Document NeqLd9kbpa4mb47GNBB5bj9Jg

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5 77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604 DATE: SUBJECT: FROM: THRU: TO: See Date of Section Chief Signature Below CLEAN AIR ACT INSPECTION REPORT J.B. Gifford WWTP, Michigan City, Indiana Vicky Mei, Environmental Engineer AECAB (IL/IN) Nathan Frank, Section Chief AECAB (IL/IN) File BASIC INFORMATION Facility Name: J.B. Gifford Wastewater Treatment Plant Facility Location: 1100 E. 8th Street, Michigan City, Indiana Date of Inspection: July 27, 2021 EPA Inspector(s): 1. Vicky Mei, Environmental Engineer 2. Jason Schenandoah, Environmental Engineer 3. Silvia Palomo, Environmental Engineer Other Attendees: 1. Michael Kuss, General Manager, J.B. Gifford WWTP 2. Dan McCoy, Safety Consultant, Daniel McCoy & Associates LLC 3. Steven Stanford, Operations Manager, J.B. Gifford WWTP 4. Darren Pflaumer, Mechanic, J.B. Gifford WWTP 5. Kevin Van Sickle, Mechanic, J.B. Gifford WWTP 6. Dave McCorvie, Chief Operator, J.B. Gifford WWTP 7. Milorad Milotavic, Superintendent of Water Reclamation Department, J.B. Gifford WWTP Contact Email Address: mkuss@mcsan.org Purpose of Inspection: 40 C.F.R. Part 68 inspection Facility Type: Wastewater treatment plant Regulations Central to Inspection: 40 C.F.R. Part 68 Arrival Time: 9:00 AM Departure Time: 4:20 PM Inspection Type: Unannounced Inspection Announced Inspection OPENING CONFERENCE Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet Small Business Resource Information Sheet not provided. Reason: Not a small business Provided CBI warning to facility The following information was obtained verbally from J.B. Gifford and Daniel McCoy & Associates LLC personnel unless otherwise noted. Process Description: J.B. Gifford Wastewater Treatment Plant (WWTP) is owned and operated by the Sanitary District of Michigan City. The facility serves approximately 31,000 residents and 5 industry users. The WWTP uses chlorine for the disinfection of water and sulfur dioxide for the dechlorination of water. The disinfection and dechlorination of the water take place in two operations: effluent, and storm basin discharge. The dechlorination process takes place before the treated wastewater is discharged through NPDES outfalls into the Trail Creek. Staff Interview: The facility maintains a maximum inventory of 12,000 pounds of chlorine as liquified compressed gas in 1-ton tanks. The facility maintains a maximum inventory of 12,000 pounds of sulfur dioxide. Alexander Chemical supplies chlorine and sulfur dioxide to the facility. Chlorine and sulfur dioxide are received every 3 weeks. The facility uses 1 ton of each chemical per 7 to 8 days during the disinfection season from mid-March to October. Usage is 250 pounds of chlorine and 150 pounds of sulfur dioxide per day. From November through February, the inventory is reduced to 1 ton of each chemical. Maintenance personnel are responsible for unloading the 1ton cylinders from the truck. The cylinders are unloaded by monorail hoist. The tanks are stored in the storage tank building. One of each tank is in service and one of each tank is on standby. The tanks are controlled by auto-transfer switches. The chlorine and sulfur dioxide are fed to the effluent building with a feeding line above ground in protective tubing. There is no scrubber. Page 2 of 7 Passive mitigation includes the enclosed storage room and the ventilation system staying off when no one is in the room. Active mitigation includes Siemens sensors, alarm systems, and a vacuum regulator system, that emits to atmosphere from the regulator. Two of each type of sensor for chlorine and sulfur dioxide are in the gas storage room; one of each are in the effluent building and stormwater building. Additional safety measures in place include: the on/off switch to the ventilation system being located on the outside of the chlorinator room, locks on the rooms, emergency announcements over the PA system, a help button in the gas storage and effluent buildings, fire extinguishers, and procedural checks, such as checking the sensor monitors before entering rooms. There are 5 employees that maintain and change the tanks, and that connect, disconnect, and transfer materials between tanks. There are 3 chief operators to record scale weights, to monitor tanks, and to adjust the feed. There are 2 shift operators per each of the 3 shifts for 24/7 operation at the facility, monitoring readings in the rooms. There are 50 employees total at the facility. There is no union representation. TOUR INFORMATION EPA Tour of the Facility: Yes Data Collected and Observations: During the facility tour, EPA saw safety instructions and labels on the doors to each of the buildings. EPA saw sensors, locations of vent and light switches, safety equipment, the sulfur and chlorine tanks and the scale, PRVs, the daily effluent usage form, vents, chlorine and sulfur dioxide piping, pipe protection, flow meters, and the injectors. The different sets of pipes for chlorine and sulfur dioxide near the injectors going underground to the stormwater and effluent buildings are missing labels to distinguish the different chemicals in them, as photographed in Image 16 of Appendix A. After the inspection, the facility relayed to EPA that they labeled the pipes. Action items in the 2016 management of change analysis need to be completed and closed out. (See the RMP Program Level 3 Process Checklist in Appendix B.) The facility has not established a system to promptly address the PHA findings and recommendations nor documented that the recommendations are resolved in a timely manner. PHA recommendations need to be completed and closed out according to a written schedule. Actions resolving the PHA recommendations and findings need to be communicated to affected employees. The PHA needs to be revalidated and address stationary source siting and human factors. (See the RMP Program Level 3 Process Checklist in Appendix B.) Operating procedures need to include safety and health considerations, as well as the safety systems and their functions. (See the RMP Program Level 3 Process Checklist in Appendix B.) Re-fresher training documentation is required at least every 3 years. Competency testing needs to be provided to the employees involved in the process to evaluate the employees' understanding of the refresher training. Initial training did not include emergency operations, such as shutdown. (See the RMP Program Level 3 Process Checklist in Appendix B.) Page 3 of 7 The results of mechanical integrity inspections or tests are not documented. (See the RMP Program Level 3 Process Checklist in Appendix B.) The compliance audits have not been certified at least every three years. The documented deficiencies have not been promptly corrected. (See the RMP Program Level 3 Process Checklist in Appendix B.) Findings from incident investigations have not been reviewed with all affected personnel whose job tasks are relevant to the incident findings. (See the RMP Program Level 3 Process Checklist in Appendix B.) The RMP needs to include the email address of the local emergency planning and response organizations with which the facility last coordinated emergency response efforts. (See the RMP Program Level 3 Process Checklist in Appendix B.) Photos and/or Videos: were taken during the inspection. Field Measurements: were not taken during this inspection. RECORDS REVIEW 1. Most recent documentation on the management structure and the assigned responsibilities for the different program elements. a. Document on safety goals b. "RMP Management System Organization" 2. Most recent off-site consequence analysis and supporting documentation. a. Supporting documentation on 7 chlorine and sulfur dioxide alternate release scenarios b. Supporting documentation on sulfur dioxide worst-case release scenario c. "Worst Case and Alternate Scenarios-Estimates of Offsite Receptors" 3. Most recent process safety information. a. Design codes and standards b. Electrical classification c. Max inventory d. P&ID e. Process chemistry material balance f. Process description g. Process equipment materials of construction and PRV design basis h. Safe limits for operation and consequences of deviation i. Safety systems and functions j. SDS k. Ventilation design 4. Two most recent process hazard analyses. a. 2012 MCSD Disinfection Process PHA b. 2016 MCSD Disinfection Process PHA 5. Most recent operating procedures specific to the covered chlorine and sulfur dioxide processes. a. "Disinfection Process Operating Procedure" (2021) b. "Process Safety Management Plan: Disinfection Treatment Area" (2020) Page 4 of 7 c. PSM WWTP shift operation department procedures d. "Control of Hazardous Energy Procedure SH-15 (Rev. 1)" 6. Training procedures, details on the training provided, and training records for employees. a. "Maintenance Department Procedure Review" for hot work, lockout/tagout, and disinfection, disconnection and connection procedure (2020) b. "Application for Approval of Training for