Document Z471mqgbrJwVmVMEgBEbVYkRp
A Division of The Society of The Plastics industry, Inc.
RECEIVED
AUG 1 0 1989
Sherry M. Carr.
Roy T. Gottesman
Executive Direcior
August 8, 1989
TO: The Pipe Resources Organization RE: Information From Uni-Bell
I believe the attached two letters received from Bob Walker at UniBell will be of interest and value to you.
RTG/pmb enclosures
CTL027698
Wayne Interchange Plaza II 155 Route 46 West Wayne, NJ 07470 (201) 890-9299
UNI-BELL PVC PIPE ASSOCIATION
2655 Villa Creek Drive, Suite 155 Dallas, Texas 75234-7362 Phone (214) 243-3902 Fax (214) 243-3907
August 4, 1989
TO: Roy Gottesman
FROM:
Robert Walker
SUBJECT: Large Diameter Pipe Competition
RtC'D AUG 71989
Per your request we obtained an internal analysis of non-PVC, large diameter pipe prices
conducted by one of our members. While I cannot attest to the accuracy of the figures, I consider the source to be a reliable one.
Corrugated Steel Pipe fNon-Pressurel
The term gauge refers to wall thickness of metal pipe used for culverts and storm drains (not
applicable to iron pressure pipes). In this nomenclature, the smaller the Gauge the thicker the wall of the pipe.
Corrugated Metal Pipe
Gauge
18 16 14
12 10 8
Wall Thickness
ininchcs
0.052 0.064 0.079 0.109 0.138 0.168
Only corrugated steel is included in this pipe analysis. Corrugated aluminum has an AASHTO Specification, but it is a minor factor in the market because it is difficult to install. Generally, a lower Gauge aluminum is often required against a higher Gauge steel because aluminum is highly flexible and will buckle thus adding to the installation disadvantage.
18 Gauge steel is rarely used in diameters larger than 10".
16 Gauge Steel is generally restricted to 24" and below for most highway projects.
14 Gauge steel is generally not used in diameters larger than 36" for most highway projects.
CTL027699
TECHNOLOGY SERVING THE WATER AND SEWER INDUSTRIES
August 4, 1989
Page 2
12 Gauge steel may be used for all diameters, 48" and smaller.
10 Gauge steel may be used for all larger diameters 48" and smaller. It is estimated, however, that less than 20 percent of metal projects are specified 10 Gauge.
CORRUGATED STEEL PRICE TABLES
Corrugated Steel: 16 Gauge
Diameter (D)
Wt (Lbs/Ft)
Price ($/Ft)
18 15
$6.00
21 17 $7.00
24 19
$8.50
Corrugated Steel: 14 Gauge
Diameter (D)
Wt (Lbs/Ft)
Price ($/Ft)
18 18
$7.38
21 21
$8.61
24 24
$9.84
27 27 $11.07
30 30 $12.00
Corrugated Steel: 12 Gauge
Diameter (D)
Wt (Lbs/Ft)
Price ($/Ft)
18 25 $10.25 21 29 $11.89 24 33 $13.53 27 37 $15.17
30 41 $16.81
36 49 $20.09 42 57 $22.00
48 65 $25.00 54 73 $29.93
Corrugated Steel: 10 Gauge
Diameter (D)
18 21 24 27 30 36 42 48 54
Wt (Lbs/Ft)
m -
41 47 52 62 72 82 92
Price ($/Ft)
$16.81 $19.27 $21.32 $25.42 $29.52 $33.62 $37.72
Concrete Pipe (Non-Pressurel
Type III concnto accounts for approximately 60-70 percent of all concrete used for highway projects.
Concrete prices will vary in an attempt to keep PVC pipes out of the highway market Once PVC pipe has been accepted by all DOTs, throughout the U.S., then concrete prices will probably stabilize. Concrete traditionally prices high when competitors are not specified, then drops to exceptionally low levels when competitors are specified.
Concrete pipe is difficult to install because of its enormous weight ratio over PVC pipe. Laying advantages for PVC pipe can amount to $1.00 - $2.00/ft by contractors who have become used to the product.
