Document NEB83LKe4Zj9Y44GD8kxKwbBV
DOW CHEMICAL U.S.A.
December 5, 1986
LOUISIANA DIVISION P. O. BOX 160
PLAQUEMINE. LOUISIANA 70766-0160 604 366-6000
Sharon Cole Chlorine Bldg. 2601
cc: Safety Supt: Plant Mgr: Major Mgr: Safety Mgr:
Mark Mitchell - 3701
Carey Brannan - 2601
Ray Gaska
3701
Henry Bell
4701T
REACTIVE CHEMICALS COMMITTEE REVIEW - DECEMBER 4, 1986
PROJECT: Chlorine - Brine Treating Environmental Upgrade
PROJECT REPS: Sharon Cole
COMMITTEE PRESENT: Pennington, Wagener, Cochran
CONSIDERATIONS:
1. Investigate possibility that combined decreased residence time of brine in new tanks at Brine Production and new tanks at Chlorine Plant brine treating might increase possibility of dissolved organics in brine to cells and eventually more chlorinated organics in the taffy pots.
Please respond in writing to the Committee Chairman within two weeks as to action taken or planned in regard to these considerations.
^2
J. Y. Pennington, Chairman REACTIVE CHEMICALS COMMITTEE rcb
CONFIDFNTTAl. DO 003520
an operating unit op the dow chemical company
c ,1986
R W GALLANT GENERAL MANAGER
AUTHORIZATION REQUEST:
CHLORINE I PLANT URINE TREATING ENVIRONMENTAL UPGRADE
DESCRIPTION:
A PRELIMINARY CAPITAL AUTHORIZATION FOR 1.3 MM IS REQUESTED TO INITIATE DESIGN AND CONSTRUCTION OF LOU IPMENT TO UPGRADE THE PK1NE TREATING SYSTEM AT THE LOUISIANA DIVISION CHLORINE PLAN I'. THIS PROJECT IS NECESSARY IN ORDER TO COMPLY WITH LOUISIANA STATE-WIDE ORDER 29B WHICH SPECIFIES THAT ALL RHINE PONDS RE LINED OR CLOSED OUT RY JANUARY. 1989. THE TOTAL CAPITAL NECESSARY TO ALLOW COMPLETION OF THE PROJECT IS P5.6MM INCLUDING CAPITALIZED INTEREST.
WITHIN THE SCOPE OF THIS PROJECT, PROVISIONS WILL RE THE POTENTIAL FOR GROUNDWATER SALT CONTAMINATION DUE IN G R 0 U N D B R 1N E P R U C E S S 1N G L N U l P M E N T .. S)' l'i C .!. F I t A L L Y .. AUTHORIZATION WILL ALLOW:
MADE TO ADDRESS TO LEAKAGE DRUM
TH ' 5
1. REPLACEMENT OF THE 2 EXISTING 2.4MM GAL DRJ.NE FUNDS W HU TWO 1.8MM GAL ABOVE GROUND TANKS AND ASSOCIATED LEAK DETECTION SYSTEMS
3. INSTALLATION OF A BRINE FILTRATION SYSTEM
CONPTDFNTTA!. DO 003521
REGULATORY REQUIREMENTS *<M TECHNO NOG Y
'E CHLORINE PLANT BRINE PONDS AND IN-GROUND CLAftI lift MUST BL jDIEIED OR ELIMINATED IN ORDER TO COMPLY U H'H LOUISIANA STATE-UIDE ORDER 29B. THIS ORDER REQUIRES THAT ALL BRINE PONDS AND PRODUCED WATER PONDS ASSOCIATED WITH BRINE MINING OR HYDROCARBON STORAGE BE LINED OR CLOSED OUT BY JANUARY 20. ISOS.