Wastewater Operator/Apprentice Continuing Education Credit" for maintenance and operations technical training (February 24, 2021) and approval c. Maintenance Department safety orientation d. Maintenance mechanics qualification for connection and disconnection e. SCBA training f. Hot work permit, lockout/tagout, disconnection and connection, storage room delivery, and PSSR training g. Shift operator procedure training h. Operations Department refresher training i. New employee orientation documents 7. Mechanical integrity program procedures and record from the past 5 years. a. "Pre-use Visual Inspection-Cl2/SO2 Gas Storage Room Hoist #03 (2-Ton) and Spreader Beam" completed checklists (2020, 2021) b. Chlorine/sulfur dioxide container connection and disconnection completed checklists (2020, 2021) c. Maintenance Department disinfection procedures d. Mechanical integrity procedure e. Mechanical integrity contractor work documents f. Fire inspection report g. Process components visual inspection h. Inspection checklist schedule 8. Management of change (MOC) procedures and MOC analyses conducted from the past 2 years. a. "MCSD Disinfection Process MoC Log (2019-2021)" b. "Disinfection Process Management of Change Procedure SH-07 (Rev. 03)" c. "Appendix B: Management of Change (MoC) Form" 9. Pre-startup safety review procedures and records from the past 5 years. a. "Pre-Startup Safety Review Form (Rev:02), Disinfection Process" b. "Pre-Startup Safety Review Procedure SH-09 (Rev. 03)" 10. Two most recent compliance audits. a. "PSM Compliance Audit (Nov 09, 2017)" b. "Facility/Process: Disinfection Process Audit Report" (July 23, 2021) c. "2021 MCSD RMP Disinfection Process Audit Action Plan" 11. Incident investigation reports from the past 5 years. a. August 26, 2019 incident reports and supporting documentation b. September 2, 2020 incident reports and supporting documentation 12. Most recent employee participation plan of action. a. "Employee Participation Procedure SH-03 (Rev. 02)" b. Appendix A: "H&S Committee: Typical Duties and Qualities of a Committee" c. Appendix B: "Health and Safety Committee Meeting Minutes" Page 5 of 7 d. Appendix C: "Awareness Change Teach Initiate Observe Notify" e. Appendix D: "Dept. Health and Safety Meeting Report" 13. Hot work permit program procedures and example permits. a. "Fire Prevention-Hot Work Procedure SH-02 (Rev.04)" b. Hot Work Permit Form c. Hot Work Warning Sign d. Hot work permit for Hoosier Crane service work order (June 6, 2018) e. Hot work permit for wielding in chlorine storage building (June 6, 2018) f. "Contractor Evaluation Form" (2018) 14. Contractor policy, performance evaluation and selection procedures, and safety procedures for contractors. a. Records on contractor evaluations from 2018 to 2021 b. "Contractor Safety Orientation/Briefing, Chlorination/Sulfonation Process" documents from February 27, 2019 and February 26, 2020 for Living Waters c. 2019-2021 contractor pre-job reviews for Living Waters d. Contractor Safety Procedure from January 15, 2020 15. Most recent emergency action plan. a. "Water Reclamation Department Emergency Action Plan" b. Form for reporting release to National Response Center c. Map of severe water shelter locations d. Tabletop exercise documentation from September 2020 e. 2018-2020 Tier II reports CLOSING CONFERENCE Provided U.S. EPA point of contact to the facility Requested documents: Service reports from Living Waters on maintenance DIGITAL SIGNATURES Digitally signed by Mei, Mei, Vicky Vicky Date: 2021.09.24 Report Author: _____________1_3:_02_:1_2 -_05_'0_0'_____________ LINDA Digitally signed by LINDA ROSEN Section Chief: _R__O_S__E_N_______D13_a:t5e_5::_2300_2-10_.50_'90.0_2'4_____________ Page 6 of 7 Facility Name: J.B. Gifford WWTP Facility Location: 1100 E. 8th Street, Michigan City, Indiana 46360 Date of Inspection: July 27, 2021 APPENDICES AND ATTACHMENTS 1) Appendix A: Digital Image Log 2) Appendix B: RMP Program Level 3 Process Checklist Page 7 of 7 Facility Name: J.B. Gifford WWTP Facility Location: 1100 E. 8th Street, Michigan City, Indiana 46360 Date of Inspection: July 27, 2021 APPENDIX A: DIGITAL IMAGE LOG 1. Inspector Name: Vicky Mei 2. Archival Record Location: EPA OneDrive Image Number 1 2 3 4 5 6 7 8 9 10 11 File Name IMG_5983.JPG IMG_5984.JPG IMG_5985.JPG IMG_5986.JPG IMG_5987.JPG IMG_5988.JPG IMG_5989.JPG IMG_5990.JPG IMG_6016.JPG IMG_6033.JPG IMG_6034.JPG 12 IMG_6035.JPG 13 IMG_6036.JPG 14 IMG_6037.JPG 15 IMG_6038.JPG 16 IMG_6039.JPG 17 IMG_6040.JPG 18 IMG_6041.JPG 19 IMG_6042.JPG 20 IMG_6043.JPG 21 IMG_6044.JPG 22 IMG_6045.JPG 23 IMG_6046.JPG 24 IMG_6047.JPG 25 IMG_6048.JPG Date and Time (incl. time zone and DST) 2021:07:27 15:01:52 2021:07:27 15:01:56 2021:07:27 15:02:12 2021:07:27 15:03:20 2021:07:27 15:03:40 2021:07:27 15:03:56 2021:07:27 15:04:31 2021:07:27 15:05:17 2021:07:27 15:07:53 2021:07:27 15:08:03 2021:07:27 15:09:40 2021:07:27 15:11:57 2021:07:27 15:11:58 2021:07:27 15:13:10 2021:07:27 15:16:45 2021:07:27 15:17:46 2021:07:27 15:20:23 2021:07:27 15:21:09 2021:07:27 15:23:56 2021:07:27 15:25:03 2021:07:27 15:27:15 2021:07:27 15:40:56 2021:07:27 15:42:06 2021:07:27 15:43:26 2021:07:27 15:46:31 Description of Image Entry to Storage Building Ventilation switch and light switches Emergency shower Sensor reading with battery pack Sulfur dioxide and chlorine sensors Another pair of sensors for redundancy Scale reading Tanks with one in service; other on standby Service tag Effluent daily usage form, recorded at midnights Pressure relief valve (PRV) Left: chlorine tanks; Right: disconnected stormwater tanks; sensor meters for chemicals and stormwater; PRV Left: chlorine tanks; Right: disconnected stormwater tanks; sensor meters for chemicals and stormwater; PRVs Vent Pipe protection added in 2016 Unlabeled pipes going underground to stormwater and effluent in separate manholes. Split manhole Stormwater building door with vent switch Electrical and manual flow meters, used only for overflows Sensors End of chlorine process; mixed chlorine and water for stormwater system Piping to effluent building Rate sensor and vacuum sensor with auto shutoffs Labelled pipes and valves; Chlorine valve V-39 is the end of the chlorine process after the chlorinator End of sulfur process V-30 after sulfonator Appendices Page 1 of 1 Appendix B: RMP Program Level 3 Process Checklist General Facility Information Facility Name: Mailing Address (Street, City, State, Zip): J.B. Gifford WWTP 1100 E. 8th Street Michigan City, Indiana 46360 Physical Address (Street, City, State, Zip): 1100 E. 8th Street Michigan City, Indiana 46360 Latitude/Longitude: (Source) 41.718334, -86.882932 (Source: November 16, 2016 RMP Submission) County: La Porte RMP Number/ FRS Number: 110000732048 Facility Contact (Name, Title): Michael Kuss, General Manager Facility Contact Phone No: (219) 874-7799 Reported NAICS Code(s): 22132 Facility Contact Email: mkuss@mcsan.org Inspection Information Inspection Begin Date: July 27, 2021 Inspection End Date: July 27, 2021 Arrival Time: 9:00 AM Departure Time: 4:20 PM Name: Organization: Phone No./Email: Lead Inspector Vicky Mei EPA 312-353-2054 Silvia Palomo EPA 312-353-2172 Jason Schenandoah EPA Participating Inspectors 312-886-9506 Page 1 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ Subpart A - General [68.10-15] General requirements followed and implemented as in 40 CFR 68.10-15? Comments: *HQHUDOApplicability [68.10] 1. Has the owner or operator of a stationary source that has more than a threshold quantity of a regulated substance in a process, as determined under 68.115, complied with the requirements of this part no later than the latest of the following dates [68.10(a)]: June 21, 1999? [68.10(a)(1)]; Three years after the date on which a regulated substance is first listed under 68.130? [68.10(a)(2)]; The date on which a regulated substance is first present above a threshold quantity in a process? [68.10(a)(3)]; or For any revisions to this part, the effective date of the final rule that revises this part? [68.10(a)(4)] 2. Has the owner or operator complied with the emergency coordination activities in accordance with 68.93 by September 21, 2018? [68.10(b)] (See Items 2 through 5 of Subpart E) 3. Has the owner or operator developed and implemented an emergency response program in accordance with 68.95 within three years of when the owner or operator determined that the stationary source is subject to the emergency response program requirements of 68.95? [68.10(c)] (See Items 1.b.(2) - 1.b.(7) of Subpart E) 4. Has the owner or operator developed plans for conducting emergency response exercises in accordance with 68.96 by December 19, 2023? [68.10(d)] (See Items 1.b.(8) - 1.b.