CTL027700
August 4, 1989
Page 3
CONCRETE PIPE PRICE TABLES
Reinforced Concrete: Type HI "n" = 0.015
Diameter P)
Wt (Lbs/Ft)
Price (S/Ft)
18 168
$7.20
21 214
$8.40
24 264
$9.60
27 322 $10.80
30 384 $16.90
36 451 $23.20
42 753 $28.40
48 960 $35.60
54
1162
$42.00
Reinforced Concrete: Type IV If n" = 0.015
Diameter P)
Wt (Lbs/Ft)
Price ($/Ft)
18 181 $7.78
21 231
$9.07
24 285 $10.37
27 348 $11.66
30 414 $18.25
36 487 $25.06
42 813 $30.67
48
1036
$38.45
54
1255
$45.36
Ductile Iron (Pressure Pipel
General observation has revealed that ductile iron rarely is sold for much less than 22 cents per pound The attached weight tables are provided to facilitate price per foot calculations.
RPW/vac Enclosure cc: Arthur Kahn
CTL027701
16 ANSI/AWWA C151/A21.51-81
TABLE 51.4 Standard Dimensions and Weights of Push-on-Joint Ductile-Iron Pipe
Size in.
Thick ness Class
Thick
ness in.
OD* in.
Wt. of
Barrel Per Ft
Ih
Wt. of
Bell lb
18-ft Laving Length
Wt. Per
Lgih.* Ih
Avg. Wt.
Per Ft* lb
20-ft Laying Length
Wt. Per
Lgih.* Ih
Avg. Wt. Per Fit
lb
3
51
0.25
3.96
8.9
7.0
165
52
0.28
3.96
9.9
70
185
53
0.31
3.96
10.9
7.0
205
54
0.34
3.96
11.8
7.0
220
55
0.37
3.96
12.8
7.0
235
56
0.40
3.96
13.7
7.0
255
4
51
0.26
4.80
II.3
9.0
210
52
0.29
4.80
12.6
9.0
235
53
0.32
4.80
13.8
9.0
255
54
0.35
4.80
15.0
9.0 280
55
0.38
4.80
16.1
9.0
300
56
0.41
4.80
17.3
9.0
320
6
50
0.25
6.90
16.0
11.0
300
51
0.28
6.90
17.8
11.0
330
o
0.31
6.90
19.6
11.0
365
53
0.34
6.90
21.4
11.0
395
54
0.37
6.90
23.2
II.0
430
55
0.40
6.90
25.0
11.0
460
56
0.43
6.90
26.7
11.0
490
8
50
0.27
9.05
22.8
|7 0
425
51
0.30
9.05
25.2
17.0
470
52
0.33
9.05
27.7
ro
515
53
0.36
9.05
30.1
17 0
560
54
0.39
9.05
32.5
1* 0
600
55
0.42
9.05
34.8
ro
645
56 0.43 p
9.05
37 2
17 0
685
10
50 F 0.29
11.10
30.1
24 0
565
51
0.32
11.10
33.2
24 0
620
52
0.35
11.10
36.2
24 0
675
53
0.38
11.10
39.2
24 0
HI
54
0.41
11.10
42.1
24 0
70
55
0.44
11.10
45.1
24 0
835
56
0.47
11.10
48.0
24 0
890
9.3 10.3 11.3 12.2 13.2 14.1
11.8 13.1 14.3 15.5 16.6 17.8
16.6 18.4 20.2 22.0 23.8 25.6 27.3
23.7 26.1 28.6 31.0 33.4 3_5_7
38.1
31.4 34.5 37.5 40.5 43 4 46.4 49.3
185 205 225 245 265 280
235 260 285 310 330 355
330 365 405 440 475 510 545
475 520 570 620 665 7|5 760
625 690 750 810 865 925 985
9.2 10.2 11.2 12.2 13.2 .14.0
11.8 13.0 14.2 15.4 16.6 17.8
16.6 18.3 20.2 22.0 23.8 25 6
-t- -l
23." 26 0 28 6 31 0
*
38 0
31 ' U .j * 4 40 4 43 5 46 t 49 2
`Tolerance of OD of spigot end: 3-12 in.. 0.06 in.: 14-24 in., --0 05 in.. -0.08 in.; 30-54 in.. +0.08 in.. -0.06 in. (Tne beli weights shown above are adequate lor 350 psi operating pressure. Bell weights vary due to differences in push-on joint design The manufacturer shall calculate pipe weights using standard barrel weights and weights of bells being produced, including bell: calculated weight of pipe rounded off to nearest 5 lb. ^Including bell: average weight per foot based on calculated weight of pipe before rounding.
CTL027702
DUCTILE-IRON PIPE
17
TABLE 51.4--(com.)
Size in.
Thick ness Class
Thick ness in.
