879 1,187 5,795 0.32 0.44 1.24
49,500 15,000 27,556 20,816 1,003 5,931 67,710 16,630 33,810 44,777 19,550 39,274 60,074 34,212 17,818 1,846 9,014
0.46 0.64 1.81
49,500 15,000 50,102 37,847 1,824 10,783 96,730 23,758 48,300 63,966 27,928 52,365 85,820 48,874 23,758 2,638 12,878
0.65 0.90 2.54
Saganing WWTP Inspection Report Appendix 2
page 80 of 92
Wastewater System
The following WWTP improvements are included in the Phase 1 design documents:
Demolition of the influent pumps and replacement of 3 existing pumps.
Piping improvements to allow the bypass of the raw wastewater wetwell for repair, cleaning and maintenance.
Process piping Improvements.
Control panel updating and associated control and electrical conduit and wiring.
-I
__
Ii F I
Saganing WWTP Inspection Report Appendix 2
page 81 of 92
Water Wastewater System Conclusions
Current system reliability and redundancy concerns and the necessity to handle immediate demands requires that the Phase 1 project be constructed.
Improvements for Phase 1 are interim measures, and a Phase 2 design report is currently being completed for recommended improvements over the 20-year planning period.
Saganing WWTP Inspection Report Appendix 2
page 82 of 92
Water Wastewate r System Co nd usio ns,
Continued
Expected Phase 2 water improvements:
Additional UF skids or other membrane system in a building expansion. Associated booster pump and air compressor capacity. SCADA system for better process control and remote monitoring.
Upsizing high service Pumps. Additional clear well capacity.
Expected Phase 2 wastewater Improvements:
An equalization tank with aeration and mixing. Large solids removal prior to the Raw Wastewater Pumping Station. Possible oil and grease removal system. Additional Membrane Biological Reactor (MBR) or Moving Bed Biofilm Additional building expansion to contain the treatment units. Sludge handling and storage facilities
Long term agreements for sludge hauling and disposal. SCADA system for better process control and remote monitoring. Upgrade Chemical Feed Systems.
Reactor
(MBBR).
Saganing WWTP Inspection Report Appendix 2
page 83 of 92
Water Wastewater System Conclusions,
Continued
Elevated Storage Tank
The completion of the Water System Evaluation allows for the Elevated Tank design
to begin.
A minimum 250,000-gallon tank has been recommended in the Water System Evaluation Study recently completed.
Saganing WWTP Inspection Report Appendix 2
page 84 of 92
Water Wastewater Project Schedule
0 Task
I
W
1201562055 Phase I Oseign and 8idng
2$
lwphsgPhase(Phase2Deslgnlaslsnnndy)
29
W
Phase 2Deslgnand6Idding
10
(lenatedlank Design and Biddlisg
89
r
90
Pnel-PrvcuredEqutShopliravdsgs and delivery
94 U PhaselCerutructlon
137
Phase 2- Procured lqulpmeirtshup Dr2wing and delivery
112
Phane2 cononrecnicn
2
1
127 U Elevaned Tank Conanruellon
Dsoa1or
I 132 days
Stan
Moss 10111/21
Saganing Design and Construction
Preliminary Schedule
Feuds
Tue 6/21/22
Psodevessors
2102rC2n2l ovi,ocui
askpdadsv02roneonutyo
__
72 days Tue 3/2/22 Wed 6/15/22
303 days Wed 6/13/22 Mon 8/14/23
383d2y5 Thvll/4/21 Mon4/Z4/23
1,202500 20220053522 Qoa, 2022 Tel. 532305-02123003.2C23
Scaphrg Phase (Phase 2 Design Eons Shady) Phase 2 Design and Bidding ________________________________
Eienated Tank Design and Bidding
3 t.2C2305rZ232$SOi 202$
186 days Tue 3/2/22 The 10/11/22 235 days Wed 6/22/22 Tue 4/1.3/23 126 days Fri 3/3/23 Fri 8/25/23 305 days Tue 8/16/23 Mon 12/03/24
-.