(17), 6, and 7 of Subpart E) 5. Has the owner or operator complied with the public meeting requirement in 68.210(b) within 90 days of any RMP reportable accident at the stationary source with known offsite impacts specified in 68.42(a), that occurs after March 15, 2021? [68.10(e)] (See Item 2 of Subpart H) 6. After December 19, 2024, has the owner or operator reported in the RMP submission: [68.10(f)] A public meeting after an RMP reportable accident under 68.160(b)(21)? [68.10(f)(1)]; Emergency response program information under 68.180(a)(1)? [68.10(f)(2)]; Emergency response program information under 68.180(a)(2) and (3)? [68.10(f)(3)]; and, Emergency response program and exercises information under 68.180(b), as applicable? Including submittal of the following: [68.10(f)(4)] Dates of the most recent notification, Dates of field and tabletop exercises in the risk management plan, Dates for exercises completed as required under 68.96 at the time the risk management plan is either submitted under 68.150(b)(2) or (3), or is updated under 68.190. Y N Y N Y N Y N Y N Y N N/A N/A N/A N/A N/A N/A Page 2 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ *HQHUDOProgram Eligibility [68.10(g)-(i)] 7. Does the covered process meet the eligibility requirements of Program 1? Specifically: [68.10(g)] Does the covered process meet all of the following requirements: For the five years prior to the submission of an RMP, the process has not had an accidental release of a regulated substance where exposure to the substance, its reaction products, overpressure generated by an explosion involving the substance, or radiant heat generated by a fire involving the substance led to any of the following offsite? [68.10(g)(1)]; Death; [68.10(g)(1)(i)] Injury; [68.10(g)(1)(ii)] or, Response or restoration activities for an exposure of an environmental receptor; [68.10(g)(1)(iii)] and The distance to a toxic or flammable endpoint for a worst-case release assessment conducted under subpart B and 68.25 is less than the distance to any public receptor, as defined in 68.3 [68.10(g)(2)]; and Emergency response procedures have been coordinated between the stationary source and local emergency planning and response organizations [68.10(g)(3)] 8. Does the covered process meet the eligibility requirements of Program 3? Specifically: [68.10(i)] The process does not meet the eligibility requirements of Program 1. [68.10(i)]; and Is the covered process any of the following NAICS codes: [68.10(i)(1)] 32211, 32411, 32511, 325181, 325188, 325192, 325199, 325211, 325311, or 32532; or Is the process subject to the OSHA process safety management standard, 29 CFR 1910.119? [68.10(i)(2)] Y N N/A Y N N/A 9. Does the covered process fail to meet the eligibility requirements of Program 1 and Program 3 (i.e., is the covered process a Program 2)? [68.10(h)] *HQHUDOManagement [68.15] Has the owner or operator: 10. Developed a management system to oversee the implementation of the risk management program elements? [68.15(a)] 11. Assigned a qualified person or position that has the overall responsibility for the development, implementation, and integration of the risk management program elements? [68.15(b)] 12. Documented other persons responsible for implementing individual requirements of the risk management program and defined the lines of authority through an organization chart or similar document? [68.15(c)] Subpart B Hazard Assessment [68.20-68.42] Hazard assessment conducted and documented as provided in 40 CFR 68.20-68.42? Comments: Y N N/A Y N N/A Y N N/A Y N N/A Notes: A management system was laid out in an Organizational Chart in the RMP binder. Page 3 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ Hazard Assessment: Offsite consequence analysis parameters [68.22] 1. Used the following endpoints for offsite consequence analysis for a worst-case scenario: [68.22(a)] Y For toxics: the endpoints provided in Appendix A of 40 CFR Part 68? [68.22(a)(1)] For flammables: an explosion resulting in an overpressure of 1 psi? [68.22(a)(2)(i)]; or For flammables: a fire resulting in a radiant heat/exposure of 5 kw/m2 for 40 seconds? [68.22(a)(2)(ii)] For flammables: a concentration resulting in a lower flammability limit, as provided in NFPA documents or other generally recognized sources? [68.22(a)(2)(iii)] 2. Used the following endpoints for offsite consequence analysis for an alternative release scenario: [68.22(a)] Y For toxics: the endpoints provided in Appendix A of 40 CFR Part 68? [68.22(a)(1)] For flammables: an explosion resulting in an overpressure of 1 psi? [68.22(a)(2)(i)] For flammables: a fire resulting in a radiant heat/exposure of 5 kw/m2 for 40 seconds? [68.22(a)(2)(ii)] For flammables: a concentration resulting in a lower flammability limit, as provided in NFPA documents or other generally recognized sources? [68.22(a)(2)(iii)] 3. Used appropriate wind speeds and stability classes for the release analysis? [68.22(b)] Y 4. Used appropriate ambient temperature and humidity values for the release analysis? [68.22(c)] Y 5. Used appropriate values for the height of the release for the release analysis? [68.22(d)] Y 6. Used appropriate surface roughness values for the release analysis? [68.22(e)] Y 7. Do tables and models, used for dispersion analysis of toxic substances, appropriately account for dense or neutrally Y buoyant gases? [68.22(f)] 8. Were liquids, other than gases liquefied by refrigeration only, considered to be released at the highest daily Y maximum temperature, based on data for the previous three years appropriate for a stationary source, or at process temperature, whichever is higher? [68.22(g)] Hazard Assessment: Worst-case release scenario analysis [68.25] 9. Analyzed and reported in the RMP one worst-case release scenario estimated to create the greatest distance to an Y endpoint resulting from an accidental release of a regulated toxic substance from covered processes under worst- case conditions? [68.25(a)(2)(i)] 10. Analyzed and reported in the RMP one worst-case release scenario estimated to create the greatest distance to an Y endpoint resulting from an accidental release of a regulated flammable substance from covered processes under worst-case conditions? [68.25(a)(2)(ii)] 11. Analyzed and reported in the RMP additional worst-case release scenarios for a hazard class if the worst-case Y release from another covered process at the stationary source potentially affects public receptors different from those potentially affected by the worst-case release scenario developed under 68.25(a)(2)(i) or 68.25(a)(2)(ii)? [68.25(a)(2)(iii)] 12. Has the owner or operator determined the worst-case release quantity to be the greater of the following: [68.25(b)] Y If released from a vessel, the greatest amount held in a single vessel, taking into account administrative controls that limit the maximum quantity? [68.25(b)(1)] If released from a pipe, the greatest amount held in the pipe, taking into account administrative controls that limit the maximum quantity? [68.25(b)(2)] N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A Page 4 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 13.a. Has the owner or operator for toxic substances that are normally gases at ambient temperature and handled as a gas or liquid under pressure: 13.a.(1) Assumed the whole quantity in the vessel or pipe would be released as a gas over 10 minutes? [68.25(c)(1)] Y N N/A 13.a.(2) Assumed the release rate to be the total quantity divided by 10, if there are no passive mitigation systems in place? [68.25(c)(1)] Y N N/A 13.b. Has the owner or operator for toxic gases handled as refrigerated liquids at ambient pressure: 13.b.(1) Assumed the substance would be released as a gas in 10 minutes, if not contained by passive mitigation systems or if the contained pool would have a depth of 1 cm or less? [68.25(c)(2)(i)] Y N N/A 13.b.(2) If released substance would be contained by passive mitigation systems in a pool with a depth > 1 cm; Assumed the quantity in the vessel or pipe (as determined per 68.25(b)) would be spilled instantaneously to form a liquid pool? [68.25(c)(2)(ii)] Calculated the volatility rate at the boiling point of the substance and at the conditions specified in 68.25(d)? [68.25(c)(2)(ii)] Y N N/A 13.c. Has the owner or operator for toxic substances that are normally liquids at ambient temperature: 13.c.(1) Assumed the quantity in the vessel or pipe would be spilled instantaneously to form a liquid pool? [68.25(d)(1)] Y N N/A 13.c.(2) Determined the surface area of the pool by assuming that the liquid spreads to 1 cm deep, if there is no passive mitigation system in place that would serve to contain the spill and limit the surface area, or if passive mitigation is in place, was the surface area of the contained liquid used to calculate the volatilization rate? [68.25(d)(1)(i)] Y N N/A 13.c.(3) Taken into account the actual surface characteristics, if the release would occur onto a surface that is not paved Y N N/A or smooth? [68.25(d)(1)(ii)] 13.c.(4) Determined the volatilization rate by accounting for the highest daily maximum temperature in the past three Y N N/A years, the temperature of the substance in the vessel, and the concentration of the substance if the liquid spilled is a mixture or solution? [68.25(d)(2)] 13.c.