12 50 51 52 53 54
55 56
0.31 0.34 0.37 0.40 0.43 0.46 0.49
14 50 0.33 51 0.36 52 0.39 53 0.42 54 0.45 55 0.48 56 0.51
16 so 0.34
51 0.37 52 0.40 53 0.43 54 0.46 55 0.49 56 0.52
18 50 0.35 51 0.38 52 0.41 53 0.44 54 0.47
55 0.5
56 atsi
20 so <u*
51 0L36" 52 0.42 53 0.4J 54 0.48 55 0.51 56 0.54
OD* in.
13.20 13.20 13.20 13.20 13.20 13.20 13.20
15.30 15.30 15.30 15.30 15.30 15.30 15.30
17.40 17.40 17.40 17.40 17.40 17.40 17.40
19.50 19.50 19.50 19.50 19.50 I9.5B 19.50
21.60 21.60 21.60 21.60 21.60 21.60 21.60
Wt. of Barrel Per Ft
lb
Wt. of Bell
lb
38.4 42.0 45.6 49.2 52.8 56.3 59.9
47.5 51.7 55.9 60.1 64.2 68.4 72.5
55.8 60.6 65.4 70.1 74.9 79.7 84.4
64.4 69.8 75.2 80.6
86.0
91.3 96.7
73.5 79.5 85.5 91.5 97.5 103.4 109.3
29.0 29.0 290 29.0 29.0 29.0 29.0
45.0 45.0 45.0 45.0 45.0 45.0 45.0
54.0 54.0 54.0 54.0 54.0 54.0 54.0
59.0 59.0 59.0 59.0 59.0 59.0 59.0
74.0 74.0 74.0 74.0 74.0 74.0 74.0
18-ft Laying Length
Wt. Per Lgth.f lb
720 785 850 915 980 1040 1105
900 975 1050 1125
1200
1275 1350
1060 1145 1230 1315 1400 1490 1575
1220
1315 1415 1510 1605 1700 1800
1395 1505 1615 1720 1830 1935 2040
Avg. Wt. Per FtJ
lb
40.0 43.6 47.2 50.8 54.4 57.9 61.5
50.0 54.2 58.4 62.6 66.7 70.9 75.0
58.8 63.6 68.4 73.1 77.9 82.7 87.4
67.7 73.1 78.5 83.9 89.3 94.5
100.0
77.6 83.6 89.6 95.6
101.6
107.5 113.4
20-ft Laying Length
Wt. Per Lgth.*
Ih
795 870 940 1015 1085 1155 1225
995 1080 1165 1245 1330 1415 1495
1170 1265 1360 1455 1550 1650 1740
1345 1455 1565 1670 1780 1885 1995
1545 1665 1785 1905 2025 2140 2260
Avg. Wt Per Ft:
lb
39.8 43.4 47.0 50.7 54.2 57.8 61.4
49.8 54.0 58.2 62.4 66.4 70.7 74.8
58.5 63.3 68.1 72.8 77.6 82.4 87.1
67.4 72.8 78.2 83.6 89.0 94.2 99.7
77.2 83.2 89.2
19051..22
107.1 113.0
Tolerance f OD of spigot end: 3-12 in* 0.06 in.: 14-24 in., 40.05 in., -0.06 in.; 30-54 in.. 40.06 in., --0.06 in. (The bell weight* shown tbove arc adequate for 350 pei operating pressure. Bell weights vary due to differences in push-on j int design. The manufacturer shall calculate pipe weights using standard barrel weights and weights of bells being produced, tlnduding bell; calculated weight of pipe rounded off to nearest 5 lb. {Including bell; average weight per foot based on calculated weight of pipe before rounding.
CTL027703
18 ANSI/AWWA C151/A21.51-81
TABLE 51.4--(com.)
Size in.
Thick ness Class
Thick ness in.
OD* in.
Wt. of Barrel Per Ft
lb
Wt. of
Bell lb
18-ft Laying Length
Wt. Per
Lgth.t lb
Avg. Wt. Per Ft* lb
20-ft Laying Length
Wt. Per Lgth.t
lb
Avg. Wt.