TO ACHIEVE COMPLIANCE. THE EXISTING PONDS AND CLARIFER WILL BE REPLACED WITH ABOVE GROUND TANKS. THE IN GROUND BRINE PONDS CURRENTLY MODERATE THE EFFECTS OF HIGH BRINE HARDNESS EXCURSIONS . BRINE HARDNESS SETTLES IN THE PONDS DUE TO LOW VELOCITY AND LONG RESIDENCE TIME. DUE TO REDUCED SETTLING TIME ASSOCIATED WITH SMALLER CAPACITY ABOVE GROUND TANKS. HIGHER BRINE HARDNESS CAN BE EXPECTED TO OCCUR. THIS WILL BE PREVENTED BY THE INSTALLATION OF A SAND FILTRATION SYSTEM.
JUSTIFICATION:
THE DESIGN OF THE EXISTING IN GROUND EQUIPMENT (PONDS AND CLARIFIER)
NOT MEET THE REQUIREMENTS SPECIFIED IN LOUISIANA ORDER 2C)P. PA II,ORE TO BRING THIS EQUIPMENT INTO COMPLIANCE MAY RELUCT IN DISCONTINUED OPERATION OF THE LOUISIANA DIVISION CHLORINE PLANT. THE NEW EQUIPMENT PROVIDED BY THIS AUTHORIZATION WILL BRING THE r'v IN E HANDLING EQUIPMENT INTO FULL COMPLIANCE.
DOES
ECONOMIC CONSIDERATIONS: .
WHILE THIS CAPITAL PROJECT WAS DEVELOPED TO SATISFY CURRENT ENVIRONMENTAL REGULATIONS. IT'S IMPLEMENTATION WILL RESULT IN SEVERAL ECONOMIC AND OPERATIONAL BENEFITS FOR THE LL2 PLANT. IMPROVED PUMP PIPING DESIGN AND MORE NPSH AVAILABLE WITH TANKAGE SHOULD GREATLY REDUCE CURRENT PUMP MAINTENANCE ASSOCIATED WITH CAVITATION. THESE SAVINGS ARE EXPECTED TO APPROACH *25M PER YEAR. IN ADDITION. REPLACEMENT OF STEAM TURBINE DRIVES ON TWO BRINE PUMPS WITH ELECTRIC MOTORS WILL REDUCE 235* STEAM USAGE BY *45M PER YEAR. REDUCED BRINE SURFACE AREA ASSOCIATED WITH TANKAGE IS EXPECTED TO REDUCE CORROSION IN ADJACENT AREAS. FINALLY, HARDNESS EXCURSIONS, WHICH REDUCE CELL DIAPHRAM LIFE. WILL BE SIGNIFICANTLY REDUCED WITH THE DUAL CLARIFIER INSTALLATION.
IT SHOULD ALSO BE NOTED THAT IF SPARE EQUIPMENT PRESENTLY AVAILABLE WITHIN THE COMPANY PROVES SUITABLE. MAJOR EQUIPMENT COSTS ASSOCIATED WITH THIS PROJECT COULD BE S IGNE ICANTLY REDUCED.
CONFIDENTIAL 0C '03522
ALTERNATIVES
C r " R E N T REGULATIONS REQUIRE THAT EXISTING IN GROUND EQUIPMENT PE
R- /tOEITTED WITH A MINIMUM SINGLE LINER LEAK PROTECTION BARRIER. SINGLE LINER
HAVE PROVEN TO BE HIGHLY UNRELIABLEftN CONTINUOUS OPERATION AND CANNOT BE
CONSIDERED NON-
,
PERMEABLE. A DOUBLE LINERLEACHATE SYSTEM IS MURE DESIRABLE THAN A
SINGLE LINER SYSTEM. HOWEVER. LEAK POTENTIAL , AS IS CURRENTLY DEMONSTRATED
IN EXISTING LINER AND LEACHATE INSTALLATIONS IN DOW. REMAINS IN A C C EFTAB L Y HIGH
ABOVE GROUND TANKAGE IS CONSIDERED TO BE THE BEST ALTERNATIVE TO INSURE
THAT ANY LONG TERM ENVIRONMENTAL PROBLEMS ARE MINIMIZED OR ALLEVIATED.