(5) Determined the rate of release to air from the volatilization rate of the liquid pool? [68.25(d)(3)] Y N N/A 13.c.(6) Determined the rate of release to air by using the methodology in the RMP Offsite Consequence Analysis Guidance, any other publicly available techniques that account for the modeling conditions and are recognized Y N N/A by industry as applicable as part of current practices, or proprietary models that account for the modeling conditions may be used provided the owner or operator allows the implementing agency access to the model and describes model features and differences from publicly available models to local emergency planners upon request? [68.25(d)(3)] What modeling technique did the owner or operator use? [68.25(g)] _M_A__R_P_L_O__T_R__M_P_C__o_m_p____ 13.d. Has the owner or operator for flammable gases: 13.d.(1) Assumed the quantity in a vessel(s) of flammable gas held as a gas or liquid under pressure is released as a gas Y N N/A over 10 minutes resulting in a vapor cloud explosion? [68.25(e)(1)] 13.d.(2) For gas handled as refrigerated liquid that is not contained by passive mitigation systems, assumed the total quantity in a vessel(s) of refrigerated liquid is released as a gas over 10 minutes resulting in a vapor cloud explosion? [68.25(e)(2)(i)] Y N N/A 13.d.(3) For gas handled as refrigerated liquid released to a contained area, assumed the quantity volatilized in 10 minutes results in a vapor cloud? [68.25(e)(2)(ii)] Y N N/A Page 5 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 13.d.(4) Assumed a yield factor of 10% of the available energy is released in the explosion for determining the distance Y to the explosion endpoint, if the model used is based on TNT-equivalent methods? [68.25(e)] 13.e. Has the owner or operator for flammable liquids: 13.e.(1) Assumed the entire quantity in the vessel or pipe, taking into account administrative controls that limit the Y maximum quantity, would be spilled instantaneously to form a liquid pool? [68.25(f)(1)] 13.e.(2) For liquids at temperatures below their atmospheric boiling point, calculated the volatility rate at the boiling Y point of the substance and at the conditions specified in 68.25(d) and assumed that the quantity which becomes vapor in the first 10 minutes is involved in the vapor cloud explosion? [68.25(f)(1)-(2)] 13.e.(3) Assumed a yield factor of 10% of the available energy is released in the explosion for determining the distance Y to the explosion endpoint, if the model used is based on TNT-equivalent methods? [68.25(f)] 14. Used the parameters defined in 68.22 to determine distance to the endpoints? [68.25(g)] Y 15. Determined the rate of release to air by using the methodology in the RMP Offsite Consequence Analysis Guidance, Y any other publicly available techniques that account for the modeling conditions and are recognized by industry as applicable as part of current practices, or proprietary models that account for the modeling conditions may be used provided the owner or operator allows the implementing agency access to the model and describes model features and differences from publicly available models to local emergency planners upon request? [68.25(g)] What modeling technique did the owner or operator use? [68.25(g)] _M__A_R__P_L_O__T_R__M__P_C_o_m__p_ 16. Ensured that the passive mitigation system, if considered, is capable of withstanding the release event triggering the Y scenario and will still function as intended? [68.25(h)] 17. Considered also the following factors in selecting the worst-case release scenarios: [68.25(i)] Y Smaller quantities handled at higher process temperature or pressure? [68.25(i)(1)] Proximity to the boundary of the stationary source? [68.25(i)(2)] Hazard Assessment: Alternative release scenario analysis [68.28] 18. Identified and analyzed at least one alternative release scenario for each regulated toxic substance held in a covered Y process(es) and at least one alternative release scenario to represent all flammable substances held in covered processes? [68.28(a)] 19. Selected a scenario: [68.28(b)] Y That is more likely to occur than the worst-case release scenario under 68.25? [68.28(b)(1)(i)] That will reach an endpoint off-site, unless no such scenario exists? [68.28(b)(1)(ii)] 20. Considered release scenarios which included, but are not limited to, the following: [68.28(b)(2)] Y Transfer hose releases due to splits or sudden hose uncoupling? [68.28(b)(2)(i)] Process piping releases from failures at flanges, joints, welds, valves and valve seals, and drains or bleeds? [68.28(b)(2)(ii)] Process vessel or pump releases due to cracks, seal failure, or drain, bleed, or plug failure? [68.28(b)(2)(iii)] Vessel overfilling and spill, or overpressurization and venting through relief valves or rupture disks? [68.28(b)(2)(iv)] Shipping container mishandling and breakage or puncturing leading to a spill? [68.28(b)(2)(v)] 21. Used the parameters defined in 68.22 to determine distance to the endpoints? [68.28(c)] Y N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A Page 6 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 22. Determined the rate of release to air by using the methodology in the RMP Offsite Consequence Analysis Guidance, Y any other publicly available techniques that account for the modeling conditions and are recognized by industry as applicable as part of current practices, or proprietary models that account for the modeling conditions may be used provided the owner or operator allows the implementing agency access to the model and describes model features and differences from publicly available models to local emergency planners upon request? [68.28(c)] What modeling technique did the owner or operator use? [68.25(g)] _M__A_R__P_L_O__T_R__M__P_C_o_m__p 23. Ensured that the passive and active mitigation systems, if considered, are capable of withstanding the release event Y triggering the scenario and will be functional? [68.28(d)] 24. Considered the following factors in selecting the alternative release scenarios: [68.28(e)] Y The five-year accident history provided in 68.42? [68.28(e)(1)] Failure scenarios identified under 68.50? [68.28(e)(2)] Hazard Assessment: Defining off-site impacts-Population [68.30] 25. Estimated population that would be included within a circle where its center is the point of the release and a radius Y determined by the distance to the endpoint? [68.30(a)] 26. Identified the presence of institutions, parks and recreational areas, major commercial, office, and industrial Y buildings in the RMP? [68.30(b)] 27. Used most recent Census data, or other updated information to estimate the population? [68.30(c)] Y 28. Estimated the population to two significant digits? [68.30(d)] Y Hazard Assessment: Defining off-site impacts-Environment [68.33] 29. Identified environmental receptors within a circle where its center is the point of the release and a radius determined Y by the distance to the endpoint? [68.33(a)] 30. Relied on information provided on local U.S.G.S. maps, or on any data source containing U.S.G.S. data to identify Y environmental receptors? [Source may have used LandView to obtain information] [68.33(b)] Hazard Assessment: Review and update [68.36] 31. Reviewed and updated the off-site consequence analyses at least once every five years? [68.36(a)] Y 32. Completed a revised analysis and submit a revised RMP within six months of a change in processes, quantities Y stored or handled, or any other aspect that might reasonably be expected to increase or decrease the distance to the endpoint by a factor of two or more? [68.36(b)] Hazard Assessment: Documentation [68.39] 33. Has the owner or operator maintained the following records on the offsite consequence analyses: 33.a For worst-case scenarios: a description of the vessel or pipeline and substance selected, assumptions and Y parameters used, the rationale for selection, and anticipated effect of the administrative controls and passive mitigation on the release quantity and rate? [68.39(a)] 33.b For alternative release scenarios: a description of the scenarios identified, assumptions and parameters used, the Y rationale for the selection of specific scenarios, and anticipated effect of the administrative controls and mitigation on the release quantity and rate? [68.39(b)] 33.c Documentation of estimated quantity released, release rate, and duration of release? [68.39(c)] Y 33.d Methodology used to determine distance to endpoints? [68.39(d)] Y N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A Page 7 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 33.e Data used to estimate population and environmental receptors potentially affected? [68.39(e)] Y Hazard Assessment: Five-year accident history [68.42] 34. Has the owner or operator included all accidental releases from covered processes that resulted in deaths, injuries, or Y significant property damage on site, or known offsite deaths, injuries, evacuations, sheltering in place, property damage, or environmental damage? [68.42(a)] 35. Has the owner or operator