Phase 1- Provured EcpmrO9 lImp Dramlogn and delivery
- Phase 1 Ceimtniclian
___________ Phase 2- Procured Equipment Shop Drandngand delivery
____________________________________
Phase 2 Connnrncticn
252 days Tue 4/21/23 Wed 4/10/24
Saganing WWTP Inspection Report Appendix 2
page 85 of 92
.27Q2.m,7pN
Saganing WWTP Inspection Report Appendix 2
'-I
.)
ii
CdF
Of
rfnshbeckI Engineers Architects Scientists Constructors
___________
page 86 of 92
TNT 830 Nitrogen, Ammonia
,j3
D0C312.53.94125
0.015-2.000 mg/L NH3-N Ultra Low Range
TNTplus
Scope and application: For municipal and industrial wastewaters, environmental waters and watershed protection monitoring.
Test preparation
Reagent storage pHlTemperature
Before starting
Storage temperature: 2-8 C (35-46 F)
The pH of the water sample must be between pH 4-8. The temperature of the water sample and reagents must be between 20-23 C (68-73.4 F).
In case of not working at the correct recommended temperature an incorrect resultrnay be obtained.
Analyze the samples as soon as possible for best results.
Time dependency: The final absorbance is reached after a reaction time of 15 minutes and then remains constant fora further 15 minutes.
Review safety information and expiration date on the package.
Review the Safety Data Sheets (MSDS/SDS) for the chemicals that are used. Use the recommended personal protective equipment.
Dispose of reacted solutions according to local, state and federal regulations. Refer to the Safety Data Sheets for disposal information for unused reagents. Refer to the environmental, health and safety staff for your facility and/or local regulatory agencies for further disposal information.
Procedure
1. Carefully remove the foil from the screwed-on DosiCap Zip.
2. Unscrew the DosiCap Zip.
3. Carefully pipet 5.0 mL of sample.
4. Immediately screw the DosiCap Zip back on; fluting at the top.
Saganing WWTP Inspection Report Appendix 2
page 87 of 92
5. Shake vigorously (2-3 times).
6. After 15 minutes, thoroughly clean the outside of the vial and evaluate.
7. Insert the vial into the cell holder. DR 1900: Go to LCK/TNTplus methods. Select the test, push READ.
Interferences
Interference level 1000 mg/L 500 mg/L 50 mg/L 25 mg/L 10 mg/L 5 mg/L 2 mg/L
The ions listed in the table have been individually checked against the given concentrations and do not cause interference. The cumulative effects and the influence of other ions have not been determined. Primary amines are also determined and cause high-bias results. A 10,000-fold excess of urea does not interfere. All reducing agents interfere and cause low-bias results. A large excess of ammonium can cause result displays within the measuring range. It is advisable to carry out a plausibility check by making dilutions. The measurement results must be subjected to plausibility checks (dilute and/or spike the sample).
Interfering substance
CI, SO42-
K, Nat Ca2
C032, NO3-, Fe3t Crt Crt Zn2t Cu2t Co2t Ni2t Hg2'
Fe2
Sn2
Pb2
Ag
Summary of method
Ammonium ions react at pH 12.6 with hypochiorite ions and salicylate ions in the presence of sodium nitroprusside as a catalyst to form indophenol blue.
TN rInUIuIIsI
________ FOR TECHNICAL ASSISTANCE, PRICE INFORMATION AND ORDERING:
HACH COMPANY
in the U.S.A. - Call toli.free 800.227.4224WORLD HEADQUARTERS
Outside the U.S.A. - Contact the HACH office or distributor serving you.
Telephone: (970) 669-3050
On the Worldwide Web - www.hach.com; E-mail - techhelp@hach.com
FAX: (970) 669-2932
Hach Company, 2019. All rights reserved.
02/2019, Edition I
Saganing WWTP Inspection Report Appendix 2
page 88 of 92
I,
('S
TNT 843 Phosphorus, Reactive (Orthophosphate) and Total
0.05-1.50 mg/L P043 -P or 0.15-4.50 mglL P043 Low Range
TNTpIus -Method 10209/10210
Scope and application: For wastewater, drinking water, boiler water, surface water and process analysis.
L[I1 Test preparation
Reagent storage pH/Temperature
Before starting
Storage temperature: 15-25 C (59-77 F)
The pH of the water sample must be between pH 2-10. The temperature of the water sample and reagents must be between 15-25 C (59-77 F).
ATTENTION-Important information for the evaluation! Without hydrolysis, onlythe (dissolved) orthophosphate is measured. The result of the orthophosphate measurement can
be expressed as: mg/L P04-P (for example,process,analysis), mg/L P04 (for example, drinking water or boiler water analysis), mg/L P205 (for example, soil analysis).