WHILE THE COST ASSOCIATED WITH ABOVE GROUND TANKAGE IS HIGHER THAN WITH
LINER SYSTEMS, THE ENVIRONMENTAL AND OPERATIONAL ADVANTAGES MAKE THIS
APPROACH MORE DESIRABLE. THE COST OE A DOUBLE LINER SYSTEM FOR THE
CHLORINE PLANT WOULD BE $4.3MM, NUT INCLUDING CAPITALIZED INTEREST.
RAW MATERIALS:
STEAM USAGE (235*) WILL BE REDUCED BY 105056M LB PER YEAR WITH IMPLEMENTATION OE THIS PROJECT. UTILITY USAGE WILL DECREASE BY 250 HP PER YEAR.
WASTE CONTROL:
!H r E E WILL BE NO NEW OR ADDITIONAL QUANTITIES OE EXISTING WASTES PI UCED AS A RESULT OE THIS PROJECT. THE EXISTING CLARIFIER UNDER FLOW WILL BE DIVIDED AND COLLECTED FROM THE TWO FUTURE CLARIFIERS AND TREATED IN THE EXISTING SLUDGE ACIDIFICATION EQUIPMENT,,
PERSONNEL CONSIDERATIONS:
THERE WILL BE NO ADDITIONAL OPERATIONS OR TECHNICAL MANPOWER NECESSARY TO OPERATE THE BRINE TREATING AREA AFTER IMPLEMENTATION OF THIS PROJFCT, THE PROJECT MANUFACTURING REPRESENTATIVE WILL BE SHARON Li'LL. THE PROCESS ENGINEERING REPRESENTATIVE WILL BE BACH WILLIAMS.
CONFIDENTIAL DO 003523
SAFETY FACTORS:
THIS PROJECT WILL BE DESIGNED AND IMPLEMENTED IN ACCORDANCE WITH E LOUISIANA DIVISION SAFETY AND LOSS PREVENTION STANDARDS AND THE
-jRPORATE LOSS PREVENTION PRINCIPLES. THERE SHOULD BE NU NEW REACTIVE CHEMICAL CONCERNS ASSOCIATED WITH THIS PROJECT DUE TO IT'S SIMULAEin TO EXISTING OPERATIONS. A PRELIMINARY REACTIVE CHEMICALS AND 5AFET i REVIEW OF THE PROJECT HAS BEEN CONDUCTED AND FOLLOW-UP REVIEWS WILL BE HELD AS THE PROJECT DETAILED DESIGN PROCEEDS.
SCHEDULE:
THE PROJECT IS PLANNED TO PROCEED AS NOTED IN THE FOLLOWING SCHEDULE:
PRELIMINARY AUTHORIZATION - MARCH. 1907
*1.3 MM
FINAL AUTHORIZATION
SEPTEMBER, 1987 $4.3 MM
TOTAL AUTHORIZED CAPITAL (INCLUDING INTEREST) - $5.6 HM
RTO - JANUARY. 1989
SPENDING SCHEDULE:
THE PROJECTED SPENDING SCHEDULE IE
FIRST HALF, 1907 SECOND HALF, 3907 FIRST MALI.'. 1900 SECOND HALF. 1900
DEPRECIATION WILL BE TO ACCOUNT 25 COST BREAKDOWNS ARE ATTACHED.