reported the following information for each accidental release: [68.42(b)] Y Date, time, and approximate duration of the release? [68.42(b)(1)] Chemical(s) released? [68.42(b)(2)] Estimated quantity released in pounds and percentage weight in a mixture (toxics)? [68.42(b)(3)] NAICS code for the process? [68.42(b)(4)] The type of release event and its source? [68.42(b)(5)] Weather conditions (if known)? [68.42(b)(6)] On-site impacts? [68.42(b)(7)] Known offsite impacts? [68.42(b)(8)] Initiating event and contributing factors (if known)? [68.42(b)(9)] Whether offsite responders were notified (if known)? [68.42(b)(10)] Operational or process changes that resulted from investigation of the release? [68.42(b)(11)] Subpart D Program 3 Prevention Program [68.65-68.87] Implemented the Program 3 prevention requirements as provided in 40 CFR 68.48 - 68.60? Comments: Prevention Program Process safety information [68.65] 1. Has the owner or operator compiled written process safety information, which includes information pertaining to the Y hazards of the regulated substances used or produced by the process, information pertaining to the technology of the process, and information pertaining to the equipment in the process, before conducting any process hazard analysis required by the rule? [68.65(a)] Does the process safety information contain the following for hazards of the substances: [68.65(b)] Toxicity information? [68.65(b)(1)] Permissible exposure limits? [68.65(b)(2)] Physical data? [68.65(b)(3)] Reactivity data? [68.65(b)(4)] Corrosivity data? [68.65(b)(5)] Thermal and chemical stability data? [68.65(b)(6)] Hazardous effects of inadvertent mixing of materials that could foreseeably occur? [68.65(b)(7)] N N/A N N/A N N/A N N/A Note: Safety Data Sheets (SDS) meeting the requirements of the OSHA Hazard Communication Standard [29 CFR 1910.1200(g)] may be used to comply with this requirement to the extent they contain the information required by 68.65(b). Notes: The Facility has not had any accidental releases that meet the five-year accident history criteria. Page 8 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 2. Does the process safety information contain information pertaining to technology of the process [68.65(c)]? Does the information concerning the technology of the process include the following: [68.65(c)(1)] Y N N/A A block flow diagram or simplified process flow diagram? [68.65(c)(1)(i)] Process chemistry? [68.65(c)(1)(ii)] Maximum intended inventory? [68.65(c)(1)(iii)] Safe upper and lower limits for such items as temperatures, pressures, flows, or compositions? [68.65(c)(1)(iv)] An evaluation of the consequences of deviation? [68.65(c)(1)(iv)] 3. Does the process safety information contain information pertaining to the equipment in the process? [68.65(d)] Does the information pertaining to the equipment in the process include the following: [68.65(d)(1)] Materials of construction? 68.65(d)(1)(i)] Piping and instrumentation diagrams [68.65(d)(1)(ii)] Electrical classification? [68.65(d)(1)(iii)] Relief system design and design basis? [68.65(d)(1)(iv)] Ventilation system design? [68.65(d)(1)(v)] Design codes and standards employed? [68.65(d)(1)(vi)] Material and energy balances for processes built after June 21, 1999? [68.65(d)(1)(vii)] Safety systems? [68.65(d)(1)(viii)] Y N N/A 4. Has the owner or operator documented that equipment complies with recognized and generally accepted good engineering practices? [68.65(d)(2)] Y N N/A 5. Has the owner or operator determined and documented that existing equipment, designed and constructed in accordance with codes, standards, or practices that are no longer in general use, is designed, maintained, inspected, tested, and operating in a safe manner? [68.65(d)(3)] Y N N/A Prevention Program Process hazard analysis [68.67] 6. Has the owner or operator performed an initial process hazard analysis (PHA), and has this analysis identified, evaluated, and controlled the hazards involved in the process? [68.67(a)] Y N N/A 7. Has the owner or operator determined and documented the priority order for conducting PHAs, and was it based on Y N N/A an appropriate rationale? [68.67(a)] 8. Has the owner used one or more of the following technologies to conduct process PHA: [68.67(b)] What-if? [68.67(b)(1)] Checklist? [68.67(b)(2)] What-if/Checklist? [68.67(b)(3)] Hazard and Operability Study (HAZOP) [68.67(b)(4)] Failure Mode and Effects Analysis (FMEA) [68.67(b)(5)] Fault Tree Analysis? [68.67(b)(6)] An appropriate equivalent methodology? [68.67(b)(7)] Y N N/A Page 9 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 9. Did the PHA address: The hazards of the process? [68.67(c)(1)] Identification of any incident that had a likely potential for catastrophic consequences? [68.67(c)(2)] Engineering and administrative controls applicable to hazards and interrelationships?[68.67(c)(3)] Consequences of failure of engineering and administrative controls? [68.67(c)(4)] Stationary source siting? [68.67(c)(5)] Human factors? [68.67(c)(6)] A qualitative evaluation of a range of the possible safety and health effects of failure of controls? [68.67(c)(7)] Y N N/A 10. Was the PHA performed by a team with expertise in engineering and process operations and did the team include at Y N N/A least one employee who has experience and knowledge specific to the process being evaluated and at least one member of the team who is knowledgeable in the specific process hazard analysis methodology being used?? [68.67(d)] 11. Has the owner or operator completed the following: [68.67(e)] Established a system to promptly address the team's findings and recommendations? Assured that the recommendations are resolved in a timely manner and documented? Documented what actions are to be taken? Completed actions as soon as possible? Developed a written schedule of when these actions are to be completed? and Communicated the actions to operating, maintenance, and other employees whose work assignments are in the process and who may be affected by the recommendations? Y N N/A 12. Has the PHA been updated and revalidated by a team every five years after the completion of the initial PHA to assure that the PHA is consistent with the current process? [68.67(f)] Y N N/A 13. Has the owner or operator retained PHAs and updates or revalidations for each process covered, as well as the resolution of recommendations for the life of the process? [68.67(g)] Y N N/A Prevention Program Operating procedures [68.69] 14. Has the owner or operator developed and implemented written operating procedures that provide instructions or steps for conducting activities associated with each covered process consistent with the safety information? [68.69(a)] Y N N/A Notes: PHA: The facility conducted a PHA on February 13-14, 2012. The PHA was led by Keramida. Two PHA was done by following the Failure Mode and Effects Analysis. The PHA team did not address the human factors and facility siting. The PHA team had many recommendations but the facility did not establish a system to promptly address these recommendations. On September 1-2, 2016, a revalidation was conducted by the facility. The revalidation was led by Mr. Dan McCoy, Health & Safety Consultant. The revalidation was a review of the previous PHA. The PHA team changed the risk priority number on the previous PHA without indicating the reasoning behind the new numbers. It is unclear whether or the facility address the recommendations of the previous PHA or if the PHA team reviewed the recommendations from the previous PHA. This revalidation is inadequate. Operating Procedure: Section 68.69(a)(3) and 68.69(a)(4): The disinfection system operating procedures (30 pages document) does not address the safety and health considerations and the safety systems and their function (chlorine detectors and alarms). Page 10 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 15 Do the procedures address the following: [68.69(a)] Steps for each operating phase: [68.69(a)(1)] Initial Startup? [68.69(a)(1)(i)] Normal operations? [68.69(a)(1)(ii)] Temporary operations? [68.69((a)(1)(iii)] Emergency shutdown including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner? [68.69(a)(1)(iv)] Emergency operations? [68.69(a)(1)(v)] Normal shutdown? [68.68(a)(1)(vi)] Startup following a turnaround, or after emergency shutdown? [68.69(a)(1)(vii)] Operating limits: [68.69(a)(2)] Consequences of deviations [68.69(a)(2)(i)] Steps required to correct or avoid deviation? [68.69(a)(2)(ii)] Safety and health considerations: [68.69(a)(3)] Properties of, and physical hazards presented by, the chemicals used in the process [68.69(a)(3)(i)] Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment? [68.69(a)(3)(ii)] Control measures to be taken if physical contact or airborne exposure occurs? [68.69(a)(3)(iii)] Quality control for raw materials and control of hazardous chemical inventory levels? [68.69(a)(3)(iv)] Any special or unique hazards? [68.69(a)(3)(v)] Safety systems and their functions? [68.69(a)(4)] Y N