With hydrolysis, all of the phosphorus (Total-P, Ptotal) is measured. The result of the total phosphorus measurement can
be expressed as: mg/L Ptot = Display mg/L P04-P (for example,for monitoring threshold values in wastewater), mg/L P04 (for example, drinking water or boiler water analysis), mg/L P205 (for example, soil analysis).
Inverting the vial after hydrolysis improves the reliability of the result.
Determination of orthophosphate: filtrate the samplbefore the analysis
In case of not working at the correct recommended temperature an incorrect result may be obtained.
feview safety information and expiration date on the package.
Review the Safety Data Sheets (MSDS/SDS) for the chemicals that are used. Use the recommended personal protective equipment.
Dispose of reacted solutions according to local, state and federal regulations. Refer to the Safety Data Sheets for disposal information for unused reagents. Refer to the environmental, health and safety staff for your facility and/or local regulatory agencies for further disposal information.
Procedure-Phosphorus Total
1r ,4lII5A
r I -.
1. Preheat the reactor to
2. Carefully remove the foil 3. Unscrew the DosiCap
100 C (212 F).
from the screwed -on
Zip.
DosiCap Zip.
__________
__________
6
4. Carefully pipet 2.0 mL of sample.
Saganing WWTP Inspection Report Appendix 2
page 89 of 92
5. Immediately screw the DosiCap Zip back on; fluting at the top.
Vt J
6. Shake vigorously.
_____
7. Heatin the reactorforl hour at 100 C (212 F).
F
U
8. Allow to cool to room
temperature.
9. Shake vigorously
10. Unscrew the DosiCap Zip.
: on1
11. Pipet into the cooled vial: 0.2 mL reagent B. Close reagent B immediately after use.
12. Screw a grey colored DosiCap C on the vial.
13. Invert a few times until the freeze-dried contents are completely dissolved
14. After 10 minutes, invert a few more times, thoroughly clean the outside of the vial and evaluate.
15. Insert the vial into the cell holder. DR 1900: Go to LCKITNTplus methods. Select the test, push READ.
2
Saganing WWTP Inspection Report Appendix 2
TNT 843 Phosphorus, Reactive (Orthophosphate) and Total
page 90 of 92
Procedure-Phosphorus Reactive (Orthophosphate)
(2::
a
1. Carefully pipet 2.0 mL of sample.
i: Q'
2. Pipet 0.2 mL reagent B. Close reagent B immediately after use.
: ___
3. Screw a grey colored DosiCap C on the vial.
4. Invert a few times until the freeze-dried contents are completely dissolved.
5. After 10 minutes, invert a few more times, thoroughly clean the outside of the vial and evaluate.
6. Insert the vial into the cell holder. DR 1900: Go to LCK/TNTplus methods. Select the test, push READ.
Interferences
Interferencelevel 5000 mg/L 2000 mg/L 1000 mg/L 500 mg/L 250 mg/L 100 mg/L 50 mg/L
5 mg/L 2.5 mg/L 1 mg/L 0.5 mg/L '
The ions listed in the table have been individually checked against the given concentrations and do not cause interference. The cumulative effects and the influence of other ions have not been determined. The measurement results must be subjected to plausibility checks (dilute and/or spike the sample).
Interfering substance
S042
Cl
K, Na
NO3Ca2
Mg2
Co2, Fe2, Fe3, Zn2, Cu2, Ni2, 1, NO2-, Cd2, NH4,
Mn2, Al3, C032, SiO2
Sn4, Hg2
Ag, Pb21
Cr
TNT 843 Phosphorus, Reactive (Orthophosphate) and Total
3
Saganing WWTP Inspection Report Appendix 2
page 91 of 92
Summary of method
Phosphate ions react with molybdate and antimony ions in an acidic solution to form an antimonyl phosphormolybdate complex, which is reduced by ascorbic acid to phosphormolybdenum blue.
TNTp"il1ls
_______ FOR TECHNICAL ASSISTANCE, PRICE INFORMATION AND ORDERING:
In the U.S.A. - Call toll-free 800-227-4224
_____________
Outside the U.S.A. - Contact the HACH office or distributor serving you.
On the Worldwide Web - www.hach.com; E-mail - techhelp@hach.com
Hach Company, 2019. All rights reserved.
Saganing WWTP Inspection Report Appendix 2
page 92 of 92