CONFIDENTIAL DO 003524
QAJbo^u^j^ Pjlasvdb (xhAs*** I
(leXT
Hcl^Y Jt^Ui^YYdL*dZ ;
Cpv^UiAs i3AL*J' t *$oom) ^U^KjCj "T&si^At ( eS )
fOO*> 2>SOt7)
) OO
rZ^O ___ / -1 yo a/
JL&vk__ fi-i tr^y- a i-i nnrjyev ^c^^iu^dr mrrt.A.J,!? ^jAU^tcuuJJ *CuJ~
Pa
&Lezc**Q. $-^13JL~'*~'
&&s-e^aJL*. /7)&c/i&mcAL
a^i
1<!s5D
f7^ *7 OO
/ ooo
,5"
137 . tT / */^3 n s" /?>?. -53
'
C^^tSi^S^ ii/llui^cf'
*
^-^051 ~7$ P\
3oo
'faJrvJL^ CuuX^
iT^ ^
CONFIDENTTAL DO 003525
TREATING SftltC FOR CU
<MC *21 UJ oM lzci. u
OUSTING
m-t flW
clarifier
* --Iibrine storage
, TO SLUOCE TREATnEM
FUflPS
FILTERS
TREAT rCNl
FILTERS
TO CELLS IQ CELLS
OO 0 0 3 5 2 7
L303-66F
LOUISIANA DIVISION PROJECT ESTIMATE (DOW CONFIDENTIAL)
IT. COST 45,^)0)000 STARTUP DATE
PHASE
JOB NO. __________________ TITLE da, -CNiVtRQKJ^FJ^TAi- TRQJtgCl.
MFG. REP. S. CoL
DEPT. CLZ>
PROCESS ENGR.'S, UltUAMS
PHONE SI 6 J
PHONE
PROJECT ENGR.
____ ' '
PHONE
ESTIMATING METHOD:
_____ BLUE SKY
*S FACTORED (NEWTON)
UNIT OF OPERATION _____ FACTORED (GUTHRIE) _____ EXTRAPOLATION FROM SIMILAR PLANT
_____ SEMI-DETAILED PAID
_____ DETAILED (DEFINITIVE)
DOCUMENTS ON WHICH ESTIMATE IS BASED (INCLUDE PRINT DATE): __________________
________
DATE IZI+H*'
TIMATE DESCRIPTION: TRn.Trrr TNCLUbEX : Jj nLARi&F.PZ] Z
TO? SToRK 6> TANKS>
SuJZBcVuwPs 4
PcjwPSj fiLTPtf,; fih/j) T&/ATZK `Zi'tc Monk
J LfAk. pemctibid
Bn Tt in f Pi Pit* 6 J^jSTbLUUA erJTA TiotJ ArtJD Lrr7tSJCA L syt fFrU S____ PROJECT SCOPE DISCUSSED WITH M COlE f PLA MT P&Sovf /,__________
, DATE / / / nhb
SITE VISIT: NO --___ f YES ______ , DATE SITE VISIT BY
IS PROJECT ASSOCIATED WITH ANY OTHER PROJECTS. OR A LARGER JOB?
YES, NO
; IF YES, DESCRIBE
PKG. REVIEW BY CAPITAL PROJECTS OFFICE COMPLETE? ___ YES,
NO,
DATE.
N/A
SPECIAL CONDITIONS: PENALTIES OR CREDITS
BUSINESS ACTIVITY:
^ INSIDE OPERATING PLANT ___ _ CONGESTED WORK AREA
SITE CONDITIONS ____ HIGH PITCH
____ INSIDE IDLE PLANT ____ CONSTRUCTION SCHED.
____ NEW OPEN WORK AREA
OVERTIME *PREMIUM
NORMAL ____ SLACK
ESCALATION OF_____ % USED OVER_____ MONTHS. CAPITALIZED INTEREST $ 300 NV IS/IS NOT INCLUDED
PURPOSE(S) FOR WHICH THIS ESTIMATE CAN BE USED: ________ STUDY, ECONOMIC EVALUATION,
PRELIMINARY, ^ AUTHORIZATION,
BID,
ADDENDUM TO PRIOR ESTIMATE
AUDIT
CONFIRMED:
1MENTS:
EST. GROUP
MFC.
p* REP
*MuA&yJ(/r.
C&JLs
ESTIMATOR(S)
Lui(li#ni<: f
ENGR. REP.
CONFIDFNTT AL DO 003528