N/A 16. Are operating procedures readily accessible to employees who are involved in a process? [68.69(b)] Y N N/A 17. Has the owner or operator certified annually that the operating procedures are current and accurate and that Y N N/A procedures have been reviewed as often as necessary to assure that they reflect current operating practice, including changes that result from changes in process chemicals, technology, and equipment, and changes to stationary sources? [68.69(c)] 18. Has the owner or operator developed and implemented safe work practices to provide for the control of hazards during specific operations, such as lockout/tagout; confined space entry; opening process equipment or piping; and control over entrance into a stationary source by maintenance, contractor, laboratory, or other support personnel? [68.69(d)] Y N N/A Prevention Program Training [68.71] 19 Has each employee involved in operating a process, and each employee before being involved in operating a newly Y N N/A assigned process, been initially trained in an overview of the process and in the operating procedures? [68.71(a)(1)] 20. Did initial training include emphasis on safety and health hazards, emergency operations including shutdown, and safe work practices applicable to the employee's job tasks? [68.71(a)(1)] Y N N/A 21. In lieu of initial training for those employees already involved in operating a process on June 21, 1999, an owner or Y N N/A operator may certify in writing that the employee has the required knowledge, skills, and abilities to safely carry out the duties and responsibilities as specified in the operating procedures [68.71(a)(2)] Page 11 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 22. Has refresher training been provided at least every three years, or more often if necessary, to each employee involved in operating a process to assure that the employee understands and adheres to the current operating procedures of the process? [68.71(b)] Y N N/A 23. Has owner or operator ascertained and documented in record that each employee involved in operating a process has received and understood the training required? [68.71(c)] Y N N/A 24. Does the prepared record contain the identity of the employee, the date of the training, and the means used to verify Y N N/A that the employee understood the training? [68.71(c)] Prevention Program Mechanical integrity [68.73] 25. Has the owner or operator established and implemented written procedures to maintain the on-going integrity of the Y N N/A process equipment listed in 68.73(a)? [68.73(b)] 26. Has the owner or operator trained each employee involved in maintaining the on-going integrity of process equipment? [68.73(c)] Y N N/A 27. Has the owner or operator performed inspections and tests on process equipment? [68.73(d)(1)] Y N N/A 28. Has the owner or operator followed recognized and generally accepted good engineering practices for inspections and testing procedures? [68.73(d)(2)] Y N N/A 29. Has the owner or operator ensured the frequency of inspections and tests of process equipment is consistent with applicable manufacturers' recommendations, good engineering practices, and prior operating experience? [68.73(d)(3)] Y N N/A 30. Has the owner or operator documented each inspection and test that had been performed on process equipment, and Y N N/A identified the following: [68.73(d)(4)] The date of the inspection or test? The name of the person who performed the inspection or test? The serial number or other identifier of the equipment on which the inspection or test was performed? A description of the inspection or test performed? and The results of the inspection or test? 31. Has the owner or operator corrected deficiencies in equipment that were outside acceptable limits defined by the process safety information before further use or in a safe and timely manner when necessary means were taken to assure safe operation? [68.73(e)] Y N N/A 32. Has the owner or operator assured that equipment as it was fabricated is suitable for the process application for which it will be used in the construction of new plants and equipment? [68.73(f)(1)] Y N N/A 33. Has the owner or operator performed appropriate checks and inspections to assure that equipment was installed properly and consistent with design specifications and the manufacturer's instructions? [68.73(f)(2)] Y N N/A 34. Has the owner or operator assured that maintenance materials, spare parts and equipment were suitable for the process application for which they would be used? [68.73(f)(3)] Y N N/A Prevention Program Management of change [68.75] 35. Has the owner or operator established and implemented written procedures to manage changes to process chemicals, Y technology, equipment, and procedures, and changes to stationary sources that affect a covered process? [68.75(a)] N N/A Section 68.73(d)(4): Alexander Chemicals owns the 1-ton cylinders. The facility does not conduct any maintenance on the cylinders. However, the facility obtained the maintenance procedures that Alexander Chemicals follows to maintain the cylinders. The cylinders are visually inspected when they are received by the facility. The facility has developed a maintenance schedule for the equipment associated with the chlorination system. (See Appendix A-Disinfection Process Safety Critical Equipment ITPM Table). The schedule does not include the chlorine/sulfur dioxide underground pipelines from the storage room to the effluent building and the stormwater disinfection building. Living Waters, a contractor conducts annual inspections on the system and replaces any equipment as needed. Living Waters does not provide the facility with an inspection report but rather it provides the facility with an invoice on the cost of the equipment replaced or repaired. The monorail hoist is inspected every time it is used, and the inspection is documented. The monorail hoist is also inspected every year by a contractor. Page 12 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 36. Do procedures assure that the following considerations are addressed prior to any change: [68.75(b)] The technical basis for the proposed change? [68.75(b)(1)] Impact of change on safety and health? [68.75(b)(2)] Modifications to operating procedures? [68.75(b)(3)] Necessary time period for the change? [68.75(b)(4)] Authorization requirements for the proposed change? [68.75(b)(5)] Y N N/A 37. Were employees, involved in operating a process and maintenance, and contract employees, whose job tasks would Y N N/A be affected by a change in the process, informed of, and trained in, the change prior to start-up of the process or affected parts of the process? [68.75(c)] 38. If a change resulted in a change in the process safety information, was such information updated accordingly? [68.75(d)] Y N N/A 39. If a change resulted in a change in the operating procedures or practices, had such procedures or practices been updated accordingly? [68.75(e)] Y N N/A Prevention Program Pre-startup safety review [68.77] 40. Has the owner or operator performed a pre-startup safety review for new stationary sources and for modified stationary sources when the modification is significant enough to require a change in the process safety information? [68.77(a)] Y N N/A 41. Does the pre-startup safety review confirm the following prior to the introduction of a regulated substance to a process: [68.77(b)] Construction and equipment was in accordance with design specifications? [68.77(b)(1)] Safety, operating, maintenance, and emergency procedures were in place and were adequate? [68.77(b)(2)] For new stationary sources, a process hazard analysis had been performed and recommendations had been resolved or implemented before startup? [68.77(b)(3)] Modified stationary sources meet the requirements contained in management of change? [68.77(b)(3)] Training of each employee involved in operating a process had been completed? [68.77(b)(4)] Y N N/A Prevention Program Compliance audits [68.79] 42. Has the owner or operator certified that the stationary source has evaluated compliance with the provisions of the Y N N/A prevention program at least every three years to verify that the developed procedures and practices are adequate and being followed? [68.79(a)] 43. Has the audit been conducted by at least one person knowledgeable in the process? [68.79(b)] Y N N/A 44. Are the audit findings documented in a report? [68.79(c)] Y N N/A 45. Has the owner or operator promptly determined and documented an appropriate response to each of the findings of the audit and documented that deficiencies had been corrected? [68.79(d)] Y N N/A 46. Has the owner or operator retained the two most recent compliance reports? [68.79(e)] Y N N/A Prevention Program Incident investigation [68.81] 47. Has the owner or operator investigated each incident that resulted in, or could reasonably have resulted in a catastrophic release of a regulated substance? [68.81(a)] Y N N/A Page 13 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 48. Were all