Per FtJ lb
24
50
0.38
25.80
92.9
95.0
1765
51
0.41
25.80
100.1
95.0
1895
52
0.44
25.80
107.3
95.0
2025
53
0.47
25.80
114.4
95.0
2155
54
0.50
25.80
121.6
95.0
2285
55
0.53
25.80
128.8
95.0
2415
56
0.56
25.80
135.9
95.0
2540
30
50
0.39
32.00
118.5
139.0
2270
51
0.43
32.00
130.5
139.0
2490
52
0.47
32.00
142.5
139.0
2705
53
0.51
32.00
154.4
139.0
2920
54
0.55
32.00
166.3
139.0
3130
55
0.59
3100
178.2
139.0
3345
56
0.63
32.00
190.0
139.0
3560
36
50
0.43
38.30
156.5
184.0
3000
51
0.48
38.30
174.5
184.0
3325
52
0.53
38.30
192.4
184.0
3645
53
0.58
38.30
210.3
184.0
3970
54
0.63
38.30
228.1
184.0
4290
55
0.68
38.30
245.9
184.0
4610
56
0.73
38.30
263.7
184.0
4930
42
50
0.47
44.50
198.9
224.0
51
0.53
44.50
224.0
224.0
52
0.59
44.50
249.1
224.0
53
0.65
44.50
274.0
224.0
54
0.71
44.50
298.9
224.0
55
0.77
44.50
323.7
224.0
56
0.83
44.50
348.4
224.0
48
50
0.51
50.80
246.6
274.0
51
0.58
50.80
280.0
274.0
52
0.65
50.80
313.4
274.0
53
0.72
50.80
346.6
274.0
54
0.79
50.80
379.8
274.0
55
0.8*
50.80
412.9
274.0
56
0.93'
50.80
445.9
274.0
54
50
0.57
57.10
309.8
335.0
51
0.6S
57.10
352.7
335.0
52
0.73
57.10
395.6
335.0
53
0.81
57.10
438.3
335.0
54
0.89
57.10
480.9
335.0
55
0.97
57.10
523.4
335.0
56
1.05
57.10
565.8
335.0
98.1 105.4 1116 119.7 126.9 134.1 141.2
126.2 138.2 150.2 1611 174.0 185.9 197.7
166.7 184.7 2016 220.5 238.3 256.1 273.9
1955 2095 2240 2385 2525 2670 2815
2510 2750 2990 3225 3465 3705 3940
3315 3675 4030 4390 4745 5100 5460
4200 4705 5205 5705 6200 6700 7190
5205 5875 6540 7205 7870 8530 9190
6530 7390 8245 9100 9955 10805 11650
97.7 104.8 112.0 119.2 126.3 133.6 140.7
125.4 137.4 149.4 161.3 173.2 185.2 197.0
165.7 183.7 201.6 219.5 237.3 255.1 272.9
210.1 235.2 260.3 285.2 310.1 334.9 359.6
260.3 293.7 327.1 360.3 393.5 426.6 459.6
326.6 369.4 412.3 455.0 49" 140.2 582.6
'Tolerance of OD of spigot end: 3-12 in- 0.06 in.: 14-24 in., +0.05 in., --0.08 m.; 30-54 in., +0.01 in.. --0.06 in. (The bell weights shown above are adequate for 350 pti operating pressure. Bell weights vary due to differences in push-on joint design. The manufacturer shall calculate pipe weights using standard barrel weights and weights of bells being produced, tIncluding bell; calculated weight of pipe rounded of! to nearest 5 lb. J Including bell; average weight per foot based on calculated weight of pipe before rounding.
CTL027704
UNI-BELL PVC PIPE ASSOCIATION -
2655 Villa Creek Drive, Suite 155 Dallas, Texas 75234-7362 Phone (214)~243-3902 ' Fax (2T4)~24:K3907
---------
August 2, 1989
TO: FROM:
Uni-Bell Board of Directors Uni-Bell Market Development Committee
Robert Walker
!
SUBJECT: Alleged Bid Rigging
Your friendly competition may have been a little too friendly amongst themselves. The July 20 issue of Engineering News Record (ENR) reports that Atlanta has filed suit against U.S. Pipe Co. and American Cast Iron Pipe Co. for alleged bid rigging (see attached article).
The ductile iron pipe companies involved could lose between $25 million and $50 million if guilty. Even more significant is the fact that publicity from the suit may encourage other cities to bring similar actions against your ductile iron competitors or to join in Atlanta's suit.
We will continue to provide you with additional information regarding this matter as it becomes available.