incident investigations initiated not later than 48 hours following the incident? [68.81(b)] Y N N/A 49. Was an accident investigation team established and did it consist of at least one person knowledgeable in the process involved, including a contract employee if the incident involved work of a contractor, and other persons with appropriate knowledge and experience to thoroughly investigate and analyze the incident? [68.81(c)] Y N N/A 50. Was a report prepared at the conclusion of every investigation? [68.81(d)] Y N N/A 51. Does every report include: [68.81(d)] Date of incident? [68.81(d)(1)] Date investigation began? [68.81(d)(2)] A description of the incident? [68.81(d)(3)] The factors that contributed to the incident? [68.81(d)(4)] Any recommendations resulting from the investigation? [68.81(d)(5)] Y N N/A 52. Has the owner or operator established a system to promptly address and resolve the incident report findings and recommendations, and are the resolutions and corrective actions documented? [68.81(e)] Y N N/A 53. Was the report reviewed with all affected personnel whose job tasks are relevant to the incident findings including contract employees where applicable? [68.81(f)] Y N N/A 54. Has the owner or operator retained incident investigation reports for at least five years? [68.81(g)] Y N N/A Prevention Program Employee participation [68.83] Has the owner or operator developed a written plan of action regarding the implementation of the employee participation required by this section? [68.83(a)] Y N N/A . Has the owner or operator consulted with employees and their representatives on the conduct and development of process hazards analyses and on the development of the other elements of process safety management in chemical accident prevention provisions? [68.83(b)] Y N N/A . Has the owner or operator provided to employees and their representatives access to process hazards analyses and to Y all other information required to be developed under the chemical accident prevention rule? [68.83(c)] N N/A Prevention Program Hot work permit [68.85] . Has the owner or operator issued a hot work permit for each hot work operation conducted on or near a covered process? [68.85(a)] Y N N/A . Does the permit document that the fire prevention and protection requirements in 29CFR 1910.252(a) have been implemented prior to beginning the hot work operations? [68.85(b)] Y N N/A . Does the permit indicate the date(s) authorized for hot work and the object(s) upon which hot work is to be performed? [68.85(b)] Y N N/A . Are the permits being kept on file until completion of the hot work operations? [68.85(b)@ Y N N/A Prevention Program Contractors [68.87] . Has the owner or operator obtained and evaluated information regarding the contract owner or operator's safety performance and programs when selecting a contractor? [68.87(b)(1)] Y N N/A . Has the owner or operator informed contract owner or operator of the known potential fire, explosion, or toxic release hazards related to the contractor's work and the process? [68.87(b)(2)] Y N N/A Page 14 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ . Has the owner or operator explained to the contract owner or operator the applicable provisions of the emergency Y response or the emergency action program? [68.87(b)(3)] . Has the owner or operator developed and implemented safe work practices consistent with 68.69(d), to control the Y entrance, presence, and exit of the contract owner or operator and contract employees in the covered process areas? [68.87(b)(4)] . Periodically evaluated the performance of the contract owner or operator in fulfilling their obligations (as described Y at 68.87(c)(1) - (c)(5))? [68.87(b)(5)] Subpart E- Emergency Response [68.90 - 68.96] Developed and implemented an emergency response program as provided in 40 CFR 68.90-68.96? Comments: 1. Is the facility designated as a "responding stationary source"? Y 1.a. If the facility is not a responding stationary source, it need not comply with 68.95 if the following conditions are met: 1.a.(1) For stationary sources with any regulated substances held in a process above threshold quantities, is the source Y included in the community emergency response plan developed under 42 U.S.C. 11003? [68.90(b)(1)] 1.a.(2) For stationary sources with only regulated flammable substances held in a process above threshold quantities, Y has the owner or operator coordinated response actions with the local fire department? [68.90(b)(2)] 1.a.(3) Are appropriate mechanisms in place to notify emergency responders when there is need for a response? Y [68.90(b)(3)] 1.a.(4) As of September 21, 2018, has the owner or operator performed the annual emergency response coordination Y activities required under 68.93? [68.90(b)(4)] (See Items 2 through 5) 1.a.(5) Has the owner or operator performed the annual notification exercises required under 68.96(a) before Y December 19, 2024? [68.90(b)(5)] (See Items 6 and 7) For non-responding stationary sources where 1.a.(1)-(5) are all marked as `Y', proceed to Subpart E Item 2 1.b. If the facility is a responding stationary source: 1.b.(1) Has the owner or operator developed and implemented an emergency response program that includes the Y elements required in 68.95(a)(1-4)? [68.95(a)] (See Items 1.b.(2) - 1.b.(5)) N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A 1.b.(2). An emergency response plan is maintained at the stationary source and contains the following? [68.95(a)(1)] Y N N/A Procedures for informing the public and the appropriate Federal, state, and local emergency response agencies about accidental releases? [68.95(a)(1)(i)] Documentation of proper first-aid and emergency medical treatment necessary to treat accidental human exposures? [68.95(a)(1)(ii)] Procedures and measures for emergency response after an accidental release of a regulated substance? [68.95(a)(1)(iii)] 1.b.(3) Does the emergency response program contains procedures for the use of emergency response equipment and for its inspection, testing, and maintenance? [68.95(a)(2)] Y N N/A 1.b.(4) Does the emergency response program include training for all employees in relevant procedures? [68.95(a)(3)] Y N N/A 1.b.(5) Does the emergency response program include procedures to review and update, as appropriate, the emergency Y N N/A response plan to reflect changes at the stationary source and ensure that employees are informed of changes? [68.95(a)(4)] Page 15 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 1.b.(6) Does the emergency response program include a written plan that complies with other Federal contingency plan Y regulations or is consistent with the approach in the National Response Team's Integrated Contingency Plan Guidance (``One Plan'')? If so, does the plan include the elements provided in paragraph (a) of 68.95, and also complies with paragraph (c) of 68.95? [68.95(b)] 1.b.(7) Has the emergency response plan been coordinated with the community emergency response plan developed Y under EPCRA? [68.95(c)] 1.b.(8) Has the owner or operator developed and implemented an exercise program for its emergency response Y program, including the emergency plan required under 68.95(a)(1)? [68.96(b)] 1.b.(9) Do the exercises involve facility emergency response personnel and, as appropriate, emergency response Y contractors? [68.96(b)] 1.b.(10) When planning emergency response field and tabletop exercises, has the owner or operator coordinated with Y local public emergency response officials and invite them to participate in the exercise? [68.96(b)] 1.b.(11) Does the emergency response exercise program include: [68.96(b)] Y Emergency response field exercises? [68.96(b)(1)] Tabletop exercises? [68.96(b)(2)] Documentation? [68.96(b)(3)] 1.b.(12) As part of coordination with local emergency response officials, has the owner or operator consulted with Y these officials to establish an appropriate frequency for field exercises? [68.96(b)(1)(i)] 1.b.(13) Field exercises shall involve tests of the source's emergency response plan, including deployment of emergency Y response personnel and equipment. Do field exercises include: [68.96(b)(1)(ii)] Tests of procedures to notify the public and the appropriate Federal, state, and local emergency response agencies about an accidental release? Tests of procedures and measures for emergency response actions including evacuations and medical treatment? Tests of communications systems? Mobilization of facility emergency response personnel, including contractors, as appropriate? Coordination with local emergency responders? Emergency response equipment deployment? Any other action identified in the emergency response program, as appropriate? 1.b.(14) As part of coordination with local emergency response officials, has the owner or operator consulted with Y these officials to establish an appropriate frequency for tabletop exercises and conducted a tabletop exercise before December 21, 2026 and at a minimum of at least once every three years thereafter? [68.96(b)(2)(i)] 1.b.(15) Tabletop exercises shall involve discussions of the source's emergency response plan. Do the exercises include Y discussions of: [68.96(b)(2)(ii)] Procedures to notify the public and the appropriate Federal, state, and local emergency response agencies? Procedures and measures for emergency response including evacuations and medical treatment? Identification of facility emergency response personnel and/or contractors and their responsibilities? Coordination with local emergency responders? Procedures for emergency response equipment deployment? Any other action identified in the emergency response plan, as appropriate? N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A N N/A Page 16 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 1.b.(16) Has the owner or operator prepared an evaluation report within 90 days of each field and tabletop exercise, which included: [68.96(b)(3)] A description of the exercise scenario? Names and organizations of each participant? An evaluation of the exercise results including lessons learned? Recommendations for improvement or revisions to the emergency response exercise program and emergency response program, and a schedule to promptly address and resolve recommendations? Y N N/A 1.b.(17) Has the owner or operator satisfied the requirement to conduct notification, field and/or tabletop exercises through alternative means such as: [68.96(c)] Exercises conducted to meet other Federal, state, or local exercise requirements, provided the exercise meets the requirements of paragraphs (a) and/or (b) of this section, as appropriate. [68.96(c)(1)] Response to an accidental release, provided the response includes the actions indicated in paragraphs (a) and/or (b) of this section, as appropriate. When used to meet field and/or tabletop exercise requirements, the owner or operator shall prepare an after-action report comparable to the exercise evaluation report required in paragraph (b)(3) of this section, within 90 days of the incident. [68.96(c)(2)] Y N N/A For all responding and non-responding stationary sources: 2. Has the owner or operator of a stationary source coordinated response needs with local emergency planning and response organizations to determine how the stationary source is addressed in the community emergency response plan and to ensure that local response organizations are aware of the regulated substances at the stationary source, their quantities, the risks presented by covered processes, and the resources and capabilities at the stationary source to respond to an accidental release of a regulated substance? [68.93(a)] Y N N/A 3. Has coordination occurred at least annually, and more frequently if necessary, to address changes: At the stationary source; in the stationary source's emergency response and/or emergency action plan; and/or in the community emergency response plan? [68.93(a)] Y N N/A 4. Has coordination included providing to the local emergency planning and response organizations? [68.93(b)] The stationary source's emergency response plan if one exists? s Emergency action plan? s Updated emergency contact information? s Other information necessary for developing and implementing the local emergency response plan? For responding stationary sources, has facility consulted with local emergency response officials to establish appropriate schedules and plans for field and tabletop exercises required under 68.96(b)? (See Items 1.b.(8), 1.b.(10), 1.b.(12), and 1.b.(14)) Y N N/A 5. As of September 21, 2018, has the owner or operator documented coordination with local authorities, including: [68.93(c)] s The names of individuals involved and their contact information (phone number, email address, and organizational affiliations)? s Dates of coordination activities? s Nature of coordination activities? Y N N/A 6. Has the owner or operator of a stationary source with any Program 2 or Program 3 process conducted an exercise of Y N N/A the stationary source's emergency response notification mechanisms before December 19, 2024 and annually thereafter? [68.96(a)] (Owners or operators of responding stationary sources may perform the notification exercise as part of the tabletop and field exercises) Page 17 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 7. Has the owner/operator maintained a written record of each notification exercise conducted over the last five years? Y N N/A [68.96(a)] Subpart G - Risk Management Plan [40 CFR 68.150 - 68.195] Documented a Risk Management Plan as provided in 40 CFR 68.150-68.195? Comments: 1. Does the single registration form include, for each covered process: [68.160(b)(7)] s The name and CAS number of each regulated substance held above the threshold quantity in the process? s The maximum quantity of each regulated substance or mixture in the process (in pounds) to two significant digits? s The five- or six-digit NAICS code that most closely corresponds to the process? s The correct program level of the process? 2. Does the registration form include whether a public meeting has been held following an RMP reportable accident, pursuant to 68.210(b)? [68.160(b)(21)] Y N N/A Y N N/A 3. Does the owner or operator provide in the RMP: [68.180(a)] Y N N/A Name, phone number and email address of local emergency planning and response organizations with which the stationary source last coordinated emergency response efforts, pursuant to 68.10(g)(3) or 68.93? [68.180(a)(1)] s The date of the most recent coordination with the local emergency response organizations, pursuant to 68.93? [68.180(a)(2)] s A list of Federal or state emergency plan requirements to which the stationary source is subject? [68.180(a)(3)] 4. For non-responding stationary sources, does the owner or operator identify: [68.180(b)(1)] s For stationary sources with any regulated toxic substance held in a process above the threshold quantity, whether the stationary source is included in the community emergency response plan developed under 42 U.S.C. 11003, pursuant to 68.90(b)(1)? [68.180(b)(1)(i)] For stationary sources with only regulated flammable substances held in a process above the threshold quantity, the date of the most recent coordination with the local fire department, pursuant to 68.90(b)(2)? [68.180(b)(1)(ii)] s What mechanisms are in place to notify the public and emergency responders when there is a need for emergency response? [68.180(b)(1)(iii)] s The date of the most recent notification exercise, as required in 68.96(a)? [68.180(b)(1)(iv)] Y N N/A 5. For responding stationary sources, does the owner or operator identify the date of the most recent: [68.180(b)(2)] Review and update of the emergency response plan, pursuant to 68.95(a)(4)? [68.180(b)(2)(i)] Notification exercise, as required in 68.96(a)? [68.180(b)(2)(ii)] Field exercise, as required in 68.96(b)(1)? [68.180(b)(2)(iii)] Tabletop exercise, as required in 68.96(b)(2)? [68.180(b)(2)(iv)] Y N N/A Page 18 of 19 Rev 01/07/2021 RMP Program Level 3 Process Checklist Facility Name: _J_.B__. _G_i_f_fo_r_d__W__W__T_P____________________ 6. Has the owner or operator reviewed and updated the RMP and submitted it to EPA for the following: [68.190(a)]? Five-year update. [68.190(b)(1)] Within three years of a newly regulated substance listing. [68.190(b)(2)] At the time a new regulated substance is first present in an already regulated process above threshold quantities. [68.190(b)(3)] At the time a regulated substance is first present in an new process above threshold quantities. [68.190(b)(4)] Within six months of a change requiring revised PHA or hazard review. [68.190(b)(5)] Within six months of a change requiring a revised OCA as provided in 68.36. [68.190(b)(6)] Within six months of a change that alters the Program level that applies to any covered process. [68.190(b)(7)] 7. If the owner or operator experienced an accidental release that met the five-year accident history reporting criteria (as described at 68.42) subsequent to April 9, 2004, did the owner or operator submit the information required at 68.168, 68.170(j) and 68.175(l) within six months of the release or by the time the RMP was updated as required at 68.190, whichever was earlier. [68.195(a)] 8. If the emergency contact information required at 68.160(b)(6) has changed since June 21, 2004, did the owner or operator submit corrected information within thirty days of the change? [68.195(b)] Subpart H - Other Requirements [40 CFR 68.200 - 68.210] Y N N/A Y N N/A Y N N/A Implemented Other Requirements as provided in 40 CFR 68.200-68.210? Comments: 1. Has the owner or operator maintained records supporting the implementation of this part at the stationary source for Y N N/A five years, unless otherwise provided in Subpart D: Program 3 Prevention Program? [68.200] 2. Did the owner or operator hold a public meeting to provide information required under 68.42(b), no later than 90 days after any RMP reportable accident at the stationary source with any known offsite impact specified in 68.42(a)? [68.210(b)] Y N N/A Page 19 of 19 Rev 01/07/2021