RPW/vac
Enclosure
cc: Uni-BeltAssociate Members
Roy Gottesman Arthur Kahn
CTL027705
Tcrutmi nnv ecovirue iuatco
ccu>ea iMmicTpicc
BIB BIBEIMB
would be lower, and, therefore, U.S
Pipe would be awarded the city's con
Ruling may open the door
tract for ductile pipe." The suit alleges common law fraud
for large antitrust suits
restraint of trade and violations o both federal and Georgia racketeering
laws. It also claims that because o
those illegal acts, the supply contract
the city had with U.S. Pipe are void
The City of Atlanta may recover all U.S. Pipe and American Cast Iron Under a theory of common law calle< the money it has paid to a cast iron are the largest pipe suppliers in the disgorgement, the city claims, it is enti pipe company over the past 17 years--country. .Atlanta buys ductile pipe di- tied to recover all sums it paid unde
between 525 million and $50 million-- reedy from the manufacturer, and each those contracts while keeping all of th
if the city proves its allegations of bid year since 1972 the city has published pipe. Usually in such cases, the plain
rigging, a federal judge ruled last invitations to bid asking for a unit tin is awarded the difference betweei
month.
price for each category of pipe. The the market price and the rigged price
The city filed suit in U.S. District contract is awarded to the company plus triple damages.
Court in January against United States whose total price for all categories is The defendants asked the judge t<
Pipe and Foundry Co. and .American the lowest.
dismiss that claim, and it was in hi
Cast Iron Pipe Co., both based in Bir According to the lawsuit, U.S. Pipe order denting dismissal that Judg
mingham, .Ala. The city claimed that and .American Cast Iron exchanged Tidwell ruled that the city may be enu
the two conspired to rig bids and allo bid price information so that .American tied to recover the amounts it paf
cate territories for the sale of ductile Cast Iron's prices on some items were under the pipe contracts even thoug.
iron pipe. Specifically, the city charges lower than the U.S. Pipe prices, "with it cannot return all the pipe it ha
that by fixing prices. U.S. Pipe was the understanding... of the defen received from the vendors during th
guaranteed to supply Atlanta, while dants, however, that U.S. Pipe's total 17-year duration of the allege<
American Cast Iron supplied Macon aggregate price for all... items listed conspiracy."
:
and Columbus. Ga.
by the city on its invitation of bid
By Mary Powers in Birmingham
The ruling touched off a fight be
tween opposing attorneys in the case,
when a large Adania law firm hired by
the city issued a press release claiming
that the decision by U.S. District Judge
G. Ernest Tidwell was a landmark that
Ashland to sell off A-E armcould change the nature of municipal
antitrust lawsuits across the country by allowing the use of a legal theory of
CTL027706
recovery never before used in antitrust
Rcases. "The court decision potentially adds
ethinking its role as one of the stated that it intended to make ATC largest A-E conglomerates in the major player in the architectural an
tens of millions of dollars to the
U.S.. Ashland Oil Inc.. Columbuse. ngineering markets.
amount of damage that could be Ohio, has agreed to sell its architectur That thinking has changed. ATC "
awarded in such suits." the press re al and engineering subsidiary to the not closely aligned with our core p<
lease said.
unit's management and employees for troleuni refining and related growt
Atiomevs for the defendants were S97 million jn cash and securities. The businesses." savs John R. Hall, chai
outraged by the press release, calling it subsidiary. Ashland Technology Corp. man of Ashland Oil. Its sale, he add
an attempt to pressure other city gov (ATC). includes some of the biggest will allow Ashland to focus more on i
ernments to join the suit or bring simi design firms m the country, such as growth strategy "while offering .VI
lar actions against the pipe companies. Holmes & Xarver Inc.. Orange. Calif.: management and employees the oj
The companies also are the primary Daniel. Mann. Johnson. Mendenhall. portuniiy to own and grow with the
suppliers to the cities of New York. Los Angeles: Ficdeiu. R. Harris Inc- operations."
Miami. San Francisco. Detroit. Cincin New York City: and Williams Brothers An Ashland spokesman sa\ s that if
nati. New Orleans. Charleston. S.C... [ Engineering Co.. Tulsa.
company has no plan to sell its cot
and Birmingham. Ala.
I The sale represents a marked depar siruction contracting and materia
The defendants filed a motion ac ture from the strategy mapped out by subsidiary. "It's a natural fit." he sa\
cusing the atiomevs of unethical con the parent firm in 1987. when it ac adding that The Tanner Cos., a Pho
duct and asking the judge for a confi- quired PRC Engineering Inc. and nix-based contractor and materia
demialitv order limiting the | broke it into three subsidiaries, includ compam owned bv the subsidiary h
information released about ihe cae to j ing Frederic R. Hams (ENR 2/5/87 p. remained profitable despite the slo'
rTKiire . f<ii in.!
J-V. A, . I- -. -
it.......... 1.
.1 . . . .;... ^ ...t.. . .